HomeMy WebLinkAboutR-413727IF
1
W
TO FA �r ' ' �" '
TOFA � I I I = I 10
� N
0
— 52 �_l—
I
TAXIWAYB�
TAXIWAY B = —
i
I / �
RO
' FA U
j ROFA .LU) �
I / i ROFA
ROFA (U)� R FA
I
RU) ROFA (U) TOFA
i
- �FA (U) ROFA (i
� TOFA
TOFA
� TOFA �
I
TOFA
/ I FA TO FATOFA �— TOFA _ .0 - mmommom
-
TOFA TOFA � TO , '
w
1
c I STALL
o I A-7
Q
z
zl
of
CP 204
Z SCRIBE SET
BLDG -
5-103
200' SSB
CP 219
Z MAG SET
i
GENERAL NOTES
1. CONTRACTOR SHALL USE ALL NEW FENCING MATERIALS
INCLUDING POLES, FENCING FABRIC & BARBED WIRE FABRIC
AND BARBED WIRE FOR REPAIR OF REMOVED SECURITY FENCE
SECTIONS. CONTRACTOR SHALL MATCH THE EXISTING FENCE
POST MOUNTING UTILIZED FOR THE EXISTING FENCING.
2. EXISTING LANDSCAPING DISTURBED DURING CONSTRUCTION
SHALL BE RESTORED AT THE COMPLETION OF CONSTRUCTION.
THE CONTRACTOR SHALL MAKE A LIST OF ALL PLANTS
DISTURBED FOR RESTORATION AND PROVIDE THE LIST OF THE
BOEING CONSTRUCTION MANAGER.
3. THE CONTRACTOR SHALL SALVAGE ALL EXISTING GUARDRAIL
REMOVED TO ALLOW FOR CONSTRUCTION AND SHALL
REINSTALL AT THE COMPLETION OF CONSTRUCTION. ANY
DAMAGED OR DESTROYED PARTS SHALL BE REPLACED IN KIND.
CONSTRUCTION NOTES
1�INSTALL CHAINLWK SECURITY FENCE DETAIL PER DETAIL
CHAINLINK FENCE TO BE SURFACE MOUNTED AS NEEDED � o
TO PROTECT UNDERGROUND UTILITIES
2� CONNECT TO EXISTING FENCE.
LEGEND
-X - SECURITY FENCE
---------------- --- I ���� o a ®. ��� -� �
►1�so 00
X �GR PwR
25 LF SECURITY o l-
0 SN
FENCE ® O � '
g sls O
101 LF N. 181670.67 sls o ® ® ® 0 • • LINE
SECURITY FENCE E. 1299411.83� ❑ - r, .4n�i� _ �� TELEPHONE TRUNK
BLAST FENCE
L Z
—xx
SSB —
op
so
•
� 0 ••
---MOO
so 00
SYM
REVISION
ORIG
737 MAX
FLIGHTLINE UTILITIES
-APRON A Cl PROJECT
-
CITY OF
RENTON PERMIT
REVIEW COMMENTS
-
APRON A
Cl PROJECT -
SITE
DCN-01
-
APRON A
Cl PROJECT -
SITE
DCN-02
-
APRON A
Cl PROJECT -
SITE
DCN-03
�CP 205
i Z PKW DC 1 �1
ONW
BY
APPROVED
DATE
SYM
REVISION
BY
APPROVED
RT
TWN
04.13.16
-
APRON A Cl PROJECT - SITE DCN-06
RT
TWN
RT
TWN
05.23.16
-
RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES
RT
TWN
RT
TWN
06.13.16
-
APRON A SITE STORMWATER IMPROVEMENTS-30%
RT
TWN
RT
TWN
07.19.16
-
APRON A SITE STORMWATER IMPROVEMENTS-60% TO IFC
RT
TWN
RT
TWN
08.05.16
-
APRON A SITE STORMWATER REVISIONS PER CITY COMMENTS
RT
TWN
DD
m •wo 00
00
so •
0
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
ER R�A�
PER1ME�
E•
RC1A� W
C13 M
R RAVER
CE�A
20 10 0 10 20 40
SCALE: 1:20
DATE
I s w
4 �� of WAS
�,
ACCEPTABILITY
THIS DESIGN AND/OR
THIS
R.`� TEMPLADO
09.27.16
""Aill ®
��� o�G
_
SPECIFICATION IS APPROVED
T. NEUD
10.28.16
ENGINEER
T. NEU
APPROVED BY
DEPT.
DATE
01.17.18
CHECKED
D. MURATA
50
�o Rf4 �4'W
Is
��ss ONA�
07.14.20
APPROVED
09.29.20
APPROVED
oNW
DATUM NOTE:
PLANS PREPARED USING NGVD 29 AS THE
VERTICAL DATUM. TO CONVERT TO NAVD 88
ADD 3.556 FEET TO ALL ELEVATIONS.
C472 �471
KEY PLAN ❑
SCALE: N.T.S.
PERMIT SUB
DESIGN BY DOWL
APRON A PLAN z
SCALE: 1 = 20 R-413727
4TE SUBTITLE
09.29.20 FENCING PLAN
09.29.20
09.29.20 TITLE APRON A -SITE STORMWATER IMPROVEMENTS (STALLS A3-A7)
09.29.20 1 SITE 05-YD
CIVIL MASTER
MITTAL
DATE 09.29.20
BOWL
CURRENT REVISION SYMBOL DATE
W5184605 — 09.29.20
SHEET SEQUENCE NO.
C470 C24
RENTON, WA I DWG N0.
05-APRON-A-C470
CD
N
N