Loading...
HomeMy WebLinkAboutRS_Cyprus Lane Plat_Geotechnical Reports_210412_v1Cyprus Lane Preliminary Plat Geotechechnical Reports 1. 5816 NE 4th Pl, Renton, WA 2. 510 Nile Ave NE, Renton, WA Cobalt Geosciences, LLC P.O. Box 82243 Kenmore, Washington 98028 www.cobaltgeo.com (206) 331-1097 February 2, 2021 Mr. Bob Wenzl Tuscany Homes RE: Geotechnical Evaluation Proposed Residence 5816 NE 4th Place Renton, Washington Dear Mr. Wenzl, In accordance with your authorization, Cobalt Geosciences, LLC has prepared this letter to discuss the results of our geotechnical evaluation at the referenced site. The purpose of our evaluation was to determine the feasibility of utilizing infiltration devices for stormwater runoff management as well as relevant earthwork information. Site and Project Description The site is located at 5816 NE 4th Place in Renton, Washington. The site consists of two rectangular parcels (No. 1123059021 and 1123059023) with a total area of about 111,000 square feet. The property is developed with a single-family residence, driveway, and detached shop. The property is vegetated with grasses, bushes/shrubs, blackberry vines, ivy, and variable diameter evergreen and deciduous trees. The site slope gently downward from northeast to southwest at magnitudes of 5 to 20 percent and total relief of about 25 feet. The property is bordered to the east, west, and north by residential parcels and to the south by NE 4th Place. The project includes construction of multiple new residential structures in the central portion of the property with at least one access roadway. Stormwater management may include dispersion, detention, or infiltration facilities depending on feasibility. Area Geology The Geologic Map of King County indicates that the site is underlain by Vashon Glacial Till. Vashon Glacial Till is typically characterized by an unsorted, non-stratified mixture of clay, silt, sand, gravel, cobbles and boulders in variable quantities. These materials are typically dense and relatively impermeable. The poor sorting reflects the mixing of the materials as these sediments were overridden and incorporated by the glacial ice. February 2, 2021 Page 2 of 8 Geotechnical Evaluation www.cobaltgeo.com (206) 331-1097 Soil & Groundwater Conditions As part of our evaluation, we excavated two test pits to determine the shallow soil and groundwater conditions, where accessible. The test pit encountered approximately 6 inches of topsoil and vegetation underlain by approximately 2.25 to 2.75 feet of loose to medium dense, silty-fine to medium grained sand with gravel (Weathered Glacial Till). These materials were underlain by dense to very dense, silty-fine to medium grained sand with gravel (Glacial Till). Groundwater was not encountered in the test pits. Groundwater could be present seasonally perched on the underlying glacial till. Erosion Hazard The Natural Resources Conservation Services (NRCS) maps for King County indicate that the site is underlain by Alderwood gravelly sandy loam (8 to 15 percent slopes). These soils would have a slight to moderate erosion potential in a disturbed state depending on the slope magnitude. It is our opinion that soil erosion potential at this project site can be reduced through landscaping and surface water runoff control. Typically, erosion of exposed soils will be most noticeable during periods of rainfall and may be controlled by the use of normal temporary erosion control measures, such as silt fences, hay bales, mulching, control ditches and diversion trenches. The typical wet weather season, with regard to site grading, is from October 31st to April 1st. Erosion control measures should be in place before the onset of wet weather. Seismic Hazard The overall subsurface profile corresponds to a Site Class D as defined by Table 1613.5.2 of the International Building Code (IBC). A Site Class D applies to an overall profile consisting of stiff/medium dense soils within the upper 100 feet. We referenced the U.S. Geological Survey (USGS) Earthquake Hazards Program Website to obtain values for SS, S1, Fa, and Fv. The USGS website includes the most updated published data on seismic conditions. The following tables provide seismic parameters from the USGS web site with referenced parameters from ASCE 7-10 and 7-16. Seismic Design Parameters (ASCE 7-10) Site Class Spectral Acceleration at 0.2 sec. (g) Spectral Acceleration at 1.0 sec. (g) Site Coefficients Design Spectral Response Parameters Design PGA Fa Fv SDS SD1 D 1.384 0.519 1.0 1.5 0.923 0.519 0.567 February 2, 2021 Page 3 of 8 Geotechnical Evaluation www.cobaltgeo.com (206) 331-1097 Seismic Design Parameters (ASCE 7-16) Site Class Spectral Acceleration at 0.2 sec. (g) Spectral Acceleration at 1.0 sec. (g) Site Coefficients Design Spectral Response Parameters Design PGA Fa Fv SDS SD1 D 1.384 0.473 1.2 Null 1.107 Null 0.589 Additional seismic considerations include liquefaction potential and amplification of ground motions by soft/loose soil deposits. The liquefaction potential is highest for loose sand with a high groundwater table. The site has a low likelihood of liquefaction. Conclusions and Recommendations General The site is underlain by weathered and unweathered glacial till. There are likely areas of fill around the existing residence in yard areas. The proposed residences may be supported on shallow foundation systems bearing on medium dense or firmer native soils or on structural fill placed on the native soils. Local overexcavation of loose fill and weathered native soils may be necessary depending on the proposed elevations and locations of the new residences. Infiltration is not feasible due to the presence of dense fine-grained soil deposits, which act as an aquitard. We recommend utilizing dispersion systems, detention, or direct connection to City infrastructure. We should be provided with the final plans to verify suitability of the system locations and elevations. Site Preparation Trees, shrubs and other vegetation should be removed prior to stripping of surficial organic-rich soil and fill. Based on observations from the site investigation program, it is anticipated that the stripping depth will be 6 to 18 inches. Deeper excavations will be necessary below large trees where root systems can extend to greater depths, in areas of existing foundation systems, and in any areas underlain by undocumented fill. The native soils consist of silty-sand with gravel. Most of the native soils may be used as structural fill provided they achieve compaction requirements and are within 3 percent of the optimum moisture. Some of these soils may only be suitable for use as fill during the summer months, as they will be above the optimum moisture