HomeMy WebLinkAboutERC_DNS_Signature_Sheet_210615
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
SIGNATURES:
Martin Pastucha, Administrator
Public Works, Chair
Date Anjela Barton, Fire Marshal
Renton Regional Fire Authority
Date
Kelly Beymer, Administrator
Community Services Department
Date Chip Vincent, Administrator Date
Community and Economic Development
ENVIRONMENTAL (SEPA) DETERMINATION OF
NON-SIGNIFICANCE (DNS)
PROJECT NUMBER: PR21-000001/LUA21-000116, ECF
APPLICANT: Ann Fowler, City of Renton / 1055 S Grady Way, Renton, WA 98057 /
afowler@rentonwa.gov
PROJECT NAME: Long Range Wastewater Management Plan Environmental Review
PROJECT DESCRIPTION: The applicant, the City of Renton Public Works Department, is requesting SEPA
Environmental Review for the City of Renton 2021 Long Range Wastewater Management Plan. The subject plan will
reviewed as a non-project action, as defined by Section 197-11-774 in the Washington Administrative Code. The plan
primarily serves as an update to the City of Renton’s 2010 Long Range Wastewater Management Plan and was
developed collaboratively by City staff and Carollo Engineers, Inc. (Carollo), including ADS Environmental Services LLC as
part of the Carollo team. The plan addresses policies, criteria, assumptions, and recommendations regarding the
Wastewater Management of the City’s planning area with consideration to population growth and increased demands
on the sewer utility. The plan will be used as a guide in maintaining and improving the water system in the short -term
over the next 10 years. It also provides a planning framework for the 20-year, long-term planning horizon.
The primary purpose of this plan is to identify capacity deficiencies in the wastewater collection system, develop feasible
alternatives to correct these deficiencies, and plan the infrastructure that will serve future development by addressing
facility reliability, public health, groundwater and environmental protection, operation and maintenance, and financing
issues. Maintaining a current Plan is required to meet the regulations of the Washington State Department of Health
(DOH) and the requirements of the Washington State Growth Management Act. The plan also contains estimated
timeframes, which are the intended framework for future funding decisions. The applicant submitted an Environmental
(SEPA) Checklist with the application.
PROJECT LOCATION: Citywide
LEAD AGENCY: City of Renton
Environmental Review Committee
Department of Community & Economic Development
The City of Renton Environmental Review Committee has determined that it does not have a probable significant adverse
impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21C.030(2)(c). This
Determination of Non-Significance is issued under WAC 197-11-340. Because other agencies of jurisdiction may be
involved, the lead agency will not act on this proposal for fourteen (14) days.
Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on July 1, 2021. Due to
Governor Jay Inslee’s Proclamation 20-25 (“Stay Home, Stay Healthy”), the City Clerk’s Office is working remotely. For
that reason, appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov. The appeal fee,
normally due at the time an appeal is submitted, will be collected at a future date. Appeals to the Hearing Examiner are
governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s
DocuSign Envelope ID: F3AF94AC-B4FB-4986-A7DB-8D55B0D43273
6/17/2021 | 2:16 PM PDT
6/17/2021 | 10:54 AM PDT6/17/2021 | 10:45 AM PDT
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Office, cityclerk@rentonwa.gov. If the situation changes such that the City Clerk’s Office is open when you file your
appeal, you have the option of filing the appeal in person.
DATE OF DECISION: June 17, 2021
DocuSign Envelope ID: F3AF94AC-B4FB-4986-A7DB-8D55B0D43273