Loading...
HomeMy WebLinkAboutR-413714IF W TOFA �'—�' ' TOFA � CONSTRUCTION NOTES I \ I I I I I I — — —cZm / / / Is ♦ ��� I I __-------- — — --- // �5�� 1 CONSTRUCT TYPE 1 ASPHALT PAVEMENT PER SECTION 4 L ------ !2 -- _ — _ — _ j / // SP/ C502 I _ I Iu CID 2� CONSTRUCT TYPE I STD CEMENT r CONCRETE PAVEMENT PER SECTION C502 Dzm S CONSTRUCT TRENCH DRAIN ASPHALT r3 o /j °� PAVEMENT PER SECTION C511 AY B // �S ♦ 4 CONSTRUCT TRENCH DRAIN I TAXIWAY — — / �. pFP/ ♦ ��� CONCRETE PAVEMENT PER SECTION C! 5111 _— — - T — I TAXIWAY B / �' I — — — — D ♦ ♦ 00 CONSTRUCT REINFORCED CONCRETE COVER PER DETAIL S286 S286 mmm o � I � / (n FE _ ? II =000, © CONSTRUCT REINFORCED CONCRETE COVER PER 1 2 porno oz�c FP♦ < U I � � � m � — _ — — _ ♦ ♦ �QQ I S288 5288 � FOOTING MARK A PER / — 0 �oF� �' SCHEDULE AND DETAILS S289 Z TOFA O O — — — z _ - ® FOOTING MARK B PER r1 f F, M Z7 .X r m m 22 W m r I r D I / N Z o N m II ; Z II N I 111110 SCHEDULE AND DETAILS cn z I N o N Z o o 01�o� N, 181686.51 �: +++++:+ STALL FOOTING MARK C PER / N: 181669.90 N M E. 1299201.67 TOFA A-10 °° SCHEDULE AND DETAILS 5289 I E: 1299203.04 � w 17 TOFA OO 7 , N: 181717.16 TOFA____—TOFA 10 FOOTING MARK D PER 1 I 2,098 SF REPLACED 30 T F E: 1299204.82 STALL ° SCHEDULE AND DETAILS S289 CONCRETE PAVEMENT i0 6 0 A I n N: 181671.11 A-9 I I TOFA cs � ° � � � FOOTING MARK E PER _ SCHEDULE AND DETAILS S IA � E: 1299220.24 �° _t 9 O o z 1 4 I289 wwwwwwam no ONwo� 5 5 - oD 1 ° p = _ 23' m N 12 FOOTING MARK F PER S 289 r° , m, o L G I H L N ET S - 9 TYP ° `- ° _ 5-439 % 1 f 1 D \ o ss / � FOOTING MARK G PER S289 II 15' TYP Z ° C50 32' 1 CP 219 19' 200 SCHEDULE AND DETAILS I f ' 15 Z MAG SET 36 CP 204 p G N z z 200 ss , N m� N Z SCRIBE SET o ° SG , D GENERAL NOTES.. 0-4 Ti CV I m < N N OC - - Z7 Cn Xo ° ° ° N: 181705.42 00' ssg = 1. FINAL ASPHALT PAVING LIMITS SHALL BE APPROVED BY 0 Z ° _ �, °-� o I E: 1299248.01 w I � 15 o 1 2 C BOEING CONSTRUCTION MANAGER PRIOR TO FINAL I ° ssg 0 o z SAWCUTTING. a � - p ° nP o ° ° � oo' � rT, _ � N - N: 181669.12 ° 6773 SF REPLACED SG I I I .pt _ - p \ m 0 -,:T- I 1 2. THE CONTRACTOR SHALL SAWCUT FULL DEPTH ALL E: 1299251.13 ° I o CONCRETE PAVEMENT sg w I z w p ` �, z -� PROPOSED PAVING EDGES TO THE LIMITS APPROVED BY STALL I o ° ° I 9 G � BOEING CONSTRUCTION MANAGER PRIOR TO FINAL PAVING. z \ I - I g 5 2 °' ssg ® 0 3. EXISTING LANDSCAPING DISTURBED DURING CONSTRUCTION O o A 6°_-� ° \ �, 0 SHALL BE RESTORED AT THE COMPLETION OF CONSTRUCTION. I BLDG L THE CONTRACTOR SHALL MAKE A LIST OF ALL PLANTS z 5-103 p ° MATCH ° G o D DISTURBED FOR RESTORATION AND PROVIDE THE LIST OT I ° EXISTING71' o 5 THE BOEING CONSTRUCTION MANAGER. �200 I o ■ O o s� 00 m 200' OFFSET LINE ■ I LEGEND rn I I °oo' �, v° ° p FROM SHORELINE ` --� 0 TYPE 1 ASPHALT PAVEMENTK 2 C502 z I I 51 ° ° J ' ssg BLDG 20°0 I a a s TYPE I STANDARD _ I ° 5-440 W �,, , ,,, CEMENT CONCRETE PAVEMENT C I 1 as m O 200 I N: 181669.12 C502 0 N: 181728.91 sg I o Q I ° 1 E: 1299340.13 w ��°° 100' SSB 100' SHORELINE SETBACK I I E: 1299353.28 5 ° 0_FF °5 I g 2 `n s - 200' SSB 200' SHORELINE SETBACK 6 E� 0 6 8 N: 181728.61 0 s g E: 1299371.61 0 S - DATUM NOTE. Lp I I N: 181670.40 0 15 8' 2 _ _ �0 � STAW _ —� ��" • ' PLANS PREPARED USING NGVD 29 AS THE X MIN- - _ _ 7 _ - ��_ ,1 E: 1299369.63 GR �I - _ - —� 5 EA R / VERTICAL DATUM. TO CONVERT TO NAVD 88 I 100 OFFSET LINE ADD 3.556 FEET TO ALL ELEVATIONS. N 181716 43 FROM SHORELINE00 O O _ A _ _ _ _ �-cW s - N: 181701.55 5' E: 1299380.84- T - - T — �S ® ® • ' I _ ETA = _ _r>� A — — — IE: 1299382.08 - _ - _$� - E ss 0 ® ® - TELEPHONE TRUNK LINE \ - -1,364 SF REPLACED X - -� _- ASPHALT PAVEMENT — X - Q P _= T_E _ ��_E� N: 181710.28 3 © °o ssg FENCE - - - �o E: 1299416.99 S ►� _ BLAST _ 3 s sS I 1 'SS D 3 _ _ ss NO ing m R RO A _ - X ER1ME I \ I 8 TYP 24,55 / m rm ' Dom• N: 181715.88 ' 1� I BLDG E: 1299424.54 X N sg — F\,N — w BL5-43 = DG � � I s x I -n -FW F1�� • o 5-36 A-- KEY PLAN •_ 00 o N `n SCALE: N.T.S. U) i E� jam_ Z' m, �r — RW IN COMPLIANCE WITH CITY OF RENTON STANDARDS _ o m FW CP 16420 0 � 1t� Z FIND PKW DHA-63 0 pNw CpMME o `� R RAVER CEDA D 7D 20 10 0 10 20 40 PERMIT SUBMITTAL DESIGN BY DOWL DATE 09.29.20 pH APRON A PLAN 205 �ZPPKW DC 1 uw T H SCALE: 1:20 SCALE: 1" = 20' z R-413714 SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE S w ACCEPTABILITY R. TEMPLADO 09.29.20 PAVING PLAN ORIG 737 MAX FLIGHTLINE UTILITIES -APRON A CI PROJECT RT TWN 04.13.16 - APRON A CI PROJECT - SITE DCN-06 RT TWN 09.27.16 4�� of W;skz THIS DESIGN AND/OR TH CK D 09.29.20 G SPECIFICATION IS APPROVED 40'6BOWL REVISION SYMBOL DATE W5184605 — 09.29.20 SEQUENCE NO. - CITY OF RENTON PERMIT REVIEW COMMENTS RT TWN 05.23.16 - RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES RT TWN 10.28.16 ® ""AaFafAV" ti 50 �o �,f4 4 �p'�s I STER �lSt W SIONAL E� APPROVED BY DEPT. DATE ENGINEER T. NEU 09.29.20 TITLE APRON A -SITE STORMWATER IMPROVEMENTS (STALLS A3-A7) �/ SITE 05- I D CIVIL MASTER RENTON, NIA C221 11 APRON A CI PROJECT SITE DCN-01 RT TWN 06.13.16 APRON A SITE STORMWATER IMPROVEMENTS-30� RT TWN 01.17.18 CHECKED D. MURATA 09.29.20 - APRON A CI PROJECT - SITE DCN-02 RT TWN 07.19.16 - APRON A SITE STORMWATER IMPROVEMENTS-60% TO IFC RT TWN 07.14.20 APPROVED - I APRON A CI PROJECT - SITE DCN-03 RT TWN 08.05.16 - APRON A SITE STORMWATER REVISIONS PER CITY COMMENTS RT TWN 09.29.20 APPROVED DWG NO. 05-APRON-A-C221 0 N N