levels in their current state. These soils are variably moisture sensitive and may degrade during periods of wet weather and under equipment traffic. Imported structural fill should consist of a sand and gravel mixture with a maximum grain size of 3 inches and less than 5 percent fines (material passing the U.S. Standard No. 200 Sieve). Structural fill should be placed in maximum lift thicknesses of 12 inches and should be compacted to a minimum of 95 percent of the modified proctor maximum dry density, as determined by the ASTM D 1557 test method. February 2, 2021 Page 4 of 8 Geotechnical Evaluation www.cobaltgeo.com (206) 331-1097 Temporary Excavations Based on our understanding of the project, we anticipate that the grading could include local cuts on the order of approximately 4 feet or less for foundation and utility placement. Any deeper temporary excavations should be sloped no steeper than 1.5H:1V (Horizontal:Vertical) in loose native soils and fill, 1H:1V in medium dense native soils, and 3/4H:1V in dense to very dense native soils. If an excavation is subject to heavy vibration or surcharge loads, we recommend that the excavations be sloped no steeper than 2H:1V, where room permits. Temporary cuts should be in accordance with the Washington Administrative Code (WAC) Part N, Excavation, Trenching, and Shoring. Temporary slopes should be visually inspected daily by a qualified person during construction activities and the inspections should be documented in daily reports. The contractor is responsible for maintaining the stability of the temporary cut slopes and reducing slope erosion during construction. Temporary cut slopes should be covered with visqueen to help reduce erosion during wet weather, and the slopes should be closely monitored until the permanent retaining systems or slope configurations are complete. Materials should not be stored or equipment operated within 10 feet of the top of any temporary cut slope. Soil conditions may not be completely known from the geotechnical investigation. In the case of temporary cuts, the existing soil conditions may not be completely revealed until the excavation work exposes the soil. Typically, as excavation work progresses the maximum inclination of temporary slopes will need to be re-evaluated by the geotechnical engineer so that supplemental recommendations can be made. Soil and groundwater conditions can be highly variable. Scheduling for soil work will need to be adjustable, to deal with unanticipated conditions, so that the project can proceed and required deadlines can be met. If any variations or undesirable conditions are encountered during construction, we should be notified so that supplemental recommendations can be made. If room constraints or groundwater conditions do not permit temporary slopes to be cut to the maximum angles allowed by the WAC, temporary shoring systems may be required. The contractor should be responsible for developing temporary shoring systems, if needed. We recommend that Cobalt Geosciences and the project structural engineer review temporary shoring designs prior to installation, to verify the suitability of the proposed systems. Foundation Design The proposed residential buildings may be supported on shallow spread footing foundation systems bearing on undisturbed dense or firmer native soils or on properly compacted structural fill placed on the suitable native soils. Any undocumented fill and/or loose native soils should be removed and replaced with structural fill below foundation elements. Structural fill below footings should consist of clean angular rock 5/8 to 4 inches in size. Please note that significant overexcavation may be required in some areas. For shallow foundation support, we recommend widths of at least 16 and 24 inches, respectively, for continuous wall and isolated column footings supporting the proposed structure. Provided that the footings are supported as recommended above, a net allowable bearing pressure of 2,500 pounds per square foot (psf) may be used for design. Detention vaults at least 5 feet below grade may be designed using 5,000 psf bearing. February 2, 2021 Page 5 of 8 Geotechnical Evaluation www.cobaltgeo.com (206) 331-1097 A 1/3 increase in the above value may be used for short duration loads, such as those imposed by wind and seismic events. Structural fill placed on bearing, native subgrade should be compacted to at least 95 percent of the maximum dry density based on ASTM Test Method D1557. Footing excavations should be inspected to verify that the foundations will bear on suitable material. Exterior footings should have a minimum depth of 18 inches below pad subgrade (soil grade) or adjacent exterior grade, whichever is lower. Interior footings should have a minimum depth of 12 inches below pad subgrade (soil grade) or adjacent exterior grade, whichever is lower. If constructed as recommended, the total foundation settlement is not expected to exceed 1 inch. Differential settlement, along a 25-foot exterior wall footing, or between adjoining column footings, should be less than ½ inch. This translates to an angular distortion of 0.002. Most settlement is expected to occur during construction, as the loads are applied. However, additional post-construction settlement may occur if the foundation soils are flooded or saturated. All footing excavations should be observed by a qualified geotechnical consultant. Resistance to lateral footing displacement can be determined using an allowable friction factor of 0.35 acting between the base of foundations and the supporting subgrades. Lateral resistance for footings can also be developed using an allowable equivalent fluid passive pressure of 225 pounds per cubic foot (pcf) acting against the appropriate vertical footing faces (neglect the upper 12 inches below grade in exterior areas). The frictional and passive resistance of the soil may be combined without reduction in determining the total lateral resistance. Care should be taken to prevent wetting or drying of the bearing materials during construction. Any extremely wet or dry materials, or any loose or disturbed materials at the bottom of the footing excavations, should be removed prior to placing concrete. The potential for wetting or drying of the bearing materials can be reduced by pouring concrete as soon as possible after completing the footing excavation and evaluating the bearing surface by the geotechnical engineer or his representative. Concrete Retaining Walls The following table, titled Wall Design Criteria, presents the recommended soil related design parameters for retaining walls with a level backslope. Contact Cobalt if an alternate retaining wall system is used. This has