HomeMy WebLinkAboutR-4137016
1
1
W
1�
BOEING COMMERCIAL AIRPLANES
APRON A -SITE STORMWATER IMPROVEMENTS
PROJECT LOCATION
LAKE WAS H I N GTO N
PLAN E W
SCALE 1" = 600'
Li
10-33710-469�]
HO-20
N. 6TH STREET
Z
Z
10-16
Z
i,
Z
Z
Z
W
w
w
w
CD wCD
z
N
KY
g
J
3
J
a
QQ
gw
J
m
3
N. 5THLREETJ
N�4TH
REET
(� (
17__�I r
- PROJECT
LOCATION
AIRFIELD NORTH
w
N
00
N
HORIZONTAL & VERTICAL DATUM
HORIZONTAL DATUM: NAD 83/91
VERTICAL DATUM: NGVD 29
TO CONVERT TO NAVD 88, ADD 3.556'
GALVANIZATION NOTE
THERE SHALL BE NO EXPOSED GALVANIZED MATERIALS, COATINGS OR ZINC APPLIED SURFACE TREATMENTS ON
ANY EXTERIOR OR UNDERGROUND MATERIALS OR SURFACES. ALL GALVANIZED OR ZINC APPLIED MATERIALS OR
COATINGS SHALL BE PERMANENTLY PAINTED OR COATED TO PREVENT EXPOSURE OF THE GALVANIZED/ZINC
MATERIALS PRIOR TO INSTALLATION OR COMPLETION OF CONSTRUCTION.
VICINITY MAP
TO EVERETT
MUKILTEO
EVERETT
®
26
0
LYNN
OD
DMOND
0
BOTHELL 2
99
KIR LAND RE MOND
5
Z
0
0
z
ocZ
20 901
S
ATTLE
3
BE LEVUE
90
Lu
0 BCE
g
90 =�
B E ON
5
ISSAQUAH
S. PAR
❑
DUWAM SH ❑
CNT RENTON
509
RENTON
0
99
DES
OIN
16
K
SCALE: NONE
KENT PROJECT
N
SITE
5
181
AUBURN
TO TA
MA
AUBURN
SYM
REVISION
BY
APPROVED
DATE
SYM
REVISION
BY
APPROVED
DATE
ORIG
737 MAX FLIGHTLINE UTILITIES -APRON A Cl PROJECT
RT
TWN
04.13.16
-
APRON A Cl PROJECT - SITE DCN-06
RT
TWN
09.27.16
-
CITY OF RENTON PERMIT REVIEW COMMENTS
RT
TWN
05.23.16
-
RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES
RT
TWN
10.28.16
-
APRON A Cl PROJECT - SITE DCN-01
RT
TWN
06.13.16
-
APRON A SITE STORMWATER IMPROVEMENTS-30%
RT
TWN
01.17.18
-
APRON A Cl PROJECT - SITE DCN-02
RT
TWN
07.19.16
-
APRON A SITE STORMWATER IMPROVEMENTS-60% TO IFC
RT
TWN
07.14.20
-
APRON A Cl PROJECT - SITE DCN-03
RT
TWN
08.05.16
-
APRON A SITE STORMWATER REVISIONS PER CITY COMMENTS
RT
TWN
09.29.20
Q� BOE/NG°
LEGAL DESCRIPTION
RENTON MUNICIPAL AIRPORT THE BOEING COMPANY LEASE APRON "A"
BEGINNING AT
A POINT LOCATED ON THE RENTON AIRFIELD RUNWAY CENTERLINE REFERED
TO AS STATION 0+00: THENCE CONTINUING ALONG THE RUNWAY CENTERLINE N 4049'43" W
A DISTANCE OF 152.35 FEET; THENCE N85010'17" E A DISTANCE OF 350 FEET; THENCE
N85012'15" E
A DISTANCE OF 81'; THENCE N 4049'43" W ADISTANCE OF 28FEET TO THE
TRUE POINT OF BEGINNING; THENCE N 4049'43" W A DISTANCE OF 1,650.27 FEET;
THENCE S 85010'17"
W A DISTANCE OF 106.00 FEET; THENCE N 4049'43" W A DISTANCE
OF 484.96 FEET; THENCE N 85012'04" E A DISTANCE OF 191.93 FEET; THENCE S
13043'27" E A DISTANCE OF 366.39 FEET; THENCE S 20033'42" E A DISTANCE OF 38.16
FEET; THENCE
S 35004'46" E A DISTANCE OF 104.61 FEET; THENCE S 21021'04" E A
DISTANCE OF
40.71 FEET; THENCE S 13005'42" E A DISTANCE OF 117.52 FEET; THENCE S
8023'00" E A
DISTANCE OF 130.97 FEET; THENCE S 12007'24" E A DISTANCE OF 119.46
FEET; THENCE
S 16057'28" E A DISTANCE OF 125.85 FEET; THENCE S 15059'27" E A
