HomeMy WebLinkAboutMFP21002241.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Major Franchise Permit: MFP21002241
IVR Number: 21002241
Permit Information
Permit Name: Comcast Cable Franchise Permit
Address/Location:05/12/2021Application Date:7227800995Parcel Number: 3031 NE 10TH ST
Permit Type:06/14/2021Issue Date:Franchise
Permit Work Class:06/14/2022Expiration Date:Major Utility
Job Number: 320920Franchise Type:Cable
Description: Comcast to tie in fiber, underground and overhead work in ROW along NE 10th St and Kirkland Ave NE.
Contacts
Name Address PhoneTypeBilling
Terri Coe
Cannon Construction Inc
406 Porter Way
Milton, WA 98354
B: (253) 922-2787
C: (360) 620-8811
Applicant
Rhonda Resnik
Comcast
410 Valley Ave NW, Suite 12, Bldg C
Puyallup, WA 98371
B: (253) 864-4246Applicant
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Michael Cannon
Cannon Constructors Inc
406 Porter Way
Milton, WA 98354
B: (253) 922-2787Contractor
Business License Number: 41539Construction Contractor: CANNOCI055CS
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
X
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Comcast
JB0000320920
Rhonda Resnik
253-864-4246
Rhonda_Resnik@comcast.com
3031 NE 10TH ST RENTON, WA 98056 Highland Community Church
TIE IN FIBER, UNDERGROUNG AND OVERHEAD WORK IN ROW ALONG NE 10TH ST AND KIRKLAND
AVE NE.
115 FT
Cannon Construction Inc - Terri Coe 360-620-8811
601590363 20838
6/18/2020
MFP21002241
Scott Warlick
This permit is for Major construction work in the ROW and will be billed at an additional
$60/HR for inspections. After hours and weekend work will be billed at $125/HR
6/14/2021
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 11/25/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 11/25/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.☐ A copy of the Traffic Control Plan (TCP) Application form.
2.☐ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
☐Include map(s) showing the location of the project and work area.
☐Be legible lettering and clear, contrasting, symbols of viewing or printing.
☐Must indicate street names, and north arrow and scale.
☐All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
☐Types of plans required:
☐Work hour plan – show all mobility impacts during construction hours.
☐Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
☐Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
☐Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
Highland Community Church
3031 Ne 10TH ST RENTON, WA 98056
Monday Friday 8:00 AM 3:00 PM
TIE IN FIBER, UNDERGROUNG
AND OVERHEAD WORK IN ROW ALONG NE 10TH ST AND KIRKLAND
AVE NE.
Cannon Construction Inc 360 620 8811
Terri Coe tcoe@cannonconstructioninc.com
406 Milton Way Milton, WA 98354
MFP21002241
Scott Warlick CED 6/14/2021
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 11/25/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
•TCP must be approved prior to commencing the work, and all permit conditions shall be met.
•Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
•Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
•The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
•Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
•Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
•TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
•Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
•Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
•The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
•Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
•Approved Temporary TCP must be at the work site during work hours.
•Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
•Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
•Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
•The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
•Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
Terri Coe 6/18/2020
ROW ROWROWROW
ROW
ROW
ROWROWROWROWROWROWROWROW
ROW
ROWROWROWROW ROW
ROW
RO
W
RO
W
RO
WROWROWROW
ROW ROW
RO
W
ROWROW ROW ROW
ROWROW
ROWROWROWROW
ROW
ROW
RO
W
R
OW
ROWROWROWROW
RO
W
RO
W
RO
WROWROWROWROWROWROWROWRO
W ROWROWROWROWEOPEOP
EOP EOP
EOP EOPEOPEOPEOP
EO
P
EO
P
EOP
EOP
EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEO
P
EO
P
EO
P
EOP
EO
P
EO
P
EOP EOP
EOP EOP EOPEO
P
EO
P
EO
P
EO
P
EO
P
EOP
EOP
N
E
1
0
T
H
S
TSUNSET L
N
N
E
NE SUNSET BLVDN
E
1
0
T
H
S
T
DRIVE
WAY
DRIVEWAY
DRIVE
WAY
DR
I
V
E
W
A
YDRIVEWAYEOPEOP NE SUNSET BLVD2801
2801
2800
D
R
I
V
E
W
A
Y
W21-7
W20-5R
W4-2R
W21-7
W21-7
WTDH W21-7
N
E
1
0
T
H
S
T
W21-7
W20-7A
W3-4
FA
S R2-1
R2-1
N
COMCAST
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
SITE SPECIFIC TRAFFIC CONTROL PLAN [UNDERGROUND WORK]
CONTROL TYPE: SINGLE CLOSURE 4-LANE ROAD
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. PLACE TEMP "NO PARKING" SIGNS AT LEAST
72 HOURS PRIOR TO WORK
3. SIDE WALKS TO REMAIN OPEN DURING
ROAD WORK, UNLESS NOTED OTHERWISE
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.OF
DATE REVISION BY QC
CANNON COMPANIES
0000320920HIGHLAND COMMUNITY CHURCH
3031 NE 10TH ST
RENTON, WA 98056
TCP 1 1 3
06/02/2020 JBL PM
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO
ADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROL
WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF
THE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF AND
ANY SPECIAL CONDITIONS EXIST
***TRAFFIC CONTROL ADDITIONAL
NOTES ***
- At aerial work, will be a moving traffic
control setup
-Will coordinate with business that will be
affected by construction.
