Loading...
HomeMy WebLinkAboutR-413746Fqa 1 1 Lu SHORING ENLARGED SITE PLAN S2901 C296 5;UALL: 1 =5 SHORING NOTES: 1. THE INFORMATION SHOWN ON THIS PLAN IS PROVIDED TO AID 6. ALL SHEET PILE SHALL BE LEFT IN PLACE AND CUT OFF 3' THE CONTRACTOR IN PREPARING A FORMAL ENGINEERED BELOW EXISTING GRADE OR AS NEEDED FOR PIPE INSTALLATION. SHORING DESIGN SUBMITTAL. THE CONTRACTOR'S SHORING DESIGN SHALL MEET OR EXCEED THE REQUIREMENTS INCLUDED 7. VERIFY EXISTING BURIED UTILITIES INCLUDING SIZE, TYPE AND ON THIS PLAN. THE EXACT CONFIGURATION OF THE SHORED DEPTH PRIOR TO DRIVING SHEET PILES. AREA AND THE SHEET PILE SECTIONS TO BE USED SHALL BE DETERMINED BY THE CONTRACTOR AND SHALL BE DOCUMENTED 8. PLACE DEWATERING SUMPS WITHIN INDIVIDUAL CELLS AS NEEDED IN THE DESIGN. TO COMPLETE INSTALLATION OF CATCH BASINS AND VAULTS. 2. THE SHEET PILE PERIMETER SHALL CONSIST OF FULLY 9. GROUNDWATER CAN BE WITHIN 3 FEET OF THE SURFACE DURING INTERLOCKED SHEET PILE TO MINIMIZE GROUND WATER AND IMMEDIATELY AFTER PERIODS OF HEAVY PRECIPITATION, PENETRATION. OTHERWISE GROUNDWATER IS TO BE ANTICIPATED AT APPROXIMATELY 5.5 TO 6.5 FEET BELOW THE SURFACE. 3. THE SHEET PILE STAGE DIVIDER SECTIONS AREA DESIGNED TO MINIMIZE THE SIZE OF THE OPEN EXCAVATION. 10. ANTICIPATED GROUNDWATER FLOW RATES INTO THE CELLS IS ESTIMATED AT 15 TO 50 GALLONS PER 24 HOURS PER LINEAL 4. THE CONTRACTOR SHALL NOTE TO EXCAVATE MORE THAN ONE FOOT OF SHEET PILE WALL PER S&EE'S GEOTECHNICAL REPORT DATUM NOTE. STAGE AT A TIME. DATED 5/25/2020. PLANS PREPARED USING NGVD 29 AS THE 5. THE CONTRACTOR SHALL INSTALL ALL STRUCTURES AND VERTICAL DATUM. TO CONVERT TO NAVD 88 BACKFILL THE EXCAVATED AREA UP TO A MINIMUM OF 5' BELOW ADD 3.556 FEET TO ALL ELEVATIONS. GRADE PRIOR TO MOVING TO THE NEXT STAGE. SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ORIG 737 MAX FLIGHTLINE UTILITIES -APRON A Cl PROJECT RT MJM 04.13.16 - APRON A Cl PROJECT - SITE DCN-06 RT MJM 09.27.16 V - CITY OF RENTON PERMIT REVIEW COMMENTS RT MJM 05.23.16 - RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES RT MJM 10.28.16 ® O - APRON A Cl PROJECT - SITE DCN-01 06.13.16 - APRON A SITE STORMWATER IMPROVEMENTS-30% RT MJM 01.17.18 - APRON A Cl PROJECT - SITE DCN-02 07.19.16 - APRON A SITE STORMWATER IMPROVEMENTS-60% TO IFC RT MJM 07.14.20 O - APRON A Cl PROJECT - SITE DCN-03 08.05.16 - APRON A SITE STORMWATER REVISIONS PER CITY COMMENTS RT MJM 09.29.20 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED R. TEMPLADO CHECKED T. NEU ENGINEER M. METTLER APPROVED BY DEPT. DATE CHECKED D. MURATA APPROVED 5 2.5 0 2.5 5 10 SCALE: 1:5 STAGE 3 STAGE DIVIDERS KEEP SHEET PILE MINIMUM OF 2' FROM EDGE OF EXISTING PIPE NinTP-- x i THE 12 FOOT DEEP CELLS REQUIRE A MINIMUM SHEET PILE LENGTH OF 38 FEET, WHEREAS THE 10 FOOT DEEP CELLS REQUIRE A 35 FOOT MINIMUM LENGTH. IN COMPLIANCE WITH CITY OF RENTON STANDARDS PERMIT SUBMITTAL DESIGN BY DOWL R-413746 41 L SUBTITLE CURRENT 09.29.20 ENLARGED SHORING PLAN 09.29.20 SHEET 09.29.20 TITLE APRON A -SITE STORMWATER IMPROVEMENTS (STALLS A3-A7) 09.29.20 RENTON SITE JOB N0. STRUCTURAL MASTER RENTON,WA DWG NO. 40'6DOWL REVISION SYMBOL W5184605 S290 DATE 09.29.20 09.29.20 COMP N0. S6. 05-APRON-A-S290 N N