Loading...
HomeMy WebLinkAboutR-413740O 0 Lu DESIGN CRTERA: a) CONTAINMENT FOR FUEL SHOULD BE 10,000 GALLONS. a) GREEN BEACON NORMALLY ON TO SIGNAL RUNOFF IS GOING TO STORM SYSTEM. IF THE EMERGENCY SPILL OCCURS AND THE FLOATS ARE TRIGGERED OR A SPILL BUTTON IS ACTIVATED THE RED BEACON WILL TURN ON AND THE GREEN BEACON WILL TURN OFF. VALVE STATUS PILOT LIGHT: RED: VALVE CLOSED GREEN: VALVE OPEN O GREEN BEACON LIGHT: NORMAL STORM FLOW INDICATOR • RED BEACON LIGHT: FUEL SPILL INDICATOR i BOUNDARY AREA FOR SYSTEM SCHEMATIC APPLIED TO CONTROL PANEL DOOR. ALL BUTTERFLY VALVES TO HAVE VALVE STATUS PILOT LIGHT. BEACON LIGHTS TO INDICATE CURRENT SYSTEM STATUS. i SYSTEM SCALE: NONE BLDG 7 EXISTING VAU LT FUEL CONTAINMENT VAULT PROPOSED STORAGE VOLUME=5,200 GAL TOTAL STORAGE VOLUME=11,700 GAL I I of I / J Li LEVEL SENSOR EMCS z Q URE-795 o Q of ELECTRICAL PANEL INLINE CHECK Q VALVE I I BV A7-3 CB (1157-20) — — — — — — — SDMH (1162-20) rl3V A7-2 BV A7-1 FLOW SPLITTER CATCH BASIN I LEVEL SENSOR EMCS I SDMH-1163-20 o CPS OWS-0072 OIL/WATER I o SEPARATOR I � (816-3-CPS) I z a rY CD c� zl n MODULAR < RTU-27-20 WETLAND (MWS-L-8-24 -V-UG) CB (1155-20) CB (1156-20) I I INLINE CHECK VALVE I I CB (1158-20) SDMH (1165-20) SDMH (1164-20) INLINE CHECK VALVE CONNECT STRUCTURE TO EXISTING PIPE FUEL SPILL DIAGRAM AND DOOR FRONT GRAPHICS SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ® D Q ORIG 737 MAX FLIGHTLINE UTILITIES -APRON A Cl PROJECT RT TWN 04.13.16 - APRON A Cl PROJECT - SITE DCN-06 RT TWN 09.27.16 - CITY OF RENTON PERMIT REVIEW COMMENTS RT TWN 05.23,16 - RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES RT TWN 10.28.16 - APRON A Cl PROJECT - SITE DCN-01 RT TWN 06.13.16 - APRON A SITE STORMWATER IMPROVEMENTS-30% RT TWN 01.17.18 -� �FG 5 - APRON A Cl PROJECT - SITE DCN-02 RT TWN 07.19.16 - APRON A SITE STORMWATER IMPROVEMENTS-60% TO IFC RT TWN 07.14.20 - APRON A Cl PROJECT - SITE DCN-03 RT TWN 08.05.16 - APRON A SITE STORMWATER REVISIONS PER CITY COMMENTS RT TWN 09.29.20 C5141 C296,C450 �H ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED R. TEMPLADO TCHECKED ENGINEER APPROVED BY DEPT. DATE T. NEU CHECKED sR4a D. MURATA �� �� APPROVED rN DESCRIPTION OF STORMWATER SYSTEM OPERATION 1. STORMWATER IS COLLECTED FROM THE AREA OF APRON A OUTSIDE OF THE STALLS Al -A7 AND DIRECTED TO THE EXISTING VALVE VAULT SYSTEM. A GREEN BEACON IS NORMALLY ON. 2. STORMWATER FLOWS THROUGH THE FLOW SPUTTER CATCH