-Will have Spotter on site to escort
pedestrian through work zone.
- All work will stop while pedestrians are
escorted through work zones.
MFP21002241
ROWROWROWROW
RO
W
RO
W
RO
W
ROWROWROWR
O
W
R
O
W
RO
W
ROW ROWROWROWROW ROW
ROWROWROWROWROWROWEO
P
EO
P
EO
P
EO
P
EO
P EOPEOPEOPEOPEO
P
EO
P
EO
P
EO
P
EO
P
EO
P
EO
P
EOPEOPEOPEOPN
E
1
0
T
H
S
T INDEX AVE NENE
1
0
T
H
S
T
EOP
EO
P
EOP
EOP
EOPEOPEOPEOPEOP
EOPEOPEOPEOPEO
P
EO
P
EOP
EOP
EOP
EOPDRIVEWAY
DRIVE
WAY
DRIVE
WAY
DRIVEWAYDRIVEWAYDRIVEWAYDRIVE
WAY
INDEX AVE NE2725
2808
2900
2804
2806
N
E
1
0
T
H
S
T
W21-5
W21-7
W21-7
W20-7a
W20-7A
W3-4
W3-4
W
T
R2-1FLAGGER
FLAGGERFLAGGERW20-7a
W3-4
W21-7
W20-7a
W3-4
FLAGGER
W21-7
N
COMCAST
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURESWILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
SITE SPECIFIC TRAFFIC CONTROL PLAN [ OVERHEAD WORK]
CONTROL TYPE: SINGLE CLOSURE 2-LANE ROAD
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. PLACE TEMP "NO PARKING" SIGNS AT LEAST
72 HOURS PRIOR TO WORK
3. SIDE WALKS TO REMAIN OPEN DURING
ROAD WORK, UNLESS NOTED OTHERWISE
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
***TRAFFIC CONTROL ADDITIONAL
NOTES ***
- At aerial work, will be a moving traffic
control setup
-Will coordinate with business that will be
affected by construction.
-Will have Spotter on site to escort
pedestrian through work zone.
- All work will stop while pedestrians are
escorted through work zones.
OF
DATE REVISION BY QC
CANNON COMPANIES
0000320920HIGHLAND COMMUNITY CHURCH
3031 NE 10TH ST
RENTON, WA 98056
TCP 2 2 3
06/02/2020 JBL PM
MFP21002241
ROWROWROWROWROWROWROWROW
ROW
ROWROWROWROWROWROW ROW
ROW
ROWROWROWROWROWROWROW
ROW ROW
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW
ROWROWROWROWROWROW
ROW ROWROWROWROW
ROWROW
ROW
ROW
ROW
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWRO
W
RO
W
ROW
ROW ROWROWROWROWROWROWROWROW
ROW
ROWROWROWROWROW ROW ROW
ROWROWROW ROW
ROW ROWROWROWROWROW
ROW ROWROWROWROW
ROW
EOP
EOP
EOP
NE 10TH
S
T
NE
1
0
T
H
S
T
EOPEOPEOPEOPEOPEOPEOPEOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOPEOPEOPEOPEOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
NE 10TH
S
T
KIRKLAND AVE NEEOPEOPEOPEOPEOPEOP
EOP
EOP
EOP
EOP
EOPEOPEOPEOPEOP
EOP
EOP
EOP
EOP
EOP EOPEOPEOPJEFFERSON AVE NEEOPEOPEOPEOPEOPEOP
EOP
EOP
EOP
EOP
EOPEOPEOPEOPEOPDRIVE
W
AY
DRIVE
WA
Y
DRIVEW
AY
DRIVE
W
A
Y
DRIVEWAY
DRIVEWAY
DRIVEWAY
DRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAY
DRIVEWAY
DRIVEWAY KIRKLAND AVE NE926
1010
1011
951
2901
1017
920
0
3112
3030
912
3104
1016
3031
929
WT
R2-1
W21-7
FLAGGER
W21-7
W20-7a
W20-7a
FLAGGER
W3-4
W3-4
W20-7a
W3-4
W21-7
FLAGGERWTW21-7
W20-7a
W3-4
W21-7
W20-7A
W3-4
WT
WT
SPOTTER
FLAGGER
FLAGGER
SPOTTER
N
COMCAST
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
SITE SPECIFIC TRAFFIC CONTROL PLAN [OVERHEAD WORK]
CONTROL TYPE: SINGLE CLOSURE 2-LANE ROAD
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. PLACE TEMP "NO PARKING" SIGNS AT LEAST
72 HOURS PRIOR TO WORK
3. SIDE WALKS TO REMAIN OPEN DURING
ROAD WORK, UNLESS NOTED OTHERWISE
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
OF
DATE REVISION BY QC
CANNON COMPANIES
0000320920HIGHLAND COMMUNITY CHURCH
3031 NE 10TH ST
RENTON, WA 98056
3 3 3
06/02/2020 JBL PM
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO
ADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROL
WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF
THE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF AND
ANY SPECIAL CONDITIONS EXIST
***TRAFFIC CONTROL ADDITIONAL
NOTES ***
- At aerial work, will be a moving traffic control
setup
-Will coordinate with business that will be
affected by construction.
