HomeMy WebLinkAboutR-413703DRAWING INDEX
DRAWING NUMBER
SHEET
SEQUENCE NUMBER
REV
DRAWING TITLE
00
�
I
w
w
O
O
N
�
w
w
CD co
O
N
�
I
w
w
CD m
O
CD
�
w
>
w
O
N
O
N
O
m
c
z
o
of
o
�
GENERAL
05—APRON—A—GO
GO
GO
A
COVER SHEET
•
•
•
•
•
05—APRON—A—G1
G1
G1
A
KEY SHEET —SITE
•
•
•
•
•
05—APRON—A—G2
G2
G2
A
INDEX —SITE
•
•
•
•
•
CIVIL
05—APRON—A—C2
C2
Cl
—
CIVIL GENERAL NOTES
•
•
•
•
•
05—APRON—A—C3
C3
C2
A
CIVIL NOTES
•
•
1 •
•
•
05—APRON—A—C4
C4
C3
ORIG
CONSTRUCTION PHASING & STAGING PLAN
•
•
•
•
•
05—APRON—A—05
C5
C4
ORIG
CONSTRUCTION PHASING & STAGING PLAN
•
•
•
•
•
05—APRON—A—C6
C6
C5
ORIG
CONSTRUCTION PHASING & STAGING PLAN
•
•
•
•
•
RTN—APRON—A—C81
C81
C6
B
CIVIL SITE & TESC PLAN
•
•
•
•
•
RTN—APRON—A—C82
C82
C7
B
TESC DETAILS
•
•
05—APRON—A—C151
C151
C8
C
GRADING PLAN
•
•
•
•
•
05—APRON—A—C152
C152
C9
ORIG
GRADING PLAN
•
•
•
•
•
05—APRON—A—C153
C153
C10
ORIG
GRADING PLAN
•
•
•
•
•
05—APRON—A—C221 R
C221 R
C
PAVING REMOVAL & TESC PLAN
05—APRON—A—C222R
C222R
A
PAVING REMOVAL & TESC PLAN
05—APRON—A—C223R
C223R
A
PAVING REMOVAL & TESC PLAN
05—APRON—A—C221
C221
C11
A
PAVING PLAN
•
•
•
•
•
05—APRON—A—C222
C222
C12
ORIG
PAVING PLAN
•
•
•
•
•
05—APRON—A—C223
C223
C13
ORIG
PAVING PLAN
•
•
•
•
•
05—APRON—A—C226R
C226R
B
PAVEMENT MARKING REMOVAL PLAN
05—APRON—A—C227R
C227R
ORIG
PAVEMENT MARKING REMOVAL PLAN
05—APRON—A—C229R
C229R
ORIG
PAVEMENT MARKING REMOVAL PLAN
05—APRON—A—C226
C226
C14
C
PAVEMENT MARKING PLAN
•
•
•
•
•
05—APRON—A—C227
C227
C15
ORIG
PAVEMENT MARKING PLAN
•
•
•
•
•
05—APRON—A—C229
C229
C16
ORIG
PAVEMENT MARKING PLAN
•
•
•
•
•
05—APRON—A—C296R
C296R
—
STORM DRAINAGE REMOVAL PLAN
05—APRON—A—C302R
C302R
ORIG
STORM DRAINAGE REMOVAL PLAN
05—APRON—A—C303R
C303R
ORIG
STORM DRAINAGE REMOVAL PLAN
05—APRON—A—C296
C296
C17
A
STORM DRAINAGE PLAN
•
•
•
•
•
05—APRON—A—C302
C302
C18
ORIG
STORM DRAINAGE PLAN
•
•
•
•
•
05—APRON—A—C303
C303
C19
ORIG
STORM DRAINAGE PLAN
•
•
•
•
•
05—APRON—A—C304
C304
C20
ORIG
STORM DRAINAGE PROFILES
•
•
•
•
•
05—APRON—A—C305
C305
C21
ORIG
STORM DRAINAGE PROFILES
•
•
•
•
•
05—APRON—A—C306
C306
C22
ORIG
STORM DRAINAGE PROFILES
•
•
•
05—APRON—A—C450
C450
C23
—
ENLARGED STORM DRAIN PLAN
•
•
•
•
05—APRON—A—C47OR
C470R
—
FENCING PLAN REMOVAL
05—APRON—A—C471 R
C471 R
FENCING PLAN REMOVAL
05—APRON—A—C472R
C472R
FENCING PLAN REMOVAL
05—APRON—A—C470
C470
C24
—
FENCING PLAN
•
•
•
•
•
05—APRON—A—C471
C471
C25
ORIG
FENCING PLAN
•
•
•
•
•
05—APRON—A—C472
C472
C26
ORIG
FENCING PLAN
•
•
•
•
•
05—APRON—A—0502
C502
C27
—
CIVIL DETAILS
•
•
•
•
•
05—APRON—A—0503
C503
C28
—
PAVEMENT MARKING DETAILS
•
•
•
•
•
05—APRON—A—0504
C504
C29
—
FENCING AND GATE DETAILS
•
•
•
•
•
05—APRON—A—0507
C507
C30
—
STORM DRAINAGE DETAILS
•
•
•
•
•
05—APRON—A—0508
C508
C31
—
STORM DRAINAGE DETAILS
•
•
•
•
