Loading...
HomeMy WebLinkAboutTCS - 2/16/2017 _ Washington State Contractor's Daily Report of WDepartment of Transportation pp Traffic Control - Summary `03853 709.3-TCS 02/16/2017^ Page One Ctr t Number SR Number Date 11 �, Photos /Videos taken today for record? ❑Yes No If Yes, note locations: -7 bL D Z Summary of T-CS Activities LY /V\-A— VLA t vU r Contract r Contract o raffic trot Supe or s Si nature Comments To be Completed by Contractor's Traffic Control Supervisor(TCS) DOT Form 421-040A EF Distribution: White-Contractor;Canary-Project Engineer Revised 412004 SR Number ML"":illi i y .. . � AY : 3L PHIMANFI�� .• tl Amok FA Wean State Contractor's Daily Report of Traffic �I/ Deparpnent of Transportation Control - Traffic Control Log Use separate sheets for each setup. (May be altered to record Class A signs.) Page Contr t Number SR Number Day Dat I -7 Sta AF-Setup Sta B Legend Station — Time Station — Time (List of Signs Used)Work < > � O ' 50+ll A 9 F Cones Piloted > O 4,Ces ❑No ❑ Yes ler Per Approved Plan Plan Title (, Yes ❑No Sta C One Way TrafficFlagger/SpotterSta Start End Hours T Sta (one or more lanes) I Station A - Two W ay Traffic Station B (two or more lanes) Station C Station D Other Traffic Control Labor Na a Start End Hours C ractor Contra or C rvisor's Signature Type of Traffic Control Time Set Up I Time(s)Checked I Time Removed IW To be Completed by Contractor's Traffic Control Supervisor(TCS) 2 3 DOT Form 421-0408 EF Distribution: White-Contractor;Canary-Project Engineer Revised 03/2008 I IIIIIIIIIINIIIIIIIIIIIIiIIiINIiI�IIIIIIIIiIIIIIIII�IIIIIIIINIIIIIIIIIIIIIIIgIIIIIIIIIIIMNIIIIIIII!II' '03853 708-Inspector's Daily Reports 02117/2017' e R E N T O N Inspector's Daily Report AHEAD OF THE CURVE. IDR Sheet 1 of 3 Sheets Project No. Project Name Day Date CITY y OF RENTON-116TH AVENUE SE Friday February17,2017 CM-1193(003) SIDEWALK Prime Contractor Representative/Tide A. KAMINS CONSTRUCTION,INC. Chad Kamins/Owner Subcontractor or AgentYd D/M/W_BE Representative/Title B. AGS x x An la BostwicWfCS C. D. E. A.M. P.M. Weather: Clear Clear Site Conditions: Wet Temperature: Low: 41 x°F High: x°F Contractor's Work Activity Description and Location Cocrete Removal Required Backup Samples Taken Item, Description, and Location of Work Marls 000umentatlon Approved (NOTE:Any"NO'is to be explained in Diary) Merl Source Approved Pay Note Made Item No. Contract Item Description Location YM YM YM YM Traffic Control Was Traffic Control Required Today? Yes EINo Was WZTC according to approved TCP? Yes =No Was TCS on Project Site Today? Fa Yes No Do all Flaggers have current flagging card? �a Yes =No DIARY See Below Photos taken Today?%Yes ]No (Signed) NAME: /-. f Construction Inspector Reviewed By rA Inspector's Daily Report CONSULTING HEr1 a�s0' - (CONTRACTOR'S EQUIPMENT & WORKFORCE) IDR Sheet 2 of 3 Sheets Project No. Project Name Day I Date CITY OF RENTON- 116TH AVENUE SE CM-1193(003) SEDEWALH Friday February 17,2017 Prime Contractor Subcontractor KAMINS CONSTRUCTION,INC. CONTRACTOR' S EQUIPMENT Operating Contractor's ID A-E,seepage 1 Equi UrnUnits p Equipment Description Oper Stdby Down Idle REMARKS No. a 1 E-01 I Cat 924 Loader 5 A 2 E-021 Cat 307 Exc. 8 A 1 E-03 Cat 303 Exc. 8 A 1 E-04 La Mor Sweeper A 1 E-05 F450 U/1' 8 A 1 &06 F650 D/1' 8 E-07 B 1 E-08 F150 P/U 8 E-09 E-10 E-11 1-12 E-13 E-14 E-15 E-16 _ E-17 E-18 E-19 E-20 E-21 CONTRACTOR'S WORKFORCE * rating Contractor's ID(A-E,see page 1) NUMBERIHOURS NUMBER Laborers Pipe Layr Oper Drivers Flaggers Electrician Other Male FMIWO Wipronfles Trainee A 1/8 / U 8 IN / / FOREMAN 4 B C l l l l If ... E (Signed) NME: . ✓ Construction Inspector Inspector's Daily Report Gey t3z Osborac, Itr� coNsuLnNG ENGINEERS (DIARY-continued) IDR Sheet 3 of 3 Sheets Project No. Project Name Day Date CM-1193(003) CITY OF RENTON- 116TH AVENUE SE Friday February 17,2017 SIDEWALK Prime Contractor KAMMS CONSTRUCTION,INC. DIARY-continued 7:30am;Kamins is on site cutting out the driveway approches. 8:00am;AGS is on site preparing T/C.8:30am;AGS has created a clear zone at the south end of the project to allow Kamins to place equipment for removals.9:00am;Chad Kamins is on site to observe the removals;He states that the error is mine and that I should have noted the defect in the curb before the walks were in place.I have stated that I need to inspect the job when finished.Work continues at Sta. 12+82R+/-. 12:30pm;Kamins continues removals at Sta. 13+57. 2:30pm;Kamins has finished removing concrete from the last of the driveways. (Signed)NAME: Construction Inspector