HomeMy WebLinkAboutLUA98-035 ABBREVIATIONS SYMBOLS
A/SMH MR OR STEW VANHOE G.CALV GRATED.GKVANMED S SIGN.SCUM.St EEL.SLOPE ' NEW CONSTRUCTION TT FILL EMBANKMENT
AGAGGREGATE BASE ALTERNATE
ARAMABAVOHN(ED) GEN GENERATOR SW SANITARY
AMAIARN DATA TRANSMISSION
- EXISTING FEATURE OR PIPE
GPM GALLONS PER MINUTE CO STORY OWNSDR STANDARD DAMETER RATIO PROPERTY LINE
GR GRADE Y Y°" CUT EMBANKMENT
AN4 RAl10NMAl STANDARDS INSTITUTEGIRD GROUND SG STAG GROUND PERIMETER,MAJOR BASIN
W ANGLE PONT H,HORZ EIGHT,HORIZONTAL HEATING SPRINKLER /f-i/", EXISTING TO BE ABANDONED /U/i/i/r� NATURAL GROUND OR GRADE
APPNO% APPROXIMATELY HAND NONE SPEC SPECIFICATIONS
`\``\\\`\
APYIA WOMAN vUBUC WORKS ADYINISIRATION HI Pi NIGH FONT SR STATE ROUTE --- CENTERLINE EOM COMPACTED SUBGRADE
SORB A MERICAN SOCIETY OP TESTING AND MATERIALS 55 DRAT.'SEWER —A— FENCE �D�
m AMvALK mow STA STATION yc TrpNry RP RAG
AWWA AYERN:w WATER WORKS,SSOCNTNNI q INVERT ELEVATDN SR STEEL EXISTING GRADE CONTOUR
Bl1IO BUILDING IN INCH STN STEM FINISH GRADE SPOT ELEVATOR A " LEVELING COURSE
BW BUREAU O LAND MANAGEMENT NV INVERT STS STORM SEWER SYSTEM I' -••1 CONCRETE !-j
BY BENCHWRK N INDUSTRIAL WASTE T •
13"-� SLOPE(S NOBZ TO I C Rf) E§
TRASHTELEPHONE
COY WC BOTTOM O CURB L RRUST TLPACfON !///////,%1% PRECAST CONCRETE - b
Bow BOTTOM OF WALL TOR OF BERM _y DNECTNkN OF ROW
LC LENGTH OF CURVE TOP CURB 1'- ^1 MORTAR GROUT N
ORD BEARING TUC TOP CURB
ME BEGIN VERTIG —
I CURVE AU LINEAL FEET TOW TOP WALL 1 1 WOO
LOX Pr LOW POOR POo— VAULT
m TYPICALI J AGGREGATE BASE
C CONCRETE LT LEFT ® VALVE
LB CATCH MIN Y METAL UG UNDERGROUND _ �i%.,!:'Ai: Ne
O CUBIC FEET.COMPRESSION FITTING MAX IMAM USCXLS UNITED STATES COASTAL AND GECOETIC SURVEY'
IX CATCH MEIN(CB) POLYMER
CFM CUBIC FEET PER uINUTE USGS UNITED STATES GEO,V'v'u SURVEY ® GRATING
IAN ym/H CATCH BASIN(CB)
o CAST IRON.CUBIC IN ® AC PAVEMENT
O P G ST IN PLACE CH YIN MINI v VALVE O LlFANOUT(CO)
MI MECHANICAL.DINT VFRT VERTICAL
CJ CONSTRUCTION.DINT
MIN MONITORING WELL VC VRMFIED CLAYIX MANNOE(RAH) FILTER FABRIC
CLR CLEAR,CLEARING
OAP CORRUGATED METAL PIPE LSOMMN VALVE OPENING KT VAULT • • MANHOLE(YIN) END GP
VITREOUS RILE PIPE
CO CLFANOUT N NORTH.NORTHERLY H CIF UNION
CON rs C CONCRETE M NOT TO SCALE X WEST.WIDTH.WATER A FIRE HYDRANT ON
CONE CONTINUE.CONTINUATION wu RATER METER CP FLANGED JOINT CONNECTION
COORD COORDINATE OD OUTSIDE DIAMETER.OUTSIDE DIMENSION RATER VALVE - ACTT
Cti MECHANICAL JOINT CONNECTION •
CAC CRUSHED SURFACE BASE COURSE OC ON CENTER W/ RITH � ��
CMw/0 WITHOUT —}—ows aL WATER SEPARATOR ENTITIES(PIEUNE.ETC)CONNECT N 4, BRERR VA UY LVE
Lv CUBIC TARO WSDOT WASHNGTON STATE DEPARTMENT OF TRANSPORTATION —I— ENTITIES(PIPELINE.ETC.)CROSS (MH-598C) STRUCTURE DESIGNATION
P VOLE -NO CONNECT -
m7 DETALI 9.
