Loading...
HomeMy WebLinkAboutR-413715IF W 00 / dw0„ZI,/M NI'48G 431105„Z I \ I TUrr I I A�TOFATOFA- INE I —� 1FA\--us_ TOFATOFA TOF PROPERTY LEAS _ . �FA�TOFA TOFATOFA I l.�•l� _ TO —f I I I TOFATOFA � � N: 181400.29 to I I I - TOFA TOFA - - E: 1299234.28 I N: 181401.05 _ I E: 1299243.25 I_ I I I o - I I I �� I � I I I I I BLDG I I I I STALL I - 5 105 STALL BLDG A-5 I I I I I I 5-106 I BLDG A-4 I I � 5-107 I I �o I I II I I I I I o0o I I I II I I I I I II I I I � I — rl-)IN N U I w I w W w I I z O z o ° C 0 s==A O w -= N I n L - - cn � N Z U tz : I �� I PARKING LOT , Ssg - T ---- T _SS — _ -SS - sSe of _ —S — _ v / / / \ SS _ E ' SS OE SS5 -S ss H _ = -SS - OEM ' OE E RIM 3.45 _ / S� ASBANDONOES� E ' i E • •' I i E E ' so E' -- 00 • • E _ - 1,542 SF REPLACED —TOFA- 0 —To FA -TO A CONCRETE PAVEMENT 4 CONSTRUCTION NOTES cn I - CONSTRUCT TRENCH DRAIN ASPHALT r PAVEMENT PER SECTION C511 9' T(P I� 5' TYP ®CONSTRUCT TRENCH DRAIN 1 CONCRETE PAVEMENT PER SECTION I C511 ® FOOTING MARK B PER SCHEDULE AND DETAILS S I BLDG 5-104 n0' ssg CN g N oGR I U SF REPLACED G — A = wASPHALT PAVEMENT _ _ _ _— —_— A= — = E = _ _ — 74,530 q - =_-�� _ =A___- --- A CW -- A-- CW A (� A:::-�__- A--�W Aw��ACW CP215 w c/) A CP 207 ---- E Z SET PKW=-_--__--=1 P Z PKW SET- E _CV�I E-_-- E- � Q BLAST FENCE E- x z z s� x —�V —� — —x 8, Typ c� 0 0 0 0 0 1 S g FW WIZ ssg FW F FW = - _SS - — —SS F_ ssg ABANpONESSEwER — —SS J - _ - -SS _ __ -SS - - T _ T _ _-_ T - OE F S—_ T ---- T 0� CP 209 = -T� OE o o SS _ Z PKW SET OE ' OE o 0 0 0 0 0 _ E ��NE - ER�ME�ER CP 211 I Z PKW SET • / pROPE go • �N w A-�ERW OH1VER CO MMERC�A� CE�p,R R m • I CP 206 ��%�� •' • _��� LZPKW DC 010 0 10 20 40 -�•• APRON A PLAN z • • SCALE: 1:20 SCALE: 1 = 20 SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE Z S 1 4>� WA. ORIG 737 MAX FLIGHTLINE UTILITIES -APRON A Cl PROJECT RT TWNF 04.13.16 - APRON A ClCI PROJECT - SITE DCN-06 RT TWN 09.27.16 �4�� co - CITY OF RENTON PERMIT REVIEW COMMENTS RT TWN 05.23.16 - RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES RT TWN 10.28.16 - APRON A Cl PROJECT - SITE DCN-01 RT TWN 06.13.16 - APRON A SITE STORMWATER IMPROVEMENTS-30% RT TWN 01.17.18 i 4 - APRON A Cl PROJECT - SITE DCN-02 RT TWN 07.19.16 - APRON A SITE STORMWATER IMPROVEMENTS-60% TO IFC RT TWN 07.14.20 -.pl �ECISTV SSIONAL - APRON A Cl PROJECT - SITE DCN-03 RT TWN 08.05.16 - APRON A SITE STORMWATER REVISIONS PER CITY COMMENTS RT TWN 09.29.20 IN COMPLIANCE WITH CITY OF RENTON STANDARDS oG ,y ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN R. TEMPLADO CHECKED T. NEU ENGINEER T. NEU APPROVED BY DEPT. DATE CHECKED D. MURATA APPROVED 4I L SUBTITLE 09.29.20 PAVING PLAN 09.29.20 RIM A IE N,j IE S, IE E, BOT i LEGEND 100' SSB 200' SSB TYPE 1 ASPHALT PAVEMENT C 502 TYPE I STANDARD 1 CEMENT CONCRETE PAVEMENT C 502 100' SHORELINE SETBACK 200' SHORELINE SETBACK GENERAL NOTES: 1. FINAL ASPHALT PAVING LIMITS SHALL BE APPROVED BY BOEING CONSTRUCTION MANAGER PRIOR TO FINAL SAWCUTfING. 2. THE CONTRACTOR SHALL SAWCUT FULL DEPTH ALL PROPOSED PAVING EDGES TO THE LIMITS APPROVED BY BOEING CONSTRUCTION MANAGER PRIOR TO FINAL PAVING. 3. EXISTING LANDSCAPING DISTURBED DURING CONSTRUCTION SHALL BE RESTORED AT THE COMPLETION OF CONSTRUCTION. THE CONTRACTOR SHALL MAKE A LIST OF ALL PLANTS DISTURBED FOR RESTORATION AND PROVIDE THE LIST OT THE BOEING CONSTRUCTION MANAGER. DATUM NOTE: PLANS PREPARED USING NGVD 29 AS THE VERTICAL DATUM. TO CONVERT TO NAVD 88 ADD 3.556 FEET TO ALL ELEVATIONS. KEY PLAN z SCALE: N.T.S. PERMIT SUBMITTAL DESIGN BY DOWL R-413715 09.29.20 I TITLE APRON A -SITE STORMWATER IMPROVEMENTS (STALLS A3-A7 09.29.20 1 SITE 05-YD CIVIL MASTER DATE 09.29.20 40'6DOWL CURRENT REVISION SYMBOL DATE W5184605 — 09.29.20 SHEET SEQUENCE NO. C222 C12 RENTON, Wq I DWG N0. 05-APRON-A-C222 CD N N