Loading...
HomeMy WebLinkAboutMFP21002590.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP21002590 IVR Number: 21002590 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:06/07/2021Application Date:3664500315Parcel Number: 6509 NE 4TH ST Permit Type:07/08/2021Issue Date:Franchise Permit Work Class:07/08/2022Expiration Date:Minor Utility Job Number: 186058969Franchise Type:Electric Description: Puget Sound Energy Electric REPLACE 3 TRANSMISSION POLES, GUYING UPGRADES, ZIPTIES; INSTALL NEW PLATE ANCHOR. Work is for P01 P05. P06 is in King Co. WORK IN THE CITY OF RENTON ROW IS APPROVED. ADDITIONAL APPROVAL MAY BE NEEDED FROM kING COUNTY FOR WORK IN THEIR ROW. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL DIATRI MICHELLE 6509 NORTHEAST 4TH STREET RENTON , WA 98059 Owner Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering 4 4 4 4 4 4 4 4 4 4 4 186058969 15608 SE 128TH ST Monday Friday 8:00am 3:00pm PLEASE SEE ATTACHED POTELCO, INC 425 892 0416 KATIE DIERICK KATIE.DIERICK@PSE.COM 6905 S. 228TH ST KENT, WA 98032 MFP21002590 Scott Warlick CED 7/8/2021 MFP21002590 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date CORRIE RYDBERG MFP21002590 P01156TH AVE SE156TH AVE SE OTHER SIDES/W CLOSEDOTHER SIDES/W CLOSED ARRW-BRD RIGHT LANE CLOSED AHEAD W20-5RW4-2LROAD WORK AHEAD W20-1350'350'350'ROADWORKAHEADW20-1 ROADWORKAHEADW20-111111111141111SE 128TH ST11 11 11 11 RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSURE1111121111 Puget Sound EnergyTraffic Control Supervisor:John CrofootCard No. 012613Card Exp. 10/31/24John.Crofoot@pse.com(425)424-6658TEMPORARY TRAFFIC CONTROL PLANPSEPUGETSOUNDENERGYJOB#18605896915608 SE 128TH ST, RENTON, WA 9805902/08/21JOHN.CROFOOT@PSE.COM425-424-6658SHEET 1 of 5Notes:1. All signs and spacing to conform to theMUTCD and King County standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NWORK PIT28" TRAFFIC CONETRAFFIC FLOWSIGN LOCATIONLEGENDCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MFP21002590 P02P03158TH AVE SE SE 128TH ST141111111111 11 11 11 1111121111 ARRW-BRD RIGHT LANE CLOSED AHEAD W20-5RW4-2LROAD WORK AHEAD W20-1350'350'350'ROADWORKAHEADW20-1ROADWORKAHEADW20-1 SE 128TH STNotes:1. All signs and spacing to conform to theMUTCD and King County standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NWORK PIT28" TRAFFIC CONETRAFFIC FLOWSIGN LOCATIONLEGENDCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Puget Sound EnergyTraffic Control Supervisor:John CrofootCard No. 012613Card Exp. 10/31/24John.Crofoot@pse.com(425)424-6658TEMPORARY TRAFFIC CONTROL PLANPSEPUGETSOUNDENERGYJOB#18605896915608 SE 128TH ST, RENTON, WA 9805902/08/21JOHN.CROFOOT@PSE.COM425-424-6658SHEET 2 of 5MFP21002590 P031111111211158TH AVE SE SE 128TH STSE 128TH STSE 128TH ST160TH AVE SE 160TH AVE SE11111111111111 1111111111 CONETOPPER ARRW-BRD RIGHT LANE CLOSED AHEAD W20-5RW4-2LROAD WORK AHEAD W20-1350'350'350'ROADWORKAHEADW20-1 ROADWORKAHEADW20-1ROADWORKAHEADW20-111 11 11 11 maintain 11' laneNotes:1. All signs and spacing