-Will have Spotter on site to escort
pedestrian through work zone.
- All work will stop while pedestrians are
escorted through work zones.
TCP
MFP21002241
WORK
AREA
1 - COVER SHEET
2 -OVERVIEW
3 -PHOTOS
4 -NODE MAP
THIS IS PROPRIETARY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED CANNON COMPANIES
96CT FIBER: 1055 FT + 20% STORAGE = 1266 FT
12CT FIBER: 195 FT + 20% STORAGE = 234 FT
CONTACTS:
PROJECT MAP:
*ALL FOOTAGES AND MATERIALS ARE ESTIMATED
N
SCOPE OF WORK:
SHEET INDEX:
BILL OF MATERIALS*:
NEW AERIAL =
OVERLASH =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
RISER (50)=
TOTAL FOOTAGE =
X FT.
840 FT.
X FT.
150 FT.
50 FT.
1040 FT.
PROJECT DESCRIPTION - ROW*
NEW BUILDING PATH WAY =
EXISTING BUILDING PATH WAY =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
TOTAL FOOTAGE =
145 FT.
X FT.
65 FT.
X FT.
210 FT.
PROJECT DESCRIPTION -SITE*
TOTAL PROJECT FOOTAGE =1250 FT.
- TIE INTO EXISTING SPLICE CASE KV07MX1.9A IN EXISTING TIGER HOUSE.
- PROOF AND PULL (1) 96CT FIBER THROUGH EXISTING UNDERGROUND CONDUIT.
- PROOF AND PULL (1) 96CT FIBER THROUGH EXISTING RISER.
- OVER-LASH (1) 96CCT FIBER ON EXISTING AERIAL STRAND (TYPICAL).
- PLACE NEW TRANSITION SPLICE CASE AND TRANSITION TO 12CT FIBER.
- PLACE NEW RISER AND PULL (1) 12CT FIBER.
- OPEN TRENCH AND PLACE NEW CONDUIT, PLACE 2" CONDUIT, PULL (1) 12CT
FIBER.
- ROOM 250, INTERIOR PATH.
- COMMUNICATION EQUIPMENT ROOM.
- (*) POLE#318519-166739 HAS A RED "DO NOT OPERATE" TAG.
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
COMCAST Business/Job Contact
POC:Kerry Warren (425) 255-4751
EMAIL: highlandssc.org
3031 NE 10TH ST.
SEATTLE, WA 98056
HIGHLAND COMMUNITY CHURCH
PC#500000
JB0000329920
METRO-E
CANNON COMPANIES
Jeff Tungsvik - (253)-677-3459 - jtungsvik@cannonconstructioninc.com
COMCAST COMMUNICATION
Aaron Cantrell - (253)-864-4281 - Aaron_Cantrell@cable.comcast.com
MFP21002241
COMCAST
GENERAL NOTES
STANDARD
1. THE LOCATIONS OF UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. ALL UTILITY LOCATIONS SHALL BE VERIFIED PRIOR TO
CONSTRUCTION. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL MAKE EXCAVATIONS AND BORINGS AHEAD OF THE WORK, AS
NECESSARY, TO DETERMINE THE EXACT LOCATIONS OF UTILITIES AND UNDERGROUND STRUCTURES. IT IS UNDERSTOOD THAT
THERE WILL BE INTERFERING UTILITIES AND OTHER UNDERGROUND PIPES, DRAINS OR STRUCTURES ENCOUNTERED THAT ARE
NOT SHOWN OR AREAS SHOWN INCORRECTLY ON THE PLANS OR THAT HAVE NOT BEEN PREVIOUSLY DISCOVERED IN THE FIELD.
THE CONTRACTOR AGREES THIS IS A NORMAL AND USUAL OCCURRENCE IN THE CONSTRUCTION OF UNDERGROUND
IMPROVEMENTS. FURTHERMORE, CONTRACTORS UNDERSTAND AND AGREE THAT WORK IN SOME CASES PROPOSED PATH MAYBE
IN CLOSE PROXIMITY TO SAID UTILITIES AND UNDERGROUND PIPES, DRAINS AND STRUCTURES NOT SHOWN ON THE PLANS WHICH
MAY REQUIRE A CHANGE IN OPERATIONS AND MAY CAUSE SLOUGHING OF THE TRENCH, ADDITIONAL TRAFFIC CONTROL,
ADDITIONAL PAVEMENT AND BACKFILL COSTS AND TIME. THE CONTRACTOR AGREES THAT A REASONABLE NUMBER OF THESE
OCCURRENCES IS USUAL AND ORDINARY, AND ARE REFLECTED IN THE BID AND PLAN OF OPERATION. THE CONTRACTORS AGREES
TO PROVIDE FOR THESE CONFLICTS AND AGREES TO PROVIDE FOR A REASONABLE AMOUNT OF TIME FOR DESIGN CHANGES
AND/OR UTILITY RELOCATIONS DUE TO SAID CONFLICTS.
2. CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 811
3. INSPECTIONS - THE CONTRACTOR SHALL NOTIFY LOCAL JURISDICTIONS FOR REQUIRED INSPECTION SERVICES.
4. EXCESS WATER - SHOULD WATER BE ENCOUNTERED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
DEWATER, AS PER LOCAL JURISDICTIONS STANDARD SPECIFICATIONS, BEFORE CONSTRUCTION CONTINUES.
5. NO SILT LADEN WATER IS TO BE DISCHARGED FROM THE SITE WITHOUT PASSING THROUGH AN EROSION CONTROL SYSTEM.
6. THE CONTRACTOR SHALL SCHEDULE AND CONTROL HIS/HER WORK SO AS TO COMPLY WITH ALL APPLICABLE ORDINANCES TO
PREVENT ANY HAZARDS TO PUBLIC SAFETY, HEALTH AND WELFARE.
7. ALL STREETS SHALL BE KEPT FREE OF DIRT AND DEBRIS ON A CONTINUOUS BASIS.
8. AN APPROVED COPY OF THESE PLANS WILL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
9. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS OF THE JOB SITE, INCLUDING SAFETY
OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY
AND NOT BE LIMITED TO NORMAL WORKING HOURS.
10. PEDESTRIAN AND VEHICULAR ACCESS TO ADJACENT PROPERTIES SHALL BE MAINTAINED AT ALL TIMES EXCEPT WHERE PRIOR
WRITTEN APPROVAL FROM THE PROPERTY OWNER HAS BEEN OBTAINED.
11. BARRICADE OPEN DEPRESSIONS AND HOLES OCCURRING AS PART OF THIS WORK, AND POST WARNING LIGHTS ON ADJACENT
PROPERTIES WITH PUBLIC ACCESS. OPERATE WARNING LIGHTS DURING HOURS FROM DUSK TO DAWN EACH DAY AND AS
OTHERWISE REQUIRED.
12. PROTECT STRUCTURES, UTILITIES, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL
MOVEMENT, UNDERMINING WASHOUT AND OTHER HAZARDS CREATED BY OPERATIONS UNDER THIS SECTION.
TRAFFIC CONTROL
1. THE CONTRACTOR IS ADVISED THAT ALL LANE CLOSURES SHALL BE KEPT TO A MINIMUM. LOCAL JURISDICTIONS WILL APPROVE
ONLY THOSE LANE AND ROADWAY CLOSURES DETERMINED TO BE NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH A
SPECIFIC TASK. NO LANE OR ROADWAY CLOSURES WILL BE PERMITTED WITHOUT PRIOR APPROVALS.
2. THE CONTRACTOR SHALL KEEP ALL TRAFFIC LANES AND SHOULDERS CLEAR OF EQUIPMENT AND MATERIALS DURING
NON-WORKING HOURS. EQUIPMENT AND MATERIALS SHALL NOT BE STORED ON THE STREETS. THE CONTRACTOR'S EMPLOYEES
AND AGENTS SHALL NOT PARK PRIVATE VEHICLES ALONG THE ROADWAY OR MEDIAN.
SITE PREPARATION
1. SOD AND LAWN TO BE REMOVED SHALL BE CUT TO A NEAT VERTICAL LINE 6" MINIMUM BEYOND THE TRENCH LINE. SOD SHALL BE
EITHER REMOVED FROM THE SITE, OR CAREFULLY STOCKPILED FOR REUSE.
2. SAW CUT PAVEMENT TO A NEAT VERTICAL LINE 8" TO 12" MINIMUM BEYOND THE TRENCH LINE. REPLACE PAVEMENT WITH LIKE
MATERIAL (I.E., ASPHALT WITH ASPHALT, CONCRETE WITH CONCRETE).
3. EXCEPT AS NOTED HEREIN, ALL MATERIAL REMOVED SHALL BE TAKEN FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR.
TRENCH EXCAVATION AND BACKFILL
1. TRENCH BACKFILL - WHERE MATERIAL EXCAVATED FROM TRENCHES IS UNSUITABLE FOR BACKFILL, THE CONTRACTOR SHALL
BACKFILL WITH BANK RUN GRAVEL OR MAY ELECT TO USE CDF IN LIEU OF THE COMPACTION/PROCTOR PROCESS. STONEWAY MIX
351 IS ACCEPTABLE IN ALL LOCATIONS. QUICK SETTING MIX 1004 IS ACCEPTABLE IN NON-TRAFFIC AREAS. MIX 1121 IS TO BE USED IN
TRAFFIC-BEARING LOCATIONS.
2. COMPACTION, WHEN NECESSARY, SHALL BE PERFORMED IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS.
UTILITY DUCT
1. BURIED DUCT SHALL BE (1) 4" SCHEDULE 40 PVC, UNLESS NOTED OTHERWISE. MINIMUM CONDUIT COVER SHALL BE 36" WITH A
MINIMUM SLOPE OF 1/2 % TO VAULT.
2. THOROUGHLY CLEAN CONDUIT BEFORE USING OR LAYING. DURING CONSTRUCTION AND AFTER THE DUCT LINE IS COMPLETED,
PLUG ENDS OF CONDUITS TO PREVENT WATER WASHING INTO CONDUIT OR MANHOLES, TAKE PARTICULAR CARE TO KEEP
CONDUITS CLEAR OF CONCRETE, DIRT AND ANY OTHER SUBSTANCE DURING THE COURSE OF CONSTRUCTION.