•
05—APRON—A—0509
C509
C32
—
STORM DRAINAGE DETAILS
•
•
•
•
•
05—APRON—A—0510
C510
C33
—
STORM DRAINAGE DETAILS
•
•
•
•
•
05—APRON—A—0511
C511
C34
—
STORM DRAINAGE DETAILS
•
•
•
•
•
05—APRON—A—0512
C512
C35
—
STORM DRAINAGE DETAILS
•
•
•
05—APRON—A—0513
C513
C36
—
FUEL CONTAINMENT VAULT DETAILS
•
•
•
•
•
05—APRON—A—0514
C514
C37
—
FUEL SPILL DIAGRAM
•
•
•
•
•
GALVANIZATION NOTE
THERE SHALL BE NO EXPOSED GALVANIZED MATERIALS, COATINGS OR ZINC APPLIED
SURFACE TREATMENTS ON ANY EXTERIOR OR UNDERGROUND MATERIALS OR
SURFACES. ALL GALVANIZED OR ZINC APPLIED MATERIALS OR COATINGS SHALL BE
PERMANENTLY PAINTED OR COATED TO PREVENT EXPOSURE OF THE GALVANIZED/ZINC
MATERIALS PRIOR TO INSTALLATION OR COMPLETION OF CONSTRUCTION.
SYM
REVISION
BY
APPROVED
DATE
SYM
REVISION
BY
APPROVED
DATE
ORIG
737 MAX FLIGHTLINE UTILITIES -APRON A CI PROJECT
RT
M119
04.13.16
-
APRON A CI PROJECT - SITE DCN-06
RT
ma
09.27.16
-
CITY OF RENTON PERMIT REVIEW COMMENTS
RT
MIN
05.23.16
-
RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES
RT
m
10.28.16
-
APRON A CI PROJECT - SITE DCN-01
RT
M913
06.13.16
-
APRON A SITE STORMWATER IMPROVEMENTS-30%
RT
1fi1 m
01.17.18
-
APRON A CI PROJECT - SITE DCN-02
RT
M913
07.19.16
-
APRON A SITE STORMWATER IMPROVEMENTS-60% TO IFC
RT
1fA m
07.14.20
-
APRON A CI PROJECT - SITE DCN-03
RT
M913
08.05.16
-
APRON A SITE STORMWATER REVISIONS PER CITY COMMENTS
RT
IMM
09.29.20
DRAWING INDEX
DRAWINGNUMBER
U
SHEET
S
SEQUENCE
NUMBER
REV
DRAWINGTITLE
00
w
O
O
N
r�
w
w
�
O
O
O
N
4
N
Lw
w
w
O
O
O
r
w
>
w
U
O
N
O
N
CDI�
m
�
w
CL
z
Q
�
C:)w
C:)Of
w
o
W
STRUCTURAL
05—APRON—A—S286
S281
A
BLAST FENCE FOUNDATION DETAILS
•
05—APRON—A—S285
S285
S1
A
STRUCTURAL GENERAL NOTES
05—APRON—A—S286
S286
S2
A
48 INCH — MH REINFORCED CONCRETE COVER
05—APRON—A—S287
S287
S3
A
60 INCH — MH REINFORCED CONCRETE COVER
05—APRON—A—S288
S288
S4
A
TYPE 1 CB — REINFORCED COVER DETAILS
•
•
•
05—APRON—A—S289
S289
S5
A
REINFORCEMENT DETAILS—MH & VAULT MAT FOUNDATION
05—APRON—A—S290
S290
S6
A
ENLARGED SHORING PLAN
05—APRON—A—S291
S291
S7
A
SHORING EARTH PRESSURE DIAGRAM
•
ELECTRICAL
05—APRON—A—E536R
E536R
ORIG
ENLARGED PLAN DETAIL OIL WATER SEPARATOR OWS037
05—APRON—A—A2301 R
A2301 R
A
MAIN CONTROL PANEL LAYOUT
05—APRON—A—A2401 R
A2401 R
A
MAIN CONTROL PANEL BILL OF MATERIALS
•
05—APRON—A—A4101 R
A4101 R
A
MAIN CONTROL PANEL POWER DISTRIBUTION AND RACK SCHEDULE
05—APRON—A—A4201 R
A4201 R
A
MAIN CONTROL PANEL HARDWIRED CONTROLS
05—APRON—A—A4301 R
A4301 R
A
MAIN CONTROL PANEL DISCRETE INPUTS
•
05—APRON —A—A4302R
A4302R
A
MAIN CONTROL PANEL DISCRETE INPUTS
05—APRON—A—A4401 R
A4401 R
A
MAIN CONTROL PANEL DISCRETE OUTPUTS
05—APRON —A—A4402R
A4402R
A
MAIN CONTROL PANEL DISCRETE OUTPUTS
05—APRON—A—A5101 R
A5101 R
A
MAIN CONTROL PANEL INTERCONNECT DIAGRAM
