HomeMy WebLinkAboutR-413704GENERAL NOTES:
BOEING EROSION CONTROL NOTES:
POLLUTION PREVENTION NOTES:
O
r
W
1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND
SPECIFICATIONS OF THE CITY OF RENTON UTILITY DEPARTMENT AND THE LATEST
EDITION OF THE WSDOT/APWA STANDARDS AND SPECIFICATIONS. A SET OF
APPROVED PLANS SHALL BE KEPT ON SITE AT ALL TIMES DURING CONSTRUCTION.
2. ALL WORK THAT MAY IMPACT UTILITIES, INCLUDING BUT NOT LIMITED TO
SAWCUTTING, DEMOLITION, POTHOLING, AND TRENCHING, SHALL BE SUBJECT TO
THE BOEING SHUTDOWN COMMITTEE PROCESS PRIOR TO ANY SITEWORK. CONTACT
CONSTRUCTION MANAGER, RUSS BATES, 206-218-9475,
RUSSELL.H.BATES@BOEING.COM FOR SPECIFIC REQUIREMENTS. THE BOEING CM WILL
COORDINATE THE HOURS OF WORK IN THE STREET RIGHT-OF-WAY OR AIRPORT
TAXIWAYS WITH RENTON AIRPORT MANAGER AND DEPARTMENT OF PUBLIC WORKS.
ALL STREETS CLOSURES, PARTIAL OR FULL, SHALL BE APPROVED BY THE BOEING
CM OR SHUTDOWN COMMITTEE, RENTON AIRPORT MANAGER, AND DEPARTMENT OF
PUBLIC WORKS A MINIMUM OF 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT,
BOEING AND RENTON FIRE DEPARTMENTS, AND 911 SHALL BE NOTIFIED 24 HOURS
IN ADVANCE.
3. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE
THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION
SO AS TO AVOID DAMAGE OR DISTURBANCE. CONTRACTOR SHALL PROVIDE ALL
FIELD UTILITY LOCATION SERVICES AND VERIFY ALL UTILITY LOCATIONS WITH THE
PROPER BOEING FACILITIES PERSONNEL PRIOR TO THE START OF EXCAVATION
WORK. FOR WORK LOCATED ON THE CITY OF RENTON PROPERTY, THE
CONTRACTOR SHALL CONTACT UTILITY LOCATE AT 1-800-424-5555.
4. A PRECONSTRUCTION CONFERENCE IS REQUIRED PRIOR TO ANY CONSTRUCTION. A
MINIMUM OF 3 (THREE) WORKING DAYS NOTICE IS REQUIRED FOR SCHEDULING.
PRIOR TO SCHEDULING THE PRECON, A PERMIT INFORMATION SHEET MUST BE
SUPPLIED TO THE UTILITY ENGINEER'S OFFICE. 24 HOUR NOTICE WILL BE
REQUIRED PRIOR TO STARTING NEW CONSTRUCTION.
5. THE CONTRACTOR SHALL COORDINATE WITH BOEING TO VERIFY THAT ALL
APPLICABLE LOCAL, STATE AND FEDERAL PERMITS HAVE BEEN OBTAINED PRIOR TO
CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY AND ALL
PERMITS UNLESS OTHERWISE DIRECTED BY BOEING.
6. THE CONTRACTOR SHALL PREPARE AND HAVE APPROVED ALL REQUIRED TRAFFIC
CONTROL PLANS PRIOR TO IMPLEMENTING ANY TRAFFIC CONTROL. THE
CONTRACTOR SHALL COORDINATE WITH BOEING REPRESENTATIVE FOR ALL TRAFFIC
CONTROL REQUIREMENTS WITHIN BOEING PROPERTY, TRAFFIC CONTROL REQUIRED
ON AIRPORT PROPERTY OR WITHIN CITY RIGHT OF WAY SHALL BE SUBMITTED AND
APPROVED BY THE AIRPORT AND CITY OF RENTON PRIOR TO IMPLEMENTATION.
7. CONTRACTOR IS TO HAVE UTILITY LOCATOR SERVICE LOCATE UTILITIES AND SHOW
THEM ON CONSTRUCTION DRAWINGS FOR REVIEW AND APPROVAL BY RENTON
FACILITIES SHUTDOWN COMMITTEE PRIOR TO SAWCUTTING AND EXCAVATION.
