HomeMy WebLinkAboutEx 26_Barton Email.pdfFrom: Anjela Barton <abarton@rentonrfa.org>
Sent: Monday, June 7, 2021 1:35 PM
To: Matthew Herrera
Subject: Fwd: New Renton Elementary School #16 - fire lane surfacing
FYI...
Get Outlook for iOS
From: Corey Thomas <cthomas@rentonrfa.org>
Sent: Tuesday, May 18, 2021 1:51 PM
To: Anjela Barton
Subject: RE: New Renton Elementary School #16 - fire lane surfacing
Ok thanks, I will let them know.
Corey T.
From: Anjela Barton <abarton@rentonrfa.org>
Sent: Tuesday, May 18, 2021 1:44 PM
To: Corey Thomas <cthomas@rentonrfa.org>
Subject: RE: New Renton Elementary School #16 - fire lane surfacing
Corey,
I spoke with the Chief and Will Aho (he will likely be Roy’s replacement when he retires) and Mark
Seaver and will allow the following variance based on that discussion:
· The use of the grass paving is approved as submitted on the drawing provided with the
following requirements:
o Where the fire lane transitions to the grass paving at both ends, they will be required to
install signs that state “Fire Lane ONLY” to indicate the grass paving area is intended to
be maintain as a continuation of the fire lane.
Please let me know if you have additional questions or need additional information.
Sincerely,
A
From: Corey Thomas <cthomas@rentonrfa.org>
Sent: Tuesday, May 18, 2021 12:27 PM
To: Anjela Barton <abarton@rentonrfa.org>
Subject: FW: New Renton Elementary School #16 - fire lane surfacing
Here is the other picture of the grass fire lane they sent me if you need it.
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open
attachments unless you know the content is safe.
Corey Thomas, Lead Plans Review Inspector
Renton Regional Fire Authority l Office of the Fire Marshal
1900 Lind Ave SW Renton, WA 98055
425-276-9582 l 425-276-9547 Fax (NEW PHONE NUMBERS!!!!!!!!)
cthomas@rentonrfa.org
Professionalism . Integrity . Leadership . Accountability . Respect
From: Nicole Hernandez <NicoleH@lpdengineering.com>
Sent: Tuesday, May 11, 2021 4:22 PM
To: Corey Thomas <cthomas@rentonrfa.org>
Cc: Ingrida Sanders <isanders@hoarch.com>; Katie Pond <kpond@hoarch.com>; Sophia Nespor
<SophiaN@lpdengineering.com>
Subject: New Renton Elementary School #16 - fire lane surfacing
Good afternoon Corey,
I’m emailing regarding the use of a grass pave type system for the west and south portion of the new
fire lane proposed at the new Elementary 16 project for the Renton School District. We successfully
used this product for a fire lane at Peter Kirk Elementary School in Kirkland, WA that just opened a
couple years ago. I’ve attached a photo of that installation as the grass was starting to grow in. I’ve also
attached some additional information from the manufacturer. We can install fire lane signs along the
perimeter as well as paint the top of the adjacent flush curb red with white “FIRE LANE” stenciling to
help identify this as a fire lane that will support emergency and fire vehicles. This section of fire lane is
adjacent to an existing wetland buffer on the west side of the site that will be used for educational
opportunities so we were hoping to reduce the use of asphalt in this area provide some additional
green-scape with this alternate product.
Please let me know if you have any questions or would need additional information to consider this
product for use on the Elementary 16 project.
Thank you,
Nicole Hernandez, P.E., LEED AP
206.491.5835 (cell)
206.725.1211 (office)