been included for detention vaults. Wall Design Criteria “At-rest” Conditions (Lateral Earth Pressure – EFD+) 55 pcf (Equivalent Fluid Density) “Active” Conditions (Lateral Earth Pressure – EFD+) 35 pcf (Equivalent Fluid Density) Seismic Increase for “At-rest” Conditions (Lateral Earth Pressure) 21H* (Uniform Distribution) 1 in 2,500 year event Seismic Increase for “At-rest” Conditions (Lateral Earth Pressure) 14H* (Uniform Distribution) 1 in 500 year event Seismic Increase for “Active” Conditions (Lateral Earth Pressure) 7H* (Uniform Distribution) Passive Earth Pressure on Low Side of Wall Neglect upper 2 feet, then 300 pcf EFD+ February 2, 2021 Page 6 of 8 Geotechnical Evaluation www.cobaltgeo.com (206) 331-1097 (Allowable, includes F.S. = 1.5) Soil-Footing Coefficient of Sliding Friction (Allowable; includes F.S. = 1.5) 0.35 *H is the height of the wall; Increase based on one in 500 year seismic event (10 percent probability of being exceeded in 50 years), +EFD – Equivalent Fluid Density The stated lateral earth pressures do not include the effects of hydrostatic pressure generated by water accumulation behind the retaining walls. Uniform horizontal lateral active and at-rest pressures on the retaining walls from vertical surcharges behind the wall may be calculated using active and at-rest lateral earth pressure coefficients of 0.3 and 0.5, respectively. A soil unit weight of 125 pcf may be used to calculate vertical earth surcharges. To reduce the potential for the buildup of water pressure against the walls, continuous footing drains (with cleanouts) should be provided at the bases of the walls. The footing drains should consist of a minimum 4-inch diameter perforated pipe, sloped to drain, with perforations placed down and enveloped by a minimum 6 inches of pea gravel in all directions. The backfill adjacent to and extending a lateral distance behind the walls at least 2 feet should consist of free-draining granular material. All free draining backfill should contain less than 3 percent fines (passing the U.S. Standard No. 200 Sieve) based upon the fraction passing the U.S. Standard No. 4 Sieve with at least 30 percent of the material being retained on the U.S. Standard No. 4 Sieve. The primary purpose of the free-draining material is the reduction of hydrostatic pressure. Some potential for the moisture to contact the back face of the wall may exist, even with treatment, which may require that more extensive waterproofing be specified for walls, which require interior moisture sensitive finishes. We recommend that the backfill be compacted to at least 90 percent of the maximum dry density based on ASTM Test Method D1557. In place density tests should be performed to verify adequate compaction. Soil compactors place transient surcharges on the backfill. Consequently, only light hand operated equipment is recommended within 3 feet of walls so that excessive stress is not imposed on the walls. Slab-on-Grade We recommend that the upper 18 inches of the existing fill and/or native soils within slab areas be re-compacted to at least 95 percent of the modified proctor (ASTM D1557 Test Method). Often, a vapor barrier is considered below concrete slab areas. However, the usage of a vapor barrier could result in curling of the concrete slab at joints. Floor covers sensitive to moisture typically requires the usage of a vapor barrier. A materials or structural engineer should be consulted regarding the detailing of the vapor barrier below concrete slabs. Exterior slabs typically do not utilize vapor barriers. The American Concrete Institutes ACI 360R-06 Design of Slabs on Grade and ACI 302.1R-04 Guide for Concrete Floor and Slab Construction are recommended references for vapor barrier selection and floor slab detailing. Slabs on grade may be designed using a coefficient of subgrade reaction of 210 pounds per cubic inch (pci) assuming the slab-on-grade base course is underlain by structural fill placed and compacted as outlined in Section 8.1. A 4- to 6-inch-thick capillary break layer should be placed February 2, 2021 Page 7 of 8 Geotechnical Evaluation www.cobaltgeo.com (206) 331-1097 over the prepared subgrade. This material should consist of pea gravel or 5/8 inch clean angular rock. A perimeter drainage system is recommended unless interior slab areas are elevated a minimum of 12 inches above adjacent exterior grades. If installed, a perimeter drainage system should consist of a 4 inch diameter perforated drain pipe surrounded by a minimum 6 inches of drain rock wrapped in a non-woven geosynthetic filter fabric to reduce migration of soil particles into the drainage system. The perimeter drainage system should discharge by gravity flow to a suitable stormwater system. Exterior grades surrounding buildings should be sloped at a minimum of one percent to facilitate surface water flow away from the building and preferably with a relatively impermeable surface cover immediately adjacent to the building. Stormwater Management Feasibility The site is underlain by weathered and unweathered glacial till. Groundwater could be present at 3 to 4 feet below grade during the wet season. We conducted infiltration testing in TP-1 at a depth of 3 feet below grade. Following saturation, testing and application factors for site variability (0.8), influent control (0.9), and testing (0.5), the infiltration rate was 0.11 inches per hour. We do not recommend utilizing infiltration devices at this site. Runoff will migrate to the unweathered till and then laterally across that soil layer. Ultimately, this runoff would migrate onto adjacent properties. Depending on the site grading and layout, local dispersion trenches could be utilized. We anticipate that detention systems will be required for most of the new runoff from impervious surfaces. We should be provided with final plans for review to determine if the intent of our recommendations has been incorporated or if additional modifications are needed. Erosion and Sediment Control Erosion and sediment control (ESC) is used to reduce the transportation of eroded sediment to wetlands, streams, lakes, drainage systems, and adjacent properties. Erosion and sediment control measures should be implemented, and these measures should be in general accordance with local regulations. At a minimum, the following basic recommendations should be incorporated into the design of the erosion and sediment control features for the site: Schedule the soil, foundation, utility, and other work requiring excavation or the disturbance of the site soils, to take place during the dry season (generally May through September). However, provided precautions are taken using Best Management Practices (BMP’s), grading