Loading...
HomeMy WebLinkAboutM_Water and Sewer Availability_210614_v1.pdfW04 Web date: 11/09/2012 Water Availability King County Department of Permitting King County Certificate of and Environmental Review Water Availability 35030 SE Douglas Street, Suite 210 Snoqualmie, WA 98065-9266 206-296-6600 TTY Relay: 711 For alternate formats, call 206-296-6600. www.kingcounty.gov This certificate provides the Public Health - Seattle & King County Department and the Department of Permitting and Environmental Review with information necessary to evaluate development proposals. Do not write in this box I Number Name ❑ Building Permit ❑ Preliminary Plat or PUD ❑ Short Subdivision ® Rezone or other: Applicant's name: Owner: Kulwant Sandhu Contact # 425-269-7270 Proposed use: Short Plat Location (attach map and legal description if necessary). 13952 SE 159 Place Renton, Wa 98058 PIN: 222305-9022 Grid Map: B2-3&2 Water purveyor information: 1. ® a. Water will be provided by service connection only to an existing 12" (size) water main that is 7 feet from the site. OR ❑ b. Water service will require an improvement to the water system of: ❑ (1) feet of water main to reach the site; and/or ❑ (2) The construction of a distribution system on the site; and/or ❑ (3) Other (describe): 2. ® a. OR The water system is in conformance with a County approved water comprehensive plan. ❑ b. The water system improvement is not in conformance with a County approved water comprehensive plan and will require a water comprehensive plan amendment. (This may cause a delay in issuance of a permit or approval.) 3. ® a. The proposed project is within the corporate limits of the district, or has been granted Boundary Review Board approval for extension of service outside the district or city, or is within the County approved service area of a private water purveyor. OR ❑ b. Annexation or Boundary Review Board (BRB) approval will be necessary to provide service. 4. ® a. Water is or will be available at the rate of flow and duration indicated below at no less than 20 psi measured at the nearest fire hydrant 80 feet from the building/property (or as marked on the attached map): Rate of flow at Peak Demand: ❑ less than 500 gpm (approx. gpm) ❑ 500 to 999 gpm ® 1000 gpm or more ❑ flow test of gpm Elcalculation of gpm Duration: ❑ less than 1 hour ❑ hour to hoto 2 hours ® 2 hours or more Other: OR (Note: Commercial building permits which include multifamily structures require flow test or calculation.) ❑ b. Water system is not capable of providing fire flow. 5. ® a. OR Water system has certificates of water rights or water right claims sufficient to provide service. ❑ b. Water system does not currently have necessary water rights or water right claims. Comments/conditions: SEE ATTACHMENTS I certify that the above water purveyor information is true. This certification shall be valid for one year from date of signature. Cedar River Water & Sewer District _ e Davisson Agency name Sign ory name 6 � Developer Extension Administrator 8-23-18 Title ignature Date Check out the Permi ' g Web site at www.kingcounty.goy/permits Water Availability Sandhu 9022.doc b-cert-water.pdf WU4 11/09/2012 Page 1 of 1 La King County Department of Permitting and Environmental Review 35030 SE Douglas Street, Suite 210 Snoqualmie, WA 98065-9266 206-296-6600 TTY Relay: 711 www.kingcounty.gov S06 Web date: 11/09/2012 Sewer Availability: King County Certificate of Sewer Availability For alternate formats, call 206-296-6600. This certificate provides the Public Health - Seattle & King County Department and the Department of Permitting and Environmental Review with information necessary to evaluate development proposals. Do not write in this box Number ❑ Building Permit ❑ Short Subdivision ® Preliminary Plat or PUD ❑ Rezone or other: Applicant's name: Owner: Kulwant Sandhu Proposed use: Short Plat Location (attach map and legal description if necessary): 13952 SE 159 Place Renton, Wa 98058 Name Contact # 425-269-7270 PN: 222305-9022 Grid Map: B2-3&2 information: Sewer agency 1. ® a. Sewer service will be provided b side s y ewer connection only to an existing 8 size sewer OR 30 feet from the site and the sewer system has the capacity to serve the proposed use. ❑ b. Sewer service will require an improvement to the sewer system of: ❑ (1) ❑ (2) ❑ (3) feet of sewer trunk or lateral to reach the site; and/or The construction of a collection system on the site; and/or Other (describe): 2. ® a. The sewer system improvement is in conformance with a County approved sewer comprehensive plan. OR ❑ b. The sewer system improvement will require a sewer comprehensive plan amendment. 3. ® a. The proposed project is within the corporate limits of the district or has been granted Boundary Review Board OR approval for extension of service outside the district or city. ❑ b. Annexation or Boundary Review Board (BRB) approval will be necessary to provide service. 4. Service is subject to the following: a. Connection charge: Yes b. Easement(s): C. Other: If property is subdivided then a new side sewer Stub may need to be constructed Comments: See Attachments I certify that the above sewer agency information is true. This certification shall be valid for one year from date of signature Cedar River Water & Sewer District Agency name Developer Extension Administrator Title Check out the Permitting Davisson name c 8-23-18 Date site at www.kingcounty.gov/permits SewerAvailability Sandhu .doc b-cert-sewer.pdf S06 11/09/2012 Page 1 of 1