Loading...
HomeMy WebLinkAboutMFP21001348.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP21001348 IVR Number: 21001348 Permit Information Permit Name: Comcast Cable Franchise Permit Address/Location:03/25/2021Application Date:4204400094Parcel Number: 401 LIND AVE NW Permit Type:05/04/2021Issue Date:Franchise Permit Work Class:05/04/2022Expiration Date:Major Utility Job Number: 569593Franchise Type:Cable Description: Revision: Replace 433LF of broken conduit via directional drill. Pothole all existing utilities. Restoration per City of Renton standards. Comcast to tie into new splice case. Overlash 144ct fiber. Proof and pull 144ct fiber through existing conduit and two existing risers. Tie into existing splice case. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Rhonda Resnik Comcast 410 Valley Ave NW, Suite 12, Bldg C Puyallup, WA 98371 B: (253) 864-4246Applicant Shannon Heaton Cannon Construction 406, Porter Way Milton, WA 98354 Applicant Tom Donnelly Comcast Business Communications 1701 Jfk Blvd, 32nd Floor Philadelphia, PA 19103 B: (215) 286-7347 C: (215) 286-7557 Contact Michael Cannon Cannon Constructors Inc 406 Porter Way Milton, WA 98354 B: (253) 922-2787Contractor Business License Number: 41539Construction Contractor: CANNOCI055CS CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Laurie Dietz Comcast - Billing 1701 John F. Kennedy Blvd. Philadelphia, PA 19103 H: (425) 741-5733Specialized Billing X General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Comcast Cable Communications Management JB0000569593 Rhonda Resnik 253-864-4246 Rhonda_Resnik@comcast.com 401 LIND AVE NW TIE IN TO NEW SPLICE CASE. OVERLASH 144CT FIBER. PROOF AND PULL 144CT FIBER THROUGH EXISTING CONDUIT AND TWO EXISTING RISERS. TIE IN TO EXISTING SPLICE CASE. Cannon Construction Inc - Shannon Heaton 253-922-2787 ext 258 601590363 20838 MFP21001348 Scott Warlick RESTORATION PER CITY OF RENTON STANDARDS This permit is for Major construction work in the ROW and will be billed at an additional $60/HR for inspections. After hours and weekend work will be billed at $125/HR 5/4/2021 DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 11/25/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 11/25/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.☐ A copy of the Traffic Control Plan (TCP) Application form. 2.☐ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ☐Include map(s) showing the location of the project and work area. ☐Be legible lettering and clear, contrasting, symbols of viewing or printing. ☐Must indicate street names, and north arrow and scale. ☐All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ☐Types of plans required: ☐Work hour plan – show all mobility impacts during construction hours. ☐Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ☐Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ☐Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering JB0000569593 401 LIND AVE NW Monday Friday 8:00am 3:00pm TIE IN TO NEW SPLICE CASE OVERLASH 144CT FIBER. PROOF AND PULL 144CT FIBER THROUGH AND TWO EXISTING RISERS. TIE IN TO EXISTING SPLICE CASE. Cannon Construction Inc 253 922 2787 Shannon Heaton sheaton@cannonconstructioninc.com 406 Milton Way Milton, WA 98354 MFP21001348 Scott Warlick CED 5/4/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 11/25/2019 APPLICANT AGREES TO ALL THE FOLLOWING: •TCP must be approved prior to commencing the work, and all permit conditions shall be met. •Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. •Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. •The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. •Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. •TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. •Approved Temporary TCP must be at the work site during work hours. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. •The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date 371 305402401369 368NW 4TH STLIND AVE NWMAPLE AVE NW368401404403NOTES:1. ALL SIGNS ARE 36" - 48" ACROSS2. ASTERISK DENOTES X, L, OR B DISTANCES ARE NOT TO SCALE3. CONTRACTOR SHALL ALWAYS PROVIDE ACCESS TO DRIVEWAYS4. STANDARD ADVANCE WARNING SIGNS SHALL BE USED FOR PLATES OR ROUGH ROAD DURING AFTER-HOURS, INCLUDING "MOTORCYCLIST" SIGN5. FLAGGERS SHALL BE USED IN ACCORDANCE WITH WAC 468-95-302. UPO WILL BE REQUIRED IF A TRAFFIC SIGNAL COULD BE COUNTERMANDED6. IF ONLY ONE LANE IS OPEN IN A DIRECTION, THAT LANE SHALL BE A MINIMUM OF 11' WIDE, UNLESS SPOTTER/FLAGGERS ARE USED, IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10'7. SIDEWALKS ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 4' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OF CURB71SHEET NUMBEROFSPENCER KARINIEMITRAFFIC CONTROL SUPERVISOR360-722-2852TYPE OF TCP: WORK HOURSPHASE OF WORK: OVERLASHRURAL ROADS & URBAN ARTERIALSRURAL ROADSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSRURAL ROADS & URBAN ARTERIALS350'±500'±100'±200'±(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATEINTERCHANGE RAMPS, AT-GRADE INTERSECTIONS ANDDRIVEWAYS(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TOFIT ROADWAY CONDITIONSSIGN SPACING = X35/40 MPH45/55 MPH25 MPH OR LESS25/30 MPHCHANNELIZATION DEVICESPACING (FEET)35/4525/3050MPHTAPER403020406080TANGENT25303540455055606570730645570495425360305250200155LENGTH (FEET)SPEED (MPH)LONGITUDINAL BUFFER SPACE = BBUFFER DATA150251051151253530165180205225245402702953204545049554050500550600101112LANEWIDTH(FEET)MINIMUM TAPER LENGTH = L (FEET)POSTED SPEED (MPH)TRAFFIC CONTROL PLANHOURS OF TCP: 8AM-5PM24 HR CONTACT:ALEX GAUNTCANNON253-922-2787AGAUNT@CANNONCONSTRUCTIONINC.COMJOB NUMBER: JB0000569593JOB ADDRESS: 369 MAPLE AVE NWDESCRIPTION: