EXECUTIVE DEPARTMENT
M E M O R A N D U M
DATE: June 14, 2021
TO: Randy Corman, Council President
Members of Renton City Council
FROM: Armondo Pavone, Mayor
Ed VanValey, Chief Administrative Officer
SUBJECT: Administrative Report
• The Surface Water Utility received Pollution Prevention Assistance funding up to
$175,000 from the Department of Ecology’s Hazardous Waste and Toxics Reduction
Program. The funding will be used in partnership with Ecology to cover technical
assistance for automotive, light industrial, dry cleaning, distribution centers, food
services, grocery stores, mini-marts, and retail. A subcontractor will focus on
reducing or removing pollutants from stormwater and hazardous waste by providing
technical assistance, system and program development, and producing educational
videos in multiple languages.
• Parks, Planning & Natural Resources Forestry Program is pleased to announce that
the 10-year Urban Forestry Management Plan is being redrafted for 2021-2031.
PlanIT Geo is the external consultant who will help in these efforts over the next
nine months. Their participation was announced at the April 12, 2021 COW. The
project slogan is “Rooted in Renton” and public feedback will be sought throughout
the planning process. RentonForestryPlan.com is a dedicated website that has been
set up to invite public participation and provide a specific point of contact for the
project. Please contact the Urban Forester, Ian Gray with any questions at
igray@rentonwa.gov or 425-430-6601.
• Information about preventative street maintenance, traffic impact projects, and
road closures happening this week can be found at http://rentonwa.gov/traffic. All
projects are weather permitting and unless otherwise noted, streets will always
remain open. Preventative street maintenance, traffic impact projects, and road
closures will be at the following locations:
Monday, June 14 through Friday, June 18, 8:30 a.m. to 3:30 p.m. Possible
trucks entering and exiting onto Maple Valley Highway east of 140th Way SE.
Questions may be directed to Tom Main at 206-999-1833.
Street Maintenance Asphalt Repairs. The following is a list of locations and
dates during which traffic will be impacted while maintenance crews conduct
asphalt repairs. All work will take place between 7:00 a.m. and 4:00 p.m.
Randy Corman, Council President
Members of Renton City Council
Page 2 of 2
June 14, 2021
o Tuesday, June 15. SE 174th Street between 106th Place SE and SR 515.
Flaggers will be onsite to maintain traffic flow.
o Wednesday, June 16. South Grady Way near Renton City Hall. The
eastbound curb lane will be closed between Williams Avenue South and
Old Benson Road.
o Thursday, June 17. NE 16th Street at Kirkland Avenue NE near Meadow
Crest Elementary School. Flaggers will be onsite to maintain traffic flow.
Ongoing Trail Closure through Summer 2021. Ripley Lane North Trail closure
just north of the VMAC and the trailhead going north in support the WSDOT I-
405 Renton to Bellevue Widening and Express Toll Lanes Project. Questions may
be directed to Justin Johnson at 425-902-7172.
Williams Avenue South and Wells Avenue South Conversion Project. Impacts
to traffic will continue throughout this area between South 2nd Street and South
3rd Street. Please visit the project webpage at https://rentonwa.gov/ww for
more information.
Downtown Utility Improvement Project. The Downtown Utility Improvement
Project requires several roadway closures and detours between now and project
completion in 2022. For more information on current upcoming road closures
and traffic impacts or to sign up for email or text alerts, visit the project website
at https://rentonwa.gov/duip.