activities can be completed during the wet season (generally October through April). All site work should be completed and stabilized as quickly as possible. Additional perimeter erosion and sediment control features may be required to reduce the possibility of sediment entering the surface water. This may include additional silt fences, silt fences with a higher Apparent Opening Size (AOS), construction of a berm, or other filtration systems. February 2, 2021 Page 8 of 8 Geotechnical Evaluation www.cobaltgeo.com (206) 331-1097 Any runoff generated by dewatering discharge should be treated through construction of a sediment trap if there is sufficient space. If space is limited other filtration methods will need to be incorporated. Closure The information presented herein is based upon professional interpretation utilizing standard practices and a degree of conservatism deemed proper for this project. We emphasize that this report is valid for this project as outlined above and for the current site conditions and should not be used for any other site. Sincerely, Cobalt Geosciences, LLC 2/2/2021 Phil Haberman, PE, LG, LEG Principal PH/sc Proposed Development 5816 NE 4th Place Renton, Washington N SITE PLAN FIGURE 1 Cobalt Geosciences, LLC P.O. Box 82243 Kenmore, WA 98028 (206) 331-1097 www.cobaltgeo.com cobaltgeo@gmail.com TP-1 TP-2 PT Well-graded gravels, gravels, gravel-sand mixtures, little or no fines Poorly graded gravels, gravel-sand mixtures, little or no fines Silty gravels, gravel-sand-silt mixtures Clayey gravels, gravel-sand-clay mixtures Well-graded sands, gravelly sands, little or no fines COARSE GRAINED SOILS (more than 50% retained on No. 200 sieve) Primarily organic matter, dark in color, and organic odor Peat, humus, swamp soils with high organic content (ASTM D4427)HIGHLY ORGANIC SOILS FINE GRAINED SOILS (50% or more passes the No. 200 sieve) MAJOR DIVISIONS SYMBOL TYPICAL DESCRIPTION Gravels (more than 50% of coarse fraction retained on No. 4 sieve) Sands (50% or more of coarse fraction passes the No. 4 sieve) Silts and Clays (liquid limit less than 50) Silts and Clays (liquid limit 50 or more) Organic Inorganic Organic Inorganic Sands with Fines (more than 12% fines) Clean Sands (less than 5% fines) Gravels with Fines (more than 12% fines) Clean Gravels (less than 5% fines) Unified Soil Classification System (USCS) Poorly graded sand, gravelly sands, little or no fines Silty sands, sand-silt mixtures Clayey sands, sand-clay mixtures Inorganic silts of low to medium plasticity, sandy silts, gravelly silts, or clayey silts with slight plasticity Inorganic clays of low to medium plasticity, gravelly clays, sandy clays, silty clays, lean clays Organic silts and organic silty clays of low plasticity Inorganic silts, micaceous or diatomaceous fine sands or silty soils, elastic silt Inorganic clays of medium to high plasticity, sandy fat clay, or gravelly fat clay Organic clays of medium to high plasticity, organic silts Moisture Content Definitions Grain Size Definitions Dry Absence of moisture, dusty, dry to the touch Moist Damp but no visible water Wet Visible free water, from below water table Grain Size Definitions Description Sieve Number and/or Size Fines <#200 (0.08 mm) Sand -Fine -Medium -Coarse Gravel -Fine -Coarse Cobbles Boulders #200 to #40 (0.08 to 0.4 mm) #40 to #10 (0.4 to 2 mm) #10 to #4 (2 to 5 mm) #4 to 3/4 inch (5 to 19 mm) 3/4 to 3 inches (19 to 76 mm) 3 to 12 inches (75 to 305 mm) >12 inches (305 mm) Classification of Soil Constituents MAJOR constituents compose more than 50 percent, by weight, of the soil. Major constituents are capitalized (i.e., SAND). Minor constituents compose 12 to 50 percent of the soil and precede the major constituents (i.e., silty SAND). Minor constituents preceded by “slightly” compose 5 to 12 percent of the soil (i.e., slightly silty SAND). Trace constituents compose 0 to 5 percent of the soil (i.e., slightly silty SAND, trace gravel). Relative Density Consistency (Coarse Grained Soils) (Fine Grained Soils) N, SPT, Relative Blows/FT Density 0 - 4 Very loose 4 - 10 Loose 10 - 30 Medium dense 30 - 50 Dense Over 50 Very dense N, SPT, Relative Blows/FT Consistency Under 2 Very soft 2 - 4 Soft 4 - 8 Medium stiff 8 - 15 Stiff 15 - 30 Very stiff Over 30 Hard Cobalt Geosciences, LLC P.O. Box 82243 Kenmore, WA 98028 (206) 331-1097 www.cobaltgeo.com cobaltgeo@gmail.com Soil Classification Chart Figure C1 Test Pit Logs Cobalt Geosciences, LLC P.O. Box 82243 Kenmore, WA 98028 (206) 331-1097 www.cobaltgeo.com cobaltgeo@gmail.com Proposed Residences 5816 NE 4th Place Renton, Washington Test Pit TP-1 Date: December 29, 2021 Contractor: Client provided Depth: 7’ Elevation: Logged By: PH Checked By: SC Groundwater: None Material Description Moisture Content (%)Plastic Limit Liquid Limit 10 20 30 400 50 1 2 3 4 5 6 DCP Equivalent N-Value 7 8 9 10 Loose to medium dense, silty-fine to medium grained sand with gravel, reddish brown to yellowish brown, moist. (Weathered Glacial Till) SM End of Test Pit 7’ Dense, silty-fine to medium grained sand with gravel, grayish brown, moist. (Glacial Till) -Locally cemented SM Topsoil/Grass Test Pit TP-2 Date: December 29, 2021 Contractor: Client provided Depth: 7’ Elevation: Logged By: PH Checked By: SC Groundwater: None Material Description Moisture Content (%)Plastic Limit Liquid Limit 10 20 30 400 50 1 2 3 4 5 6 DCP Equivalent N-Value 7 8 9 10 Loose to medium dense, silty-fine to medium grained sand with gravel, reddish brown to yellowish brown, moist. (Weathered Glacial Till) SM End of Test Pit 7’ Dense, silty-fine to medium grained sand with gravel, grayish brown, moist. (Glacial Till) -Locally cemented SM Topsoil/Grass Cobalt Geosciences, LLC P.O. Box 82243 Kenmore, Washington 98028 www.cobaltgeo.com (206) 331-1097 April 12, 2021 Mr. Bob Wenzl Tuscany Homes RE: Geotechnical Evaluation Proposed Short Plat 510 Nile Avenue Renton, Washington Dear Mr. Wenzl, In accordance with your authorization, Cobalt Geosciences, LLC has prepared this letter to discuss the results of our geotechnical evaluation at the referenced site. The purpose of our evaluation was to determine the feasibility of utilizing infiltration devices for stormwater runoff management as well as relevant earthwork information. Site and Project Description The site is located at 510 Nile Avenue NE in Renton, Washington. The site consists of one rectangular parcel (No. 1123059031) with a total area of about 102,801 square feet. The western portion of the property is developed with a single-family residence and driveway. The property is vegetated with grasses, bushes/shrubs, blackberry vines, ivy, and variable diameter evergreen and deciduous trees. The site slope gently downward