Loading...
HomeMy WebLinkAboutF_Sierra Heights ES Ballfield_Civil_ApprovedTED-40-4189R-418901 C21-003650PR21-0002971 of 18 2 of 18 3 of 18 4 of 18 5 of 18 6 of 18 7 of 18 8 of 18 9 of 18 10 of 18 11 of 18 12 of 18 13 of 18 14 of 18 15 of 18 16 of 18 17 of 18 18 of 18 sheet 1 of 18 APPROVED 07/30/2021 msippo DEVELOPMENT ENGINEERING DIVISION TED-40-4189R-418902 C21-003650PR21-000297sheet 2 of 18 DEVELOPMENT ENGINEERING msippo 07/30/2021 TED-40-4189R-418903 C21-003650PR21-000297sheet 3 of 18 contact city if any work may appear to impact trees or tree critical root zones. fire lane shall not be used for staging of any materials, vehicles, tesc facilities and is required to remain open and unobstructed at all times. if damage or fading of fire lane striping occurs during construction, striping shall be returned to original or better condition following project completion. DEVELOPMENT ENGINEERING msippo 07/30/2021 TED-40-4189R-418904 C21-003650PR21-000297sheet 4 of 18 DEVELOPMENT ENGINEERING msippo 07/30/2021 TED-40-4189R-418905 C21-003650PR21-000297sheet 5 of 18 DEVELOPMENT ENGINEERING msippo 07/30/2021 TED-40-4189R-418906 C21-003650PR21-000297sheet 6 of 18 DEVELOPMENT ENGINEERING msippo 07/30/2021 TED-40-4189R-418907 C21-003650PR21-000297sheet 7 of 18 DEVELOPMENT ENGINEERING msippo 07/30/2021 TED-40-4189R-418908 C21-003650PR21-000297sheet 8 of 18 provide catch basin with turned down elbow for presettling prior to water quality vault. recommend tying cpep from south french drain to catch basin or provide additional cleanouts at bends. confirm with engineer and city if existing sd line will be plugged, abandoned or removed prior to installation of new 8" cpep connection into existing manhole provide turned down-elbows on outlets for any surface structures located near infield. DEVELOPMENT ENGINEERING msippo 07/30/2021 TED-40-4189R-418909 C21-003650PR21-000297sheet 9 of 18 DEVELOPMENT ENGINEERING msippo 07/30/2021 TED-40-4189R-418910 C21-003650PR21-000297sheet 10 of 18 fencing, backstop and dugouts not approved under this permit. see approved building permit plan and details for installation instructions. DEVELOPMENT ENGINEERING msippo 07/30/2021 TED-40-4189R-418911 C21-003650PR21-000297sheet 11 of 18 provide approved impermeable liner on downstream side and bottom of trench provide approved impermeable liner on downstream side and bottom of trench apply perforation to top half of tubing only apply perforation to top half of tubing only DEVELOPMENT ENGINEERING msippo 07/30/2021 TED-40-4189R-418912 C21-003650PR21-000297sheet 12 of 18 DEVELOPMENT ENGINEERING msippo 07/30/2021 TED-40-4189R-418913 C21-003650PR21-000297sheet 13 of 18 DEVELOPMENT ENGINEERING msippo 07/30/2021 TED-40-4189R-418914 C21-003650PR21-000297sheet 14 of 18 DEVELOPMENT ENGINEERING msippo 07/30/2021 TED-40-4189R-418915 C21-003650PR21-000297sheet 15 of 18 fencing, backstop and dugouts not approved under this permit. see approved building permit plan and details for installation instructions. TED-40-4189R-418916 C21-003650PR21-000297sheet 16 of 18 fencing, backstop and dugouts not approved under this permit. see approved building permit plan and details for installation instructions. non-leachable covenant required for painted galvanized materials to be approved prior to finalization of the construction permit. TED-40-4189R-418917 C21-003650PR21-000297sheet 17 of 18 fencing, backstop and dugouts not approved under this permit. see approved building permit plan and details for installation instructions. DEVELOPMENT ENGINEERING msippo 07/30/2021 TED-40-4189R-418918 C21-003650PR21-000297sheet 18 of 18 DEVELOPMENT ENGINEERING msippo 07/30/2021