PC POINT OF CURVATURE NE TRANSFORMER -
DI DUCTILE IRON:DROP INLET E
DIAMETER
PORTLAND MENT CONCRETE TO rARD CANAL MIRE OR PROPERTY UNE B PRIMARY MONUMENT
DIN pMW51 IN PE
C PUNT END CC DM
I CENTERLINE ® SECOND.WY sower MARKER S
OS DUWNSPOVT Now PERFORATED
DWG DRAWING PI POINT OF INTERSECTION
PIV POST INDICATOR VALVE
E CAST.E.T.A!. P PROPERTY U I
`LE. °£"°" PRO PERRECORD[AING SECTION AND DETAIL REFERENCE
DEL arm.,
a<TANGENCY
EOP EDGE PAVEMENT P P vSTATION
W Of
ED,PM EQUAL.EGUNALENT PVC POLYVINYL CHLORIDE
DETAIL NUMBER
EOUIP EQUIPMENT
ELECTRICAL VAULT RAOUS.RECORD
EV
EW EACH RAY RCP REINFORCED CONCRETE NE DETAIL
EX EXISTING RENT REINFORCEMENT
SCALE: 1/e'=1'-0' C 91 00
DM EXPANSION REO'D REQUIRED
RET RETNNING
F FIRE RD ROOF DRAM SHEET NUMBER FROM WHERE DETAIL SHEET NUMBER FROM
Fc FINISHED GRADE RAs POINTIS REFERENCED. USE A DASH IF WHERE DETAIL IS DRAWN.
DETAIL IS REFERENCED AND DRAWN
IN FIRE HNRAMT RT RIGHT ON THE SAME SHEET.
TW FINISHED
FORCE WINSECTION LETTER
Fro FOOTING
Tw FRE/RATER. SECTION
SCALE:1/8'-I'—IY C 91 00 •
SHEET NUMBER FROM WHERE SECTION SHEET NUMBER FROM
IS CUT. USE A DASH IF SECTION IS WHERE SECTION IS DRAWN.
DRAWN ON THE SAME SHEET AS CUT.
' SECTION LETTER
C 91 0
SHEET NUMBER FROM WHERE SECTION SHEET NUMBER FROM any mghwriv
IS CUT. USE A DASH IF SECTION IS .WHERE SECTION IS DRAWN.
CUT ON THE SAME SHEET AS DRAWN.
r°41...�w.R"iu)s
Im-TN-Ts ye fav,M-ImI muse. r 90.AM1-90+
LAST*LAMM
DATE Srm REVISION N ARRIND OM �TL E TVL[ BATE
sXl EvliOM N IPNDv[D 0 AUBURN. VA.98002 ..6 4,), ES1EEP�TNA Novae DI(IRIrR IEI9TB RIF SYMBOLS AND ABBREVIATIONS SKr
- - --' -- IND0.19 - - --- --- 8lGL3R 0 EVERETT, VA.98201 4., 4 SPECIFICATION IS APPROVED L.VFRN[c .42_.� II
BOEiivc DKENT, VA.98031 C1
/- ❑PORTLAND,OR.97220 1I� 'WED Ir DErT. RATE N CHEv I0.I9.95 16
NtLNT
FACILITIES DEPARTMENT ■RENTON, VA.98055 ' • I -- .DD ND YavBG
D SEATTLE, WA.91312/ I .\.�..o6 winipv[0 CRANE BRIDGE BUILDING s�o95{—tOS mo,Nxl
s __...�.T. I 10-YD-UG-Ct
AILwM9NI
24.-0" E.H. 24.-0" E.H.
l: ' F"----
U1RI;
iD
r
m
71
trn
—
lc)11>>
Z
m j5
11-1
— — _ 1-'1
J: -
F
FI
fr
24'-0" E.H.
