�. GENERAL NOTES
Io I I o \ 1. THE CONTRACTOR SHALL NOT UTILIZE THE BRIDGE OR AIRPORT ACCESS
GATE WITHOUT PRIOR AUTHORIZATION FROM BOEING SECURITY AND
UNDER SECURITY SUPERVISION.
o _ 2. CONTRACTOR SHALL SECURE THE WORK AREA WITH FOD/SECURITY
�� FENCE FOR THE DURATION OF CONSTRUCTION. SECURITY FENCING SHALL
Tg
e BE IN PLACE PRIOR TO REMOVAL OF EXISTING SECURITY FENCING
TAXIWAY B-
�. 3. THE CONTRACTOR SHALL NOT IMPACT STALL OPERATIONS AT ANY TIME
0 DURING CONSTRUCTION. IF STALL IMPACTS ARE REQUIRED THE
.000 CONTRACTOR SHALL COORDINATE WITH THE BOEING PROJECT MANAGER
j - I I / A MINIMUM OF 1 WEEK PRIOR TO NEEDING TO IMPACT OPERATIONS OR
PHASE 5 _ I _ _ _ _ _ _ _ _ - ACCESS THE STALL.
m ON MORAN ON
_ El- 0-0-0-0 _ ❑ ❑ _ _ 4. APRON D BRIDGE ACCESS SHALL BE MAINTAINED AT ALL TIMES.
7-7/
'te 5. THE TOWPATH FOR APRON D SHALL BE MAINTAINED AT ALL TIMES.
❑- -❑-❑- ❑ MCP 219
STALL STALL STALL STALL - - -STaLC - - - - - ®- - - - - - -STAZL7 SCRiBF Z MAG SET ° STALL LD STALL
A-2 A-3 A-4 A-5 A-6 A-7 PHASE 4 A-9 _43 A-10 6. BOEING VEHICLE AND EMPLOYEE ACCESS TO BE PROVIDED THROUGH
I BLDG I BLDG BLDG I BLDG BLDG I BLDG + S THE SITE AT ALL TIMES. UNLESS SHOWN IN THESE DOCUMENTS THE
- - I - 5-104 - ' CONTRACTOR SHALL PROVIDE ACCESS PLANS THROUGH THE
+ I+ 5-108 I 5 107 5 106 5 105 t 5 103 °
CONSTRUCTION PLANS AS REQUESTED BY THE BOEING PROJECT
o I 0 4 p�
° g MANAGER.
° I i p' SS
- I 'SSB 7. MAINTAIN ACCESS TO THE 05-43 BUILDING (RESTROOMS) AT ALL TIMES
+ 200 ° J ° DURING CONSTRUCTION.
/ --- -1 BLDG + ° .
CP 217 CP 213 -- -- 5-440 8. FLAGGERS SHALL BE PROVIDED AT ALL CONSTRUCTION GATES AT ALL
- - - _ Z MAG SET . - , �Z SET SCRIBE \ n - - - - - - - - f TIMES WHEN GATES ARE UNLOCKED. ALL CONSTRUCTION GATES SHALL
rjr
SSB CP 214 BLAST CP 207 CP 215 1 _ _ _ _ _ 0 S
C.- 4 ° q� �20CCP 216 Z SET PKW • FENCE Z PKW SET Z SET PKW BE LOCKED AND SECURED OUTSIDE OF WORK HOURS.
