Loading...
HomeMy WebLinkAboutExh.06_Elevations_Renderings_Building_A1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE REQUESTS, AND HEIGHT DIAGRAMS 2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES 3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES EXTERIOR ELEVATION NOTES: LEVEL 1 EL. 52' - 0" LEVEL 2 EL. 62' - 6" LEVEL 3 EL. 73' - 0" LEVEL 4 EL. 83' - 6" LEVEL 5 EL. 94' - 0" ROOF LEVEL EL. 104' - 6" FC3GV1FC1GV1GV1GV2FC3RA2M2 SHEET DRAWN: SCALE: JOB # : DATE:SUBMITTALS SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT 2018.11.08 2018.11.08 MASTER SITE PLAN APPROVAL As indicated 2018.11.01 18-119 CEDAR RIVER APARTMENTS 1915 MAPLE VALLEY HWY, RENTON, WA 98055 BUILDING ELEVATIONS - BUILDING A - (NORTH) FACADE A3.1 ELEVATION KEY NOTE LEGEND # DESCRIPTION AC2 ARCHITECTURAL CONCRETE - BOARD FORMED COL1 WOOD COLUMN ED1 MULTI-SLIDING DOOR FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE) FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE) FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE) GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED GV1 VINYL WINDOWS (WHITE) GV2 VINYL WINDOWS (BLACK) M1 METAL PANEL (AEP SPAN PRESTIGE PLUS) M2 METAL PANEL (AEP SPAN PRESTIGE PLUS) M3 METAL PANEL (AEP SPAN PRESTIGE PLUS) M5 METAL STANDING SEAM ROOF RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS RA2 STEEL RAILING W/ METAL PANEL RA3 STEEL RAILING W/ GLASS INSETS SCALE:1/16" = 1'-0"A3.1 1 BUILDING A - NORTH ELEVATION KEY PLAN A REVISIONS EXHIBIT 6 RECEIVED 08/13/2020 MHerrera PLANNING DIVISION DocuSign Envelope ID: 99BA427F-FE67-49CC-B142-9BE0760232C1 1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE REQUESTS, AND HEIGHT DIAGRAMS 2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES 3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES EXTERIOR ELEVATION NOTES: LEVEL 1 EL. 52' - 0" LEVEL 2 EL. 62' - 6" LEVEL 3 EL. 73' - 0" LEVEL 4 EL. 83' - 6" LEVEL 5 EL. 94' - 0" ROOF LEVEL EL. 104' - 6" FC3 GV1 COL1 M5 RA2 GV1GV1FC2M1M3 FC1 AC2 SHEET DRAWN: SCALE: JOB # : DATE:SUBMITTALS SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT 2018.11.08 2018.11.08 MASTER SITE PLAN APPROVAL As indicated 2018.11.01 18-119 CEDAR RIVER APARTMENTS 1915 MAPLE VALLEY HWY, RENTON, WA 98055 BUILDING ELEVATIONS - BUILDING A - (EAST) FACADE A3.2 KEY PLAN A ELEVATION KEY NOTE LEGEND # DESCRIPTION AC2 ARCHITECTURAL CONCRETE - BOARD FORMED COL1 WOOD COLUMN ED1 MULTI-SLIDING DOOR FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE) FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE) FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE) GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED GV1 VINYL WINDOWS (WHITE) GV2 VINYL WINDOWS (BLACK) M1 METAL PANEL (AEP SPAN PRESTIGE PLUS) M2 METAL PANEL (AEP SPAN PRESTIGE PLUS) M3 METAL PANEL (AEP SPAN PRESTIGE PLUS) M5 METAL STANDING SEAM ROOF RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS RA2 STEEL RAILING W/ METAL PANEL RA3 STEEL RAILING W/ GLASS INSETS SCALE:1/16" = 1'-0"A3.2 1 BUILDING A - EAST FACADE REVISIONS EXHIBIT 6 RECEIVED 08/13/2020 MHerrera PLANNING DIVISION DocuSign Envelope ID: 99BA427F-FE67-49CC-B142-9BE0760232C1 1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE REQUESTS, AND HEIGHT DIAGRAMS 2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES 3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES EXTERIOR ELEVATION NOTES: LEVEL 1 EL. 52' - 0" LEVEL 2 EL. 62' - 6" LEVEL 3 EL. 73' - 0" LEVEL 4 EL. 83' - 6" LEVEL 5 EL. 94' - 0" ROOF LEVEL EL. 104' - 6" GV1RA1GV1GV1M2FC2 10'-6"10'-6"10'-6"10'-6"10'-6"AC2 RA2 FC3 GV1GV1FC3RA1 M5 COL1 SHEET DRAWN: SCALE: JOB # : DATE:SUBMITTALS SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT 2018.11.08 2018.11.08 MASTER SITE PLAN APPROVAL As indicated 2018.11.01 18-119 CEDAR RIVER APARTMENTS 1915 MAPLE VALLEY HWY, RENTON, WA 98055 BUILDING ELEVATIONS - BUILDING A - (SOUTH) FACADE A3.3 KEY PLAN A ELEVATION KEY NOTE LEGEND # DESCRIPTION AC2 ARCHITECTURAL CONCRETE - BOARD FORMED COL1 WOOD COLUMN ED1 MULTI-SLIDING DOOR FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE) FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE) FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE) GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED GV1 VINYL WINDOWS (WHITE) GV2 