Loading...
HomeMy WebLinkAboutD_Leighton_Dock_Repair_210628DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT D_Leighton Dock Repair PLANNING DIVISION CERTIFICATE OF EXEMPTION FROM SHORELINE SUBSTANTIAL DEVELOPMENT EVALUATION FORM & DECISION DATE OF DECISION: June 28, 2021 PROJECT NUMBER: LUA21-000225, SME PROJECT NAME: Leighton Dock Repair PROJECT MANAGER: Jill Ding, Senior Planner APPLICANT/OWNER: Lisa Lavally Leighton 3307 Mountain View Ave N, Renton, WA 98056 CONTACT: Jay Irwin, Irwin land Use Consulting, Inc. PO Box 1715, Bellingham, WA 98227 PROJECT LOCATION: 3307 Mountain View Ave N, Renton, WA 98056 PROJECT DESCRIPTION: The applicant is requesting a Shoreline Exemption for proposed repairs to an existing dock. The project site is located within the Shoreline Residential designation of Lake Washington Reach D and is zoned R-8. The proposed dock repairs include replacement of the dock framing with ACZA treated fir, the stringers would be 4 inches by 8 inches and joist/pile caps would be 6 inches by 8 inches. The wooden decking would be replaced with ThruFlow grated panels to allow for light penetration. The existing wood piles would be sleeved with HDPE tubes. No pile replacement, land disturbance/grading, or expansions of the existing dock are proposed. All work would be completed via a work barge located adjacent to the existing dock. SEC-TWN-R: SE31-24-05 LEGAL DESCRIPTION: POR OF SE 1/4 31-24-05 DAF- COMM AT SE OF SD SEC 31 TH N01-48-16E ALG EAST LN A DIST OF 1675.55 FT TH N 88-11-44 W 362.42 FT TO A CASED MONUMENT IN C/L OF LAKE WASH BLVD TH S 61-20-10 W 152.90 FT TO NXN WITH A LN PLW & DIST 20.00 FT AS MEAS AT R/A FR THE C/L OF BN & SF RAILWAY CO SEATTLE BELT LINE MAIN TRACK AS NOW LOCATED & CONSTRUCTED UPON OVER AND ACROSS SD SEC 31 & THE TPOB OF PARCEL HEREIN DESC - TH N 59-28-15 W A DIST OF 65.84 FT TO NXN WITH SELY LN OF MOUNTAIN VIEW AVENUE TH N 22-57-59 E ALG SD SELY LN FOR A DIST OF 12.23 FT TH N 24-57-59 E ALG SD SELY LN FOR A DIST OF 319.19 FT TH S 59-28-15 E 119.27 FT TO NXN WITH SD PLL LN OF SD RAILWAY CO TH SWLY ALG SD PLL LN OF SD RAILWAY CO BEING THE ARC OF A CRV HAVING A RAD OF 1557.21 FT THRU A C/A OF 09-45-21 & ARC DIST OF 265.15 FT TH CONT ALG SD PLL LN OF SD RAILWAY CO TANGENT TO PRECEDING CRV S 38-04-21 W FOR A DIST OF 65.36 FT TO DocuSign Envelope ID: E61C5D6B-CC36-4B6D-8944-E39F36068FB9 City of Renton Department of Community & Economic Development Certificate of Exemption From Shoreline Substantial Development Leighton Dock Repair LUA21-000225, SME Permit Date: June 28, 2021 Page 2 of 3 D_Leighton Dock Repair POB ACDG TO BDRY SURV UNDER REC NO 9904129002 WATER BODY/REACH: Lake Washington Reach D EXEMPTION JUSTIFICATION/DECISION: An exemption from a Shoreline Management Substantial Development Permit is hereby Approved on the proposed project in accordance with RMC.4.9190C “Exemption from Permit System’ and for the following reasons: Normal maintenance or repair of existing structures or developments, including damage by accident, fire or elements. "Normal maintenance" includes those usual acts to prevent a decline, lapse, or cessation from a lawfully established condition. "Normal repair" means to restore a development to a state comparable to its original condition, including but not limited to its size, shape, configuration, location and external appearance, within a reasonable period after decay or partial destruction, except where repair causes substantial adverse effects to shoreline resource or environment. Replacement of a structure or development may be authorized as repair where such replacement is the common method of repair for the type of structure or development and the replacement structure or development is comparable to the original structure or development including but not limited to its size, shape, configuration, location and external appearance and the replacement does not cause substantial adverse effects to shoreline resources or environment. FINDINGS: The proposed development is: i. Consistent with the policies of the Shoreline Management Act. ii. Not Applicable to the guidelines of the Department of Ecology where no Master Program has been finally approved or adopted by the Department. iii. Consistent with the City of Renton Shoreline Mater Program. Maintenance and Repair of Docks: Existing docks or piers that do not comply with these regulations may be repaired in accordance with the criteria below. i. When the repair and/or replacement of the surface