FIELD REPORT
Date Project Name Project No. Report No.
2021-06-19 Bethany Corner 20160674E002 023
Location Municipality AESI Project Manager AESI Field Rep
16451 111th Ave SE Renton Matthew A. Miller, P.E. Zach Skelton, E.I.T.
Permit No. Client/Owner Attn Requested By
Mark Seek (Tiger Mountain Homes) Mark Seek Contractor
Engineer/Architect General Contractor Paving Contractor Weather
D.R. Strong Tiger Mountain Homes / Mark Becker Blacktop / Joe Sunny, 80’s
THE FOLLOWING WAS NOTED:
Associated Earth Sciences, Inc. (AESI) arrived on site at approximately 10:45 AM to observe paving. While on site, we met
with Mark with Tiger Mountain Homes and Joe, the superintendent on site for Becker Blacktop.
Paving Observations:
Becker Blacktop arrived on site at approximately 12:00 PM. Becker Blacktop informed us they intend to complete paving
SE 165th St in two approximately 2-inch thick lifts of HMA and complete paving along the west side of 111th Ave SE in one
lift of HMA. Becker provided a Rice value of 153.8 pcf. AESI observed paving completed as intended by the paving
contractor. Compaction was achieved with Wacker Neuson RD12 and HAMM HD12 smooth vibratory drum rollers.
Compaction tests were performed on both layers of HMA on SE 165th St and the single layer along the west side of 111th
Ave SE. See Figure 1 for location of paving observed and approximate locations of compaction tests performed by AESI
today. Table 1 displays the results of compaction tests performed today.
Table 1: Compaction Results of Tests Taken Today
Test Location
Wet Density
(pcf)
Rice Value
(pcf), %Compaction Pass/Fail*
1 111th Ave SE, Figure 1 143.0 153.8 93 Pass
2 111th Ave SE, Figure 1 144.6 153.8 94 Pass
3 111th Ave SE, Figure 1 148.0 153.8 96 Pass
4 111th Ave SE, Figure 1 143.8 153.8 94 Pass
5 111th Ave SE, Figure 1 147.0 153.8 96 Pass
6 111th Ave SE, Figure 1 142.1 153.8 92 Pass
7 SE 165th St, Figure 1 147.6 153.8 96 Pass
8 SE 165th St, Figure 1 145.2 153.8 94 Pass
9 SE 165th St, Figure 1 142.3 153.8 93 Pass
10 SE 165th St, Figure 1 140.9 153.8 92 Pass
11 SE 165th St, Figure 1 144.1 153.8 94 Pass
12 SE 165th St, Figure 1 149.3 153.8 97 Pass
13 SE 165th St, Figure 1 146.3 153.8 95 Pass
14 SE 165th St, Figure 1 144.4 153.8 94 Pass
15 Play Area, Figure 1 142.4 153.8 93 Pass
16 Play Area, Figure 1 141.2 153.8 92 Pass
17 SE 165th St, Figure 1 150.9 153.8 98 Pass
18 SE 165th St, Figure 1 147.3 153.8 95.8 Pass
19 SE 165th St, Figure 1 141.6 153.8 92.1 Pass
20 SE 165th St, Figure 1 144.3 153.8 93.8 Pass
21 SE 165th St, Figure 1 145.0 153.8 94.3 Pass
22 SE 165th St, Figure 1 147.8 153.8 96.1 Pass
23 111th Ave SE, Figure 1 142.1 153.8 92.4 Pass
24 111th Ave SE, Figure 1 144.9 153.8 94.2 Pass
Date Project Name Project No. Report No.
2021-06-19 Bethany Corner 20160674E002 023
Page 2 of 3
FIELD REPORT
Figure 1 – Location of paving observed by AESI today shown in red. Approximately locations of compaction tests shown in
yellow.
25 111th Ave SE, Figure 1 141.2 153.8 91.8 Pass
26 111th Ave SE, Figure 1 146.6 153.8 95.3 Pass
27 111th Ave SE, Figure 1 144.4 153.8 93.9 Pass
*Minimum 92% compaction required
1
2
3
4
5
6
7
8
9 10 11
12 13 14
15
16
17 18
20
21
22
23
24
25
26
27
19
Date Project Name Project No. Report No.
2021-06-19 Bethany Corner 20160674E002 023
Page 3 of 3
FIELD REPORT
Figure 2 – Paving observed along the west side of 111th Ave SE (left) and on SE 165th St (right).