Loading...
HomeMy WebLinkAboutSR_ERC_Concurrence_Memo_Sunset_Highlands_210706DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT SR_ERC Concurrence Memo_Sunset Highlands_210706 ENVIRONMENTAL REVIEW COMMITTEE MEMO APPLICATION NUMBER: LUA21-000168, SA-H, VAR, MOD (x4) APPLICANTS: David Albers, SMR Architects / 117 S Main St, Suite 400, Seattle, WA 98104 PROJECT NAME: PR21-000160 Sunset Gardens DESCRIPTION OF PROPOSAL: The applicant is requesting Hearing Examiner Site Plan Review, Variance, four modifications, and concurrence with the Sunset Area Planned Action EIS for a proposed four-story mixed-use building and associated improvements located at 2900 NE 10th St. The proposed building would contain 76 affordable housing units with approximately 13,645 square feet of ground floor space occupied by the Renton Housing Authority services staff. The residential density of the completed project would result in approximately 66 dwelling units per net acre. The existing 13,416 square foot Renton Housing Authority building would be removed. The project site is approximately 1.28 acres and located within the Center Village (CV) zoning district, Commercial Mixed Use (CMU) comprehensive plan designation, and Urban Design District ‘D’ overlay. Vehicle access to the subject property would occur from a single driveway located on the northeast portion of the site on Jefferson Ave NE. The applicant would provide parking for 55 vehicles. The applicant would construct street frontage improvements abutting the project site along NE 10th St and Jefferson Ave NE. There are seven significant trees on the subject property all of which are proposed to be removed. The applicant is requesting a variance related to the required location for parking to allow parking between the building and the public street. The applicant is also requesting four code modifications related to street frontage improvements, retaining wall height, parking stall size, and refuse and recycling standards. Studies included with the project application include drainage report, arborist report, geotechnical report, and traffic impact analysis. The project site is within the Sunset Planned Action Area. The site would generate approximately 181 weekday trips with 31 trips occurring during the weekday AM peak hour and 19 trips occurring during the weekday PM peak hour. The applicant’s transportation analysis has indicated that the future level of service (LOS) for the five (5) studied intersections near the project site would operate at LOS ‘A’ and ‘B’ with or without the proposed development. The applicant’s drainage analysis has indicated that the runoff from the site would be collected and conveyed to bioretention planters with overflows discharged into the City’s stormwater system located in the Jefferson Ave NE ROW. The site will be required to provide Best Management Practices per the manual. The applicant’s analysis has indicated the amount of pollution generating impervious surface would be approximately 6,278 square feet for the redeveloped site and therefore is not exempt from providing water quality treatment. Final review for compliance with the City’s stormwater requirements would occur during the civil construction permit phase. LOCATION OF PROPOSAL: 2900 NE 10th St LEAD AGENCY/RESPONSIBLE ENTITY: City of Renton, Environmental Review Committee Upon determination by the City’s Environmental Review Committee that the proposal meets the criteria outlined in the Planned Action Ordinance (Ordinance #5813) and qualifies as a planned action, the proposal shall not require a State Environmental Policy Act (SEPA) threshold determination, preparation of an EIS, or be subject to further environmental review pursuant to SEPA. DocuSign Envelope ID: 79C68332-54C2-4835-BBF5-4E8BA45C5C95 SR_ERC Concurrence Memo_Sunset Highlands_210706 The City’s Environmental Review Committee designates the proposal as a “planned action”, pursuant to RCW 43.21C.030, as it meets all of the following conditions: ✓ The proposal is located within the Sunset Planned Action Area. ✓ The proposed uses and activities are consistent with those described in the Planned Action EIS and Planned Action Qualifications. ✓ The proposal is within the Planned Action thresholds and other criteria of the Planned Action Qualifications. ✓ The proposal is consistent with the City of Renton Comprehensive Plan and applicable zoning regulations. ✓ The proposal’s significant adverse environmental impacts have been identified in the Planned Action EIS. ✓ The proposal’s impacts would be mitigated by measures identified in Attachment B of Ordinance #5813 to be applied as conditions of permit approval, and other applicable City regulations, together with any modifications or variances or special permits that may be required. ✓ The proposal complies with all applicable local, state and/or federal laws and regulations, and the Environmental Review Committee determines that these constitute adequate mitigation. ✓ The proposal is not an essential public facility as defined by RCW.36.70A.200(1). SIGNATURES: Martin Pastucha, Administrator Date Anjela Barton, Administrator Date Public Works Department Renton Regional Fire Authority Kelly Beymer, Administrator Date C.E. Vincent, Administrator Date Community Services Department Department Of Community & Economic Development DocuSign Envelope ID: 79C68332-54C2-4835-BBF5-4E8BA45C5C95 7/12/2021 | 2:29 PM PDT 7/12/2021 | 2:34 PM PDT7/12/2021 | 2:49 PM PDT 7/12/2021 | 4:20 PM PDT CITY OF RENTON DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT STAFF REPORT TO THE ENVIRONMENTAL REVIEW COMMITTEE EXHIBITS Project Name: PR21-000160 Sunset Gardens Project Land Use Number: LUA21-000168, SA-H, VAR, MOD (x4) Date of Meeting July 12, 2021 Staff Contact Alex Morganroth Senior Planner Project Contact David Albers, SMR Architects / 117 S Main St, Suite 400, Seattle, WA 98104 Project Location 2900 NE 10th St The following exhibits are included with the ERC Report: Exhibit 1: Environmental Review Committee (ERC) Memo Exhibit 2: Site Plan Exhibit 3: Architectural Elevations Exhibit 4: Floor Plans Exhibit 5: Color Renderings Exhibit 6: Boundary and Topographic Survey Exhibit 7: Utility Plan Exhibit 8: Tree Retention Plan Exhibit 9: Landscape Plan Exhibit 10: Drainage and Grading Plan Exhibit 11: Technical Information Report prepared by kpff, dated April 2021 Exhibit 12: Technical Information Report Appendices prepared by kpff, dated April 2021 Exhibit 13: Update to Geotechnical Report prepared by Otto Rosenau & Associates, dated April 16, 2021 Exhibit 14: Traffic Impact Analysis prepared by Transportation Solutions, dated April 2021 Exhibit 15: Arborist Report prepared by Fazio Associates, LLC, dated February 1, 2021 Exhibit 16: Transportation Concurrency Memorandum Exhibit 17: Advisory Notes DocuSign Envelope ID: 79C68332-54C2-4835-BBF5-4E8BA45C5C95