area exceeds thirty percent (30%) of the surface area of the dock/pier, light penetrating materials must be used for all replacement decking. For floating docks, light penetrating materials shall be used where feasible, and as long as the structural integrity of the dock is maintained. Staff Comment: The proposal includes the replacement of the existing wooden decking with ThruFlow grating, which is a light penetrating material. ii. When the repair involves replacement of the surfacing materials only, there is no requirement to bring the dock/pier into conformance with dimensional standards of this Section. Staff Comment: The proposal includes the replacement of surface materials only there are no pilings proposed for replacement. iii. When the repair/replacement involves the replacement of more than fifty percent (50%) of the pilings, or more, the entire structure shall be replaced in compliance with these DocuSign Envelope ID: E61C5D6B-CC36-4B6D-8944-E39F36068FB9 City of Renton Department of Community & Economic Development Certificate of Exemption From Shoreline Substantial Development Leighton Dock Repair LUA21-000225, SME Permit Date: June 28, 2021 Page 3 of 3 D_Leighton Dock Repair regulations. For floating docks, when the repair/replacement involves replacement of more than fifty percent (50%) of the total supporting structure (including floats, pilings, or cross- bars), the entire structure shall be replaced in compliance with these regulations. Staff Comment: No piling replacement is proposed, the pilings would be sleeved with HDPE tubes. iv. When the existing dock/pier is moved or expanded or the shape reconfigured, the entire structure shall be replaced in compliance with these regulations. Staff Comment: No expansion of the existing dock is proposed. The project is exempt from SEPA in accordance with WAC 197-11-800(3): Repair, remodeling and maintenance activities. The following activities shall be categorically exempt: The repair, remodeling, maintenance, or minor alteration of existing private or public structures, facilities or equipment, including utilities, recreation, and transportation facilities involving no material expansions or changes in use beyond that previously existing; except that, where undertaken wholly or in part on lands covered by water, only minor repair or replacement of structures may be exempt (examples include repair or replacement of piling, ramps, floats, or mooring buoys, or minor repair, alteration, or maintenance of docks). SIGNATURE & DATE OF DECISION: _____________________________________ ______________________________ Vanessa Dolbee, Planning Director Date RECONSIDERATION: Within 14 days of the decision date, any party may request that the decision be reopened by the approval body. The approval body may modify his decision if material evidence not readily discoverable prior to the original decision is found or if he finds there was misrepresentation of fact. After review of the reconsideration request, if the approval body finds sufficient evidence to amend the original decision, there will be no further extension of the appeal period. Any person wishing to take further action must file a formal appeal within the 14-day appeal time frame. APPEALS: This administrative land use decision will become final if not appealed in writing to the Hearing Examiner on or before 5:00 PM on July 12, 2021. An appeal of the decision must be filed within the 14-day appeal period (RCW 43.21.C.075(3); WAC 197-11-680). Due to Governor Jay Inslee’s Proclamation 20-25 (“Stay Home, Stay Healthy”), the City Clerk’s Office is working remotely. For that reason, appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. If the situation changes such that the City Clerk’s Office is open when you file your appeal, you have the option of filing the appeal in person. EXPIRATION: Two (2) years from the date of decision (date signed). Attachments: Construction Plans cc: Lisa Leighton / Owner DocuSign Envelope ID: E61C5D6B-CC36-4B6D-8944-E39F36068FB9 6/28/2021 | 7:10 AM PDT 1 OF 2PROJECT DESCRIPTION:PROPERTY OWNER:CONTACT:LAKEWASHINGTONLEGAL DESCRIPTION:LEIGHTONDOCK REPAIR3307 MOUNTAIN VIEW AVE. NRENTON, WA 98056RECEIVED06/16/2021 jdingPLANNING DIVISIONLISA LEIGHTONDocuSign Envelope ID: E61C5D6B-CC36-4B6D-8944-E39F36068FB9 2 OF 2 DOCK LAYOUTDOCK PROFILEPIER END SECTIONPILE SLEEVING DETAILLEIGHTONDOCK REPAIR3307 MOUNTAIN VIEW AVE. NRENTON, WA 98056DocuSign Envelope ID: E61C5D6B-CC36-4B6D-8944-E39F36068FB9