3. AFTER DUCT PLACEMENT HAS BEEN COMPLETED, PROOF AND CLEAN DEBRIS FROM EACH DUCT, ITS ENTIRE LENGTH. INSTALL PULL
ROPE AND PLACE WATERTIGHT COMPRESSION PLUGS AT BOTH ENDS. ANY CONDUITS CONTAINING FIBER CABLE WILL REQUIRE
SIMPLEX COMPRESSION PLUGS SEALING THE CONDUITS AROUND THE CABLE.
4. OUTSIDE INNERDUCT SHALL BE 1-1/4" OPTIC-GUARD NON-METALLIC FLEXIBLE, IN COLOR SUCH AS RED OR ORANGE, WITH PULL
ROPES AND PLUGS. EXPOSED INNERDUCT INSIDE OF BUILDINGS SHALL BE PLENUM-RATED.
CEMENT CONCRETE PAVEMENT
1. ALL CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED ACCORDING TO THE STANDARD
SPECIFICATIONS OF EACH JURISDICTION.
ASPHALT CONCRETE PAVEMENT
1. ALL ASPHALT CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED WITH CLASS B ASPHALT
CONCRETE ACCORDING TO THE REQUIREMENTS OF EACH JURISDICTION.
GRAVEL AREAS
1. ALL GRAVEL AREAS DAMAGED OR REMOVED BY THIS WORK SHALL BE REPLACED WITH CRUSHED SURFACING TOP COURSE IN
ACCORDANCE WITH THE REQUIREMENTS OF EACH JURISDICTION.
SITE RESTORATION
1. ALL DISTURBED OR DAMAGED AREAS SHALL BE RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED
PRIOR TO PLACEMENT OF THE CONDUIT AND STRUCTURES.
2. VEGETATION REMOVED FOR THIS WORK SHALL BE REPLACED WITH IN-KIND PLANT MATERIAL AND SHALL BE PROPERLY PLANTED
AND WATERED IN TO ENSURE ITS SURVIVAL.
3. SITE RESTORATION SHALL INCLUDE REPLACING EXISTING CABLING AND PULL ROPES IN EXISTING CONDUITS AS THEY EXISTED
PRIOR TO CONSTRUCTION.
WATER QUALITY
1. CONSTRUCTION ACTIVITIES OCCURRING ADJACENT TO STORM DRAINAGE STRUCTURES SHALL COMPLY WITH THE STATE OF
WASHINGTON'S WATER QUALITY STANDARDS
2. THE CONTRACTOR SHALL LIMIT THE USE OF PETROLEUM PRODUCTS ON THE SITE.
DIRECTIONAL BORING
1. WHEN BORING ROADWAYS, INSTALL (1) 4" SCHEDULE 40 PVC CONDUIT WITH PULL ROPES AND PLUGS.
2. PROTECT EXISTING UTILITIES -- COORDINATE WITH LOCAL JURISDICTIONS TO POTHOLE AS REQUIRED TO LOCATE EXISTING
UTILITIES.
FIRE PROTECTION
1. ALL INSTALLED BACKBOARDS SHALL BE PAINTED WITH FIRE-RESISTANT PAINT.
2. ALL FIRE SEALED DUCT ENDS AND CORES SHALL BE 2 HOUR FIRE-RATED. ALL FIRE SEAL IN EXISTING LOCATIONS SHALL BE
REPAIRED OR REPLACED UPON DUCT OR CABLE PLACEMENT.
AERIAL INSTALLATION
1. ALL AERIAL CONSTRUCTION IS TO BE PERFORMED TO INDUSTRY ACCEPTABLE STANDARDS.
2. ALL NEW AERIAL (AND EXISTING) CABLE HEIGHTS OF ATTACHMENT TO BE DOCUMENTED AT TIME OF CONSTRUCTION.
3. 6.35 MM STRAND TO BE USED WITH STANDARD 1/4" POLE LINE HARDWARE UNLESS OTHERWISE SPECIFIED. BOND STRAND TO
POWER MAIN WHERE APPLICABLE.
4. ALL ANCHORS TO BE USED WILL BE 3/4" SCREW TYPE.
5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN AND FOLLOW ALL NESC CODES ALONG WITH APPLICABLE LOCAL AND
REGIONAL GOVERNING AUTHORITIES. ANY DISCREPANCIES BETWEEN THESE AUTHORITIES AND OR THE CONSTRUCTION PERMITS
IS TO BE VALIDATED WITH THE DESIGNER OR ENGINEER PRIOR TO CONSTRUCTION.