OVERLASH BETWEENPOLES, CONTINUE ONTO SHEET 2.N O R T HLEGENDTRAFFIC CONESTEMP SIGN LOCATIONWORK VEHICLER7-T39 NO PARKUTILITY POLEX*ROADWORKAHEADW20-1X*ROADWORKAHEADW20-1W4-119LX*ROADWORKAHEADW20-1X*ROADWORKAHEADW20-1W4-119LX*ROADWORKAHEADW20-1W4-119LTRAFFIC CONTROL SUPERVISOR01222408/31/2023SPE N CERD.IMEINIRAKST A TEOFNOTGNIHSAWSPEEDLIMIT2524'8'8'MFP21001348 368 203 360316114360NW 4TH ST TAYLOR AVE NW368401 203200401 115 321 312315365353321PRIVATE ACCESSNW 3RD PLNOTES:1. ALL SIGNS ARE 36" - 48" ACROSS2. ASTERISK DENOTES X, L, OR B DISTANCES ARE NOT TO SCALE3. CONTRACTOR SHALL ALWAYS PROVIDE ACCESS TO DRIVEWAYS4. STANDARD ADVANCE WARNING SIGNS SHALL BE USED FOR PLATES OR ROUGH ROAD DURING AFTER-HOURS, INCLUDING "MOTORCYCLIST" SIGN5. FLAGGERS SHALL BE USED IN ACCORDANCE WITH WAC 468-95-302. UPO WILL BE REQUIRED IF A TRAFFIC SIGNAL COULD BE COUNTERMANDED6. IF ONLY ONE LANE IS OPEN IN A DIRECTION, THAT LANE SHALL BE A MINIMUM OF 11' WIDE, UNLESS SPOTTER/FLAGGERS ARE USED, IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10'7. SIDEWALKS ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 4' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OF CURB72SHEET NUMBEROFSPENCER KARINIEMITRAFFIC CONTROL SUPERVISOR360-722-2852TYPE OF TCP: WORK HOURSPHASE OF WORK: OVERLASHRURAL ROADS & URBAN ARTERIALSRURAL ROADSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSRURAL ROADS & URBAN ARTERIALS350'±500'±100'±200'±(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATEINTERCHANGE RAMPS, AT-GRADE INTERSECTIONS ANDDRIVEWAYS(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TOFIT ROADWAY CONDITIONSSIGN SPACING = X35/40 MPH45/55 MPH25 MPH OR LESS25/30 MPHCHANNELIZATION DEVICESPACING (FEET)35/4525/3050MPHTAPER403020406080TANGENT25303540455055606570730645570495425360305250200155LENGTH (FEET)SPEED (MPH)LONGITUDINAL BUFFER SPACE = BBUFFER DATA150251051151253530165180205225245402702953204545049554050500550600101112LANEWIDTH(FEET)MINIMUM TAPER LENGTH = L (FEET)POSTED SPEED (MPH)TRAFFIC CONTROL PLANHOURS OF TCP: 8AM-5PM24 HR CONTACT:ALEX GAUNTCANNON253-922-2787AGAUNT@CANNONCONSTRUCTIONINC.COMJOB NUMBER: JB0000569593JOB ADDRESS: 360 TAYLOR AVENWDESCRIPTION: OVERLASH BETWEENPOLES, CONTINUE TO SHEET 3.N O R T H LEGENDTRAFFIC CONESTEMP SIGN LOCATIONWORK VEHICLEUTILITY POLETRAFFIC CONTROL SUPERVISOR01222408/31/2023SPE N CERD.IMEINIRAKST A TEOFNOTGNIHSAWFLAGGING STATIONROADWORKAHEADW20-1W4-119LROADWORKAHEADW20-1W20-7X*ONE LANEROADAHEADW20-4X*X*X*ROADWORKAHEADW20-1W20-7ONE LANEROADAHEADW20-4X*X*ROADWORKAHEADW20-1W20-7X*X*X*BEPREPAREDTO STOPW3-4X*X*X*ROADWORKAHEADW20-1W20-7BEPREPAREDTO STOPW3-4X*BEPREPAREDTO STOPW3-4W20-7PEDESTRIAN ESCORT: STOP WORK, SECUREPASSABLE ADA COMPLIANT PEDESTRIAN ACCESS ONEXISTING SIDEWALK (4' MIN.). CLEAR ZONE MUST BEFREE OF OVERHEAD HAZARDS WHEN PEDESTRIANSARE MOVING THROUGH THE WORK ZONE.FLAGGERS TO STOP ALLTRAFFIC BEFORE RAISINGCABLE OVER ROADBUS STOPX*X*CONTRACTOR TO NOTIFYPROPERTY OWNER OFTEMPORARY DRIVEWAYCLOSURE PRIOR TOCONSTRUCTION11'11'SPEEDLIMIT30MFP21001348 312315308268 264260264221221TAYLOR AVE NWNW 2ND PL 257207267NW 3RD PL 253259265 215NOTES:1. ALL SIGNS ARE 36" - 48" ACROSS2. ASTERISK DENOTES X, L, OR B DISTANCES ARE NOT TO SCALE3. CONTRACTOR SHALL ALWAYS PROVIDE ACCESS TO DRIVEWAYS4. STANDARD ADVANCE WARNING SIGNS SHALL BE USED FOR PLATES OR ROUGH ROAD DURING AFTER-HOURS, INCLUDING "MOTORCYCLIST" SIGN5. FLAGGERS SHALL BE USED IN ACCORDANCE WITH WAC 468-95-302. UPO WILL BE REQUIRED IF A TRAFFIC SIGNAL COULD BE COUNTERMANDED6. IF ONLY ONE LANE IS OPEN IN A DIRECTION, THAT LANE SHALL BE A MINIMUM OF 11' WIDE, UNLESS SPOTTER/FLAGGERS ARE USED, IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10'7. SIDEWALKS ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 4' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OF CURB73SHEET NUMBEROFSPENCER KARINIEMITRAFFIC CONTROL SUPERVISOR360-722-2852TYPE OF TCP: WORK HOURSPHASE OF WORK: OVERLASHRURAL ROADS & URBAN ARTERIALSRURAL ROADSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSRURAL ROADS & URBAN ARTERIALS350'±500'±100'±200'±(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATEINTERCHANGE RAMPS, AT-GRADE INTERSECTIONS ANDDRIVEWAYS(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TOFIT ROADWAY CONDITIONSSIGN SPACING = X35/40 MPH45/55 MPH25 MPH OR LESS25/30 MPHCHANNELIZATION DEVICESPACING (FEET)35/4525/3050MPHTAPER403020406080TANGENT25303540455055606570730645570495425360305250200155LENGTH (FEET)SPEED (MPH)LONGITUDINAL BUFFER SPACE = BBUFFER DATA150251051151253530165180205225245402702953204545049554050500550600101112LANEWIDTH(FEET)MINIMUM TAPER LENGTH = L (FEET)POSTED SPEED (MPH)TRAFFIC CONTROL PLANHOURS OF TCP: 8AM-5PM24 HR CONTACT:ALEX GAUNTCANNON253-922-2787JOB NUMBER: JB0000569593JOB ADDRESS: 115 NW 3RD PLDESCRIPTION: OVERLASH BETWEENPOLES, CONTINUE TO SHEET 4.N O R T HFLAGGING STATIONLEGENDTRAFFIC CONESTEMP SIGN LOCATIONWORK VEHICLEUTILITY POLETRAFFIC CONTROL SUPERVISOR01222408/31/2023SPE N CERD.IMEINIRAKST A TEOFNOTGNIHSAWX*ROADWORKAHEADW20-1ONE LANEROADAHEADW20-4W20-7X*X*X*ROADWORKAHEADW20-1ONE LANEROADAHEADW20-4W20-7ROADWORKAHEADW20-1ONE LANEROADAHEADW20-4W20-7X*X*X*X*ROADWORKAHEADW20-1ONE LANEROADAHEADW20-4W20-7X*X*PEDESTRIAN ESCORT: STOP WORK, SECUREPASSABLE ADA COMPLIANT PEDESTRIAN ACCESS ONEXISTING SIDEWALK (4' MIN.). CLEAR ZONE MUST BEFREE OF OVERHEAD HAZARDS WHEN PEDESTRIANSARE MOVING THROUGH THE WORK ZONE.FLAGGERS TO STOP ALLTRAFFIC BEFORE RAISINGCABLE OVER ROAD50'50'50'BUS STOPX*X*SPEEDLIMIT30CONTRACTOR TO NOTIFYPROPERTY OWNER OFTEMPORARY DRIVEWAYCLOSURE PRIOR TOCONSTRUCTION11'11'MFP21001348 207201201151TAYLOR AVE NWNW 2ND ST REN T O N A V E E X T E N SI O N 65 HA R D I E A V E S WNOTES:1. ALL SIGNS