Loading...
HomeMy WebLinkAboutR-4137016 1 1 W 1� BOEING COMMERCIAL AIRPLANES APRON A -SITE STORMWATER IMPROVEMENTS PROJECT LOCATION LAKE WAS H I N GTO N PLAN E W SCALE 1" = 600' Li 10-33710-469�] HO-20 N. 6TH STREET Z Z 10-16 Z i, Z Z Z W w w w CD wCD z N KY g J 3 J a QQ gw J m 3 N. 5THLREETJ N�4TH REET (� ( 17__�I r - PROJECT LOCATION AIRFIELD NORTH w N 00 N HORIZONTAL & VERTICAL DATUM HORIZONTAL DATUM: NAD 83/91 VERTICAL DATUM: NGVD 29 TO CONVERT TO NAVD 88, ADD 3.556' GALVANIZATION NOTE THERE SHALL BE NO EXPOSED GALVANIZED MATERIALS, COATINGS OR ZINC APPLIED SURFACE TREATMENTS ON ANY EXTERIOR OR UNDERGROUND MATERIALS OR SURFACES. ALL GALVANIZED OR ZINC APPLIED MATERIALS OR COATINGS SHALL BE PERMANENTLY PAINTED OR COATED TO PREVENT EXPOSURE OF THE GALVANIZED/ZINC MATERIALS PRIOR TO INSTALLATION OR COMPLETION OF CONSTRUCTION. VICINITY MAP TO EVERETT MUKILTEO EVERETT ® 26 0 LYNN OD DMOND 0 BOTHELL 2 99 KIR LAND RE MOND 5 Z 0 0 z ocZ 20 901 S ATTLE 3 BE LEVUE 90 Lu 0 BCE g 90 =� B E ON 5 ISSAQUAH S. PAR ❑ DUWAM SH ❑ CNT RENTON 509 RENTON 0 99 DES OIN 16 K SCALE: NONE KENT PROJECT N SITE 5 181 AUBURN TO TA MA AUBURN SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ORIG 737 MAX FLIGHTLINE UTILITIES -APRON A Cl PROJECT RT TWN 04.13.16 - APRON A Cl PROJECT - SITE DCN-06 RT TWN 09.27.16 - CITY OF RENTON PERMIT REVIEW COMMENTS RT TWN 05.23.16 - RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES RT TWN 10.28.16 - APRON A Cl PROJECT - SITE DCN-01 RT TWN 06.13.16 - APRON A SITE STORMWATER IMPROVEMENTS-30% RT TWN 01.17.18 - APRON A Cl PROJECT - SITE DCN-02 RT TWN 07.19.16 - APRON A SITE STORMWATER IMPROVEMENTS-60% TO IFC RT TWN 07.14.20 - APRON A Cl PROJECT - SITE DCN-03 RT TWN 08.05.16 - APRON A SITE STORMWATER REVISIONS PER CITY COMMENTS RT TWN 09.29.20 Q� BOE/NG° LEGAL DESCRIPTION RENTON MUNICIPAL AIRPORT THE BOEING COMPANY LEASE APRON "A" BEGINNING AT A POINT LOCATED ON THE RENTON AIRFIELD RUNWAY CENTERLINE REFERED TO AS STATION 0+00: THENCE CONTINUING ALONG THE RUNWAY CENTERLINE N 4049'43" W A DISTANCE OF 152.35 FEET; THENCE N85010'17" E A DISTANCE OF 350 FEET; THENCE N85012'15" E A DISTANCE OF 81'; THENCE N 4049'43" W ADISTANCE OF 28FEET TO THE TRUE POINT OF BEGINNING; THENCE N 4049'43" W A DISTANCE OF 1,650.27 FEET; THENCE S 85010'17" W A DISTANCE OF 106.00 FEET; THENCE N 4049'43" W A DISTANCE OF 484.96 FEET; THENCE N 85012'04" E A DISTANCE OF 191.93 FEET; THENCE S 13043'27" E A DISTANCE OF 366.39 FEET; THENCE S 20033'42" E A DISTANCE OF 38.16 FEET; THENCE S 35004'46" E A DISTANCE OF 104.61 FEET; THENCE S 21021'04" E A DISTANCE OF 40.71 FEET; THENCE S 13005'42" E A DISTANCE OF 117.52 FEET; THENCE S 8023'00" E A DISTANCE OF 130.97 FEET; THENCE S 12007'24" E A DISTANCE OF 119.46 FEET; THENCE S 16057'28" E A DISTANCE OF 125.85 FEET; THENCE S 