Loading...
HomeMy WebLinkAboutExhibit_6_Drainage_ReportDUNCANSON Company, Inc. SURVEYING LAND PLANNING 145 SW 155th Street Suite 102 Seattle, Washington 98166 Phone 206.244.4141 Fax 206.244.4455 Web www.duncansonco. com CIVIL ENGINEERING DCI 04168. 184 MEMO REPORT To: City of Renton CED From: Harold Duncanson, PE Date: 7/11/19 Subject: 2902 NE 12th Street Crown Castle Site 831070—SUNSET Drainage Memo Report This project involved development of a new wireless telecom site. Improvements will include an antenna tower, rock surfaced equipment compound and power/telco utility trenching. The equipment compound and an access connection comprise the total new and/or replaced impervious surface, which is 1,996 SF. The clearing limits for utility trenching, grading the equipment compound and construction access are approximately 5,300 SF of disturbed area. Also, this Project will not construct/modify a pipe/ditch 12-inches or larger, nor does it receive runoff from such a system. The Site is not in a flood, erosion, steep slope hazard or landslide hazard drainage area. The project is not a redevelopment project of an existing high use site. Based on these quantities and site characteristics, this Project falls below the thresholds for drainage review (less than 2,000 SF new/replaced impervious and less than 7, 000 SF land disturbing activity) as identified in Section 1.1.1 of the Renton Surface Water Design Manual. As a matter of good practice, permeable ballast or other relatively clean, crushed rock is specified for the equipment compound surfacing. Also, several ESC/ SWPPP measures are specified on the plans and were chosen in consideration of the lists in Section 1.2. 5.1 of the Renton Surface Water Design Manual. Please call if you have any questions. RECEIVED 01/ 08/2020 Exhibit 6 RECEIVED 06/03/2021 AMorganroth PLANNING DIVISION DocuSign Envelope ID: 10F04B11-B1B6-4ECF-85A1-13D99F6F674A