OF
DATE REVISION BY QC
CANNON COMPANIES
0000320920HIGHLAND COMMUNITY CHURCH
3031 NE 10TH ST
RENTON, WA 98056
GENERAL NOTES 2 4
06/02/2020 JBL PM
MFP21002241
COMCAST
EOP
FL
P
C
S
D
G
W
TS
T
ST
UT
ROW
DD DD DD DD
EDGE OF PAVEMENT
FOGLINE
POWER
COMMUNICATION
SEWER
DRAIN
DRAINAGE DITCH
GAS
WATER
TRAFFIC SIGNAL
TELCOM
STEAM
UNKNOWN UTILITY
RIGHT OF WAY
TRAFFIC CONES
PROPOSED NEW CONDUIT
STRAW WATTLES
P
V
LT
CW
R
UTILITY POLE
VAULT - SMALL
PEDESTAL
STREET LIGHT
CROSSWALK LIGHT
UTILITY RISER
V VAULT - SMALL
444LA MANHOLE
VAULT - 25TA
CB
CB
CATCH BASIN
CATCH BASIN WITH SOCK
GLULAM UTILITY POLECENTER LINE
LANE LINE
FENCE
HIGH VISIBILITY FENCE
S SEWER MANHOLE
D DRAIN MANHOLE
W WATER MANHOLE
V UTILITY VALVE
SHRUBBERY
BORE PIT
VAULT - LARGE
VAULT - 25TA
C COMMUNICATION MANHOLE
FIRE HYDRANT
DISTANCE STATIONSTA 0+00
NOTE CALLOUT#
X.X DISTANCE DIMENSION
ASPHALT SURFACE
CONCRETE SIDEWALK PANEL
CONCRETE ROADWAY PANEL
HF H-FRAME
VAULT - LARGE
CAB CABINET
LEGEND
LANE DIRECTION INDICATOR
PROPOSED MARK-UP NOTATIONS RESTORATION TYPESEXISTING FEATURESLINE TYPES
OF
DATE REVISION BY QC
CANNON COMPANIES
0000320920HIGHLAND COMMUNITY CHURCH
3031 NE 10TH ST
RENTON, WA 98056
LEGEND 3 4
06/02/2020 JBL PM
MFP21002241
15
0
'ROWROWROWROWROWROWROWROWROWROW ROW
ROWROWROWROWROWROWROWROWROW ROW
ROWROWROWROWROW ROW
ROWROWROWROWROWROW ROWROW
ROW
ROWROWROWROWROWROWROW
ROW ROW
ROWROWROWROWROWROWROWROWROWROWROWROWROW
ROW ROW
ROW
ROW
ROW
ROWROWROWROWROWROWROWROWROWROWROWROW ROW
ROWROWROWROWROW ROW
ROWROWROW ROWROWROW
ROWROWROWROWROWROW ROWROWROW ROWROWROW
ROW
ROW
ROW
ROWROWROWROWROWROWROWROWROWROWROWROW
RO
W
ROW
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROW
RO
W
ROW
ROW ROWROWROWROWROWROWROW
ROW
ROW
ROWROWROWROW ROW
RO
W
ROWROWROWROWROWROWROWROW
ROW
ROWROWROWROWROWROWROWROWROWROWROWROW
ROWRO
W
RO
W
ROWROWROWROWROW
ROW
ROWROWROWROWROW ROW ROW
ROWROW ROWROWROWROWROW
ROW ROWROWROWROW
ROW
R 25'
17
5
'
145'
240'164'EOP
EOP
EOP EOPEOPEOPEOP
EOP
EOP
EOPEOPEOP
EOP
EOP
EOP
EOP
EOP EOPEOPEOPEOPEOPEOPEOPEOP
EOP
EOP
EOP EOP
EOP EOPEOP
EOP
EOP
EOP
EOP
EOP
EOP
EOPEOPEOPEOPEOPEOPEOP
EOP
EOP
EOP
EOPDHN
E
1
0
T
H
S
T
NE 10TH
S
TINDEX AVE NENE
1
0
T
H
S
T
EOPEOPEOPEOP EOP EOPEOPEOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOPEOPEOPEOPEOP
EOPEOPEOPEOPEOPEOPEOPEOPEOP EOPEOP
NE 10TH S
TNE SUNSET BLVDKIRKLAND AVE NEEOPEOPEOPEOPEOPEOPEOPEOP
EOP
EOP
EOP
EOP
EOP
R
25'R 25'EOPEOP
EOPEOPEOPEOPEOPEOP
EOP
EOP
EOP
EOP
EOP
EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOP
EOP
EOP
EOP
EOP
EOPEOPEOPEOPEOP11
6
'
DRIVE
WA
YDRIVEW
AY
DRIV
E
W
A
Y
DRI
V
E
W
A
Y
DRIV
E
W
A
Y
DRI
V
E
W
A
Y
DRIVE
WAY
DRIVEWAY
DRIVEW
A
Y
DRIVEW
A
Y
DRIVEWAY
DRIVEWAY
DRIVEWAY
DRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAY
DRIVEWAY
DRIVEWAY
DRIV
E
WA
YDRIVEW
A
Y
DRIV
E
W
A
Y
DRI
V
E
W
A
Y
KIRKLAND AVE NE5'60'145'926
1010
1011
2725
951
1013
2801
2901
1017
920
1021
1000
1000
1000
0
2808
1023
3112
1028
2900
3030
1029
912
1022
3104
1035
1016
3031
929
2804
2806
JEFFERSON AVE NEN
OF
DATE REVISION BY QC
CANNON COMPANIES
0000320920HIGHLAND COMMUNITY CHURCH
3031 NE 10TH ST
RENTON, WA 98056
OVERVIEW 4 4
06/02/2020 JBL PM
COMCAST
LEGEND
INTERIOR PATH
EXISTING U/G PATH
LOCKBOX
EXISTING RISER
NEW VAULT/PEDESTAL
EXISTING VAULT/PEDESTAL
NEW BORE U/G PATH
NEW TRENCH U/G PATH
R25'
AERIAL POLE
EXISTING AERIAL PATH
NEW AERIAL PATH
SPLICE CASE
MFP21002241
Comcast Cable Communications Management
410 Valley Ave NW
Suite 12 Bldg C
Puyallup, WA 98371
5/19/2021
City of Renton
1055 South Grady Way
Renton, WA 98057
RE: Aerial Variance Request for JB0000320920
To whom it may concern:
Cannon Construction has been contracted to design and engineer this project on behalf of
Comcast Cable Communications Management. Comcast is applying for a variance request in
order to upgrade their existing facilities.
