HomeMy WebLinkAboutCOR_STD_PLAN_H027 (Addendum 4)i.-•=.-vm.,,,^J..,-.a;e-m r'.'.+—!^-^-+rrc-^vn3-x_._.. r ,.fie. ,_.3`-+F.r-,.,..._,.e,-„......
EDGE aFSNmRDDi — OR7URNDUr
AT EDGE OF SHOULDER
A TYISr P1ATE
SEEDErAly
S/EE'rSte 1
LSEE NOIE01
FACEN
I
QaiB
h
IYPE(
WTYPeOF ' SUPPORT
r
F CUPo vNUE.S
vME.
VARIES) SmE
BEHIND CURB
MAILBOX PLACEMENT. SECTIONS
eNeOx S101 1,1A OR] (TYPU
R aLALPS PER B=
n rBra IIIA 4—r w
i us ua ua ' ua ua
u wa wa nra ws
I—a-mitBEIMEENxa90)k6
vMWarorr
BEHIND SIDEWALK
NOTES:
1. An mfu.hble platform may be used In Ocu of Cha platform design shown on
Rtis nlan. Adjustable platforms must fit Ue bracket design drown on gds plan.
required. required. seeeresulted for all single post inslellalfons. Field adtag may be
2. A Type 2 support is requlmd when 2 of more mares em to be Installed on
one support A meKimum of 6 mailboxes may be installed on a Type 2 suppartSeeStd. Spec. 932.7.
3. Attach as crews r box to a steeligsstwhit two 170 Muller Clem stated
lag both m
aFie
7refnlholesinspf box
mai n the Newspaperepamorotlwmust• M& affiM beyond the tramof the
4. rng of mallson mounting holes varies among manufa haves. AttachmentoMemailboxtogreWatlortnmayrequiredMingadddionalholesthroughthe
mallbai to at the platform
S. Comer the maiDox on the plaUpm to ensure apace far Ne msExar door.to
open and to albw spam far Igshging the fostoem.
S. A Socket endSnoring system may be 6ubsgWteci M fieu of me =IL
twist Dlate assemb for single steel posts shown on this plan. The socket and
wedge anchoring system shag meet NCHRP 360 cash teat afteria. Anb-teht
replatesanot mqu tar wood post insfagatans.
EcmmwcoxmucP
SEE DETAIL. aEaaET+7
e _ eiEELPoSi. WpODPoIIi-oq z*^^ .. t ..__ ...,.,,, .. _.._ _
OP110R . OPTKIN I ., , . .. (PItOPpre'GRYDtlIONIIROMIO DODARE
TYPE ISUPPORT r. ., -- • ,,. ,. - TYPE 2SUPPORT
r -
MAILBOX SPACING DETAIL ” -:. $APTED
oeks Inu"rauu nw.r r: .
an'
T`04 j "rf« -n .s`3.:•
NCO r+ r CAST DAT
PIEEA "'.
TON
LANS T
151099!2002, --
20-/-