8. ALL UNDERGROUND PIPING SHALL BE IDENTIFIED BY THE USE OF SURFACE
LOCATED MARKERS. MARKERS SHALL BE LOCATED AT MAXIMUM INTERVALS OF 150
FT, AT ALL CHANGES OF DIRECTION, WITHIN 5 FT OF A WALL, AT ALL MANHOLES
AND VALVE BOXES, AND ADJACENT TO ROADS. MARKERS SHOULD INDICATE
SERVICE, PIPE SIZE, DIRECTION OF FLOW, PIPE MATERIAL AND PIPE DEPTH.
MARKER INSTALLATION LOCATIONS SHALL BE INDICATED ON THE CONTRACTOR
PROVIDED AS -BUILT INFORMATION IN THE FORM OF RED -MARKED DRAWINGS.
9. ONE EXISTING MONITORING WELL HAS BEEN IDENTIFIED WITHIN THE PROJECT
LIMITS. THE EXISTING MONITORING WELL SHALL BE DECOMMISSIONED IN
ACCORDANCE WITH WAC 173-160-460. DECOMMISSIONING SHALL BE PERFORMED
BY A LICENSED DRILLING CONTRACTOR. A COPY OF THE DECOMMISSIONING PAPER
WORK SHALL BE PROVIDED TO THE BOEING CONSTRUCTION MANAGER.
10. SURVEY DATUM POINTS SHOWN IN THE CONSTRUCTION DOCUMENTS SHALL BE
USED AS THE BASIS OF ALL CONSTRUCTION STAKING AND GRADE CONTROL. ALL
CONSTRUCTION STAKING AND SURVEY SHALL CLEARLY REFERENCE THE DATUM
POINT TO BE USED. THE CONTRACTOR SHALL PROVIDE CONSTRUCTION STAKING
PLANS TO THE BOEING CONSTRUCTION MANAGER FOR ALL PROPOSED VAULTS,
MANHOLES, AND CATCH BASINS FOR REVIEW AND APPROVAL A MINIMUM OF 3
DAYS BEFORE SCHEDULED CONSTRUCTION OR INSTALLATION.
11. THE CONTRACTOR SHALL INCLUDE THE FOLLOWING AS -BUILT INFORMATION WITH
THE RED LINED CONSTRUCTION DOCUMENTS PROVIDED TO BOEING AT THE
COMPLETION OF CONSTRUCTION. AS -BUILT DRAWINGS SHALL INCLUDE TOP AND
BOTTOM OF VAULT, UTILITY LINES, SUB -GRADE AND FINISHED GRADE ELEVATIONS.
12. THE CONTRACTOR SHALL PROVIDE AND ADD ALTERNATIVE BID TO PROVIDE
DEWATERING IN PLACE OF THE INSTALLATION OF COFFER DAM SHORING SHOWN IN
CONTRACT DOCUMENTS. DEWATERING COSTS ASSOCIATED WITH THE CONTRACT
DOCUMENTS SHALL BE INCLUDED IN THE BASE BID.
GALVANIZATION NOTE
THERE SHALL BE NO EXPOSED GALVANIZED MATERIALS, COATINGS OR ZINC APPLIED SURFACE TREATMENTS ON
ANY EXTERIOR OR UNDERGROUND MATERIALS OR SURFACES. ALL GALVANIZED OR ZINC APPLIED MATERIALS OR
COATINGS SHALL BE PERMANENTLY PAINTED OR COATED TO PREVENT EXPOSURE OF THE GALVANIZED/ZINC
MATERIALS PRIOR TO INSTALLATION OR COMPLETION OF CONSTRUCTION.
1. EROSION CONTROL MEASURES SHOWN ON THE PLANS ARE CONSIDERED AN ABSOLUTE
MINIMUM, AND CONTRACTOR SHALL BE REQUIRED TO PROVIDE ADDITIONAL EROSION
CONTROL MEASURES AS NEEDED. IN ADDITION TO MEASURES SHOWN, CONTRACTOR
SHALL COVER DIRT PILES AND MAY REQUIRE BAKER TANK(S) FOR GROUND WATER.
2. ON -SITE EROSION MEASURES AND STORM WATER POLLUTION PREVENTION SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR. ANY PROBLEMS OCCURRING BEFORE FINAL
ACCEPTANCE OF THE STORM SEWER BY THE OWNER SHALL BE CORRECTED BY THE
CONTRACTOR.
3. ALL EROSION AND SEDIMENTATION CONTROL DEVICES SHOWN ON THESE DRAWINGS
SHALL BE INSTALLED PRIOR TO OR AS THE FIRST STAGE OF SITE PREPARATION.