PHASE 2 BLAST FENCE �Z MAG SET . BLAST FENCE
�- - - - - - - - - o _1�_-0- g METAL TRACKED EQUIPMENT SHALL NOT BE USED ON ASPHALT
Y PAVEMENTS ON THE AIRPORT ALL EQUIPMENT USED ON WITHIN THE
•13
°
•
a
°
o 0
Izz
-T,
b
E) pyFRHEAD
C6T fm
0 r7_77 F _/i -
cr
LEGEND
DEWATERING FACILITY
- x -
FOD/SECURITY FENCE
- ❑ -
LOW PROFILE FOD BARRIER
-0-
CONSTRUCTION FENCE
CONSTRUCTION GATE
WORK AREA
CONTRACTOR STAGING AREA
CONTRACTOR HAUL ROUTE
*000+
BOEING VEHICLE ROUTE
- - - -
PROPERTY LEASE BOUNDARY
- - - - -
CONSTRUCTION PHASE AREAS
DEWATERING PIPE RAMP
DEWATERING DISCHARGE HOSE
DEWATERING PIPE LINE
CONTROL POINT
FLAGGER
BARRICADES
SYM
REVISION
ORIG
737 MAX
FLIGHTLINE UTILITIES
-APRON A CI PROJECT
-
CITY OF
RENTON PERMIT
REVIEW COMMENTS
-
APRON A
CI PROJECT -
SITE
DCN-01
-
APRON A
CI PROJECT -
SITE
DCN-02
-
APRON A
CI PROJECT -
SITE
DCN-03
CC "
200
BLDG Q°
5-50
s
•
SCO,
200
°p b 100' SSB I '� 5 S'�p SECURITY FENCING ON THE AIRPORT SHALL UTILIZE RUBBER TRACKS OR
L TEMPORARY TIRES. THE CONTRACTOR SHALL REPLACE OR REPAIR ALL ASPHALT
cP 209---------PHASE 3 - ---- GUARD SHACKS -
GATE 1 . CP 16420 OH`N PAVEMENT ON THE PROJECT SITE DAMAGED BY CONSTRUCTION
a !
D-51
� o
I, o
'
BLDG Z PKW SET
- Z FND PKW
DHA-63 -
ACTIVITIES OUTSIDE OF WORK SHOW IN THESE DOCUMENTS AS DIRECTED
5-51
��
®--
-
- -- may`
. • CP 205
OHW AIRPORT GATE V-10
BY THE BOEING CONSTRUCTION MANAGER.
_ 0
_
Z PKW DC
cP 211
FLAGGER PROVIDED TO
Z PKW SET- OHW
MAINTAIN AIRPORT
CONSTRUCTION PHASING NOTES
TRAFFIC THROUGH
BLDG
GATE V-10
1. UNLESS OTHERWISE APPROVED BY THE BOEING PROJECT MANAGER THE
- - H
BLDG 5-43
�'°'�''
CONTRACTOR SHALL ONLY HAVE CONSTRUCTION ACTIVITIES, EQUIPMENT,
OHWCP 206
5-36
MATERIAL OR PERSONNEL IN ONE PHASE AREA IDENTIFIED WITHIN THESE
Z PKW DC
oHW
SANITARY SEWER DEWATERING
PLANS AT ANY ONE TIME.
� DISCHARGE LOCATION � -
W ATERwAY
2. THE CONTRACTOR MAY BE REQUIRED TO OPEN UP A PORTION OR ALL
VER Comm
R�
-
OF ANY CONSTRUCTION PHASING AREA AT THE DIRECT OF THE BOEING
CEDAR
PROJECT MANAGER AS NEEDED TO MAINTAIN BOEING SITE OPERATIONS.
3. IT IS ANTICIPATED THAT CONSTRUCTION ACTIVITIES WITHIN PHASE 1 AND
PHASE 2 AND PHASE 4 AND PHASE 5 COULD HAPPEN CONCURRENTLY.
�
�
3
°° 10 o g
g 13 • 1 pCi w
m -4
100SS °
I
100' IsseA O
1p0, SSB
__
100' SSB _ � \\ ` coy2p ' SS
RENTON � \ 200 SB r.