Y-6. 4-0. 4 0 4-0
24'-1-YDE\WLL4 SHEE
•
- . . 7 7 I S n—�
ti q
1.-4
20'-0" CLEAR HEIGHT
-- II
o 4 I
O
4 ro
o
0
P
$ 4 j
IZ i
z
ILI
6
s
DATE CONTACT PERSr�N
THE BOEING COMP/ANY AUTHORIZED
DEALER
P.O.Box 768,Bellevue,too. 98009 3/5/98 STEVE[ENTON
CUSTOMER DRAWN PHONE [�"T�'';1�
(206)885-2400 Redmond (206)623-5666 Seattle G. C. C. RLB 206-623--5666 •^' '—
(206)922-9400 Tacoma (206)355-2600 Everett nf.AT nN ACAD CODE SHEET _ IOf _
•
24'-0" E.H.
m >
> A
X •
N
V1 5
O 71
Frr-
I 1-I —
r — 1
m
Ri in 7-I
in
•
O Z
z
0
0
P. L
8
Z
C)
C
0
1 T
_ __D,.__-0 ,_...______ O
DATE C�'TACT PERS@! AUTHORIZED DEALER
THE BOEING COMPANY 3/5/90 SIEVE BENTON �—
P.O.Box 768,Oe!Izwe,Wa. 98009 pgnrm pi uE r--
206 885-2400 Redmond 206 623-5666 Seotile CUSTtiNE2 C.
'06-623-5666
( ) ( ) r-,�,�-r�.�G.
,.C.
�11.�1.-ram.i ncAI,CODE Si�,7 OF crrrI 01111 rum",
(206)922 9400 Tacoma (206)355-2600 Everett 00/Tion' �— z
® 50'-n' 0
1_
2
N 0
23 nl n
N N
i O— L 1
U f rrl �
s I a
m
X
m
� 110
i
g o N
fi
P
1
•
S
vi N
4
n
N v.
j N 4 N
C� M S
w
c
•
6
'1 Y 0 Y
N N
f f
4 R
F;� 0
IIy I
+ 1A
1 1
'1I S
it
N_
1
r; S
Ji
L.
DATE CONTACT PERSON
AUTHORIZED DEALER
P.O.Box 766,Bellevue.V7a. 98009 {�
= CUSTOMER THE BOFING COMPANY 3/5/93 STEVE BENTON
0,AWN PHONE [�--F3 F.
,` l --pr . (206)885,2400 Redmond (206)623-5666 SWAP. G. C. C. RI_e 20e 623-retie `�L___--�
1 (20C)922-9400 Tacono (206)355-2600 Eyed LOCATION DC IT \I IAACT-Il�l�T� � ac c_ SrEn1 cr
—__ GTFFI RIIII DINES
_ 1
_
•
1/
LAKE WAS - I \ GTO \ F&GLG TCCODMNY
POWE
4
Ili
110 473
10 7- 01
LOT 5
1 II
10-66
� li 10-4510-100 -
4-20 10 69
r \___j 0 10-120 10-58 :::
llIlill ll,, �' 10 5610 57ID 0. =� 10-11. 10-554`21 I
i� 4-44 11 �� rn
I�2 4-46 0 10-50 r6&-c1 10-61
5-14 ''1S E3U 4-79 4_ 4-60 I
�� 10 60
5 60 ''`� A
�I� 4 89H7U `X5 665 /, 0 �4-61 . 4-47 4-71 o �' 10 95
'1 1`,-„; 7 '� 4-70 i 10 132 10-53 10-133
1I 4-84 o r"7r u5-403 a_ ��Ir LOT 7 a 10-90 `ilil ' a �� • - O — T 10i -
II
`o U ad ` 45\4 > \� 4 93 0� 1080
1��U �1 f 10 85
FENC' oy5-44 \a �4-56 y ` c_ ilik°
,�`U
M �1 1-081IV. 4-09 ''-4-9�
U III (D u i
1 I 71
���N i 44 10-71 R¢ /
c 1 \ 10 o I 4-.76 4-6. t
4 64 4 40.110-33 _
10-469
10-72 N._6TH STREET
0 n 4-•5 1
5-407-�� 4-69Lii
r
fkjEt.:1-.. PLANr-s VIEWw •
scut