ARE 36" - 48" ACROSS2. ASTERISK DENOTES X, L, OR B DISTANCES ARE NOT TO SCALE3. CONTRACTOR SHALL ALWAYS PROVIDE ACCESS TO DRIVEWAYS4. STANDARD ADVANCE WARNING SIGNS SHALL BE USED FOR PLATES OR ROUGH ROAD DURING AFTER-HOURS, INCLUDING "MOTORCYCLIST" SIGN5. FLAGGERS SHALL BE USED IN ACCORDANCE WITH WAC 468-95-302. UPO WILL BE REQUIRED IF A TRAFFIC SIGNAL COULD BE COUNTERMANDED6. IF ONLY ONE LANE IS OPEN IN A DIRECTION, THAT LANE SHALL BE A MINIMUM OF 11' WIDE, UNLESS SPOTTER/FLAGGERS ARE USED, IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10'7. SIDEWALKS ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 4' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OF CURB74SHEET NUMBEROFSPENCER KARINIEMITRAFFIC CONTROL SUPERVISOR360-722-2852TYPE OF TCP: WORK HOURSPHASE OF WORK: PROOF/PULLRURAL ROADS & URBAN ARTERIALSRURAL ROADSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSRURAL ROADS & URBAN ARTERIALS350'±500'±100'±200'±(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATEINTERCHANGE RAMPS, AT-GRADE INTERSECTIONS ANDDRIVEWAYS(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TOFIT ROADWAY CONDITIONSSIGN SPACING = X35/40 MPH45/55 MPH25 MPH OR LESS25/30 MPHCHANNELIZATION DEVICESPACING (FEET)35/4525/3050MPHTAPER403020406080TANGENT25303540455055606570730645570495425360305250200155LENGTH (FEET)SPEED (MPH)LONGITUDINAL BUFFER SPACE = BBUFFER DATA150251051151253530165180205225245402702953204545049554050500550600101112LANEWIDTH(FEET)MINIMUM TAPER LENGTH = L (FEET)POSTED SPEED (MPH)TRAFFIC CONTROL PLANHOURS OF TCP: 8AM-5PM24 HR CONTACT:ALEX GAUNTCANNON253-922-2787AGAUNT@CANNONCONSTRUCTIONINC.COMJOB NUMBER: JB0000569593JOB ADDRESS: 221 HARDIE AVE NWDESCRIPTION: PROOF/PULL FROM POLETO VAULT, CONTINUE ONTO SHEET 5.N O R T H LEGENDTRAFFIC CONESTEMP SIGN LOCATIONWORK VEHICLER7-T39 NO PARKUTILITY POLETRAFFIC CONTROL SUPERVISOR01222408/31/2023SPE N CERD.IMEINIRAKST A TEOFNOTGNIHSAWBUS STOPSPEEDLIMIT30X*ROADWORKAHEADW20-1W4-119LROADWORKAHEADW20-1X*X*ROADWORKAHEADW20-18'11'RENTON AVE EXTENSIONPEDESTRIAN ESCORT: STOP WORK, SECUREPASSABLE ADA COMPLIANT PEDESTRIAN ACCESS ONEXISTING SIDEWALK (4' MIN.). CLEAR ZONE MUST BEFREE OF OVERHEAD HAZARDS WHEN PEDESTRIANSARE MOVING THROUGH THE WORK ZONE.MFP21001348 RENTON AVE EXTENSION65HARDIE AVE SW102NOTES:1. ALL SIGNS ARE 36" - 48" ACROSS2. ASTERISK DENOTES X, L, OR B DISTANCES ARE NOT TO SCALE3. CONTRACTOR SHALL ALWAYS PROVIDE ACCESS TO DRIVEWAYS4. STANDARD ADVANCE WARNING SIGNS SHALL BE USED FOR PLATES OR ROUGH ROAD DURING AFTER-HOURS, INCLUDING "MOTORCYCLIST" SIGN5. FLAGGERS SHALL BE USED IN ACCORDANCE WITH WAC 468-95-302. UPO WILL BE REQUIRED IF A TRAFFIC SIGNAL COULD BE COUNTERMANDED6. IF ONLY ONE LANE IS OPEN IN A DIRECTION, THAT LANE SHALL BE A MINIMUM OF 11' WIDE, UNLESS SPOTTER/FLAGGERS ARE USED, IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10'7. SIDEWALKS ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 4' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OF CURB75SHEET NUMBEROFSPENCER KARINIEMITRAFFIC CONTROL SUPERVISOR360-722-2852TYPE OF TCP: WORK HOURSPHASE OF WORK: PROOF/PULLRURAL ROADS & URBAN ARTERIALSRURAL ROADSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSRURAL ROADS & URBAN ARTERIALS350'±500'±100'±200'±(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATEINTERCHANGE RAMPS, AT-GRADE INTERSECTIONS ANDDRIVEWAYS(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TOFIT ROADWAY CONDITIONSSIGN SPACING = X35/40 MPH45/55 MPH25 MPH OR LESS25/30 MPHCHANNELIZATION DEVICESPACING (FEET)35/4525/3050MPHTAPER403020406080TANGENT25303540455055606570730645570495425360305250200155LENGTH (FEET)SPEED (MPH)LONGITUDINAL BUFFER SPACE = BBUFFER DATA150251051151253530165180205225245402702953204545049554050500550600101112LANEWIDTH(FEET)MINIMUM TAPER LENGTH = L (FEET)POSTED SPEED (MPH)TRAFFIC CONTROL PLANHOURS OF TCP: 8AM-5PM24 HR CONTACT:ALEX GAUNTCANNON253-922-2787AGAUNT@CANNONCONSTRUCTIONINC.COMJOB NUMBER: JB0000569593JOB ADDRESS: 201 TAYLOR AVE NWDESCRIPTION: PROOF/PULL FROM VAULTTO POLE, CONTINUE TO SHEET 6.N O R T HLEGENDTRAFFIC CONESTEMP SIGN LOCATIONWORK VEHICLETRAFFIC CONTROL SUPERVISOR01222408/31/2023SPE N CERD.IMEINIRAKST A TEOFNOTGNIHSAWBUS STOP9'WORK AREAX*ROADWORKAHEADW20-1X*ROADWORKAHEADW20-1X*ROADWORKAHEADW20-1W21-5SHOULDERWORKX*SPEEDLIMIT355'5'SIDEWALKCLOSEDR9-9DETOURM4-9BDETOURM4-9BPLACE AT INTERSECTIONWITH RAINIER AVE SPLACE AT INTERSECTIONWITH RAINIER AVE SR9-11SIDEWALK CLOSEDAHEADCROSS HEREMFP21001348 201151TAYLOR AVE NWRENTON AVE EXTENSION 65HARDIE AVE SW10294120126NOTES:1. ALL SIGNS ARE 36" - 48" ACROSS2. ASTERISK DENOTES X, L, OR B DISTANCES ARE NOT TO SCALE3. CONTRACTOR SHALL ALWAYS PROVIDE ACCESS TO DRIVEWAYS4. STANDARD ADVANCE WARNING SIGNS SHALL BE USED FOR PLATES OR ROUGH ROAD DURING AFTER-HOURS, INCLUDING "MOTORCYCLIST" SIGN5. FLAGGERS SHALL BE USED IN ACCORDANCE WITH WAC 468-95-302. UPO WILL BE REQUIRED IF A TRAFFIC SIGNAL COULD BE COUNTERMANDED6. IF ONLY ONE LANE IS OPEN IN A DIRECTION, THAT LANE SHALL BE A MINIMUM OF 11' WIDE, UNLESS SPOTTER/FLAGGERS ARE USED, IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10'7. SIDEWALKS ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 4' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OF CURB76SHEET NUMBEROFSPENCER KARINIEMITRAFFIC CONTROL SUPERVISOR360-722-2852TYPE OF TCP: WORK HOURSPHASE OF WORK: OVERLASHRURAL ROADS & URBAN ARTERIALSRURAL ROADSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSRURAL ROADS & URBAN ARTERIALS350'±500'±100'±200'±(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATEINTERCHANGE RAMPS, AT-GRADE INTERSECTIONS ANDDRIVEWAYS(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TOFIT ROADWAY CONDITIONSSIGN SPACING = X35/40 MPH45/55 