DISTANCE OF
79.76 FEET; THENCE S 17011'14" E A DISTANCE OF 76.87 FEET; THENCE S
25023'28" A
DISTANCE OF 38.90 FEET; THENCE S 35055'55" E A DISTANCE OF 78.04
FEET; THENCE
S 26025'59" E A DISTANCE OF 39.62 FEET; THENCE S A DISTACE OF
23005'58" E
A DISTANCE OF 100.11 FEET; THENCE S 19002'21 " E A DISTANCE OF 44.81
FEET; THENCE
S A DISTANCE OF 76.85 FEET; THENCE S 28011'16" E A DISTANCE OF 46.24
FEET; THENCE
S 0054'54" E A DISTANCE OF 25.84 FEET; THENCE S 28026'41 " W A
DISTANCE OF
27.26 FEET; THENCE S 44011'52" W A DISTANCE OF 83.85 FEET; THENCE S
49001'39" W
A DISTANCE OF 69.63 FEET; THENCE N 79022'44" W A DISTANCE OF 63.81
FEET; THENCE
S 86045'43" W A DISTANCE OF 32 FEET; THENCE S 83003'24" W A
DISTANCE OF
155.74 FEET; THENCE S 85018'30" W A DISTANCE OF 32.78 FEET; THENCE N
4041'30" W
A DISTANCE OF 79.71 FEET; THENCE S 85012' 15" W A DISTANCE OF 72.92
FEET; THENCE
N 87005'36" W A DISTANCE OF 37.68 FEET; THENCE N 4049'43" W A
DISTANCE OF
22.95 FEET; THENCE S 85012' 15" W A DISTANCE OF 19.00 FEET; THENCE S
4049'43" E A
DISTANCE OF 28.00 FEET TO THE TRUE POINT OF BEGINNING.
PROJECT SUMMARY
DESCRIPTION OF WORK: SITE STORMWATER IMPROVEMENTS
SITE/CIVIL WORK: SEE CIVIL DRAWINGS
BUILDING WORK: N/A
PROJECT COST: TBD
CONTRACTOR: TBD
SITE ADDRESS: 301 PERIMETER ROAD WEST, RENTON, WA. 98055
OWNER: BOEING COMMERCIAL AIRPLANES
P.O. BOX 3707, M/S: 1 W-10
SEATTLE, WA. 98124-2207
OWNER CONTACT:
KING COUNTY PARCEL NO
RENTON ZONING CODE:
SEISMIC DESIGN CATEGORY:
STRUCTURAL DESIGN CRITERIA:
IBC DESIGNATION OF OCCUPANCY
NAL
WWII
MS TO 66-102, (425) 229-4279
SEE LEGAL DESCRIPTION
MEDIUM INDUSTRIAL (IM)
lmalII,F•'I0121
CONSTRUCTION AND DESIGN SHALL BE IN
ACCORDANCE WITH THE INTERNATIONAL BUILDING
CODE (IBC), 2015 EDITION, AND WITH THE LATEST
EDITION OF THE APPLICABLE SPECIFICATIONS AND THE
REQUIREMENTS NOTED AS FOLLOWS.
UNOCCUPIED
ACCEPTABILITY
THIS DESIGN AND/OR
SPECIFICATION IS APPROVED
R. TEMPLADO
CHECKED
T. NEU
ENGINEER
T. NEU
APPROVED BY
DEPT.
DATE
CHECKED
D. MURATA
APPROVED
PROJECT TEAM
CONTRACTOR:
BOEING PERMITTING:
CONSTRUCTION MANAGER:
CIVIL/STRUCTURAL:
ELECTRICAL:
TO BE DETERMINED
BOEING COMMERCIAL AIRPLANES
P.O. BOX 3707, M/S: 1 W-10
SEATTLE, WA. 98124-2207
MS TO 66-102, (425) 229-4279
RUSS BATES, (206) 218-9475
DOWL
8410 154TH AVENUE NE, SUITE 120
REDMOND,
WA 98052
(425) 869-2670
CASNE ENGINEERING, INC
10604 NE
38TH PL
KIRKLAND,
WA 98033
(425) 552-1000
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING
jchavez 05/05/2021
R-413701
Alt SUBTITLE
09.29.20 COVER SHEET
09.29.20
09.29.20 I TITLE APRON A -SITE STORMWATER IMPROVEMENTS (STALLS A3-A7
09.29.20 SITE 05-YD
CIVIL MASTER
PERMIT SUBMITTAL
DESIGN BY DOWL
DATE 09.29.20
BOWL
CURRENT REVISION SYMBOL DATE
W3441886 - 09.29.20
SHEET SEQUENCE NO.
GO GO
RENTON, Wq I °wc No.
05-APRON-A-GO
N
rn
N