BASIN; VALVES BV A7-1 & BV A7-2 ARE NORMALLY OPEN. VALVE BV A7-3 IS NORMALLY CLOSED. (A GREEN BEACON IS ON) 3. IN THE EVENT OF A FUEL SPILL THE FLOW SPUTTER CATCH BASIN DIVERTS A SPILL TO THE FUEL CONTAINMENT VAULT; VALVES BV A7-1 AND BV A7-2 CLOSE AND VALVE BV A7-3 OPENS. (A RED BEACON IS ON) 4. MANUAL ACTIVATION OF THE EMERGENCY SPILL PUSH BUTTON WILL TURN OFF A GREEN BEACON AND TURN ON A RED BEACON AND WILL CLOSE VALVES BV A7-1 AND BV A7-2 AND OPEN VALVE BV A7-3. FLOW WILL BE DIVERTED TO THE FUEL CONTAINMENT VAULT. 5. THE FLUID LEVEL SENSOR IN THE FUEL CONTAINMENT VAULT WILL NOTIFY THE EMCS SYSTEM OF FUEL/OIL ACCUMULATION. THE CPS OIL -WATER SEPARATOR SHOULD BE EVACUATED OF FUEL FOLLOWING A SPILL OR IF MONTHLY INSPECTIONS INDICATED THE PRESENCE OF FUEL. 6. THERE ARE MANUALLY OPERATED GATE VALVES BEFORE AND AFTER THE OIL -WATER SEPARATOR SO THE OIL -WATER SEPARATOR CAN BE ISOLATED. 7. THERE IS A HYDROCARBON SENSOR IN THE STORMWATER CPS OIL -WATER SEPARATOR. WHEN THERE IS A FUEL SPILL THAT INCREASES THE OIL LEVEL IN THE SEPARATOR THE SENSOR WILL CLOSE VALVE BV A7-1 AND BV A7-2 AND OPEN BV A7-3. THE CPS OIL -WATER SEPARATOR SENSOR IS THE BACK UP ACTIVATION FOR THE FUEL SPILL CONTAINMENT SYSTEM. 8. IN THE EVENT OF A SPILL DURING A POWER OUTAGE ALL VALVES CAN BE OPERATED MANUALLY. 9. THE FUEL CONTAINMENT VAULT HAS A FLUID LEVEL SENSOR THAT NOTIFIES THE EMCS SYSTEM OF ACCUMULATED FLUID IN THE VAULT. THE FUEL CONTAINMENT VAULT SHOULD BE MONITORED FOR WATER ACCUMULATION AND WATER EVACUATED SO AS TO PRESERVE CONTAINMENT CAPACITY. THE FUEL CONTAINMENT VAULT SHOULD BE EVACUATED OF FUEL FOLLOWING A SPILL. 15. THE OIL -WATER SEPARATOR DISCHARGES TO THE MODULAR WETLAND TREATMENT VAULT (MWS-L-8-24-V-UG) WHICH PROVIDES ENHANCED WATER QUALITY. THE MODULAR WETLAND SHOULD BE INSPECTED BY A BIO-CLEAN APPROVED SERVICE PROVIDER ON AN ANNUAL BASIS. WETLAND SOILS MAY OR MAY NOT NEED TO BE REPLACED ANNUALLY. 16. CHECK AND ISOLATION VALVING IS IN THE VALVE PIT ADJACENT TO THE WET WELL. 17. PUSH BUTTON TO BE LOCATED ADJACENT TO ELECTRICAL PANEL NORTH OF THE BUILDING, OR AS DIRECTED ON SHEET E536. IN COMPLIANCE WITH CITY OF RENTON STANDARDS PERMIT SUBMITTAL DESIGN BY DOWL R-413740 AIL SUBTITLE 09.29.20 FUEL SPILL DIAGRAM 09.29.20 09.29.20 I TITLE APRON A -SITE STORMWATER IMPROVEMENTS (STALLS A3-A7 09 RENTON SITE CIVIL MASTER RENTON, WA DWG No. W5184605 C514 DATE 09.29.20 05-APRON-A-0514 09.29.20 C37 0 N \ N rn 0