HomeMy WebLinkAboutCopy of Record PreferredEngineeringLLC Sunday July 11 2021.PDFMonitoring Period:06/01/2021 - 06/30/2021
Facility County:King
WAR308781Permit Number:Permittee:
Receiving Waterbody:
Outfall:1 - SiteOutfall1
SiteOutfall1
KP Development Short Plat
Monitoring
PointWeek 1 1 1
1-T 6/1/21 C C C
2-Su 6/6/21 C C C
3-Su 6/13/21 C C C
4-Su 6/20/21 C C C
5-Su 6/27/21 C C C
Minimum BM: >= 33
(RO)
BM: >= 6.5
(RO)
Maximum BM: <= 25
(RO)
BM: <= 8.5
(RO)
Reporting Codes Used: C - No Discharge
Overall DMR Notes/Comment
Reporting Code: C - No Discharge
Started inspections during June 1st. The only discharge location did not have any indications of turbid runoff or any runoff.
Outfall: 1 - SiteOutfall1
Monitoring
Point
Parameter Sample Date/
Statistical Base
Value Notes/Comment
1 All Parameters No runoff apparent during the week or in the past in the
downstream ditch.
Version:1
Monitoring Point Week BMP
1 Silt Fence
2 Sediment Trap
3 Sediment Trap
4 Silt Fence
5 Silt Fence
BMPs
I certify under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified
personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for
gathering information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for
submitting false information, including the possibility of fine and imprisonment for knowing violations.
Ting-I Lee
Signature Date
7/11/2021 2:52:34 PM
Washington State Department of Ecology Discharge Monitoring Report (DMR)Page: 1 of 1