Loading...
HomeMy WebLinkAboutR-4137451 0 1 Lu SUBSURFACE MANHOLE/VAULT MAT FOUNDATION SCHEDULE FOOTING MARK FINISH GRADE ELEVATION DEPTH OF BURY (FT) MAT ELEVATION (FT) FOOTING SIZE FOOTING REBAR MANHOLE/VAULT DIAMETER OR SIZE STRUCTURE TYPE LENGTH WIDTH THICKNESS TOP MAT BOTTOM MAT A VARIES VARIES VARIES 8'-6" 8'-6" 12" (9) #5's EA. WAY (9) #5's EA. WAY 2'-10" X 2'-6" WSDOT CATCH BASIN TYPE 1 B VARIES VARIES VARIES 4'-0" 4'-0" 12" (4) #5's EA. WAY (4) #5's EA. WAY 2'-10" X 2'-6" WSDOT CATCH BASIN TYPE 1 C VARIES VARIES VARIES 8'-9" 8'-9" 12" (9) #5's EA. WAY (9) #5's EA. WAY 4'-0" WSDOT CATCH BASIN TYPE 2 D 22.09 9.96 10.63 9'-0" 9'-0" 12" (9) #5's EA. WAY (9) #5's EA. WAY 4'-0" WSDOT CATCH BASIN TYPE 2 E 22.17 10.15 10.52 9'-0" 9'-0" 12" (9) #5's EA. WAY (9) #5's EA. WAY 4'-0" WSDOT CATCH BASIN TYPE 2 G 21.92 6.89 13.53 9'-0" 9'-0" 12" (9) #5's EA. WAY (9) #5's EA. WAY 4'-0" WSDOT CATCH BASIN TYPE 2 N ES: R F CIN ST S E B EV Y AC A OS FO IN E HS ND ID 2. SEE PLAN SHEETS C296, C302, AND C303 FOR LOCATIONS OF SPREAD FOOTINGS UNDER MANHOLES AND VAULTS. 3. SEE STORM DRAINAGE PROFILE SHEETS C304 THROUGH C306 FOR MANHOLE BASE DEPTHS. I-IA11C"1 lr-n j MANHOLE } a LL a LL i"� " OVEREXCAVATE SUBGRADE 24FOLLOWED BY THE I-LhULiViuv i Ur i U Ur QUhRR i STALLS. PLACE ONE LAYER OF TENSAR BX1500 GEOGRID FOLLOWED BY 6" CLEAN CRUSHED ROCK. COMPACT BACKFILL TO A FIRM, FLAT AND UNYIELDING SURFACE USING VIBRATORY COMPACTOR HAVING A MINIMUM WEIGHT OF 800 POUNDS. ORCING SECTION A -A LENGTH � MANHOLE P LAN SUBSURFACE MANHOLE/VAULT MAT FOUNDATION DETAILS SCALE: NTS DATUM NOTE: PLANS PREPARED USING NGVD 29 AS THE VERTICAL DATUM. TO CONVERT TO NAVD 88 ADD 3.556 FEET TO ALL ELEVATIONS. SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ORIG 737 MAX FLIGHTLINE UTILITIES -APRON A Cl PROJECT RT MJM 04.13.16 - APRON A Cl PROJECT - SITE DCN-06 RT MJM 09.27.16 - CITY OF RENTON PERMIT REVIEW COMMENTS RT MJM 05.23.16 - RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES RT MJM 10.28.16 - APRON A Cl PROJECT - SITE DCN-01 06.13.16 - APRON A SITE STORMWATER IMPROVEMENTS-30% RT MJM 01.17.18 - APRON A Cl PROJECT - SITE DCN-02 07.19,16 - APRON A SITE STORMWATER IMPROVEMENTS-60% TO IFC RT MJM 07.14.20 - APRON A Cl PROJECT - SITE DCN-03 __F 08.05.16 - APRON A SITE STORMWATER REVISIONS PER CITY COMMENTS RT MJM 09.29.20 iL / ff"ANG° '- Ivini 41 1\/ LL DIA S289 i . WAS T� �a _ ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED R. TEMPLADO CHECKED T. NEU ENGINEERM. METTLER APPROVED BY DEPT. DATE CHECKED D. MURATA NAL W nTF- SEE STRUCTURAL GENERAL NOTES SHEET S285 FOR DESIGN CRITERIA, SPECIAL INSPECTION REQUIREMENTS, MATERIALS AND GENERAL DESIGN, AND CONSTRUCTION INFORMATION. IN COMPLIANCE WITH CITY OF RENTON STANDARDS PERMIT SUBMITTAL DESIGN BY DOWL R-413745 AIL SUBTITLE 09.29.20 REINFORCEMENT DETAILS-MH & VAULT MAT FOUNDATION 09.29.20 09.29.20 TITLE APRON A —SITE STORMWATER IMPROVEMENTS (STALLS A3—A7) 09 RENTON SITE STRUCTURAL MASTER RENTON, Wq I Dwc No. BOWL REVISION SYMBOL I W5184605 0 R� S289 DATE 09.29.20 05—APRON—A—S289 09.29.20 S5