MPH25 MPH OR LESS25/30 MPHCHANNELIZATION DEVICESPACING (FEET)35/4525/3050MPHTAPER403020406080TANGENT25303540455055606570730645570495425360305250200155LENGTH (FEET)SPEED (MPH)LONGITUDINAL BUFFER SPACE = BBUFFER DATA150251051151253530165180205225245402702953204545049554050500550600101112LANEWIDTH(FEET)MINIMUM TAPER LENGTH = L (FEET)POSTED SPEED (MPH)TRAFFIC CONTROL PLANHOURS OF TCP: 8AM-5PM24 HR CONTACT:ALEX GAUNTCANNON253-922-2787AGAUNT@CANNONCONSTRUCTIONINC.COMJOB NUMBER: JB0000569593JOB ADDRESS: 120 HARDIE AVE NWDESCRIPTION: OVERLASH BETWEENPOLES, CONTINUE ONTO SHEET 7.N O R T HLEGENDTRAFFIC CONESTEMP SIGN LOCATIONWORK VEHICLETRAFFIC CONTROL SUPERVISOR01222408/31/2023SPE N CERD.IMEINIRAKST A TEOFNOTGNIHSAWUTILITY POLEFLAGGING STATION30'50'X*X*X*X*X*ROADWORKAHEADW20-1ROADWORKAHEADW20-1X*X*ROADWORKAHEADW20-1ONE LANEROADAHEADW20-4BEPREPAREDTO STOPW3-4BEPREPAREDTO STOPW3-4W20-750'X*X*X*ROADWORKAHEADW20-1ONE LANEROADAHEADW20-4W20-711'11'SPEEDLIMIT25SPOTTER TO ASSISTVEHICLES LEAVINGDRIVEWAYSMFP21001348 S W V I C T O R I A S T 94 120126NOTES:1. ALL SIGNS ARE 36" - 48" ACROSS2. ASTERISK DENOTES X, L, OR B DISTANCES ARE NOT TO SCALE3. CONTRACTOR SHALL ALWAYS PROVIDE ACCESS TO DRIVEWAYS4. STANDARD ADVANCE WARNING SIGNS SHALL BE USED FOR PLATES OR ROUGH ROAD DURING AFTER-HOURS, INCLUDING "MOTORCYCLIST" SIGN5. FLAGGERS SHALL BE USED IN ACCORDANCE WITH WAC 468-95-302. UPO WILL BE REQUIRED IF A TRAFFIC SIGNAL COULD BE COUNTERMANDED6. IF ONLY ONE LANE IS OPEN IN A DIRECTION, THAT LANE SHALL BE A MINIMUM OF 11' WIDE, UNLESS SPOTTER/FLAGGERS ARE USED, IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10'7. SIDEWALKS ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 4' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OF CURB77SHEET NUMBEROFSPENCER KARINIEMITRAFFIC CONTROL SUPERVISOR360-722-2852TYPE OF TCP: WORK HOURSPHASE OF WORK: OVERLASH,SPLICERURAL ROADS & URBAN ARTERIALSRURAL ROADSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSRURAL ROADS & URBAN ARTERIALS350'±500'±100'±200'±(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATEINTERCHANGE RAMPS, AT-GRADE INTERSECTIONS ANDDRIVEWAYS(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TOFIT ROADWAY CONDITIONSSIGN SPACING = X35/40 MPH45/55 MPH25 MPH OR LESS25/30 MPHCHANNELIZATION DEVICESPACING (FEET)35/4525/3050MPHTAPER403020406080TANGENT25303540455055606570730645570495425360305250200155LENGTH (FEET)SPEED (MPH)LONGITUDINAL BUFFER SPACE = BBUFFER DATA150251051151253530165180205225245402702953204545049554050500550600101112LANEWIDTH(FEET)MINIMUM TAPER LENGTH = L (FEET)POSTED SPEED (MPH)TRAFFIC CONTROL PLANHOURS OF TCP: 8AM-5PM24 HR CONTACT:ALEX GAUNTCANNON253-922-2787AGAUNT@CANNONCONSTRUCTIONINC.COMJOB NUMBER: JB0000569593JOB ADDRESS: 71 SW VICTORIA STDESCRIPTION: OVERLASH BETWEENPOLES. SPLICE AT AERIAL SPLICE CASE.N O R T HLEGENDTRAFFIC CONESTEMP SIGN LOCATIONWORK VEHICLETRAFFIC CONTROL SUPERVISOR01222408/31/2023SPE N CERD.IMEINIRAKST A T EOFNOTGNIHSAWUTILITY POLEFLAGGING STATIONW20-7R7-T39 NO PARKSPLICE LOCATION6 2 6 14050'50'50'X*X*X*X *X*X*X* X*ROADWORKAHEADW20-1W20-7BEPREPAREDTO STOPW3-4ROADWORKAHEADW20-1ROADWORKAHEADW20-1W20-7BEPREPAREDTO STOPW3-4X*W21-5SHOULDERWORKW20-7ONE LANEROADAHEADW20-4ROADWORKAHEADW20-18'8'X * X *ONE LANEROADAHEADW20-4PEDESTRIAN ESCORT: STOP WORK, SECUREPASSABLE ADA COMPLIANT PEDESTRIAN ACCESS ONEXISTING SIDEWALK (4' MIN.). CLEAR ZONE MUST BEFREE OF OVERHEAD HAZARDS WHEN PEDESTRIANSARE MOVING THROUGH THE WORK ZONE.SPEEDLIMIT2590TH AVE S11'11'FLAGGERS TO STOP ALLTRAFFIC BEFORE RAISINGCABLE OVER ROADALLOW DRIVEWAYACCESS BETWEENCONESSPOTTER TO ASSISTVEHICLES LEAVINGDRIVEWAYSX* X*MFP21001348 AS-BUILT121REVISIONSNO.DATEENGINEERDRAFTERORIGINAL12Know what's below.Call before you dig.RSHEET NUMBEROFPROJECT LOCATION: 401 LIND AVE NW, RENTON, WA 98057PROJECT NUMBER: JB0000569593PERMIT NUMBER: ----BOOKER ENGINEERING LLC1129 W MAIN ST,MONROE, WA 98272360.722.2852COMCAST ENGINEER: MIKE FONTENOTCONFIDENTIAL/ PROPRIETARYSDKTRM03/15/21------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.BOOKER ENGINEERING DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------SITE LOCATIONSHEET INDEXSCOPE OF WORK:TIE INTO NEW SPLICE CASE NEAR 401 LINDAVE NW AND OVERLASH NEW 144F CABLE1794' (12 SPANS) EAST AND SOUTH. PROOF/PULL NEW 144F CABLE 473' SOUTH ANDSOUTH EAST THROUGH EXISTING CONDUITAND TWO EXISTING RISERS. OVERLASH NEW144F CABLE 614' (4 SPANS) SOUTHEAST ANDWEST AND TIE INTO EXISTING SPLICE CASENEAR 71 SW VICTORIA ST.TOTAL OVERLASH = 2408'TOTAL PROOF/PULL = 473'ALL CONSTRUCTION/RESTORATION TO MEETOR EXCEED CITY OF RENTON STANDARDS.ADDRESS: 401 LIND AVE NW, RENTON, WA 98057PROJECT NAME: JB0000569593 - AERIAL & PROOF/PULL1 - COVER SHEET2 - GENERAL NOTES3 - LEGEND4/11 - DESIGN VIEWS 1/812 - AERIAL TYPICALSCONTACTSALEX GAUNTCANNON COMPANIES253-922-2787AGAUNT@CANNONCONSTRUCTIONINC.COMMIKE FONTENOTCOMCAST COMMUNICATION425-213-5482MIKE_FONTENOT@CABLE.COMCAST.COMSPENCER KARINIEMIBOOKER ENGINEERINGSPENCER@BOOKERENG.COM360-722-2852DRAWING FILE LOCATION: G:\SHARED DRIVES\BOOKER ENGINEERING\CLIENTS\CANNON\JB0000569593 - P2P\JB0000569593_PRINTSAERIAL.DWGN O R T HSHEET 4SHEET 5SHEET 6SHEET 7SHEET 8SHEET 9SHEET 10SHEET 11RENTON AVE SNW 2ND STAIRPORT WAYS TOBIN STRENTONMUNICIPALAIRPORTRAINIER AVE SLIND AVE NWSENECA PL NWVICINITY MAPMFP21001348 AS-BUILT122REVISIONSNO.DATEENGINEERDRAFTERORIGINAL12Know what's below.Call before you dig.RSHEET NUMBEROFPROJECT LOCATION: 401 LIND AVE NW, RENTON, WA 98057PROJECT NUMBER: JB0000569593PERMIT NUMBER: ----BOOKER ENGINEERING LLC1129 W MAIN ST,MONROE, WA 98272360.722.2852COMCAST ENGINEER: MIKE FONTENOTCONFIDENTIAL/ PROPRIETARYSDKTRM03/15/21------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.BOOKER ENGINEERING DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------GENERAL NOTES1.THE ACTUAL LOCATION OF EXISTING CONDUIT AND CABLES MAY VARY FROM THE LOCATION SHOWN. BOOKER ENGINEERING DISCLAIMS ANY RESPONSIBILITIES FOR DAMAGES INCURREDTO ANY FACILITIES SHOWN OR NOT SHOWN IN THESE PRINTS. PERSONS WORKING IN THE AREA COVERED BY THIS DRAWING MUST CONTACT THE STATEWIDE CALL-BEFORE-YOU-DIGSYSTEM TO CONFIRM THE LOCATION OF UNDERGROUND FACILITIES.2.