Loading...
HomeMy WebLinkAboutR-413747Fqa 1 1 Lu GROUND SURFACE SHEET PILE ---\ DEPTH (FEET) 0 r____ BOTTOM 4 10 20 30 EXCAV) — (INCLUDING OVER—EXCAV) --------- 62.4 590 666 35 ' — HYDROSTATIC 1789 PRESSURE PASSIVE PRESSURE ACTIVE 661 PRESSURE SURCHARGE —INDUCED PRESSURE (100 PSF) 62.4 HYDROSTATIC PRESSURE SECTION - 10 FOOT CANTILEVERED WALL SCALE: NTS IRfillim S291 1. ALL PRESSURES IN POUNDS PER SQUARE FEET (PSI) 2. CALCULATE HYDROSTATIC PRESSURE USING FLUID DENSITY = 62.4 PCF 3. SURCHARGE INDUCED LATERAL LOADS IS UNIFORM AND EXTENDS TO THE DEPTH OF EXCAVATION 4. PASSIVE EARTH PRESSURE INCLUDES A SAFETY FACTOR OF 1.5 5. IGNORE TOP 2 FEET OF PASSIVE PRESSURE 6. CONTROL GROUNDWATER USING LOCAL SUMPS DEPTH (FEET) 0 4 12 GROUND Sl'�rn,.r SHEET PILE BOTTOM OF EXCAVATION (INCLUDING 2FT OVER —EXCAVATION ---------- ---- -- 62.4 20 533 30 35 HYDROSTATIC 1789 PRESSURE SURCHARGE —INDUCED PRESSURE (100 PSF) 62.4 ACTIVE 661 HYDROSTATIC PRESSURE PRESSURE SECTION - 12 FOOT CANTILEVERED WALL SCALE: NTS S291 EARTH PRESSURE DIAGRAMS DEVELOPED AND REPRINTED WITH PERMISSION FROM THE GEOTECHNICAL ENGINEER, S&EE AS DIRECTED BY BOEING. DIAGRAMS ARE INCLUDED IN S&EE'S REPORT OF GEOTECHNICAL INVESTIGATION DATED MAY 29, 2020 FOR THE APRON A —SITE STORMWATER IMPROVEMENT PROJECT. SHORING EARTH PRESSURE DIAGRAM S291 I S290 NU I I U SGALL DATUM NOTE: IN COMPLIANCE WITH CITY OF RENTON STANDARDS PERMIT SUBMITTAL DESIGN BY DOWL DATE 09.29.20 PLANS PREPARED USING NGVD 29 AS THE VERTICAL DATUM. TO CONVERT TO NAVD 88 ADD 3.556 FEET TO ALL ELEVATIONS. R-413747 BOWL SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE �� F WAs TT� THIS DESIGN AND/OR 'CHECKED �DO 09.29.20 SHORING EARTH PRESSURE DIAGRAM W5184605 — 09.29.20 ORIG 737 MAX FLIGHTLINE UTILITIES —APRON A Cl PROJECT RT MJM 04.13.16 — APRON A CI PROJECT —SITE DCN-06 RT MJM 09.27.16 �� �� SPECIFICATION IS APPROVED T. NEU 09.29.20 SHEET — CITY OF RENTON PERMIT REVIEW COMMENTS RT MJM 05.23.16 — RECORD DRAWING — 737 MAX FLIGHTLINE UTILITIES RT MJM 10.28.16 ® !"' ENGINEER TITLE APRON A —SITE STORMWATER IMPROVEMENTS STALLS A3—A7 - - _ APPROVED BY DEPT. DATE M. METTLER 09.29.20 S291 7 - C � � j L CHECKED v APRON A Cl PROJECT SITE DCN-01 06.13.16 APRON A SITE STORMWATER IMPROVEMENTS-30% RT MJM 01.17.18 D. MURATA 09.29.20 RENTON SITE 36769 4 APPROVED JOB NO. COMP N0. — APRON A Cl PROJECT — SITE DCN-02 07.19.16 — APRON A SITE STORMWATER IMPROVEMENTS-60% TO IFC RT MJM 07.14.20 .� +�'�,S ECI STER��1$�' - I APRON A Cl PROJECT — SITE DCN-03 08.05.16 — I APRON A SITE STORMWATER REVISIONS PER CITY COMMENTS RT MJM 09.29.20 SIGNAL S APPROVED ]STRUCTURAL MASTER RENTON,WA DWG NO. 05—APRON—A—S291 0 N rn N \