HomeMy WebLinkAboutR-413716W
\ I TO FA � w0 T-TOFA �TOFA � I
�TOFA- TOFA \ I
I � TOFA
TOFA� TOFA
I\ ��TOFA I \ I I � _-VI,3Sgj
I �TOFA�TOFA I \ _I I
A TO I I
A
�TOFA �TO
FA�TOF �TOF I \ I I � I
—TO I I
I
I 3NIl 3SV31
— I
I I I
I � �
slow
/ I I
1-T
STALL STALLI
I I II / BLDG A-3 I
/ A-2 ► 5-108
/ I
STALL
° I
A-1 °°
I— I II � °
I I II I� I I I I
I /
I II i i I
° I II I / I I I I N: 180854.35
E: 1299483.82
CONSTRUCTION NOTES
1
' CONSTRUCT TRENCH DRAIN ASPHALT C� 3
511
PAVEMENT PER SECTION
LJJI
I ®CONSTRUCT TRENCH DRAIN
z 1 CONCRETE PAVEMENT PER SECTION 1
J C511
1 ri
w �FOOTING MARK A PER SCHEDULE AND DETAILS S
u
JFI
I ® FOOTING MARK B PER SCHEDULE AND DETAILS S
1
1
0-
� l�l
�I
I�
LEGEND
I ° TYPE 1 ASPHALT PAVEMENT( L
0° C502
I �-
TYPE I STANDARD 1
1 I I CEMENT CONCRETE PAVEMENT
C502
1
00' ssB 100 SHORELINE SETBACK
200' ss1 200' SHORELINE SETBACK
I
I
I
II _
2' N 1,320 SF REPLACED _ �,—� A ° N
I � I N: 180690.92 — _
I o II I 2' E: 1299478.93 I , o I N: 180850.93 MIN ASPHALT PAVEMENT �w - A
I N: 180538.54 I / MIN r E. 1299466.32 80889 65 _ — s — _ _ — -� w
I I — E: 180538..44 Ilo 0 1,550 SF REPLACED I -� E: 1299480.83 P cw cw �� _
I I CONCRETE PAVEMENT g 1LLJ
cn
9 I 1,226 SF REPLACED I_ u_ ° -CD LLJ
I ASPHALT PAVEMENT VP ° ° �� �,� - - o � g' TYP x cn
° �� 8 3 ° ° g 3 CP 212 z
Poi Z PKW SET O
I\ ILJI - � � N: 180845.19 s-rs � _ Z° Q
d IlljlJ= 7 20, TYP MATCH E: 1299475.80 �_ ° I z
I_ N: 180691.76 EXISTING SPACING —�—
_ � I 8 N: 180882.35 8 200SS I z
-� E: 1299487.89 E: 1299489.48 ° o
° I
I
—� \�� I I I I L7, I I
~\ \ \ �N. 180539.16
E: 1299499.41)
o° Z
° 0Ij ° °
o� O I
a_j I
I
° 0
F I I
I
— — I
— � o
I to
I I
®D
0
XX\ I I
I I
I � I
I
I
1 I
°
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
o � °
0
BLDG
5-08
U
0
mO
01
0
SYM
REVISION
BY
APPROVED
DATE
SYM
REVISION
ORIG
737 MAX FLIGHTLINE UTILITIES -APRON A Cl PROJECT
RT
TWN
04.13.16
-
APRON A Cl PROJECT - SITE DCN-06
-
CITY OF RENTON PERMIT REVIEW COMMENTS
RT
TWN
05.23.16
-
RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES
-
APRON A Cl PROJECT - SITE DCN-01
RT
TWN
06.13.16
-
APRON A SITE STORMWATER IMPROVEMENTS-30%
-
APRON A Cl PROJECT - SITE DCN-02
RT
TWN
07.19.16
-
APRON A SITE STORMWATER IMPROVEMENTS-60% TO IFC
-
APRON A Cl PROJECT - SITE DCN-03
RT
TWN
08.05.16
-
APRON A SITE STORMWATER REVISIONS PER CITY COMMENTS
<
0
0
9 ❑
200' OFFSET LINE
FROM SHORELINE
N: 180847.01J N: 180882.87�
E: 1299492.47 E: 1299495.53
vd J ✓
SS°
I Zoo
I 0
I Ss�
00 0
Q C
I
Q
m
BLDG
5-50
100' OFFSET LINE
FROM SHORELINE
0
O
❑ SSA
BY APPROVED DATE
RT TWN 09.27.16
RT TWN 10.28.16 ""A
RT TWN 01.17.18
RT TWN 07.14.20
RT TWN 09.29.20
Fu
S
110000,
ISTF
NAL
...
o�
e \ ° ° ecif
O
00 O VV D I�
,Z o 1
/ jl
x
N: 180890.16 z
E: 1299486.88 Fw
FI x =
1 IQ
x
1
1 0 I
O
0
C�
1 � ss Sy
1 —�o
ss
5
— /
ss— — 100' � E
Ss- ,-
___ x 1
o r
'
O — 100 SSB /
® x
v
\ Q
DRAWN DATE SUBTITLE
ACCEPTABILITY R. TEMPLADO 09.29.20 PAVING PLAN
THIS DESIGN AND/OR CHECKED
SPECIFICATION IS APPROVED T. NEU 09.29.20
GENERAL NOTES:
1. FINAL ASPHALT PAVING LIMITS SHALL BE APPROVED BY
BOEING CONSTRUCTION MANAGER PRIOR TO FINAL
SAWCUTTING.
2. THE CONTRACTOR SHALL SAWCUT FULL DEPTH ALL
PROPOSED PAVING EDGES TO THE LIMITS APPROVED BY
BOEING CONSTRUCTION MANAGER PRIOR TO FINAL PAVING.
3. EXISTING LANDSCAPING DISTURBED DURING CONSTRUCTION
SHALL BE RESTORED AT THE COMPLETION OF CONSTRUCTION.
THE CONTRACTOR SHALL MAKE A LIST OF ALL PLANTS
DISTURBED FOR RESTORATION AND PROVIDE THE LIST OT
THE BOEING CONSTRUCTION MANAGER.
APRON A PLAN z
SCALE: 1 = 20
20 10 0 10 20 40
SCALE: 1:20
DATUM NOTE:
PLANS PREPARED USING NGVD 29 AS THE
VERTICAL DATUM. TO CONVERT TO NAVD 88
ADD 3.556 FEET TO ALL ELEVATIONS.
r\ L- I I L- -\ I v
SCALE: N.T.S.
PERMIT SUB
DESIGN BY DOWL
R-413716
MITTAL
DATE 09.29.20
40'6DOWL
REVISION SYMBOL
W5184605
ENGINEER TITLE APRON A -SITE STORMWATER IMPROVEMENTS STALLS A3-A7 C223
APPROVED BY DEPT. DATE T. NEU 09.29.20
CHECKED
D. MURATA 09.29.20
APPROVED SITE 05-YD
APPROVED CIVIL MASTER RENTON, NIA DWG No. 05-APRON-A-C223
09.29.20
;E N0.
C13
0
N
N