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF UTILITY IMPROVEMENTS SHALL MEET OR EXCEED SITE WORK STANDARDS AND THE STANDARDS AND SPECIFICATIONS SET FORTHIN THE CITY OF RENTON REGULATIONS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANYAPPLICABLE STANDARDS, THE HIGHER QUALITY STANDARD SHALL APPLY. ALL WORK WITHIN PUBLIC R.O.W. OR EASEMENTS MAY REQUIRE INSPECTED AND APPROVED BY THE CITY OFRENTON INSPECTOR. INSPECTION SERVICES AND CONSTRUCTION CERTIFICATION TO BE PROVIDED BY DESIGNEE OF PROJECT SPONSOR/OWNER.3.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES, AS SHOWN ON THESE PLANS, IS BASED ON RECORDS OF THE VARIOUSUTILITY COMPANIES AND, WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED UPON AS BEING EXACT OR COMPLETE. THE CONTRACTORMUST CALL THE LOCAL UTILITY LOCATION CENTER AT LEAST 48 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATIONS OF EXISTING UTILITIES. THE CONTRACTOR SHALLVERIFY PERTINENT LOCATIONS AND ELEVATIONS, ESPECIALLY AT THE CONNECTION POINTS AND AT POTENTIAL UTILITY CONFLICTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTORTO RELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS.4.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FROM ALL APPLICABLE AGENCIES. THE CONTRACTOR SHALL NOTIFY THE CITY OF RENTON INSPECTORAT LEAST 48 HOURS PRIOR TO THE START OF ANY EARTH DISTURBING ACTIVITY OR CONSTRUCTION ON ANY AND ALL PUBLIC IMPROVEMENTS IF REQUIRED.5.THE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH THE CITY OF RENTON AND ALL UTILITY COMPANIES WITH REGARD TO RELOCATIONS OR ADJUSTMENTS OF EXISTINGUTILITIES DURING CONSTRUCTION, TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION, AND WITH A MINIMUM DISRUPTION OF SERVICE. THE CONTRACTOR SHALL BERESPONSIBLE FOR CONTACTING ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE.6.THE CONTRACTOR SHALL HAVE ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE APPROPRIATE STANDARDS AND SPECIFICATIONS, AND ONE (1) COPY OF ANYPERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB ON-SITE AT ALL TIMES.7.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO: EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY.8.IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED BY THE CONTRACTOR, HIS SUBCONTRACTORS, OR OTHER AFFECTED PARTIES WHICH COULD INDICATE ASITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL CONTACT THE ENGINEER IMMEDIATELY.9.ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD, UNLESS SPECIFICALLY STATED OTHERWISE.10.FOR WORK AFFECTING PUBLIC ROADWAYS OR IF REQUIRED BY THE CITY OF RENTON, THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL AND PHASING PLAN IN ACCORDANCE WITHM.U.T.C.D. FOR APPROVAL. PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN OR AFFECTING THE RIGHT-OF-WAY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALLTRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY SAID PLANS. PRIOR TO INSTALLATION A PRECONSTRUCTION CONFERENCE SHALL BE HELD WITH CITY OF RENTON.11.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THE INTENDED IMPROVEMENTS SHOWN ON THESE DRAWINGS ORDESIGNATED TO BE PROVIDED, INSTALLED, CONSTRUCTED, REMOVED OR RELOCATED UNLESS SPECIFICALLY NOTED OTHERWISE.12.PER AGENCY STANDARDS THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ROADWAYS FREE AND CLEAR OF ALL CONSTRUCTION DEBRIS AND DIRT TRACKED FROM THE SITE.13.THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING RECORD INFORMATION ON A SET OF RECORD DRAWINGS KEPT AT THE CONSTRUCTION SITE AND AVAILABLE TO THE CITY OFRENTON INSPECTOR AT ALL TIMES. THE CITY OF RENTON REQUEST A NEW PLAN SET THAT INDICATES THE NEWLY RELOCATED FACILITIES WHEN CONSTRUCTION IS COMPLETED.14.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. FOR ADDITIONAL INFORMATION CONTACT THE ENGINEER FOR CLARIFICATION AND NOTEON THE RECORD DRAWINGS.15.ALL EROSION AND SEDIMENT CONTROL (E.S.C.) MEASURES SHALL BE INSTALLED AT THE LIMITS OF CONSTRUCTION PRIOR TO GROUND DISTURBING ACTIVITY. ALL E.S.C. MEASURES SHALLBE MAINTAINED IN GOOD REPAIR BY THE CONTRACTOR UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS ARE STABILIZED WITH HARD SURFACE OR LANDSCAPING.16.ALL WORK WITHIN THE PUBLIC RIGHT-OF-WAY IS SUBJECT TO THE JURISDICTION OF THE CITY OF RENTON ENGINEERING DEPARTMENT STANDARD DETAILS AND SPECIFICATIONS.17.ALL CONSTRUCTION OPERATIONS, INCLUDING THE WARMING UP, REPAIR, ARRIVAL, DEPARTURE OR RUNNING OF TRUCKS, EARTH MOVING EQUIPMENT, CONSTRUCTION EQUIPMENT ANDANY OTHER ASSOCIATED EQUIPMENT SHALL GENERALLY BE LIMITED TO THE TIME PERIOD APPROVED BY THE CITY OF RENTON.N O R T HMFP21001348 AS-BUILT123REVISIONSNO.DATEENGINEERDRAFTERORIGINAL12Know what's below.Call before you dig.RSHEET NUMBEROFPROJECT LOCATION: 401 LIND AVE NW, RENTON, WA 98057PROJECT NUMBER: JB0000569593PERMIT NUMBER: ----BOOKER ENGINEERING LLC1129 W MAIN ST,MONROE, WA 98272360.722.2852COMCAST ENGINEER: MIKE FONTENOTCONFIDENTIAL/ PROPRIETARYSDKTRM03/15/21------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.BOOKER ENGINEERING DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------#F#F#F#LEGENDN O R T HN O R T H#MFP21001348 401 LIND AVE NWPARCEL# 4204400094371 LIND AVE NWPARCEL# 4204400177305 NW 4TH ST PARCEL# 9460000070402 LIND AVE NWPARCEL# 4202400305401 MAPLE AVE