to conform to theMUTCD and King County standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NWORK PIT28" TRAFFIC CONETRAFFIC FLOWSIGN LOCATIONLEGENDCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Puget Sound EnergyTraffic Control Supervisor:John CrofootCard No. 012613Card Exp. 10/31/24John.Crofoot@pse.com(425)424-6658TEMPORARY TRAFFIC CONTROL PLANPSEPUGETSOUNDENERGYJOB#18605896915608 SE 128TH ST, RENTON, WA 9805902/08/21JOHN.CROFOOT@PSE.COM425-424-6658SHEET 3 of 5MFP21002590 1111111211SE 128TH STSE 128TH ST160TH AVE SE 160TH AVE SEP04 P0511111111111111111111 THE CREW SHALL CEASEWORK FOR A FLAGGER/SPOTTERTO ESCORT PEDESTRIANSAROUND THE WORK AREAROADWORKAHEADW20-1 ROADWORKAHEADW20-1ROADWORKAHEADW20-1RIGHT LANE CLOSED AHEAD W20-5RW4-2LROAD WORK AHEAD W20-1350'350'350'ARRW-BRD 1111111111 Notes:1. All signs and spacing to conform to theMUTCD and King County standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NWORK PIT28" TRAFFIC CONETRAFFIC FLOWSIGN LOCATIONLEGENDCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Puget Sound EnergyTraffic Control Supervisor:John CrofootCard No. 012613Card Exp. 10/31/24John.Crofoot@pse.com(425)424-6658TEMPORARY TRAFFIC CONTROL PLANPSEPUGETSOUNDENERGYJOB#18605896915608 SE 128TH ST, RENTON, WA 9805902/08/21JOHN.CROFOOT@PSE.COM425-424-6658SHEET 4 of 5MFP21002590 SE 128TH STBUSSTOPBUSSTOPSE 128TH STSE 128TH ST164TH AVE SE 164TH AVE SE1111121111 1111121111 151112111199 111211P06ARRW-BRD RIGHT LANE CLOSED AHEAD W20-5RW4-2LROAD WORK AHEAD W20-1350'350'350'ROADWORKAHEADW20-1 ROADWORKAHEADW20-1ROADWORKAHEADW20-111 11 11 11Notes:1. All signs and spacing to conform to theMUTCD and King County standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NWORK PIT28" TRAFFIC CONETRAFFIC FLOWSIGN LOCATIONLEGENDCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Puget Sound EnergyTraffic Control Supervisor:John CrofootCard No. 012613Card Exp. 10/31/24John.Crofoot@pse.com(425)424-6658TEMPORARY TRAFFIC CONTROL PLANPSEPUGETSOUNDENERGYJOB#18605896915608 SE 128TH ST, RENTON, WA 9805902/08/21JOHN.CROFOOT@PSE.COM425-424-6658SHEET 5 of 5MFP21002590 SE 128TH ST164TH AVE SE '16434''16402'INST SW#84995SE 128TH ST160TH AVE SE '16017''16009'SE 128TH STSE 128TH ST158TH AVE SE156TH AVE SE SE 128TH ST156TH AVE SE'15606''15706''12663''6509''6515''6613''6627'EOPFOGCLROWP03EOP=5'FOG=5'CL=12'CL=22'EEOPFOGCLROWP05EOP=2'FOG=5'CL=12'CL=19'WEOPFOGCLROWP06EOP=6'FOG=4'CL=12'CL=22'W510706873186058969111026404/108126958PROJECT PHASEPWRNOTIF#ORDER#SuperiorSub OrderN/AN/APSENoNoNoYesYesYesNoYesDeveloper"Flagging Required""Outages Required""Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGSAP W.O. #186058969FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.OH CIRCUIT MAP: D2306E028 SCALE 6" = 1 MILEARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.POWER GENERAL NOTES1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from thiswork sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy.2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three(3) working