Comcast proposes to TIE IN FIBER, UNDERGROUNG AND OVERHEAD WORK IN ROW ALONG NE
10TH ST AND KIRKLAND AVE NE. Comcast is requesting that the City of Renton approve this
variance request based on the fact that the requirements for undergrounding this proposed
over-lash on existing plant will cause undue hardship.
1. Installation of undergrounding facilities will increase the total cost of construction
roughly 15-25 times the amount of an aerial over-lash on the existing Comcast strand.
2. Risk of potential damage to underground facilities will be increased.
3. Over-lash will not cause substantial adverse impact to other persons or entities in the
immediate area. Over-lashing the cable will be accomplished in a few days, and the
residents will not notice any impact. Comcast will clean up the over-lashed spans as
necessary and identify and remove any existing dead cables along this route.
4. The variance is necessary to prevent any undue hardship due to the increased
construction costs if forced to install the proposed extension underground.
5. The granting of the variance will not be materially detrimental to the public welfare.
Comcast does agree to participate in future underground improvements for its
proportionate share of the undergrounding costs, waiving the obligation into the future
when all other utilities are undergrounded to prevent an undue hardship against
Comcast currently.
Upon the granting of the variance, Comcast will coordinate construction and traffic control as
per your requirements. Comcast and their contractors want to cooperate at the highest level
and agree to adhere to all provisions and requirements set forth by the City of Renton to insure
safe installation and maintenance of the proposed facilities.
If you have any further questions regarding this project, please contact Rhonda Resnik.
Thank you for your consideration in this matter.
Rhonda Resnik
Permit Coordinator
Comcast Cable Communications Management
o 253-864-4246 | e Rhonda_Resnik@comcast.com
June 14, 2021
Rhonda Resnik
Comcast Cable Communications Management
410 Valley Ave NW
Puyallup, WA 98371
Via Email: Rhonda_Resnik@comcast.com
SUBJECT: Request for Undergrounding Exemption (JB#320920, MFP21002241, 3031 NE 10th St)
Dear Ms. Resnik:
The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal
Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required
to be installed underground, pursuant to the standards of the section of RMC.
Comcast proposes to have Cannon Construction, Inc. overlash 96ct fiber for a total of approximately 840
lineal feet to existing Puget Sound Energy (PSE) poles along the south side of NE 10th St and the west side
of Kirkland Ave NE within the City. See the enclosed Site Plan showing the proposed overlashing limits.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090. Ordinance 5720
grants Comcast, the right to install fiber optic cable and related appurtenances under, along, over, below,
through and across the streets, avenues and alleys of City of Renton within the right-of-way of Renton.
Section 3.4 of the franchise ordinance states that if all of the distribution lines all the wireline service
providers, such as telecommunications service providers, as defined in RCW 35.99.010, a utility service
provider or a Cable Operator (collectively “Service Providers”) in any portion of the Franchise Area are
underground, Grantee shall place its Cable System’s distribution cables underground within that area;
provided that such underground locations are actually capable of accommodating Grantee’s cable and
other equipment without technical degradation of the Cable Systems’ signal quality.
The proposal would utilize existing poles with other attached franchisee communication facilities and
overlash to the existing Comcast aerial path. As minimum vertical height clearance of 15’-6” would need
to be provided for, any existing obsolete cable will need to be removed; staff recommends these as
conditions of approval. Therefore, the City is granting an exemption with conditions, per the Comcast
franchise agreement which allows new overhead facilities to be placed overhead provided there are other
similar providers overhead as well. Comcast is required to obtain all necessary private utility easements
for work on private property.
DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C)
as requested by the applicant is approved with conditions subject to the conditions below as the request
complies with the Comcast Franchise Agreement.
