Loading...
HomeMy WebLinkAboutEx 26_Barton Email.pdfFrom: Anjela Barton <abarton@rentonrfa.org> Sent: Monday, June 7, 2021 1:35 PM To: Matthew Herrera Subject: Fwd: New Renton Elementary School #16 - fire lane surfacing FYI... Get Outlook for iOS From: Corey Thomas <cthomas@rentonrfa.org> Sent: Tuesday, May 18, 2021 1:51 PM To: Anjela Barton Subject: RE: New Renton Elementary School #16 - fire lane surfacing Ok thanks, I will let them know. Corey T. From: Anjela Barton <abarton@rentonrfa.org> Sent: Tuesday, May 18, 2021 1:44 PM To: Corey Thomas <cthomas@rentonrfa.org> Subject: RE: New Renton Elementary School #16 - fire lane surfacing Corey, I spoke with the Chief and Will Aho (he will likely be Roy’s replacement when he retires) and Mark Seaver and will allow the following variance based on that discussion: · The use of the grass paving is approved as submitted on the drawing provided with the following requirements: o Where the fire lane transitions to the grass paving at both ends, they will be required to install signs that state “Fire Lane ONLY” to indicate the grass paving area is intended to be maintain as a continuation of the fire lane. Please let me know if you have additional questions or need additional information. Sincerely, A From: Corey Thomas <cthomas@rentonrfa.org> Sent: Tuesday, May 18, 2021 12:27 PM To: Anjela Barton <abarton@rentonrfa.org> Subject: FW: New Renton Elementary School #16 - fire lane surfacing Here is the other picture of the grass fire lane they sent me if you need it. CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Corey Thomas, Lead Plans Review Inspector Renton Regional Fire Authority l Office of the Fire Marshal 1900 Lind Ave SW Renton, WA 98055 425-276-9582 l 425-276-9547 Fax (NEW PHONE NUMBERS!!!!!!!!) cthomas@rentonrfa.org Professionalism . Integrity . Leadership . Accountability . Respect From: Nicole Hernandez <NicoleH@lpdengineering.com> Sent: Tuesday, May 11, 2021 4:22 PM To: Corey Thomas <cthomas@rentonrfa.org> Cc: Ingrida Sanders <isanders@hoarch.com>; Katie Pond <kpond@hoarch.com>; Sophia Nespor <SophiaN@lpdengineering.com> Subject: New Renton Elementary School #16 - fire lane surfacing Good afternoon Corey, I’m emailing regarding the use of a grass pave type system for the west and south portion of the new fire lane proposed at the new Elementary 16 project for the Renton School District. We successfully used this product for a fire lane at Peter Kirk Elementary School in Kirkland, WA that just opened a couple years ago. I’ve attached a photo of that installation as the grass was starting to grow in. I’ve also attached some additional information from the manufacturer. We can install fire lane signs along the perimeter as well as paint the top of the adjacent flush curb red with white “FIRE LANE” stenciling to help identify this as a fire lane that will support emergency and fire vehicles. This section of fire lane is adjacent to an existing wetland buffer on the west side of the site that will be used for educational opportunities so we were hoping to reduce the use of asphalt in this area provide some additional green-scape with this alternate product. Please let me know if you have any questions or would need additional information to consider this product for use on the Elementary 16 project. Thank you, Nicole Hernandez, P.E., LEED AP 206.491.5835 (cell) 206.725.1211 (office) LPD Engineering PLLC 1932 First Avenue, Suite 201 Seattle, WA 98101