from northeast to southwest at magnitudes of 5 to 15 percent and total relief of about 37 feet. The property is bordered to the east, south, and north by residential parcels and to the west by Nile Avenue NE. The project includes construction of multiple new residential structures within the property along with access roadways, utilities, and stormwater infrastructure. This project may connect to a new project ot he south with an extension of at least one City roadway. Cuts and fills will likely be 6 feet or less and foundation loads will likely be light. Stormwater management may include dispersion, detention, or infiltration facilities depending on feasibility. Area Geology The Geologic Map of King County indicates that the site is underlain by Vashon Glacial Till. Vashon Glacial Till is typically characterized by an unsorted, non-stratified mixture of clay, silt, sand, gravel, cobbles and boulders in variable quantities. These materials are typically dense and relatively impermeable. The poor sorting reflects the mixing of the materials as these sediments were overridden and incorporated by the glacial ice. April 12, 2021 Page 2 of 8 Geotechnical Evaluation www.cobaltgeo.com (206) 331-1097 Soil & Groundwater Conditions As part of our evaluation, we excavated four hand borings to determine the shallow soil and groundwater conditions, where accessible. We previously excavated test pits on the parcels to the southeast. At this site, the vegetation was very heavy and did not allow suitable access for an excavator. The hand borings encountered approximately 6 inches of topsoil and vegetation underlain by approximately 2 to 3 feet of loose to medium dense, silty-fine to medium grained sand with gravel (Weathered Glacial Till). These materials were underlain by dense to very dense, silty-fine to medium grained sand with gravel (Glacial Till). Groundwater was not encountered in the hand borings. Groundwater could be present seasonally perched on the underlying glacial till. Erosion Hazard The Natural Resources Conservation Services (NRCS) maps for King County indicate that the site is underlain by Alderwood gravelly sandy loam (8 to 15 percent slopes). These soils would have a slight to moderate erosion potential in a disturbed state depending on the slope magnitude. It is our opinion that soil erosion potential at this project site can be reduced through landscaping and surface water runoff control. Typically, erosion of exposed soils will be most noticeable during periods of rainfall and may be controlled by the use of normal temporary erosion control measures, such as silt fences, hay bales, mulching, control ditches and diversion trenches. The typical wet weather season, with regard to site grading, is from October 31st to April 1st. Erosion control measures should be in place before the onset of wet weather. Seismic Hazard The overall subsurface profile corresponds to a Site Class D as defined by Table 1613.5.2 of the International Building Code (IBC). A Site Class D applies to an overall profile consisting of stiff/medium dense soils within the upper 100 feet. We referenced the U.S. Geological Survey (USGS) Earthquake Hazards Program Website to obtain values for SS, S1, Fa, and Fv. The USGS website includes the most updated published data on seismic conditions. The following tables provide seismic parameters from the USGS web site with referenced parameters from ASCE 7-10 and 7-16. Seismic Design Parameters (ASCE 7-10) Site Class Spectral Acceleration at 0.2 sec. (g) Spectral Acceleration at 1.0 sec. (g) Site Coefficients Design Spectral Response Parameters Design PGA Fa Fv SDS SD1 D 1.384 0.519 1.0 1.5 0.923 0.519 0.567 April 12, 2021 Page 3 of 8 Geotechnical Evaluation www.cobaltgeo.com (206) 331-1097 Seismic Design Parameters (ASCE 7-16) Site Class Spectral Acceleration at 0.2 sec. (g) Spectral Acceleration at 1.0 sec. (g) Site Coefficients Design Spectral Response Parameters Design PGA Fa Fv SDS SD1 D 1.384 0.473 1.0 Null 1.107 Null 0.589 Additional seismic considerations include liquefaction potential and amplification of ground motions by soft/loose soil deposits. The liquefaction potential is highest for loose sand with a high groundwater table. The site has a low likelihood of liquefaction. Conclusions and Recommendations General The site is underlain by weathered and unweathered glacial till. There are likely areas of fill around the existing residence in yard areas. The proposed residences may be supported on shallow foundation systems bearing on medium dense or firmer native soils or on structural fill placed on the native soils. Local overexcavation of loose fill and weathered native soils may be necessary depending on the proposed elevations and locations of the new residences. Infiltration is not feasible due to the presence of dense fine-grained soil deposits, which act as an aquitard. We recommend utilizing dispersion systems, detention, or direct connection to City infrastructure. We should be provided with the final plans to verify suitability of the system locations and elevations. Site Preparation Trees, shrubs and other vegetation should be removed prior to stripping of surficial organic-rich soil and fill. Based on observations from the site investigation program, it is anticipated that the stripping depth will be 6 to 18 inches. Deeper excavations will be necessary below large trees where root systems can extend to greater depths, in areas of existing foundation systems, and in any areas underlain by undocumented fill. The native soils consist of silty-sand with gravel. Most of the native soils may be used as structural fill provided they achieve compaction requirements and are within 3 percent of the optimum moisture. Some of these soils may only be suitable for use as fill during the summer months, as they will be above the optimum moisture levels in their current state. These soils are variably moisture sensitive and may degrade during periods of wet weather and under equipment traffic. April 12, 2021 Page 4 of 8 Geotechnical Evaluation www.cobaltgeo.com (206) 331-1097 Imported structural fill should consist of a sand and gravel mixture with a maximum grain size of 3 inches and less than 5 percent fines (material passing the U.S. Standard No. 200 Sieve). Structural fill should be placed in maximum lift thicknesses of 12 inches and should be compacted to a minimum of 95 percent of the modified proctor maximum dry density, as determined by the ASTM D 1557 test method. Temporary Excavations Based on our understanding of the project, we anticipate that the grading could include local cuts on the order of approximately 4 feet or less for foundation and utility placement. Any deeper temporary excavations