05—APRON—A—E61
E61
E1
ORIG
208/120V POWER & GROUNDING PLAN
05—APRON—A—E62
E62
E2
ORIG
208/120V POWER & GROUNDING PLAN
05—APRON—A—E63
E63
E3
ORIG
208/120V POWER & GROUNDING PLAN
05—APRON—A—El11
E111
E4
ORIG
480V POWER PLAN
05—APRON—A—El12
E112
E5
ORIG
480V POWER PLAN
05—APRON—A—El13
E113
E6
ORIG
480V POWER PLAN
05—APRON—A—El61
E161
E7
ORIG
400HZ POWER PLAN
05—APRON—A—E162
E162
E8
ORIG
400HZ POWER PLAN
05—APRON—A—E163
E163
E9
ORIG
400HZ POWER PLAN
05—APRON—A—E211
E211
El
ORIG
EMCS & CONTROLS PLAN
05—APRON—A—E212
E212
E11
ORIG
EMCS & CONTROLS PLAN
05—APRON—A—E213
E213
E12
ORIG
208/120V POWER & GROUNDING PLAN
05—APRON—A—E536
E536
E13
ORIG
ENLARGED PLAN DETAIL OIL WATER SEPARATOR OWS072
05—APRON—A—E537-1
E537-1
E14
ORIG
OIL WATER SEPARATOR — OWS-072 CONTROL PANEL ELEVATION/DETAIL
05—APRON—A—E537-2
E537-2
E15
ORIG
OIL WATER SEPARATOR — OWS-072 BILL OF MATERIALS
05—APRON—A—E537-3
E537-3
E16
ORIG
OIL WATER SEPARATOR — OWS-072 PLC LAYOUT/NETWORK DIAGRAM
05—APRON—A—E537-4
E537-4
E17
ORIG
OIL WATER SEPARATOR — OWS-072 POWER DISTRIBUTION
05—APRON—A—E537-5
E537-5
E18
ORIG
OIL WATER SEPARATOR — OWS-072 POWER DISTRIBUTION
•
•
05—APRON—A—E537-6
E537-6
E19
ORIG
OIL WATER SEPARATOR — OWS-072 1/0 WIRING
05—APRON—A—E537-7
E537-7
E20
ORIG
OIL WATER SEPARATOR — OWS-072 1/0 WIRING
05—APRON—A—E537-8
E537-8
E21
ORIG
OIL WATER SEPARATOR — OWS-072 1/0 WIRING
05—APRON—A—E537-9
E537-9
E22
ORIG
OIL WATER SEPARATOR — OWS-072 1/0 WIRING
05—APRON —A—A2301
A2301
A
MAIN CONTROL PANEL LAYOUT
05—APRON —A—A2401
A2401
A
MAIN CONTROL PANEL BILL OF MATERIALS
05—APRON—A—A4101
A4101
A
MAIN CONTROL PANEL POWER DISTRIBUTION AND RACK SCHEDULE
•
05—APRON —A—A4201
A4201
A
MAIN CONTROL HARDWIRED CONTROLS
•
05—APRON —A—A4301
A4301
A
MAIN CONTROL PANEL DISCRETE INPUTS
05—APRON —A—A4302
A4302
A
MAIN CONTROL PANEL DISCRETE INPUTS
05—APRON —A—A4401
A4401
A
MAIN CONTROL PANEL DISCRETE OUTPUTS
•
05—APRON —A—A4402
A4402
A
MAIN CONTROL PANEL DISCRETE OUTPUTS
05—APRON—A—A5101
A5101
A
MAIN CONTROL PANEL INTERCONNECT DIAGRAM
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
Q� BOE/A/Gm
C'-
NAL
...
LEGEND
• DOT INDICATES DRAWING IS
INCLUDED IN SUBMITTAL
NO DOT INDICATES DRAWING
IS NOT INCLUDED IN
SUBMITTAL
�G
°y
ACCEPTABILITY
THIS DESIGN AND/OR
SPECIFICATION IS APPROVED
R. TEMPLADO
CHECKED
T. NEU
ENGINEER
T. NEU
APPROVED BY
DEPT.
I DATE
CHECKED
D. MURATA
AD
APPROVED
NOT FOR CONSTRUCTION
FOR REFERENCE ONLY
DRAWING REVISION - SEE SPECIFIC
DRAWING FOR NATURE OF REVISION
LSUBTITLE
9.20 INDEX -SITE
09.29.20
PERMIT SUBMITTAL
DESIGN BY DOWL
R-413703
09.29.20 I TITLE APRON A —SITE STORMWATER IMPROVEMENTS (STALLS A3—A7
09.29.20 SITE 05-YD
CIVIL MASTER
RENTON, Wq I DWG No.
40'6DOWL
IITb'2E:itoll] 61
G2
DATE 09.29.20
05—APRON—A—G2
[Ik•►�'�I11
G2