Loading...
HomeMy WebLinkAboutR-4072050 IQ) 41 f� mO W J z 0 3 •I I l 1' DEEP TEMPORARY - INTERCEPTOR SWALE or - - - - - l W/CHECK DAMS (TYP) o d G o JJ CONSTRUCTION ENTRANCE PER COR STD � ' APPROX. LOCATION fi>�/� 215, SEE SHEET 6 III \ \ 16" D.I. WATER Tw=139.0 2" m I I� a I I d- I ^o I PER C.O.R. GIS 14" 1 f 1 I I a I \ BW=137.0 \• I \ a I I I - I I 3 \ N 6,J 16 1 I \ \ �. �1� �� I 1 4 I I - 0' POWER EASEMENT rw=l3s.o I 14" I 1 - - - - I 3 REC. NO. 7609240628 BW=137.0 I I I I \ I INSTALL CB I o j I I .. .... INSERT PER COR I Q L I °� I I T 1 SrD 216.3 (TYP) � Q X o, > 142 II I N I .� 140 N ° APPROX. LOCATION 12" D.I. WATER TW=138.0 I - - \ - - - 1 PER C.O.R. GIS BWf3 . a V 3 7.0 L56 d )9 )9 /11 a' o 3 8 14 DTI ° �12 EX TREE TO BE / �� ° / 1 / --_ I 60 j I REMOVED (TYP) / 1 4 4 ° I D _ EX. SEWER MANHOLE - -_ d I N RIM=161.11 WOOD REMOVE I X 1O � INV=152.61 (6"PVC-S&W) ° . FENCE - - \ \ INV=152.51 (8"PVC-N) 12. / �- - - - -\VX S APPROX. LOCATION YARD I CHAIN LINK .9' � -------- / / I j EX. SEWER CLEANOUDRAIN FENCE T I EX TREE TO BE T . I . r r I . _____ r r r PER CITY ASBUILTS I RESTORE AND REVEGETATE RETAINED (TYP). I j 7S I / T4 a . NV=129.8'± N INSTALL TREE A - Q OFFSITE AREA IN KIND TAX PARCEL ` I I UPON INSTALLATION OF I PROTECTION FENCE, j � � h d 312305-9091 SEE DETAIL, SHEET 6 . . . I..... EX. CB UTILITIES AND ACCEPTANC I Q RIM-160.81 BY CITY INSPECTOR . INV=156.56 15"PVC-N&S) ASBU. . ILT YARD I NOTE: \ ALL EXISTING ONSITE STRUCTURES, UTILITIES I 3 1 25 CEI AR \ Q � AND APPURTENANCES TO BE REMOVED. S S S S S S HEDGE WOOD FENCE ncompass ��Y D M� �,��� OF WA'S +� SURVEYED: SDM SCALE: ' VERTICAL: NAVD 1988 1 '=2O HORIZONTAL: NAD 1983/1991 ENGINEERING & SURVEYING DESIGNED: EDM Western Washington Division DRAWN: 165 NE Juniper Street, Suite 201 ■ IssaQuah, WA 98027 ■ Phone: (425) 392-0250 ■ Fax: (425) 391-3055 �� 39374 w� TLK ONE INCH DATUM Eastern Washington Division 0 G]STER� ti 1 AS-BUILTS EDM 101191211 SDM I CHECKED: EDM AT FULL SCALE 407 Swiftwater Blvd. ■ Cle Elum, WA 98922 ■Phone: (509) 674-7433 - Fax: (509) 674-7419 ssloNAti� IF NOT ONE INCH IF NO. REVISION BY DATE AP P R APPROVED: ACCORDINGLY 03/19/2021 NEM EROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES: THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE EROSION AND SEDIMENT CONTROL (ESCI PLAN SET. ALL THE NOTES ON THE LIST MAY NOT P5RTAJN TO EVI=RY PROJECT- THP APPLICANT OR OWNER, MER513Y REFEkREI) TO AS APPLICANT- MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER, THE APPLICANT SHALL NOT RENUMBER NOR E61T THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED AFTER THE E50 STANDARD PLAN NOTES. 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON. HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR. 2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASH INGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION STORMWATER GENERAL PERMIT, IF LT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE CITY COPhES OF ALL MONITORING REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE CONSTRUCTION STORMWATER GENERAL PERMIT. 3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION COMMENCEMENT TO POST -PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS. 4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS. AND AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN ACCORDANCE WITH APPENDIX D OF THE CITY OF R£NTON SURFACE WATER DESIGN MANUAL (RENTON SWDM} PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO NSTURRANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANTfESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. J 5-TA8ILIZEP CONSTRUCTION ENTRANCES SHALL 6E INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSLIRE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK -OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. OR MORE FREQUENTLY DURING WET WEATHER, AS NECESSARY 70 PREVENT SEDIMENT FROM ENTERING SKATERS OF THE STATE. 8- WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFFSITE OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON -SITE DUMPING OF EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE WASHOUT AREAS. 7, ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING ANDlOR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BLIPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TjmE THAT CLEARING ANDA)k CONSTRUCTION IS COMPLETE AND POTENTIAt FOR ON -SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMCVED AFTER CONSTRUICTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR (NWSITE EROSION DOES NOT EXIST- THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT, ENHANCEMENT, AND REMOVAL OF ESC BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT. 8. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY. 9. THE ESC IMPS DEPICTED 014 THIS. DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE ESC BLIPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION. IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAYBE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER DUALITY OF THE RECEIVING DRAINAGE SYSTEM. 10. APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRIC70RS, CHANNELS, OR STORMWATER FACILITIES. 11. ANY DENAMPING SYSTEM NECESSARY FOR 7HE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL, 12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH APRIL 30TH) OR SEVEN DAYS DURING 7HE DRY SEASON (MAY 1ST THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G.. SEEDING, MULCHING. PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM. 13. WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES EETWEEN OCTOBER 1ST AND APRIL 3C7H, UNLESS OTHERWISE APPROVED BY THE CITY. 14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL 6E ADDRESSED WITHIN SEVEN (7I DAYS. 15. THE ESC BMPS ON INACTIVE SITES SHALL DE INSPECTED AND MAINTAINED AT A MINIMUM OF OrtdCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT INSPECTION AHD MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY. 16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216.30 SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT EN7ERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR TRAP. ALL OATOH 9A81N INSERT$ SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING CONDITION. 17. AT NO TIME SHALL SEDIM[ NT ACCUMVI-AT10N EXCEED 2.3 OF THE OAPAG ITY OF THE CATCH BASIN SUMP. ALL CATCH BASIN$ AND CONV€Y{WOE LINES SHALL BE CLEANED PRIOR TO PAVING, THE CLEANING OPERATION SHALL N07 FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM, 16. ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY FACILITY SMALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. 19. AREAS DESIGNATED ON THE PLANS} CONTAINING EXISTING STORMWATER FACILITIES OR ON -SITE BMPS (AMENDED SOILS, BIORET£NTION, PERMEABLE PAVEMENT, ETC.),SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION AND COMPACTION DURING CONSTRUCTION, 20. PRIOR TO THE SEGINNING OF THE WET SEASON (OCTOBER laTj, ALL DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFY WHICH ONES SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON, AN EXHIBIT OF THOSE AREAS TORE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW. 21. PRIOR TO OVAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL $E STA6ILIZED TO PREVENT SEOIM£NT-LADEN WATER FROM LEAVING THE= PROJECT SITE, ALL ESC BMPS SHALL BE REMOVED, AN5 5TORMWATER CONVEYANCE SYSTEMS, FACILITIES- ANO ON -SITE BMPS SHALL BE RESTo'RE13TO THEIR FULLY FUNCTIONING CONDITION. ALL DISTURBEp AREAS OF THE PRQ,IECT SITE $HALL_ BE VEGETATED OR QTHERWI$E PERMAINENTLY STABILIZED. AT A MINIMUM, DISTURBED AREAS SHALL BE $OPRED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT OOVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANOSCh,PED BEFORE OCTOBER 1ST. 22. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS OF•WAY SHALL BE CONSTRUCTED IN ACCORDANCE W17H CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. UHMS O HERWISF N07m. DRAWING 1$ NOT 70 $CAL[ (NTjj STD, PLAN - 268.IDO PUBLIC WORKS EROSION AND SEDIMENT CONTROL RRR D DEPARTMENT STANDARD PLAN NOTES GAZ 9/29/2018 1 :45 AI' „s - x • aamm� a� DATE STRUCTURAL NOTES: THESE PLANS ARE APPROVED FOR STANDARD ROAD AND DRAINAGE IMPROVEMENTS ONLY. PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, AND RETAINING WALLS REQUIRE A SEPARATE REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION. 2. ROCKERIES ARE CONSIDERED TO BE METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHT-OF-WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF RIGHT-OF-WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. CONSTRUCTION SEQUENCE., 1. PRE -CONSTRUCTION MEETING. 2. POST NOTICE OF CONSTRUCTION ACTIVITY SIGN WITH NAME AND PHONE NUMBER OF ESC SUPERVISOR. J. FLAG OR FENCE CLEARING LIMITS. 4. INSTALL CATCH BASIN PROTECTION IF REQUIRED. 5. GRADE AND INSTALL CONSTRUCTION ENTRANCE(S). 6. INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.). 7. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT. 8. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY OF RENTON EROSION AND SEDIMENT CONTROL STANDARDS. 9. RELOCATE SURFACE WATER CONTROLS AND EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE SO THAT THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE CITY OF RENTON EROSION AND SEDIMENT CONTROL STANDARDS. 10. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON OR TWO DAY DURING WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING, OR EQUIVALENT. 11. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN 7 DAYS. 12. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND BEST MANAGEMENT PRACTICES REMOVED IF APPROPRIATE. 13. UPON COMPLETION OF THE PROJECT. ALL DISTURBED AREAS MUST BE STABILIZED AND BMP'S REMOVED, IF APPROPRIATE. Know what's below. Call before you dig. ■ CITY OF ■ RENTON Planning/Building/Public Works Dept. WASIII�`7.�� 42676 �EGISTER�'9� ZONAL LAND THESE PLANS ARE ';4S-BUILT" AND THE INFORMATION SHOWN ACCURATELY REFLECTS EXISTING FIELD CONDITIONS AS OF THIS DATE: MARCH 3, 2021 STEVEN D. McCASKEY PLS 42676 IN COMPLIANCE WITH CITY OF RENTON STANDARDS SAPPHIRE ON TALBOT TESC PLAN DATE: 0311912021 FIELDBOOK: N/A PAGE: NIA 18615 SHEET: OF: 19 R-407205