should be sloped no steeper than 1.5H:1V (Horizontal:Vertical) in loose native soils and fill, 1H:1V in medium dense native soils, and 3/4H:1V in dense to very dense native soils. If an excavation is subject to heavy vibration or surcharge loads, we recommend that the excavations be sloped no steeper than 2H:1V, where room permits. Temporary cuts should be in accordance with the Washington Administrative Code (WAC) Part N, Excavation, Trenching, and Shoring. Temporary slopes should be visually inspected daily by a qualified person during construction activities and the inspections should be documented in daily reports. The contractor is responsible for maintaining the stability of the temporary cut slopes and reducing slope erosion during construction. Temporary cut slopes should be covered with visqueen to help reduce erosion during wet weather, and the slopes should be closely monitored until the permanent retaining systems or slope configurations are complete. Materials should not be stored or equipment operated within 10 feet of the top of any temporary cut slope. Soil conditions may not be completely known from the geotechnical investigation. In the case of temporary cuts, the existing soil conditions may not be completely revealed until the excavation work exposes the soil. Typically, as excavation work progresses the maximum inclination of temporary slopes will need to be re-evaluated by the geotechnical engineer so that supplemental recommendations can be made. Soil and groundwater conditions can be highly variable. Scheduling for soil work will need to be adjustable, to deal with unanticipated conditions, so that the project can proceed and required deadlines can be met. If any variations or undesirable conditions are encountered during construction, we should be notified so that supplemental recommendations can be made. If room constraints or groundwater conditions do not permit temporary slopes to be cut to the maximum angles allowed by the WAC, temporary shoring systems may be required. The contractor should be responsible for developing temporary shoring systems, if needed. We recommend that Cobalt Geosciences and the project structural engineer review temporary shoring designs prior to installation, to verify the suitability of the proposed systems. Foundation Design The proposed residential buildings may be supported on shallow spread footing foundation systems bearing on undisturbed dense or firmer native soils or on properly compacted structural fill placed on the suitable native soils. Any undocumented fill and/or loose native soils should be removed and replaced with structural fill below foundation elements. Structural fill below footings should consist of clean angular rock 5/8 to 4 inches in size. April 12, 2021 Page 5 of 8 Geotechnical Evaluation www.cobaltgeo.com (206) 331-1097 For shallow foundation support, we recommend widths of at least 16 and 24 inches, respectively, for continuous wall and isolated column footings supporting the proposed structure. Provided that the footings are supported as recommended above, a net allowable bearing pressure of 2,500 pounds per square foot (psf) may be used for design. Detention vaults at least 5 feet below grade may be designed using 5,000 psf bearing. A 1/3 increase in the above value may be used for short duration loads, such as those imposed by wind and seismic events. Structural fill placed on bearing, native subgrade should be compacted to at least 95 percent of the maximum dry density based on ASTM Test Method D1557. Footing excavations should be inspected to verify that the foundations will bear on suitable material. Exterior footings should have a minimum depth of 18 inches below pad subgrade (soil grade) or adjacent exterior grade, whichever is lower. Interior footings should have a minimum depth of 12 inches below pad subgrade (soil grade) or adjacent exterior grade, whichever is lower. If constructed as recommended, the total foundation settlement is not expected to exceed 1 inch. Differential settlement, along a 25-foot exterior wall footing, or between adjoining column footings, should be less than ½ inch. This translates to an angular distortion of 0.002. Most settlement is expected to occur during construction, as the loads are applied. However, additional post-construction settlement may occur if the foundation soils are flooded or saturated. All footing excavations should be observed by a qualified geotechnical consultant. Resistance to lateral footing displacement can be determined using an allowable friction factor of 0.35 acting between the base of foundations and the supporting subgrades. Lateral resistance for footings can also be developed using an allowable equivalent fluid passive pressure of 225 pounds per cubic foot (pcf) acting against the appropriate vertical footing faces (neglect the upper 12 inches below grade in exterior areas). The frictional and passive resistance of the soil may be combined without reduction in determining the total lateral resistance. Care should be taken to prevent wetting or drying of the bearing materials during construction. Any extremely wet or dry materials, or any loose or disturbed materials at the bottom of the footing excavations, should be removed prior to placing concrete. The potential for wetting or drying of the bearing materials can be reduced by pouring concrete as soon as possible after completing the footing excavation and evaluating the bearing surface by the geotechnical engineer or his representative. Concrete Retaining Walls The following table, titled Wall Design Criteria, presents the recommended soil related design parameters for retaining walls with a level backslope. Contact Cobalt if an alternate retaining wall system is used. This has been included for detention vaults. Wall Design Criteria “At-rest” Conditions (Lateral Earth Pressure – EFD+) 55 pcf (Equivalent Fluid Density) “Active” Conditions (Lateral Earth Pressure – EFD+) 35 pcf (Equivalent Fluid Density) Seismic Increase for “At-rest” Conditions (Lateral Earth Pressure) 21H* (Uniform Distribution) 1 in 2,500 year event Seismic Increase for “At-rest” Conditions (Lateral Earth Pressure) 14H* (Uniform Distribution) 1 in 500 year event April 12, 2021 Page 6 of 8 Geotechnical Evaluation www.cobaltgeo.com (206) 331-1097 Seismic Increase for “Active” Conditions (Lateral Earth Pressure) 7H* (Uniform Distribution) Passive Earth Pressure on Low Side of Wall (Allowable, includes F.S. = 1.5) Neglect upper 2 feet, then 300 pcf EFD+ Soil-Footing Coefficient of Sliding Friction (Allowable; includes F.S. = 1.5) 0.35 *H is the height of the wall; Increase based on one in 500 year seismic event (10 percent probability of being