HomeMy WebLinkAboutR-406811A PORTION OF THE NW 1/4 OF SECTION 8, TOWNSHIP 23N, RANGE 5E, W.M.
\ a
\
O \\ o
SIDEWALK PER PLAN \`\\ 22J1co
pv
\
CB#A6 CB TYPE I
O COMPACTED STRUCTURAL FILL `\ RIM=22.11 \
2 0y,
0 MIRAFI 5XT GEOGRID OR EQUIVALENT REINSTALL SALVAGED ANGLE \ p LLI REINFORCEMENT APPROVED BY TC 22.64
IRON. REPAINT SAFETY YELLOW �\ BC 22.14
GEOTECHNICAL ENGINEER (SEE 22.00
REINFORCING SCHEDULE BELOW) �\
goo0 v
22.76 Sao
z 1 oog� 1 5' 22.18 0
0 x oo�o =1 II ILJlII=1
< 6 °000 l=1 I-III=1=1
(f oo L -III 1 5 \
z o� _ �--�I _ Q
w °oo° 1=III=III=III=1
8 1.5' 28.9 p \\ v
o \ v
- =-1-1 22.29 o x CRUSHED ROCK FILTER p
LU0, 0��°=III=III=III=1 MATERIAL, BETWEEN 1.5" & 3" o Q o
III III III III 1.5' TC 22.5Q
w v
SIZE WITH LESS THAN 2% FINES BC 22.00 Y v 0 22.03 p
Hl3 v p o
1.9'
18"MIN KEYWAY 12" o v2 �J171 v o v 4 ;-
FIRM UNDISTURBED MINrr
Q SOIL TO BE VERIFIED
BY SOIL ENGINEER TC KEYWAY SHOULD BE SLOPED DOWN o v p 4 ° BC 22.32
TOWARDS THE FACE BEING PROTECTED o.
ov a p o Q o v Q. v o 22.29
a o a CB#A5 CB TYPE I v
O NOTE: RIM=21.4550
_171. REINFORCED FILL REQUIRED IN FILL SECTION ONLY N o p d v
v a p a o 0 6
2. ROCKERY STATIONS AND OFFSETS TAKEN AT TOP BACK OF ROCK o 22.41
0 GEOGRID REINFORCING SCHEDULE , 421.
4
ov p v o 8 p p
U)
22.94
o a p o v p a
p p o
v. . o a p o v p v o a o p v 0
0 0 90.6
TC 22.50 v v o o a TC 22.76
BC 22.00 0 4 v o a p' �: BC 22.26
fl f 11 1
Reinforced Fill / Rocker Rocker Cross Section Driveway Grading
Y Y Y g
�X
so
C1 CB TYPE I-L \
1.99
N O
O
O
22.10
TC 22.15
BC 21.86 0��„/ 22.08
��o
0 0
o 0
>°0°0°y
0 0_
22.19 °
000
TC 22.99
> BC 22.49
R6>
6'
000 21.70
o00
000
00o
r% 000 23.05
22.72 0 ° 0
21.66 0°00
21.70 0 0.
c
0°0°0`
o°o
0000
�°0°0°
'0°0°-
;00°00,
-o-' 21.60
22.15 R-40 6 81 1
21.70 CB#C2 CB TYPE
IM=21.96 IN COMPLIANCE WITH CITY OF RENTON STANDARDS
CONSTRUCTION RECORD DRAWING
TC 22.08 This construction record drawing is a copy of a cad file prepared by
BC21.83 COUGHLIN PORTER LUNDEEN and has been edited to reflect field
' verified invert and rim elevations of the storm, sanitary sewer and water
main systems. Field verified invert and rim elevations were obtained by
KLB CONSTRUCTION IN JUNE 2022
1 »= 5' 1 5' 1 11= 51 The on -site private storm drainage facilities and public/private water and
B• S 0 ADA Gradin 4 ADA Gradin 5 Not Used sewer systems were installed in accordance with the approved plans and
O��oF WAsg g the documented field revisions and function as intended.
>, SURVEYED: SCALE: DATE:
RECORD DRAWINGS 07 08 22 TRS HORIZONTAL: NAD 1983/1991 04 30 2021
T E N W VERTICAL AD 1 1988
83/1 PARK AVENUE NORTH EXTENSION / /
COUGH DESIGNED:
As SHOWN o CITY OF RENTON, WASHINGTON
FlELDBOOK:
Transportation Engineering NorthWest RENTON PAGE
Q 33708 p g g STRUCTURAL CIVIL SEISMIC ENGINEERING DRAWN:
PRW � • DRAWING NO:
C� C� STEg �y� Transportation Planning Design Traffic Impact &Operations ONE INCH I DATUM
11400 SE 8th Street, Suite 200, Bellevue, WA 98004 CHECKED:
Office(425)889-6747 801 SECOND AVENUE, SUITE900 (206)343-0460 BSB AT FULL SG4LE Planning/Building/Public Works Dept. ROADWAY GRADING DETAILS
/LIM/SEATTLE, WA 98104 www.cplinc.com IF NOT ONE INCH
Project Contact: Elyse Stemmler, P.E. NO. REVISION BY DATE APPR APPROVED: SCALE ACCORDINGLY SHEET. 1 1 OF:
30
Phone:425-250-5004 TEIB
ROCKERY HEIGHT
NO. OF GRID LAYERS
GRID LENGTH (L)
3'
1
4'
4'
2
4'
6'
3
5'
8'
4
6.5'
C")
O
T
Al
LJ
C0
O
O
I
T
7
Z
0
'
V )
Z
LU
I-
X
LU
LU
Q
i
Q
IL
Ir
0
0-
2
I-
0
W