NWPARCEL# 4202400310369 MAPLE AVE NWPARCEL# 9460000120NW 4TH STLIND AVE NWMAPLE AVE NW158'103'154'AS-BUILT124REVISIONSNO.DATEENGINEERDRAFTERORIGINAL12Know what's below.Call before you dig.RSHEET NUMBEROFPROJECT LOCATION: 401 LIND AVE NW, RENTON, WA 98057PROJECT NUMBER: JB0000569593PERMIT NUMBER: ----BOOKER ENGINEERING LLC1129 W MAIN ST,MONROE, WA 98272360.722.2852COMCAST ENGINEER: MIKE FONTENOTCONFIDENTIAL/ PROPRIETARYSDKTRM03/15/21------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.BOOKER ENGINEERING DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------CONSTRUCTION NOTES1EXISTING UTILITY POLE UP-01N O R T H2PLACE NEW SPLICE CASE NEAR UP-013FROM NEW SPICE CASE OVERLASH NEW 144F CABLE 158'(SE) TO UP-024EXISTING UTILITY POLE UP-025FROM UP-02 OVERLASH NEW 144F CABLE 103' (E) TOUP-036EXISTING UTILITY POLE UP-037FROM UP-03 OVERLASH NEW 144F CABLE 154' (E) TOUP-041234567MATCH TO SHEET 5 MFP21001348 368 MAPLE AVE NWPARCEL# 9460000010203 NW 4TH ST PARCEL# 9460000060206 NW 4TH STPARCEL# 4202400395200 NW 4TH STPARCEL# 4202400396360 TAYLOR AVE NWPARCEL# 4204400135390 TAYLOR AVE NWPARCEL# 4202401340NW 4TH STTAYLOR PL NWTAYLOR AVE NW(154')153'117'AS-BUILT125REVISIONSNO.DATEENGINEERDRAFTERORIGINAL12Know what's below.Call before you dig.RSHEET NUMBEROFPROJECT LOCATION: 401 LIND AVE NW, RENTON, WA 98057PROJECT NUMBER: JB0000569593PERMIT NUMBER: ----BOOKER ENGINEERING LLC1129 W MAIN ST,MONROE, WA 98272360.722.2852COMCAST ENGINEER: MIKE FONTENOTCONFIDENTIAL/ PROPRIETARYSDKTRM03/15/21------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.BOOKER ENGINEERING DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------MATCH TO SHEET61154' OF NEW 144F CABLE OVERLASH CONTINUED FROMNOTE 7 ON SHEET 4CONSTRUCTION NOTESN O R T HMATCH TO SHEET4123453FROM UP-04 OVERLASH NEW 144F CABLE 153' (E) TOUP-054EXISTING UTILITY POLE UP-055FROM UP-05 OVERLASH NEW 144F CABLE 117' (S) TOUP-062EXISTING UTILITY POLE UP-04MFP21001348 365 TAYLOR AVE NWPARCEL# 9460000050361 TAYLOR AVE NWPARCEL# 9460000040353 TAYLOR AVE NWPARCEL# 4204400150321 TAYLOR AVE NWPARCEL# 4204400201315 TAYLOR AVE NWPARCEL# 4204400202115 NW 3RD PLPARCEL# 3185600005114 NW 3RD PLPARCEL# 4204400125360 TAYLOR AVE NWPARCEL# 4204400135316 TAYLOR AVE NWPARCEL# 3185600005(117')93'240'TAYLOR AVE NWAS-BUILT126REVISIONSNO.DATEENGINEERDRAFTERORIGINAL12Know what's below.Call before you dig.RSHEET NUMBEROFPROJECT LOCATION: 401 LIND AVE NW, RENTON, WA 98057PROJECT NUMBER: JB0000569593PERMIT NUMBER: ----BOOKER ENGINEERING LLC1129 W MAIN ST,MONROE, WA 98272360.722.2852COMCAST ENGINEER: MIKE FONTENOTCONFIDENTIAL/ PROPRIETARYSDKTRM03/15/21------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.BOOKER ENGINEERING DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------N O R T H CONSTRUCTION NOTES1117' OF NEW 144F CABLE OVERLASH CONTINUED FROMNOTE 5 ON SHEET 52EXISTING UTILITY POLE UP-063FROM UP-06 OVERLASH NEW 144F CABLE 93' (S)TO UP-07123454EXISTING UTILITY POLE UP-075FROM UP-07 OVERLASH NEW 144F CABLE 240' (S) TOUP-08MATCH TO SHEET5MATCH TO SHEET 7 MFP21001348 311 TAYLOR AVE NWPARCEL# 4204400207307 TAYLOR AVE NWPARCEL# 4204400208267 TAYLOR AVE NWPARCEL# 8093600016261 TAYLOR AVE NWPARCEL# 8093600015257 TAYLOR AVE NWPARCEL# 8093600026260 TAYLOR AVE NWPARCEL# 4204400281264 TAYLOR AVE NWPARCEL# 4204400277268 TAYLOR AVE NWPARCEL# 4204400283308 TAYLOR AVE NWPARCEL# 3185600030312 TAYLOR AVE NWPARCEL# 3185600020316 TAYLOR AVE NWPARCEL# 3185600005315 TAYLOR AVE NWPARCEL# 4204400202(240')148'140'171'TAYLOR AVE NWAS-BUILT127REVISIONSNO.DATEENGINEERDRAFTERORIGINAL12Know what's below.Call before you dig.RSHEET NUMBEROFPROJECT LOCATION: 401 LIND AVE NW, RENTON, WA 98057PROJECT NUMBER: JB0000569593PERMIT NUMBER: ----BOOKER ENGINEERING LLC1129 W MAIN ST,MONROE, WA 98272360.722.2852COMCAST ENGINEER: MIKE FONTENOTCONFIDENTIAL/ PROPRIETARYSDKTRM03/15/21------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.BOOKER ENGINEERING DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------CONSTRUCTION NOTESN O R T H 1240' OF NEW 144F CABLE OVERLASH CONTINUED FROMNOTE 5 ON SHEET 62EXISTING UTILITY POLE UP-083FROM UP-08 OVERLASH NEW 144F CABLE 148' (S) TOUP-094EXISTING UTILITY POLE UP-095FROM UP-09 OVERLASH NEW 144F CABLE 140' (S) TOUP-106EXISTING UTILITY POLE UP-107FROM UP-10 OVERLASH NEW 144F CABLE 171' (S) TOUP-111234567MATCH TO SHEET 8 MATCH TO SHEET6MFP21001348 253 TAYLOR AVE NWPARCEL# 8093600025PARCEL#4204400270PARCEL#4204400275PARCEL#4204400345221 HARDIE AVE NWPARCEL# 4204400340PARCEL#4204400338PARCEL#4204400333PARCEL#4204400329257 TAYLOR AVE NWPARCEL# 8093600026207 TAYLOR AVE NWPARCEL# 4204400335260 TAYLOR AVE NWPARCEL# 4204400281(171')152'165'TAYLOR AVE NWAS-BUILT128REVISIONSNO.DATEENGINEERDRAFTERORIGINAL12Know what's below.Call before you dig.RSHEET NUMBEROFPROJECT LOCATION: 401 LIND AVE NW, RENTON, WA 98057PROJECT NUMBER: JB0000569593PERMIT NUMBER: ----BOOKER ENGINEERING LLC1129 W MAIN ST,MONROE, WA 98272360.722.2852COMCAST ENGINEER: MIKE FONTENOTCONFIDENTIAL/ PROPRIETARYSDKTRM03/15/21------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.BOOKER ENGINEERING DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------CONSTRUCTION NOTESN O R T H 1171' OF NEW 144F CABLE OVERLASH CONTINUED FROMNOTE 7 ON SHEET 72EXISTING UTILITY POLE UP-113FROM UP-11 OVERLASH NEW 144F CABLE 152' (S) TOUP-1212345MATCH TO SHEET 9 MATCH TO SHEET74EXISTING UTILITY POLE UP-125FROM UP-12 OVERLASH NEW 144F CABLE 165' (S) TOUP-13MFP21001348 207 TAYLOR AVE NWPARCEL# 4204400335221 HARDIE AVE NWPARCEL# 4204400340PARCEL#2144800855201 TAYLOR AVE NWPARCEL# 2144800863151 TAYLOR AVE NWPARCEL# 2144800865(165')172'130' REN T O N A V E STAYLOR AVE NWAS-BUILT129REVISIONSNO.DATEENGINEERDRAFTERORIGINAL12Know what's