exceeded in 50 years), +EFD – Equivalent Fluid Density The stated lateral earth pressures do not include the effects of hydrostatic pressure generated by water accumulation behind the retaining walls. Uniform horizontal lateral active and at-rest pressures on the retaining walls from vertical surcharges behind the wall may be calculated using active and at-rest lateral earth pressure coefficients of 0.3 and 0.5, respectively. A soil unit weight of 125 pcf may be used to calculate vertical earth surcharges. To reduce the potential for the buildup of water pressure against the walls, continuous footing drains (with cleanouts) should be provided at the bases of the walls. The footing drains should consist of a minimum 4-inch diameter perforated pipe, sloped to drain, with perforations placed down and enveloped by a minimum 6 inches of pea gravel in all directions. The backfill adjacent to and extending a lateral distance behind the walls at least 2 feet should consist of free-draining granular material. All free draining backfill should contain less than 3 percent fines (passing the U.S. Standard No. 200 Sieve) based upon the fraction passing the U.S. Standard No. 4 Sieve with at least 30 percent of the material being retained on the U.S. Standard No. 4 Sieve. The primary purpose of the free-draining material is the reduction of hydrostatic pressure. Some potential for the moisture to contact the back face of the wall may exist, even with treatment, which may require that more extensive waterproofing be specified for walls, which require interior moisture sensitive finishes. We recommend that the backfill be compacted to at least 90 percent of the maximum dry density based on ASTM Test Method D1557. In place density tests should be performed to verify adequate compaction. Soil compactors place transient surcharges on the backfill. Consequently, only light hand operated equipment is recommended within 3 feet of walls so that excessive stress is not imposed on the walls. Slab-on-Grade We recommend that the upper 18 inches of the existing fill and/or native soils within slab areas be re-compacted to at least 95 percent of the modified proctor (ASTM D1557 Test Method). Often, a vapor barrier is considered below concrete slab areas. However, the usage of a vapor barrier could result in curling of the concrete slab at joints. Floor covers sensitive to moisture typically requires the usage of a vapor barrier. A materials or structural engineer should be consulted regarding the detailing of the vapor barrier below concrete slabs. Exterior slabs typically do not utilize vapor barriers. April 12, 2021 Page 7 of 8 Geotechnical Evaluation www.cobaltgeo.com (206) 331-1097 The American Concrete Institutes ACI 360R-06 Design of Slabs on Grade and ACI 302.1R-04 Guide for Concrete Floor and Slab Construction are recommended references for vapor barrier selection and floor slab detailing. Slabs on grade may be designed using a coefficient of subgrade reaction of 210 pounds per cubic inch (pci) assuming the slab-on-grade base course is underlain by structural fill placed and compacted as outlined in Section 8.1. A 4- to 6-inch-thick capillary break layer should be placed over the prepared subgrade. This material should consist of pea gravel or 5/8 inch clean angular rock. A perimeter drainage system is recommended unless interior slab areas are elevated a minimum of 12 inches above adjacent exterior grades. If installed, a perimeter drainage system should consist of a 4 inch diameter perforated drain pipe surrounded by a minimum 6 inches of drain rock wrapped in a non-woven geosynthetic filter fabric to reduce migration of soil particles into the drainage system. The perimeter drainage system should discharge by gravity flow to a suitable stormwater system. Exterior grades surrounding buildings should be sloped at a minimum of one percent to facilitate surface water flow away from the building and preferably with a relatively impermeable surface cover immediately adjacent to the building. Stormwater Management Feasibility The site is underlain by weathered and unweathered glacial till. Groundwater could be present at shallow depths below grade during the wet season. We conducted infiltration testing in a larger excavation near HB-1 at a depth of 2 feet below grade. Following saturation, testing and application factors for site variability (0.8), influent control (0.9), and testing (0.5), the infiltration rate was 0.14 inches per hour. We do not recommend utilizing infiltration devices at this site. Runoff will migrate to the unweathered till and then laterally across that soil layer. Ultimately, this runoff would migrate onto adjacent properties. Depending on the site grading and layout, local dispersion trenches could be utilized. We anticipate that detention systems will be required for most of the new runoff from impervious surfaces. We should be provided with final plans for review to determine if the intent of our recommendations has been incorporated or if additional modifications are needed. Erosion and Sediment Control Erosion and sediment control (ESC) is used to reduce the transportation of eroded sediment to wetlands, streams, lakes, drainage systems, and adjacent properties. Erosion and sediment control measures should be implemented, and these measures should be in general accordance with local regulations. At a minimum, the following basic recommendations should be incorporated into the design of the erosion and sediment control features for the site: Schedule the soil, foundation, utility, and other work requiring excavation or the disturbance of the site soils, to take place during the dry season (generally May through September). April 12, 2021 Page 8 of 8 Geotechnical Evaluation www.cobaltgeo.com (206) 331-1097 However, provided precautions are taken using Best Management Practices (BMP’s), grading activities can be completed during the wet season (generally October through April). All site work should be completed and stabilized as quickly as possible. Additional perimeter erosion and sediment control features may be required to reduce the possibility of sediment entering the surface water. This may include additional silt fences, silt fences with a higher Apparent Opening Size (AOS), construction of a berm, or other filtration systems. Any runoff generated by dewatering discharge should be treated through construction of a sediment trap if there is sufficient space. If space is limited other filtration methods will need to be incorporated. Closure The information presented herein is based upon professional interpretation utilizing standard practices and a degree of conservatism deemed proper for this project. We emphasize that