Comcast Job JB#320920
Page 2 of 2
June 14, 2021
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of
construction. New aerial lines within the Project Reach must have a minimum vertical clearance
of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that
construction is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take
place until the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in
the future, at the Applicant’s cost, when any one of the following events occurs: (1) any other
utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a
franchisee within the Project Reach, in which case the Applicant shall participate in the joint use
trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made
available within the Project Reach that will accommodate the aerial lines. The new aerial lines
must be undergrounded within one year, or approved otherwise by the City of Renton Community
and Economic Development Administrator or designee, from the first event triggering the
requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period
from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed
with the City Clerk, along with the required appeal fee, by 5:00 pm, June 28, 2021. Due to Governor Jay
Inslee’s Proclamation 20-25 (“Stay Home, Stay Healthy”), the City Clerk’s Office is working remotely. For
that reason, appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov. The
appeal fee, normally due at the time an appeal is submitted, will be collected at a future date. Appeals to
the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal
process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. If the situation changes
such that the City Clerk’s Office is open when you file your appeal, you have the option of filing the appeal
in person.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Manager
cc: C.E. “Chip” Vincent, CED Administrator
Vanessa Dolbee, Planning Director
Justin Johnson, Assistant Development Engineering Manager
Scott Warlick, Engineering Specialist III
Holly Powers, Permit Technician
Franchise Permits
Enclosures: Site Plan
15
0
'ROWROWROWROWROWROWROWROWROWROW ROW
ROWROWROWROWROWROWROWROWROW ROW
ROWROWROWROWROW ROW
ROWROWROWROWROWROW ROWROW
ROW
ROWROWROWROWROWROWROW
ROW ROW
ROWROWROWROWROWROWROWROWROWROWROWROWROW
ROW ROW
ROW
ROW
ROW
ROWROWROWROWROWROWROWROWROWROWROWROW ROW
ROWROWROWROWROW ROW
ROWROWROW ROWROWROW
ROWROWROWROWROWROW ROWROWROW ROWROWROW
ROW
ROW
ROW
ROWROWROWROWROWROWROWROWROWROWROWROW
RO
W
ROW
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROW
RO
W
ROW
ROW ROWROWROWROWROWROWROW
ROW
ROW
ROWROWROWROW ROW
RO
W
ROWROWROWROWROWROWROWROW
ROW
ROWROWROWROWROWROWROWROWROWROWROWROW
ROWRO
W
RO
W
ROWROWROWROWROW
ROW
ROWROWROWROWROW ROW ROW
ROWROW ROWROWROWROWROW
ROW ROWROWROWROW
ROW
R 25'
17
5
'
145'
240'164'EOP
EOP
EOP EOPEOPEOPEOP
EOP
EOP
EOPEOPEOP
EOP
EOP
EOP
EOP
EOP EOPEOPEOPEOPEOPEOPEOPEOP
EOP
EOP
EOP EOP
EOP EOPEOP
EOP
EOP
EOP
EOP
EOP
EOP
EOPEOPEOPEOPEOPEOPEOP
EOP
EOP
EOP
EOPDHN
E
1
0
T
H
S
T
NE 10TH
S
TINDEX AVE NENE
1
0
T
H
S
T
EOPEOPEOPEOP EOP EOPEOPEOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOPEOPEOPEOPEOP
EOPEOPEOPEOPEOPEOPEOPEOPEOP EOPEOP
NE 10TH S
TNE SUNSET BLVDKIRKLAND AVE NEEOPEOPEOPEOPEOPEOPEOPEOP
EOP
EOP
EOP
EOP
EOP
R
25'R 25'EOPEOP
EOPEOPEOPEOPEOPEOP
EOP
EOP
EOP
EOP
EOP
EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOP
EOP
EOP
EOP
EOP
EOPEOPEOPEOPEOP11
6
'
DRIVE
WA
YDRIVEW
AY
DRIV
E
W
A
Y
DRI
V
E
W
A
Y
DRIV
E
W
A
Y
DRI
V
E
W
A
Y
DRIVE
WAY
DRIVEWAY
DRIVEW
A
Y
DRIVEW
A
Y
DRIVEWAY
DRIVEWAY
DRIVEWAY
DRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAY
DRIVEWAY
DRIVEWAY
DRIV
E
WA
YDRIVEW
A
Y
DRIV
E
W
A
Y
DRI
V
E
W
A
Y
KIRKLAND AVE NE5'60'145'926
1010
1011
2725
951
1013
2801
2901
1017
920
1021
1000
1000
1000
0
2808
1023
3112
1028
2900
3030
1029
912
1022
3104
1035
1016
3031
929
2804
2806
JEFFERSON AVE NEN
OF
DATE REVISION BY QC
CANNON COMPANIES
0000320920HIGHLAND COMMUNITY CHURCH
3031 NE 10TH ST
RENTON, WA 98056
OVERVIEW 4 4
06/02/2020 JBL PM
COMCAST
LEGEND
INTERIOR PATH
EXISTING U/G PATH
LOCKBOX
EXISTING RISER
NEW VAULT/PEDESTAL
EXISTING VAULT/PEDESTAL
NEW BORE U/G PATH
NEW TRENCH U/G PATH
R25'
AERIAL POLE
EXISTING AERIAL PATH
NEW AERIAL PATH
SPLICE CASE
MFP21002241
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP21002241
Engineering
1 Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place.
2 The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at the
Applicant’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the
Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case the
Applicant shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or
(3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial
lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and
Economic Development Administrator or designee, from the first event triggering the requirement to underground
the aerial lines.
3 Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15'-6".
4 A traffic control plan must be separately submitted to the City, and no construction may take place until the City
has approved a traffic control plan.
Page 1 of 1