days in advance.3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing workto get the underground facilities located.4.All work is to be done in accordance with local municipal and county permit requirements as applicable.5.Inclement weather conditions may cause delays in construction times and dates.SCALE: 1:100SITE PLAN: P01-P03DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPK. DIERICK253-294-589501/29/21J. REYNA253-259-707601/29/21N/AN/AN/AB. JOHNSON01/29/21N/AKING COUNTYENGR1 COMCAST TK#4542125REPLACE (3) TRANS. POLES, GUYING UPGRADES, ZIPTIES15608 SE 128TH ST RENTON, WA 98059POTELCON/AN/AN/A186058969AS NOTED1/1KINGN/AN/AQCNOKET23, R05E, S11N/AN/AA2305E043D2306E028R2305E043,44MAP-15N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AVICINITY MAPJOB SITESITE SPECIFIC NOTESP01 (318093-167914)-INST NEW LARGE PLATE ANCHOR (6012.1000 ANDP24) W/ 17' LEAD NORTH-INST NEW 7/16" DISTRIBUTION DOWN GUY (6013.0100 GYD7SA) AND ATTACH TO NEW ANCHORP02 (318092-167950)-RAISE NEUTRAL 1'(____')P03 (318090-168010)-REPLACE EXIST 70' POLE W/ NEW 70' CLH2 POLE PER TRANSMISSION WO# 111026404-INST 3Ø SINGLE ARM UNDERBUILD (6034.1010 TANU313)-TRANSFER EXIST 25kVA 120/240v XFMR W/ LB C/O FUSED AT 10T (3412200)-INST 1Ø OH-UG TERM (6043.1000 TSU1C1) W/ LB C/O FUSED AT 25T (3412400)-INST NEW 2" RISER (6042.1000 RIS2CSS) ON S/O BKTS APPROX. 40'(____')-SPLICE AT BASE OF POLE NEW 1/0 UG SEC. APPROX 45'(____') THROUGH NEW RISER-INST SW# X10597-TRANSFER EXIST S/L-TRANSFER OH SEC.-TOP POLE TO COMMS.P04 (318089-168057)-ZIPTIE SEC. TO NEUT APPROX. 90' TO P05-CREW TO MAINTAIN SAFETY SPACE CLEARANCESP05 (318088-168066)-REPLACE EXIST 65' POLE W/ NEW 70' CLH1 POLE PER TRANSMISSION WO# 111026404-INST 3Ø DOUBLE DEAD END UNDERBUILD (6034.1044 DDEU315)-TRANSFER EXIST G/OP EXTEND CONTROL ARM IF NECESSARY-INST SW# X723-TRANSFER EXIST S/L (SLAK2128)-TRANSFER OH SEC.-TOP POLE TO COMMS.P06 (318084-168203)-REPLACE EXIST 65' POLE W/ NEW 75' CLH1 POLE PER TRANSMISSION WO# 111026404-INST 3Ø SINGLE ARM UNDERBUILD (6034.1010) TANU313)-INST 3Ø TAP (6033.5100 LAT312) W/ LI C/Os FUSED AT 65T (3412600) NORTH-EAST-INST SW#X3367-INST 1Ø ARM MOUNTED TAP (6031.5060 FR13RDE) W/ LI C/O FUSED AT 65T SOUTH-INST SW#84995-INST NEW LARGE PLATE ANCHOR (6012.1000 ANDP24) W/ 30' LEAD EAST-INST DOUBLE 7/16" DOWN GUY (6013.0100 GYDD7SA) AND ATTACH TO NEW ANCHOR-TOP POLE TO COMMS.THIS PAGE PERTAINS TO DISTRIBUTION UNDERBUILDSEE ADDITIONAL PRINT FOR TRANSMISSION NOTESCREW NOTE:INSTALL NEW POLES MIN 10' FROM EOP ORFOG LINE PER KING COUNTY CLEAR ZONESCALE: 1:100SITE PLAN: P04-P05SCALE: 1:100SITE PLAN: P06JOB SITENew pole at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER TRANSFERCompany ID#:Primary phase connected to:Tested Secondary Voltage P03318090-168010 25kVAUG CIRCUIT MAP: R2305E044 SCALE: 1:100NOT TO SCALEROW PROFILE: P03NOT TO SCALEROW PROFILE: P05NOT TO SCALEROW PROFILE: P06RESTORATION PER CITY OF RENTON STANDARDSADDITIONALAPPROVAL MAY BENEEDED FROM KINGCOUNTY FOR WORKIN THEIR ROWMFP21002590