below.Call before you dig.RSHEET NUMBEROFPROJECT LOCATION: 401 LIND AVE NW, RENTON, WA 98057PROJECT NUMBER: JB0000569593PERMIT NUMBER: ----BOOKER ENGINEERING LLC1129 W MAIN ST,MONROE, WA 98272360.722.2852COMCAST ENGINEER: MIKE FONTENOTCONFIDENTIAL/ PROPRIETARYSDKTRM03/15/21------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.BOOKER ENGINEERING DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------CONSTRUCTION NOTESN O R T H 1165' OF NEW 144F CABLE OVERLASH CONTINUED FROMNOTE 5 ON SHEET 82EXISTING UTILITY POLE UP-1312313 1 '4563FROM UP-13 PROOF/PULL NEW 144F CABLE 20' DOWNEXISTING RISER4PROOF/PULL NEW 144F CABLE 172' (S) AND 130' (SE)THROUGH EXISTING CONDUIT TO VT-015EXISTING VAULT VT-016FROM VT-01 PROOF/PULL NEW 144F CABLE 131' (E)THROUGH EXISTING CONDUITMATCH TO SHEET10MATCH TO SHEET8MFP21001348 51 HAYES PL SWPARCEL# 214480085694 HARDIE AVE SWPARCEL# 182305911198 HARDIE AVE SWPARCEL# 1823059101PARCEL#1823059293120 HARDIEAVE SWPARCEL#182305900965 HARDIE AVE SWPARCEL# 2144800868161'101'(131')HARDIE AVE SWAS-BUILT1210REVISIONSNO.DATEENGINEERDRAFTERORIGINAL12Know what's below.Call before you dig.RSHEET NUMBEROFPROJECT LOCATION: 401 LIND AVE NW, RENTON, WA 98057PROJECT NUMBER: JB0000569593PERMIT NUMBER: ----BOOKER ENGINEERING LLC1129 W MAIN ST,MONROE, WA 98272360.722.2852COMCAST ENGINEER: MIKE FONTENOTCONFIDENTIAL/ PROPRIETARYSDKTRM03/15/21------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.BOOKER ENGINEERING DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------99 HARDIE AVE SWPARCEL# 1823059015N O R T HCONSTRUCTION NOTESMATCH TO SHEET 11 MATCH TO SHEET91131' OF NEW 144F CABLE PROOF/PULL CONTINUED FROMNOTE 6 ON SHEET 92PROOF/PULL NEW 144F CABLE 20' UP EXISTING RISER TOUP-1412343EXISTING UTILITY POLE UP-144FROM UP-14 OVERLASH NEW 144F CABLE 101' (SE) TOUP-155EXISTING UTILITY POLE UP-156FROM UP-15 OVERLASH NEW 144F CABLE 161' (SE) TOUP-1656MFP21001348Maintain 10' of separationbetween water main andbore path. Pothole allexisting utilities.restoration per city ofRenton standards 65 HARDIE AVE SWPARCEL# 2144800868140 HARDIE AVE SWPARCEL# 1823059092132 HARD IE AVE SWPARCEL# 1823059291126 HARD IE AVE SWPARCEL# 182305929071 SW VICTORIA STPARCEL# 1823059017SW VICTORIA ST203'149'HARDIE AVE SWAS-BUILT1211REVISIONSNO.DATEENGINEERDRAFTERORIGINAL12Know what's below.Call before you dig.RSHEET NUMBEROFPROJECT LOCATION: 401 LIND AVE NW, RENTON, WA 98057PROJECT NUMBER: JB0000569593PERMIT NUMBER: ----BOOKER ENGINEERING LLC1129 W MAIN ST,MONROE, WA 98272360.722.2852COMCAST ENGINEER: MIKE FONTENOTCONFIDENTIAL/ PROPRIETARYSDKTRM03/15/21------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.BOOKER ENGINEERING DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------99 HARDIE AVE SWPARCEL# 1823059015N O R T HCONSTRUCTION NOTES1161' OF NEW 144F CABLE OVERLASH CONTINUED FROMNOTE 6 ON SHEET 102EXISTING UTILITY POLE UP-163FROM UP-16 OVERLASH NEW 144F CABLE 149' (SE) TOUP-17MA T C H T O S H E E T 10 21345764EXISTING UTILITY POLE UP-175FROM UP-17 OVERLASH NEW 144F CABLE 203' (NW) TOSPLICE CASE NEAR UP-186TIE INTO EXISTING SPLICE CASE NEAR UP-187EXISTING UTILITY POLE UP-18MFP21001348 AS-BUILT1212REVISIONSNO.DATEENGINEERDRAFTERORIGINAL12Know what's below.Call before you dig.RSHEET NUMBEROFPROJECT LOCATION: 401 LIND AVE NW, RENTON, WA 98057PROJECT NUMBER: JB0000569593PERMIT NUMBER: ----BOOKER ENGINEERING LLC1129 W MAIN ST,MONROE, WA 98272360.722.2852COMCAST ENGINEER: MIKE FONTENOTCONFIDENTIAL/ PROPRIETARYSDKTRM03/15/21------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.BOOKER ENGINEERING DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------AERIAL TYPICALSN O R T HMFP21001348 Comcast Cable Communications Management 410 Valley Ave NW Suite 12 Bldg C Puyallup, WA 98371 4/23/2021 City of Renton 1055 South Grady Way Renton, WA 98057 RE: Aerial Variance Request for 0000569593 To whom it may concern: Cannon Construction has been contracted to design and engineer this project on behalf of Comcast Cable Communications Management. Comcast is applying for a variance request in order to upgrade their existing facilities. Comcast proposes to TIE IN TO NEW SPLICE CASE. OVERLASH 144CT FIBER. PROOF AND PULL 144CT FIBER THROUGH EXISTING CONDUIT AND TWO EXISTING RISERS. TIE IN TO EXISTING SPLICE CASE. Comcast is requesting that the City of Renton approve this variance request based on the fact that the requirements for undergrounding this proposed over-lash on existing plant will cause undue hardship. 1. Installation of undergrounding facilities will increase the total cost of construction roughly 15-25 times the amount of an aerial over-lash on the existing Comcast strand. 2. Risk of potential damage to underground facilities will be increased. 3. Over-lash will not cause substantial adverse impact to other persons or entities in the immediate area. Over-lashing the cable will be accomplished in a few days, and the residents will not notice any impact. Comcast will clean up the over-lashed spans as necessary and identify and remove any existing dead cables along this route. 4. The variance is necessary to prevent any undue hardship due to the increased construction costs if forced to install the proposed extension underground. 