Loading...
HomeMy WebLinkAboutERC_Report_COR_2021_LRWWMP_210609_v1DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT ERC_Report_COR 2021 LRWWMP_210609_v1 ENVIRONMENTAL REVIEW COMMITTEE REPORT ERC Meeting Date: June 14, 2021 Project File Number: PR21-000001 Project Name: City of Renton 2021 Long Range Wastewater Management Plan Land Use File Number: LUA21-000116, ECF Project Manager: Brittany Gillia, Assistant Planner Owner: City of Renton Applicant: City of Renton Public Works Utility System Division Contact: Ann Fowler, City of Renton, 1055 S Grady Way, Renton WA 98057 Project Location: Citywide Service Area Project Summary: The applicant, the City of Renton Public Works Department, is requesting SEPA Environmental (SEPA) Review for the City of Renton 2021 Long Range Wastewater Management Plan. The proposal is a non-project action, as defined by Section 197-11-774 in the Washington Administrative Code. Exist. Bldg. Area SF: N/A Proposed New Bldg. Area (footprint): Proposed New Bldg. Area (gross): N/A N/A Site Area: N/A Total Building Area GSF: N/A STAFF RECOMMENDATION: Staff Recommends that the Environmental Review Committee issue a Determination of Non-Significance (DNS). PART ONE: PROJECT DESCRIPTION / BACKGROUND The applicant, the City of Renton Public Works Department- Utility Systems Division, is requesting SEPA Environmental (SEPA) Review for the City of Renton 2021 Long Range Wastewater Management Plan (LRWWMP). The proposal is a non-project action, as defined by Section 197-11-774 in the Washington Administrative Code. The primary purpose of this plan is to identify capacity deficiencies in the City’s wastewater collection system, develop feasible alternatives to correct those deficiencies, and plan the infrastructure that will serve future development by addressing facility reliability, public health, groundwater and environmental protection, operation and maintenance, and financing issues. The Plan serves as an update to the City of Renton’s 2010 Long Range Wastewater Management Plan and was developed collaboratively by City staff and Carollo Engineers, Inc. (Carollo), including ADS Environmental Services LLC as part of the Carollo team. The plan addresses policies, criteria, assumptions, and recommendations regarding the Wastewater Management of the City’s planning area with consideration to population growth and increased demands on the sewer utility. The Plan addresses the need to expand Renton’s sewer service area into its Urban Growth Area as the appropriate provider of the urban service per the King County Countywide Planning Policies. The plan will be used as a guide in maintaining and improving the water system in the short-term over the next 10 years. It also provides a planning framework for the 20-year, long- term planning horizon. Maintaining a current Plan is required to meet the regulations of the Washington State Department of Ecology and the requirements of the Washington State Growth Management Act. The plan contains timeframes, which are the intended framework for future funding decisions and within which future actions and decisions are intended to DocuSign Envelope ID: F3AF94AC-B4FB-4986-A7DB-8D55B0D43273 City of Renton Department of Community & Economic Development City of Renton 2021 Long Range Wastewater Management Plan Staff Report to the Environmental Review Committee LUA21-000116, ECF Report of June 14, 2021 Page 2 of 2 ERC_Report_COR 2021 LRWWMP_210609_v1 occur. The framework presented in the plan does not represent actual commitments by the City. The potential impacts of the proposed 2021 LRWWMP for the City of Renton could be regulated through land use and construction permits and processes required for the projects outlined in the plan. ENVIRONMENTAL REVIEW In compliance with RCW 43.21C.240, the following environmental (SEPA) review addresses only those project impacts that are not adequately addressed under existing development standards and environmental regulations. A. Environmental Threshold Recommendation Based on analysis of probable impacts from the proposal, staff recommends that the Responsible Officials: Issue a DNS with a 14-day appeal period B. Mitigation Measures 1. None C. Exhibits Exhibit 1: Environmental Review Committee (ERC) Report Exhibit 2: City of Renton 2021 Long Range Wastewater Management Plan, Dated March 2021 D. Environmental Impacts There are no environmental impacts that are anticipated to occur in conjunction with the proposed non- project City of Renton 2021 Long Range Wastewater Management Plan. Project specific impacts of individual proposals from the plan would be evaluated and further analyzed through project specific environmental (SEPA) review and/or construction permitting. E. Comments of Reviewing Departments The proposal has been circulated to City Department and Division Reviewers. Where applicable, their comments have been incorporated into the text of this report and/or “Advisory Notes to Applicant.” ✓ Copies of all Review Comments are contained in the Official File and may be attached to this report. The Environmental Determination decision will become final if the decision is not appealed within the 14-day appeal period (RCW 43.21.C.075(3); WAC 197-11-680). Environmental Determination Appeal Process: Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on July 1, 2021. Due to Governor Jay Inslee’s Proclamation 20-25 (“Stay Home, Stay Healthy”), the City Clerk’s Office is working remotely. For that reason, appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. If the situation changes such that the City Clerk’s Office is open when you file your appeal, you have the option of filing the appeal in person. DocuSign Envelope ID: F3AF94AC-B4FB-4986-A7DB-8D55B0D43273 CITY OF RENTON DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT STAFF REPORT TO THE ENVIRONMENTAL REVIEW COMMITTEE EXHIBITS Project Name: City of Renton 2021 Long Range Wastewater Management Plan Land Use File Number: LUA21-000116, ECF Date of Meeting June 14, 2021 Staff Contact Brittany Gillia Assistant Planner Project Contact/Applicant Ann Fowler City of Renton 1055 S Grady Way, Renton WA 98057 Project Location Citywide Service Area The following exhibits are included with the ERC Report: Exhibit 1: Environmental Review Committee (ERC) Report Exhibit 2: City of Renton 2021 Long Range Wastewater Management Plan, Dated March 2021 DocuSign Envelope ID: F3AF94AC-B4FB-4986-A7DB-8D55B0D43273