• Update from the Parks and Trails Division:
o Cedar River Trail will be closed for one day on Tuesday, June 22 for
geotechnical sampling to take place on the trail. Detour will be out to Maple
Valley Highway between Cedar River Park and Riverview Park. For your
safety, please follow directions on all posted signage.
o Boat launch permits are for launching at Gene Coulon Park and can be
purchased online at rentonwa.gov/boatlaunch, or call 425-430-6700 and
press 8. Boat launch parking area is open to tow vehicles with trailers only,
and car toppers. All others may be cited.
o No dogs are allowed at Gene Coulon and Kennydale Beach Parks, and no
bicycles on the pedestrian trail at Coulon Park. All other parks and trails allow
dogs on six-foot leashes or visit the off-leash Cedar River Dog Park at 1500
Houser Way South.
o For updated parks and trails information, see rentonwa.gov/parks or contact
Community Services at 425-430-6600.
• Information about preventative street maintenance, traffic impact projects, and
road closures happening this week can be found at http://rentonwa.gov/traffic. All
projects are weather permitting and unless otherwise noted, streets will always
remain open. Preventative street maintenance, traffic impact projects, and road
closures will be at the following locations:
Monday, June 28 through Thursday, July 1, 7:00 p.m. to 7:00 a.m. After-hours
construction may take place along Airport Way at Logan Avenue South to allow
the contractor to modify an existing traffic signal and intersection illumination
system. Mitigation measures will be implemented, and outreach conducted to
those possibly impacted by the nighttime construction. For more information,
please visit the project webpage at
https://rentonwa.gov/cms/One.aspx?portalId=7922741&pageId=9346818.
Street Maintenance Asphalt Repairs. The following is a list of locations and
dates during which traffic will be impacted while maintenance crews conduct
asphalt repairs. Project work hours are listed for each location.
Randy Corman, Council President
Members of Renton City Council
Page 2 of 2
June 21, 2021
o Wednesday, June 23, 9:00 a.m. to 2:00 p.m. The eastbound curb lane
will be closed along SE Carr Road between Talbot Road South and 103rd
Avenue SE/Mill Avenue South. Traffic through the intersection of SE Carr
Road and Smithers Avenue South will be maintained via a red flashing all-
way stop and police.
o Thursday, June 24, 8:00 a.m. to 12:00 p.m. Traffic flow will be
maintained by flaggers on northbound and southbound Talbot Road
South at South 45th Street.
Ongoing Trail Closure through Summer 2021. Ripley Lane North Trail closure
just north of the VMAC and the trailhead going north in support the WSDOT I-
405 Renton to Bellevue Widening and Express Toll Lanes Project. Questions may
be directed to Justin Johnson at 425-902-7172.
Williams Avenue South and Wells Avenue South Conversion Project. Impacts
to traffic will continue throughout this area between South 2nd Street and South
3rd Street. Please visit the project webpage at https://rentonwa.gov/ww for
more information.
Downtown Utility Improvement Project. The Downtown Utility Improvement
Project requires several roadway closures and detours between now and project
completion in 2022. For more information on current upcoming road closures
and traffic impacts or to sign up for email or text alerts, visit the project website