4. SHOULD THE TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES AS SHOWN
IN THE DRAWINGS OR SPECIFIED IN THE NOTES NOT PROVE ADEQUATE TO CONTROL
EROSION AND SEDIMENTATION, THE CONTRACTOR SHALL INSTALL SILT FENCE OR
ADDITIONAL FACILITIES AS NECESSARY TO PROTECT ADJACENT PROPERTIES, SENSITIVE
AREAS, NATURAL WATER COURSES AND/OR STORM DRAINAGE SYSTEMS.
5. ALL NECESSARY FACILITIES SHALL BE MAINTAINED ON -SITE TO PREVENT DEBRIS, DUST
AND MUD FROM ACCUMULATING ON THE PUBLIC RIGHT-OF-WAY AND BOEING PROPERTY.
6. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF THE SITE'S
CONSTRUCTION STORMWATER GENERAL PERMIT OR FOR CONSTRUCTION PROJECTS LESS
THAN AN ACRE THE SITE'S INDUSTRIAL STORMWATER GENERAL PERMIT.
7. THE CONTRACTOR SHALL COORDINATE WITH BOEING EHS ON WHO WILL OBTAIN ANY
REQUIRED STORMWATER SAMPLES.
8. THE CONTRACTOR SHALL COMPLETE AN EROSION CONTROL CHECKLIST, CAREFULLY
REVIEW IT, AND MAINTAIN ALL STORMWATER POLLUTION PREVENTION MEASURES DAILY.
9. CONTRACTOR SHALL PROVIDE A CERTIFIED EROSION AND SEDIMENT CONTROL LEAD
(CESCL) TO MANAGE IMPLEMENTATION OF STORMWATER CONSTRUCTION PERMIT (IF
APPLICABLE), INCLUDING INSPECTIONS, SAMPLING (COORDINATED WITH BOEING) AND BMP
MANAGEMENT.
1. PREVENT OIL AND FUELS FROM ENTERING THE STORM DRAINAGE SYSTEM WITH PROPER CONTAINMENT
DEVICES.
2. SWEEP DIRT FROM PAVING DAILY OR AS NEEDED. THE INTENT IS TO PREVENT DIRT AND DEBRIS FROM
VEHICLES AND EQUIPMENT FROM BEING DEPOSITED ON BOEING OWNED STREET AND CITY STREET PAVEMENT.
3. THE CONTRACTOR SHALL PREVENT ALL MATERIAL USED OR GENERATED ON -SITE FROM ENTERING THE STORM
DRAINAGE SYSTEM. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ADEQUATE CONTAINMENT/SEPARATION
AT ALL TIMES. ALL STORMWATER POLLUTION PREVENTION MEASURES SHALL BE COORDINATED WITH
ENVIRONMENTAL ENGINEERING TO ENSURE COMPLIANCE WITH APPLICABLE STORMWATER PERMITS.
4. THE CONTRACTOR SHALL CONDUCT DAILY STORMWATER/ENVIRONMENTAL INSPECTION OF THE CONSTRUCTION
SITE. SCOPE OF THE INSPECTION WILL BE COORDINATED WITH SITE ENVIRONMENTAL ENGINEERING.
CONSTRUCTION DEWATERING.-
-
1. THE CONTRACTOR SHALL PREPARE AND SUBMIT A DEWATERING PLAN TO BOEING PRIOR TO
COMMENCING CONSTRUCTION ACTIVITIES. BOEING WILL SUBMIT TO CITY OF RENTON AS REQUIRED.
WORK SHALL NOT COMMENCE UNTIL THE PLAN IS APPROVED BY THE CITY.
2. SHOULD DEWATERING OF EXCAVATION BECOME NECESSARY, CONTRACTOR SHALL PROVIDE DEWATERING
PLAN, LABOR AND EQUIPMENT. COORDINATE DEWATERING WITH OWNER AND THEIR GEOTECHNICAL
ENGINEER. BOEING SHALL TEST GROUNDWATER FOR CONTAMINANTS AND PROVIDE DIRECTION FOR
DEWATERING.
3. GROUNDWATER/STORMWATER WATER SHALL BE DISCHARGED TO THE SANITARY SEWER UNDER BOEING
WASTE DISCHARGE PERMIT 7630 IF APPROVED BY BOEING ENVIRONMENTAL ENGINEERING. INITIAL AND
DAILY SAMPLING WILL BE REQUIRED. DISCHARGES DIRECTLY INTO THE MUNICIPAL SEWER SYSTEM
REQUIRE ADDITIONAL PERMITTING THROUGH THE CITY OF RENTON.