this report is valid for this project as outlined above and for the current site conditions and should not be used for any other site. Sincerely, Cobalt Geosciences, LLC 4/12/2021 Phil Haberman, PE, LG, LEG Principal PH/sc Proposed Development 510 Nile Avenue Renton, Washington N SITE PLAN FIGURE 1 Cobalt Geosciences, LLC P.O. Box 82243 Kenmore, WA 98028 (206) 331-1097 www.cobaltgeo.com cobaltgeo@gmail.com Subject Property HB-1 HB-2 HB-3 HB-4 PT Well-graded gravels, gravels, gravel-sand mixtures, little or no fines Poorly graded gravels, gravel-sand mixtures, little or no fines Silty gravels, gravel-sand-silt mixtures Clayey gravels, gravel-sand-clay mixtures Well-graded sands, gravelly sands, little or no fines COARSE GRAINED SOILS (more than 50% retained on No. 200 sieve) Primarily organic matter, dark in color, and organic odor Peat, humus, swamp soils with high organic content (ASTM D4427)HIGHLY ORGANIC SOILS FINE GRAINED SOILS (50% or more passes the No. 200 sieve) MAJOR DIVISIONS SYMBOL TYPICAL DESCRIPTION Gravels (more than 50% of coarse fraction retained on No. 4 sieve) Sands (50% or more of coarse fraction passes the No. 4 sieve) Silts and Clays (liquid limit less than 50) Silts and Clays (liquid limit 50 or more) Organic Inorganic Organic Inorganic Sands with Fines (more than 12% fines) Clean Sands (less than 5% fines) Gravels with Fines (more than 12% fines) Clean Gravels (less than 5% fines) Unified Soil Classification System (USCS) Poorly graded sand, gravelly sands, little or no fines Silty sands, sand-silt mixtures Clayey sands, sand-clay mixtures Inorganic silts of low to medium plasticity, sandy silts, gravelly silts, or clayey silts with slight plasticity Inorganic clays of low to medium plasticity, gravelly clays, sandy clays, silty clays, lean clays Organic silts and organic silty clays of low plasticity Inorganic silts, micaceous or diatomaceous fine sands or silty soils, elastic silt Inorganic clays of medium to high plasticity, sandy fat clay, or gravelly fat clay Organic clays of medium to high plasticity, organic silts Moisture Content Definitions Grain Size Definitions Dry Absence of moisture, dusty, dry to the touch Moist Damp but no visible water Wet Visible free water, from below water table Grain Size Definitions Description Sieve Number and/or Size Fines <#200 (0.08 mm) Sand -Fine -Medium -Coarse Gravel -Fine -Coarse Cobbles Boulders #200 to #40 (0.08 to 0.4 mm) #40 to #10 (0.4 to 2 mm) #10 to #4 (2 to 5 mm) #4 to 3/4 inch (5 to 19 mm) 3/4 to 3 inches (19 to 76 mm) 3 to 12 inches (75 to 305 mm) >12 inches (305 mm) Classification of Soil Constituents MAJOR constituents compose more than 50 percent, by weight, of the soil. Major constituents are capitalized (i.e., SAND). Minor constituents compose 12 to 50 percent of the soil and precede the major constituents (i.e., silty SAND). Minor constituents preceded by “slightly” compose 5 to 12 percent of the soil (i.e., slightly silty SAND). Trace constituents compose 0 to 5 percent of the soil (i.e., slightly silty SAND, trace gravel). Relative Density Consistency (Coarse Grained Soils) (Fine Grained Soils) N, SPT, Relative Blows/FT Density 0 - 4 Very loose 4 - 10 Loose 10 - 30 Medium dense 30 - 50 Dense Over 50 Very dense N, SPT, Relative Blows/FT Consistency Under 2 Very soft 2 - 4 Soft 4 - 8 Medium stiff 8 - 15 Stiff 15 - 30 Very stiff Over 30 Hard Cobalt Geosciences, LLC P.O. Box 82243 Kenmore, WA 98028 (206) 331-1097 www.cobaltgeo.com cobaltgeo@gmail.com Soil Classification Chart Figure C1 Log of Hand Boring HB-1 Date: April 5, 2021 Contractor: Method: Hand Auger Depth: 6’ Elevation: N/A Logged By: PH Checked By: SC Initial Groundwater: None Sample Type: Grab Final Groundwater: N/A Material Description SPT N-Value Moisture Content (%)Plastic Limit Liquid Limit 10 20 30 400 50 1 2 3 4 5 6 7 8 9 10 End of Hand Boring 6’ Vegetation/Topsoil SM Dense, silty-fine to medium grained sand trace gravel, yellowish brown to grayish brown, moist. (Glacial Till) SM Cobalt Geosciences, LLC P.O. Box 82243 Kenmore, WA 98028 (206) 331-1097 www.cobaltgeo.com cobaltgeo@gmail.com Proposed Development 510 Nile Avenue NE Renton, Washington Hand Boring Log Loose to medium dense, silty-fine to medium grained sand with gravel and cobbles, reddish brown to yellowish brown, moist. (Weathered Glacial Till) Log of Hand Boring HB-2 Date: April 5, 2021 Contractor: Method: Hand Auger Depth: 6’ Elevation: N/A Logged By: PH Checked By: SC Initial Groundwater: None Sample Type: Grab Final Groundwater: N/A Material Description SPT N-Value Moisture Content (%)Plastic Limit Liquid Limit 10 20 30 400 50 1 2 3 4 5 6 7 8 9 10 End of Hand Boring 6’ Vegetation/Topsoil SM Dense, silty-fine to medium grained sand trace gravel, yellowish brown to grayish brown, moist. (Glacial Till) SM Cobalt Geosciences, LLC P.O. Box 82243 Kenmore, WA 98028 (206) 331-1097 www.cobaltgeo.com cobaltgeo@gmail.com Proposed Development 510 Nile Avenue NE Renton, Washington Hand Boring Log Loose to medium dense, silty-fine to medium grained sand with gravel and cobbles, reddish brown to yellowish brown, moist. (Weathered Glacial Till) Log of Hand Boring HB-3 Date: April 5, 2021 Contractor: Method: Hand Auger Depth: 6’ Elevation: N/A Logged By: PH Checked By: SC Initial Groundwater: None Sample Type: Grab Final Groundwater: N/A Material Description SPT N-Value Moisture Content (%)Plastic Limit Liquid Limit 10 20 30 400 50 1 2 3 4 5 6 7 8 9 10 End of Hand Boring 6’ Vegetation/Topsoil SM Dense, silty-fine to medium grained sand trace gravel, yellowish brown to grayish brown, moist. (Glacial Till)SM Cobalt Geosciences, LLC P.O. Box 82243 Kenmore, WA 98028 (206) 331-1097 www.cobaltgeo.com cobaltgeo@gmail.com Proposed Development 510 Nile Avenue NE Renton, Washington Hand Boring Log Loose to medium dense, silty-fine to medium grained sand with gravel and cobbles, reddish brown to yellowish brown, moist. (Weathered Glacial Till) Log of Hand Boring HB-4 Date: April 5, 2021 Contractor: Method: Hand Auger Depth: 6’ Elevation: N/A Logged By: PH Checked By: SC Initial Groundwater: None Sample Type: Grab Final Groundwater: N/A Material Description SPT N-Value Moisture Content (%)Plastic Limit Liquid Limit 10 20 30 400 50 1 2 3 4 5 6 7 8 9 10 End of Hand Boring 6’ Vegetation/Topsoil SM Dense, silty-fine to medium grained sand trace gravel, yellowish brown to grayish brown, moist. (Glacial Till) SM Cobalt Geosciences, LLC P.O. Box 82243 Kenmore, WA 98028 (206) 331-1097 www.cobaltgeo.com cobaltgeo@gmail.com Proposed Development 510 Nile Avenue NE Renton, Washington Hand Boring Log Loose to medium dense, silty-fine to medium grained sand with gravel and cobbles, reddish brown to yellowish brown, moist. (Weathered Glacial Till)