HomeMy WebLinkAboutInspector's Daily Reports - 2/16/2017 lu llll.III1I'I' , 1]111,l 111,l I I 1111 l ll 111 11
i .03853 708-Inspector's Daily Reports 0"75201 i'
RE N T O N Inspector's Daily Report
AHEAD OF THE CURVE
IDR Sheet 1 of 3 Sheets _
Project No. Project Name Day Date
CM-1193(003) CITY OF RENTON- 116TH AVENUE SE Thursday February 16, 2017
SIDEWALK
Prime Contractor Representative/Tide
A. KAMINS CONSTRUCTION,INC. Chad Kamins/Owner
Subcontractor or Agent Apple D/AAMBE Representative/Title
B. AGS x x An la Bostwick/TCS
C.
D.
E.
A.M. P.M.
Weather: Overcast Clear Site Conditions: wet
Temperature: Low: 50 x°F High: s°F
Contractor's Work Activity
Description and Location
Property Restorations
Required Backup Samples Taken
Item, Description, and Location of Work Mat'la Documentation Approved
(NOTE:Any'NO'Is to be explained in Diary) Ill Source Approved
Pay Note Mad_e
Item No. Contract Item Description Location YM YM YM YM
Traffic Control
Was Traffic Control Required Today? rX I Yes FINo Was WZTC according to approved TCP? Yes ]No
Was TCS on Project Site Today? x IYes F--]No Do all Flaggers have current flagging card? Yes =No
DIARY
See Below
Photos taken Today?L x Yes 1-7 NO
(Signed) NAME: Construction Inspector
Reviewed By
4
Inspector's Daily Report
GrywC b,,eLIU- (CONTRACTOR'S EQUIPMENT &WORKFORCE)
CONSULTING E
IDR Sheet 2 of 3 Sheets
Project No. Project Name Day Date
CM-1193(003) CITY OF RENTON- 116TH AVENUE SE
SIDEWALK Thwsday bruary 16.21117
Prime Contractor Subcontractor
KAMINS CONSTRUCTION,INC.
CONTRACTOR' S EQUIPMENT
Operating Contractor's ID(A-E,see page 1)
No.of Equi
Units p Equipment Description Oper Stdby Down Idle REMARKS
No.
rAA1 E-01 Cat 924 Loader
2 E-02 Cat 307 Exc.x2
1 E-03 Cat 303 Exc.
1 E-04 Lay Mor Swee r
1 E-05 F450 U/r
I E-06 F650 D/r
E-07
1 E-08 F150 P/U
E-09
E-10
E-11
E-12
E-13
E-14
E-15
E-16
E-17
E-18
E-19 _
E-20
E-21
CONTRACTOR'S WORKFORCE
Operating Contractor's ID(A-E,see page 1)
NUMBER/HOURS NUMBER
Laborers Pipe Layr Oper ' Drivers Flaggers Electrician Other Mels I Female JApprentim Trainee
FOREMAN
B
C IF
It
If
(Signed) NAME: `� �/f� Construction Inspector
Inspector's Daily Report
Cay �Oabo�, I�
CONSUEnNG ENGINEERS (DIARY-continued)
IDR Sheet 3 of 3 Sheets
Project No. Project Name Day Dale
CM-1193(003) CITY OF RENTON- 116TH AVENUE SE Thursday February 16,2017
SIDEWALK
Prime Contractor
KAMINS CONSTRUCTION,INC.
DIARY -continued
Contractor is not on site today.I have taken potos of the driveway approaches at the south end of the project and have forwarded them to
Tani for a decision on the final elevation of the walk between them.I have also painted out the removal areas and forwarded another
photo of the walks south of the drives that has been placed flush with the curb.
(Signed) wwE: — r Construction Inspector