4. THE CONTRACTOR
SHALL PROVIDE
A DEWATERING SYSTEM CAPABLE OF PROCESSING 15,000 GALLONS
PER DAY
AS THE
BASIS OF THEIR
BIO. HIGHER DEWATERING RATES MAY BE REQUIRED THE SYSTEM
PROVIDED
SHALL
BE SCALABLE TO
ACCOMMODATE HIGHER VOLUMES. IF HIGHER VOLUMES ARE
REQUIRED
DURING
CONSTRUCTION,
THE CONTRACTOR SHALL COORDINATE WITH BOEING CONSTRUCTION
MANAGER
PRIOR TO INCREASING DISCHARGE
VOLUMES.
10. CONTRACTOR SHALL BE REQUIRED TO PREPARE FOREIGN OBJECT DEBRIS (FOD) PLAN. 5. BOEING HAS PERFORMED GROUND WATERING SAMPLING AND TESTING BASED ON CURRENT TEST
RESULTS. NO TREATMENT BEYOND TURBIDITY IS REQUIRED. ALL OTHER CHEMICAL 8c METAL LEVELS
11. CONTRACTOR TO COORDINATE WITH BOEING FOR DISPOSITION OF EXCAVATED DIRT. TESTED FOR ARE BELOW TREATMENT LEVELS.
12. CONTRACTOR SHALL COORDINATE DEWATERING WITH BOEING ENVIRONMENTAL.
STOCKPILE NOTES.--
1. STOCKPILES SHALL BE STABILIZED (WITH PLASTIC COVERING OR OTHER
APPROVED DEVICE) DAILY BETWEEN NOVEMBER 1 AND MARCH 31.
CB PROTECTION NOTES:
1. CATCH BASIN INSERTS SHALL BE PROVIDED IN THE CATCH BASINS TRIBUTARY TO AREA
WHERE CONTRACTOR'S CONSTRUCTION ACTIVITIES OCCUR.
2. CATCH BASIN INSERTS SHALL BE REMOVED FOLLOWING COMPLETION OF CONSTRUCTION
AND STABILIZATION OF ALL CLEARED AREAS.
SYM
REVISION
BY
APPROVED
DATE
SYM
REVISION
BY
APPROVED
DATE
ORIG
737 MAX FLIGHTLINE UTILITIES -APRON A Cl PROJECT
RT
TWN
04.13.16
-
APRON A Cl PROJECT - SITE DCN-06
RT
TWN
09.27.16
-
CITY OF RENTON PERMIT REVIEW COMMENTS
RT
TWN
05.23.16
-
RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES
RT
TWN
10.28.16
-
APRON A Cl PROJECT - SITE DCN-01
RT
TWN
06.13.16
-
APRON A SITE STORMWATER IMPROVEMENTS-30%
RT
TWN
01.17.18
-
APRON A Cl PROJECT - SITE DCN-02
RT
TWN
07.19.16
-
APRON A SITE STORMWATER IMPROVEMENTS-60% TO IFC
RT
TWN
07.14.20
-
APRON A Cl PROJECT - SITE DCN-03
RT
TWN
08.05.16
-
APRON A SITE STORMWATER REVISIONS PER CITY COMMENTS
RT
TWN
09.29.20
Q� BOE/NG°
ri-
6. THE CONTRACTOR SHALL TAKE ALL APPROPRIATE MEASURES TO LIMIT DEWATERING REQUIRED. NO
ADDITIONAL COMPENSATION WILL BE PROVIDED FOR DEWATERING BEYOND WHAT IS SPECIFIED IN THESE
DOCUMENTS.
7. THE CONTRACTOR MAY PROVIDE A CONSTRUCTION PLAN AND SEQUENCE THAT DIFFERS FROM THE
DEWATERING REQUIREMENTS INCLUDED IN THESE DOCUMENTS AFTER SELECTION TO BE EVALUATED BY
THE BOEING CONSTRUCTION MANAGER.
8. THESE SYSTEMS WILL BE THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN AND OPERATE.
NAL
m
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING `
jchavez 05/05/2021
ACCEPTABILITY
THIS DESIGN AND/OR
SPECIFICATION IS APPROVED
R. TEMPLADO
CHECKED
T. NEU
ENGINEER
T. NEU
APPROVED BY
DEPT.
DATE
CHECKED
D. MURATA
APPROVED
ATE SUBTITLE
09.29.20
09.29.20
TITLE
09.29.20
09.29.20
PERMIT SUBMITTAL
DESIGN BY DOWL
R-413704
CIVIL GENERAL NOTES
APRON A -SITE STORMWATER IMPROVEMENTS (STALLS A3-A7
CIVIL MASTER
SITE 05-YD
RENTON, Wq I °wc No.
�DOWL
N3415EA1 N
cz
DATE 09.29.20
05-APRON-A-C2
09.29.20
cl
CD
N
CV