STADIUM °
200' sss - Z
'2
00' SSB
Z00, sse
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DATUM NOTE:
60 30 0 30 60 120
PLANS PREPARED USING NGVD 29 AS THE APRON A CONSTRUCTION PHASING & STAGING PLAN
VERTICAL DATUM. TO CONVERT TO NAVD 88
ADD 3.556 FEET TO ALL ELEVATIONS. SCALE: 1:60 SCALE: 1 " = 60'
BY
APPROVED
DATE
SYM
REVISION
BY
APPROVED
DATE
RT
TWN
04.13.16
-
APRON A CI PROJECT - SITE DCN-06
RT
TWN
09.27.16
RT
TWN
05.23.16
-
RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES
RT
TWN
10.28.16
RT
TWN
06.13.16
-
APRON A SITE STORMWATER IMPROVEMENTS-30%
RT
TWN
01.17.18
RT
TWN
07.19.16
-
APRON A SITE STORMWATER IMPROVEMENTS-60% TO IFC
RT
TWN
07.14.20
=RTTWN
08.05.16
-
APRON A SITE STORMWATER REVISIONS PER CITY COMMENTS
RT
TWN
09.29.20
-1 SO not
11 to
All. ► �■ ; ���.� ��: ■ ■■���\1
SIX MR
ou
CONTROL POINT (CP)
TABLE
POINT DISCRIPTION
NORTHING
FASTING
DESCRIPTION
204
181684.37
1299247.98
Z SCRIBE SET
205
181732.81
1299493.60
Z
PKW
DC
206
181358.63
1299557.54
Z
PKW
DC
207
181479.81
1299449.72
Z
PKW
SET
209
181406.82
1299484.22
Z
PKW
SET
210
181005.45
1299667.39
Z
HM
SET
211
181562.50
1299510.39
Z
PKW
SET
212
180996.51
1299512.17
Z
PKW
SET
213
181026.79
1299435.21
Z SET SCRIBE
214
181336.47
1299433.08
Z
SET
PKW
215
181528.67
1299421.51
Z
SET
PKW
216
181178.46
1299456.61
Z
MAG
SET
217
180985.90
1299456.85
Z
MAG
SET
219
181686.28
1299222.06
Z
MAG
SET
16420
181740.53
1299491.91
Z FND
PKW
DHA-63
6. DEWATERING PIPELINES SHALL BE RIDGED WATER TIGHT GLUED OR FUSED
PRESSURE RATED PVC OR HDPE PIPE.
7. THE CONTRACTOR SHALL PROVIDE TRAFFIC RATED VEHICULAR RAMPS AS
NEEDED TO PROTECT DEWATERING PIPELINES.
8. DEWATERING DISCHARGE HOSES SHALL HAVE WATER TIGHT CORRECTIONS
AND SHALL ONLY BE IN PLACE DURING ACTIVE DISCHARGE AND SHALL
BE REMOVED AS NEEDED AND DIRECTED BY BOEING CONSTRUCTION
MANAGER TO MAINTAIN AIRPLANE AND VEHICULAR TRAFFIC ACROSS THE
BRIDGE AND MAINTAIN PEDESTRIAN ACCESS ALONG THE TRAIL.
9. CONSTRUCTION ACTIVITIES WITHIN PHASE 1 AND PHASE 5 SHALL BE
COORDINATED WITH BOEING CONSTRUCTION MANAGER TO MAINTAIN STALL
AND PAINT HANGAR ACCESS AT ALL TIMES.
10. LOW PROFILE BARRICADES SHALL BE PLACED BETWEEN THE WORK AREAS
WITHIN PHASES 4-5 AND TAXIWAY B OUTSIDE OF WORK HOURS.
BARRICADES SHALL BE IN PLACE UNTIL PAVEMENT WITHIN THOSE WORK
AREAS IS REOPENED FOR TRAFFIC AND ALL EQUIPMENT AND MATERIALS
OR REMOVED OR AS DIRECTED BY THE BOEING CONSTRUCTION MANAGER.
PERMIT SUBMITTAL
DESIGN BY DOWL DATE 09.29.20
R-413706
""A
,�� ®
s w
WASkI .r�r
41 `zl �� �G
_ °�
f4� 4 n
`SSIONAL E�
ACCEPTABILITY
THIS DESIGN AND/OR
SPECIFICATION IS APPROVED
DRAWN
R. DO
DATE
09.29.20
SUBTITLE
CONSTRUCTION PHASING & STAGING PLAN
CURRENT
CHECKEDCKED
T. NEU
09.29.20
SHEET
ENGINEER
T. NEU
09.29.20
TITLE APRON A -SITE STORMWATER IMPROVEMENTS STALLS A3-A7
NORTH BOEING FIELD
CIVIL MASTER RENTON, WA
APPROVED BY
DEPT.
DATE
CHECKED
D.
09.29.20
APPROVEDROVED