HomeMy WebLinkAbout0895.06 SWFR 321.pdf CONSTRUCTION STORMWATER
GENERAL PERMIT – FIELD REPORT
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
ESNW Rep. Project No. Page Report No.
MLP 0895.06 1 of 3 321
Time On Site Time Off Site Date Day of Week
1:20 1:50 7/01/21 Thursday
NPDES Permit No. Reviewed
WAR307963
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Road S, Renton RJ Development, LLC
Erosion Control BMPs
(13 Elements)
Overall
Condition
(Good; Fair; Poor)
Needs
Repair?
(Yes; No)
Comments
1.Preserve Vegetation; Mark Clearing Limits
•Buffer Zones around Sensitive Areas
•Silt Fence
G N -Chain link fence installed along site perimeter
2.Establish Construction Access
•Fabric; Quarry Spalls
•Wheel Wash
•Sweeper Truck
F Y -Quarry spall construction entrance
-Few quarry spalls on the sidewalk, keep quarry
spalls from entrance onsite and off the road
3.Control Flow Rates
•Stormwater Vault or Facility
•Straw Wattles
•Check Dams
G N -Onsite stormwater vault plugged
4.Install Sediment Controls
•Silt Fence
•Straw Bale Barriers
•Vegetation
•Straw
•Sediment Ponds, Traps & Filters
•Treatment
•Sediment Pond (Temp. or Perm.)
•Water Truck
F Y
-Silt fence installed around majority of site perimeter
-Damaged section of silt fence along the
building, recommend remove or repair
-Stormwater sump SE of construction entrance
-Subsurface drain installed under construction
entrance to divert water to sump
-Straw wattles N of entrance to divert water to sump
5. Stabilize Soils
•Nets & Blankets
•Mulch, Bark & Rock
•Hydroseeding; Grass
•Plastic Sheeting
•Straw Stockpiles
•Stockpiles
•PAM
F N -Exposed soils in active use throughout site
6.Protect Slopes
•Benching; Track-Walking
•Pipe Slope Drains
•Plastic Sheeting; Anchors
G N -Straw wattles in place to divert water away from
slopes along western perimeter
-Slopes covered in straw
7.Protect Drain Inlets
•Catch Basin Inserts
•Gutter; Road
G N -CB inserts installed in offsite catch basins
8.Stabilize Channels and Outlets
•Channel Lining
•Check Dam
•Outlet Protection
•Nets and Blankets
- - N/A
9. Control Pollutants
•Chemical Storage Area Covered
•Concrete Handling
G N -Stormwater treated with dry ice to lower pH to
suitable levels
-Chemical/material storage onsite
10. Control Dewatering G N -Via KC Sewer Discharge Permit as needed
11. Maintain BMPs F Y -See Action Items below
12.Maintain SWPPP & Site Logbook G N -Available upon request
13. Protect Low-Impact Development (LID BMPs)
•Bioretention Rain Garden Facilities
•Permeable Pavement
- - N/A
CONSTRUCTION STORMWATER
GENERAL PERMIT – FIELD REPORT
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
ESNW Rep. Project No. Page Report No.
MLP 0895.06 2 of 3 321
Time On Site Time Off Site Date Day of Week
1:20 1:50 7/01/21 Thursday
NPDES Permit No. Reviewed
WAR307963
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Road S, Renton RJ Development, LLC
Monitoring, Records & Recommendations
Will existing BMPs need to be modified or removed, or will other BMPs need to be installed? Yes No
List the completed, not-yet-completed, or ongoing action items in the table below:
Actions Items Completed?
(Yes; No; Ongoing)
Date
(If Completed)
Few quarry spalls on the sidewalk, keep quarry spalls from entrance onsite and off the road O 7/01/21
Damaged section of silt fence along the building, recommend remove or repair N
Current Weather: 70°F, Overcast
Precipitation since last inspection (approximate): 0.00 inches
Precipitation in the last 24 hours (approximate): 0.00 inches
Type of Visit: Weekly Post–Storm Event
Was water quality sampling part of this inspection? Yes No
If “Yes”:
•Record results in the table below.
•Characterize the stormwater discharge, e.g., the presence of suspended sediment, “cloudiness”, discoloration, or oil sheen, if
present:
•Hanna Turbidity Meter #
Monitoring Location Turbidity
(NTU) pH Notes
- - - -
Is the site in compliance with the SWPPP and the permit requirements? Yes No
If “No”:
•Indicate the tasks necessary to bring the site into compliance in the table above.
•Has the non-compliance been reported to the Department of Ecology?Yes No
•Should the SWPPP be modified?Yes No
“This report is true, accurate, and complete to the best of my knowledge and belief.”
Inspector Name: Maggie Perme CESCL Number: ECO-3-4042106 Inspection Date: July 01, 2021
CONSTRUCTION STORMWATER
GENERAL PERMIT – FIELD REPORT
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
ESNW Rep. Project No. Page Report No.
MLP 0895.06 3 of 3 321
Time On Site Time Off Site Date Day of Week
1:20 1:50 7/01/21 Thursday
NPDES Permit No. Reviewed
WAR307963
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Road S, Renton RJ Development, LLC
BMP LEGEND
MONITORING POINT
JOB SHACK
WHEEL WASH
STORMWATER VAULT
TEMPORARY SEDIMENT POND/TRAP
WATTLE
SILT FENCE
CONSTRUCTION ENTRANCE
SUBSURFACE DRAIN
CHEMICAL/MATERIAL STORAGE
CATCH BASIN INSERT
Damaged
section of silt
fence