5. The granting of the variance will not be materially detrimental to the public welfare. Comcast does agree to participate in future underground improvements for its proportionate share of the undergrounding costs, waiving the obligation into the future when all other utilities are undergrounded to prevent an undue hardship against Comcast currently. Upon the granting of the variance, Comcast will coordinate construction and traffic control as per your requirements. Comcast and their contractors want to cooperate at the highest level and agree to adhere to all provisions and requirements set forth by the City of Renton to insure safe installation and maintenance of the proposed facilities. If you have any further questions regarding this project, please contact Rhonda Resnik. Thank you for your consideration in this matter. Rhonda Resnik Permit Coordinator Comcast Cable Communications Management o 253-864-4246 | e Rhonda_Resnik@comcast.com May 4, 2021 Rhonda Resnik Comcast Cable Communications Management 410 Valley Ave NW Puyallup, WA 98371 Via Email: Rhonda_Resnik@comcast.com SUBJECT: Request for Undergrounding Exemption (JB#569593, MFP21001348, 401 Lind Ave NW) Dear Ms. Resnik: The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required to be installed underground, pursuant to the standards of the section of RMC. Comcast proposes to have Cannon Construction, Inc. overlash 144ct fiber approximately 2,408 lineal feet to existing Puget Sound Energy (PSE) poles in two locations along a roadway corridor within the City. 1. Beginning at the pole at the southeast corner of 401 Lind Avenue NW, overlashing will run along the south side of NW 4th Street for approximately 568 lineal feet to the southeast corner of NW 4th Street and Taylor Avenue NW intersection, and south along the east side of Taylor Avenue NW for approximately 1,226 lineal feet ending at the pole on the southwest corner of 221 Hardie Avenue NW. Total length of overlashing for this segment is 1,794 lineal feet. 2. Following a brief undergrounded portion of the 144ct fiber line, overlashing continues at an existing pole at the southwest corner of 51 Hayes Place SW and runs east along Hardie Avenue SW for approximately 411 lineal feet to the southeast corner of Hardie Avenue SW and SW Victoria Street intersection, and then ends at a pole approximately 203 lineal feet west at the northwest corner of 71 SW Victoria Street. Total length of overlashing for this segment is 614 lineal feet. ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090. Ordinance 5720 grants Comcast, the right to install fiber optic cable and related appurtenances under, along, over, below, through and across the streets, avenues and alleys of City of Renton within the right-of-way of Renton. Section 3.4 of the franchise ordinance states that if all of the distribution lines all the wireline service providers, such as telecommunications service providers, as defined in RCW 35.99.010, a utility service provider or a Cable Operator (collectively “Service Providers”) in any portion of the Franchise Area are underground, Grantee shall place its Cable System’s distribution cables underground within that area; provided that such underground locations are actually capable of accommodating Grantee’s cable and other equipment without technical degradation of the Cable Systems’ signal quality. The proposal would utilize existing poles with other attached franchisee communication facilities and overlash to the existing Comcast aerial path. As minimum vertical height clearance of 15’-6” would need to be provided for, any existing obsolete cable will need to be removed; staff recommends these as conditions of approval. Therefore, the City is granting an exemption with conditions, per the Comcast Comcast Job JB#569593 Page 2 of 2 May 4, 2021 franchise agreement which allows new overhead facilities to be placed overhead provided there are other similar providers overhead as well. Comcast is required to obtain all necessary private utility easements for work on private property. DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C) as requested by the applicant is approved with conditions subject to the conditions below as the request complies with the Comcast Franchise Agreement. Conditions of Approval: 1. Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. 2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3. A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at Comcast’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case Comcast shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and Economic Development Administrator or designee, from the first event triggering the requirement to underground the aerial lines. This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed with the City Clerk, along with the required appeal fee, by 5:00 pm, May 18, 2021. Due to Governor Jay Inslee’s Proclamation 20-25 (“Stay Home, Stay Healthy”), the City Clerk’s Office is working remote ly. For that reason, appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. If the situation changes such that the City Clerk’s Office is open when you file your appeal, you have the option of filing the appeal in person. Sincerely, Brianne Bannwarth, PE Development Engineering Manager cc: C.E. “Chip” Vincent, CED Administrator Vanessa Dolbee, Planning Director Justin Johnson, Assistant Development Engineering Manager Scott Warlick, Engineering Specialist III Holly Powers, Permit Technician Franchise Permits Shannon Heaton, Cannon Construction sheaton@cannonconstructioninc.com DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Conditions for Permit MFP21001348 Engineering 1 The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at Comcast’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case Comcast shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and Economic Development Administrator or designee, from the first event triggering the requirement to underground the aerial lines. 2 Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3 A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 4 Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. Page 1 of 1