VINYL WINDOWS (BLACK) M1 METAL PANEL (AEP SPAN PRESTIGE PLUS) M2 METAL PANEL (AEP SPAN PRESTIGE PLUS) M3 METAL PANEL (AEP SPAN PRESTIGE PLUS) M5 METAL STANDING SEAM ROOF RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS RA2 STEEL RAILING W/ METAL PANEL RA3 STEEL RAILING W/ GLASS INSETS SCALE:1/16" = 1'-0"A3.3 1 BUILDING A - SOUTH ELEVATION REVISIONS EXHIBIT 6 RECEIVED 08/13/2020 MHerrera PLANNING DIVISION DocuSign Envelope ID: 99BA427F-FE67-49CC-B142-9BE0760232C1 1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE REQUESTS, AND HEIGHT DIAGRAMS 2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES 3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES EXTERIOR ELEVATION NOTES: LEVEL 1 EL. 52' - 0" LEVEL 2 EL. 62' - 6" LEVEL 3 EL. 73' - 0" LEVEL 4 EL. 83' - 6" LEVEL 5 EL. 94' - 0" ROOF LEVEL EL. 104' - 6" M1GV1FC2GV1FC3GV1 GS1 M3 M5 RA2 GV2 LEVEL 1 EL. 52' - 0" LEVEL 2 EL. 62' - 6" LEVEL 3 EL. 73' - 0" LEVEL 4 EL. 83' - 6" RA3GS1ED1FC3 SHEET DRAWN: SCALE: JOB # : DATE:SUBMITTALS SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT 2018.11.08 2018.11.08 MASTER SITE PLAN APPROVAL As indicated 2018.11.01 18-119 CEDAR RIVER APARTMENTS 1915 MAPLE VALLEY HWY, RENTON, WA 98055 BUILDING ELEVATIONS - BUILDING A - CENTRAL COURTYARD (EAST & SOUTH) FACADE A3.4 KEY PLAN A ELEVATION KEY NOTE LEGEND # DESCRIPTION AC2 ARCHITECTURAL CONCRETE - BOARD FORMED COL1 WOOD COLUMN ED1 MULTI-SLIDING DOOR FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE) FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE) FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE) GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED GV1 VINYL WINDOWS (WHITE) GV2 VINYL WINDOWS (BLACK) M1 METAL PANEL (AEP SPAN PRESTIGE PLUS) M2 METAL PANEL (AEP SPAN PRESTIGE PLUS) M3 METAL PANEL (AEP SPAN PRESTIGE PLUS) M5 METAL STANDING SEAM ROOF RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS RA2 STEEL RAILING W/ METAL PANEL RA3 STEEL RAILING W/ GLASS INSETS SCALE:1/16" = 1'-0"A3.4 1 BUILDING A - CENTRAL COURTYARD (EAST) FACADE SCALE:1/16" = 1'-0"A3.4 2 BUILDING A - CENTRAL COURTYARD (SOUTH) FACADE REVISIONS EXHIBIT 6 RECEIVED 08/13/2020 MHerrera PLANNING DIVISION DocuSign Envelope ID: 99BA427F-FE67-49CC-B142-9BE0760232C1 1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE REQUESTS, AND HEIGHT DIAGRAMS 2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES 3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES EXTERIOR ELEVATION NOTES: LEVEL 1 EL. 52' - 0" LEVEL 2 EL. 62' - 6" LEVEL 3 EL. 73' - 0" LEVEL 4 EL. 83' - 6" LEVEL 5 EL. 94' - 0" ROOF LEVEL EL. 104' - 6" M3 M1FC2GV1 GV1FC3COL1 FC1 GV1FC3 M5 RA2 AC2 LEVEL 1 EL. 52' - 0" LEVEL 2 EL. 62' - 6" LEVEL 3 EL. 73' - 0" LEVEL 4 EL. 83' - 6" LEVEL 5 EL. 94' - 0" ROOF LEVEL EL. 104' - 6" FC2 GV1M3GV2M1GV2 LEVEL 1 EL. 52' - 0" LEVEL 2 EL. 62' - 6" LEVEL 3 EL. 73' - 0" LEVEL 4 EL. 83' - 6" LEVEL 5 EL. 94' - 0" ROOF LEVEL EL. 104' - 6" M1 GV2 M3 FC2 GV1 FC3GV1 FC1 RA2 M5 SHEET DRAWN: SCALE: JOB # : DATE:SUBMITTALS SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT 2018.11.08 2018.11.08 MASTER SITE PLAN APPROVAL As indicated 2018.11.01 18-119 CEDAR RIVER APARTMENTS 1915 MAPLE VALLEY HWY, RENTON, WA 98055 BUILDING ELEVATIONS - BUILDING A - WEST COURTYARD (WEST, SOUTH, & EAST) FACADE A3.5 KEY PLAN A ELEVATION KEY NOTE LEGEND # DESCRIPTION AC2 ARCHITECTURAL CONCRETE - BOARD FORMED COL1 WOOD COLUMN ED1 MULTI-SLIDING DOOR FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE) FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE) FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE) GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED GV1 VINYL WINDOWS (WHITE) GV2 VINYL WINDOWS (BLACK) M1 METAL PANEL (AEP SPAN PRESTIGE PLUS) M2 METAL PANEL (AEP SPAN PRESTIGE PLUS) M3 METAL PANEL (AEP SPAN PRESTIGE PLUS) M5 METAL STANDING SEAM ROOF RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS RA2 STEEL RAILING W/ METAL PANEL RA3 STEEL RAILING W/ GLASS INSETS SCALE:1/16" = 1'-0"A3.5 1 BUILDING A - WEST COURTYARD (WEST) FACADE SCALE:1/16" = 1'-0"A3.5 2 BUILDING A - WEST COURTYARD (SOUTH) FACADE SCALE:1/16" = 1'-0"A3.5 3 BUILDING A - WEST COURTYARD (EAST) FACADE REVISIONS EXHIBIT 6 RECEIVED 08/13/2020 MHerrera PLANNING DIVISION DocuSign Envelope ID: 99BA427F-FE67-49CC-B142-9BE0760232C1