15059'27" E A DISTANCE OF 79.76 FEET; THENCE S 17011'14" E A DISTANCE OF 76.87 FEET; THENCE S 25023'28" A DISTANCE OF 38.90 FEET; THENCE S 35055'55" E A DISTANCE OF 78.04 FEET; THENCE S 26025'59" E A DISTANCE OF 39.62 FEET; THENCE S A DISTACE OF 23005'58" E A DISTANCE OF 100.11 FEET; THENCE S 19002'21 " E A DISTANCE OF 44.81 FEET; THENCE S A DISTANCE OF 76.85 FEET; THENCE S 28011'16" E A DISTANCE OF 46.24 FEET; THENCE S 0054'54" E A DISTANCE OF 25.84 FEET; THENCE S 28026'41 " W A DISTANCE OF 27.26 FEET; THENCE S 44011'52" W A DISTANCE OF 83.85 FEET; THENCE S 49001'39" W A DISTANCE OF 69.63 FEET; THENCE N 79022'44" W A DISTANCE OF 63.81 FEET; THENCE S 86045'43" W A DISTANCE OF 32 FEET; THENCE S 83003'24" W A DISTANCE OF 155.74 FEET; THENCE S 85018'30" W A DISTANCE OF 32.78 FEET; THENCE N 4041'30" W A DISTANCE OF 79.71 FEET; THENCE S 85012' 15" W A DISTANCE OF 72.92 FEET; THENCE N 87005'36" W A DISTANCE OF 37.68 FEET; THENCE N 4049'43" W A DISTANCE OF 22.95 FEET; THENCE S 85012' 15" W A DISTANCE OF 19.00 FEET; THENCE S 4049'43" E A DISTANCE OF 28.00 FEET TO THE TRUE POINT OF BEGINNING. PROJECT SUMMARY DESCRIPTION OF WORK: SITE STORMWATER IMPROVEMENTS SITE/CIVIL WORK: SEE CIVIL DRAWINGS BUILDING WORK: N/A PROJECT COST: TBD CONTRACTOR: TBD SITE ADDRESS: 301 PERIMETER ROAD WEST, RENTON, WA. 98055 OWNER: BOEING COMMERCIAL AIRPLANES P.O. BOX 3707, M/S: 1 W-10 SEATTLE, WA. 98124-2207 OWNER CONTACT: KING COUNTY PARCEL NO RENTON ZONING CODE: SEISMIC DESIGN CATEGORY: STRUCTURAL DESIGN CRITERIA: IBC DESIGNATION OF OCCUPANCY NAL WWII MS TO 66-102, (425) 229-4279 SEE LEGAL DESCRIPTION MEDIUM INDUSTRIAL (IM) lmalII,F•'I0121 CONSTRUCTION AND DESIGN SHALL BE IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE (IBC), 2015 EDITION, AND WITH THE LATEST EDITION OF THE APPLICABLE SPECIFICATIONS AND THE REQUIREMENTS NOTED AS FOLLOWS. UNOCCUPIED ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED R. TEMPLADO CHECKED T. NEU ENGINEER T. NEU APPROVED BY DEPT. DATE CHECKED D. MURATA APPROVED PROJECT TEAM CONTRACTOR: BOEING PERMITTING: CONSTRUCTION MANAGER: CIVIL/STRUCTURAL: ELECTRICAL: TO BE DETERMINED BOEING COMMERCIAL AIRPLANES P.O. BOX 3707, M/S: 1 W-10 SEATTLE, WA. 98124-2207 MS TO 66-102, (425) 229-4279 RUSS BATES, (206) 218-9475 DOWL 8410 154TH AVENUE NE, SUITE 120 REDMOND, WA 98052 (425) 869-2670 CASNE ENGINEERING, INC 10604 NE 38TH PL KIRKLAND, WA 98033 (425) 552-1000 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING jchavez 05/05/2021 R-413701 Alt SUBTITLE 09.29.20 COVER SHEET 09.29.20 09.29.20 I TITLE APRON A -SITE STORMWATER IMPROVEMENTS (STALLS A3-A7 09.29.20 SITE 05-YD CIVIL MASTER PERMIT SUBMITTAL DESIGN BY DOWL DATE 09.29.20 BOWL CURRENT REVISION SYMBOL DATE W3441886 - 09.29.20 SHEET SEQUENCE NO. GO GO RENTON, Wq I °wc No. 05-APRON-A-GO N rn N