SlH ..... NT An1RID OM SN .PPON M IMMO MN ACCEPTABILITY 1u< wtl1ji4 i 11.1POx ..0. Nrz
IBS OELW N./OR. 4,.. NEIGHBORHOOD DETAIL MAP
ROE/AV rz NEMO
CRANE BRIDGE BUILDING «a
.ram
"`"°
I
N o.O to-1159
---....111111111111111111111
MATCHLINE F R CONTINUATION SEE SHEET C15D
, v 1 \\\\,,
ix
-l—--"6" -- -------- ---—
\i
a__ : \ :°°,-- ___. ..---.--.0,-_-_-:------_-_---;----
\ per i /' 1 \ \ \\ \
4—45 k \ _- 1\ \\\- —,.„, =7—-1,A .\\ \ 1
\1 t \ ,i•-\\ ,,,) . 6(...,,IX57
•
' 11, ' --.'o. -1--------z"."- ---'-_-4-..-, / -------14---\\--f7-7:7-- -------:---_ V) \ \\ \
.f. .____ ------___ ty ...„ ,...; , --tz:---.::--'"z_-_-_._-___Vc_1,-------'.... ' ___._-_-:-_-__--_
Illif.o\ �= AST 1\ \\ \ 1 \ \\ j = �' ``�\
• W
~ �yp, l\\V"
LU Lir7eb— PO" / \\ \ \ \ '/ 1 W
o \ \\%�, ,.D\ \�\� // \\ \ \\ \\ ,C // _ _,—— rap \ \51
\'-- o
.... ,C \\ \ \ \ \ P
\\ - \. \\,c,:, si ttei6
\ \ SDI. /\ — \
II
�� *III \• \
\\ \ \\`\! //i i��jl\ \\ \\ \ -7 v ms, \ i F • \;
.:,.,i. \ '\I \l000sirjif,,otwi\li\ \ r, \ ,,,e----` i t\ '
1 4_6 A .,i.A iici \\___--\I \\ \ \ )\ '\ I 110\ r.* .P \ co
1\ \..... / ,
\\.....,,,... / ' °°"°i • 111
0
KEY PLAN
10:1111 \\ ' .'
100 //4
' � 0 j // / 1l. FT1u'7'DE'3m1[31:533'Jm:D:7
rre \\ `//, . // ` \ V/ // •. / 1 01 I �i¢Qmm irarxraimanuft
•/4/ 31;, \. 1 �� I 1 �/1 •‘**
. G7GCL1: `;lfluTJ*r•.'.33C 7
marmrillo
/\. \`\ ` a r \ 0i ,g'b •` 11111 I- Ltii11I1II
tiperii,:i' 1 =,...............
..ite .00,
'-'1—'—%' % 1 ..—.—""'-'" \\ \ \ r,10, „mar =,,,,,,„5,.....,„,„„,,
„,,, ,.........4 _
,__ va 4' 01 MMMIN.=.M..111.1
- - - - - - 1.
— - - — ZQ. lip
MATCHLINE FOR CONTINUATION SEE SHEET C17D SCALE iN FEET
�'
SE. RM. M MOM Ma SW WO r rvpm DUE ACCEPTABILITY
s rag aro 8 9` a i11ILI E MAP KM.
BOE/iYG r"
FACIUTIES DEPARTMENT
•�® CRANE BRIDGE BUILDING
C 16 D
Sw.o,.° o w.
wU•rr
rwaa AD n
RTH-ro-c1w
LA K WAS H I N GTO N \ PUGET SOUND POWE
— 4- - at- LIGHT COMPANY
4-a2\ Il v
g MITIlif._...\.4-51
10-473 �
��ei LOT 5
r 10-66
10-100
4-20 10-69
10-120� 10-58 :::::
II ci-0 il' i„ii
10-56. iv
ll� q-2.
1 4 44
II 5-14 '' u 4-46 z i o 10-50 r6-51
5-.r $1 - �(� 4-79 q_ 4-60 tIA.10-6q
LI
''` I� W\ m 4-7� Q '�� 4-89 El I 10-60
5-63 m
•
�5-65 /i11 I"O 4-61'. 4-47 4-71 , i o �'
u r� 4-70 � LoT4-84 0 10-132 10-53 10-133 r 10-95
5-403 _
111 I\
`�� �� 4-54 \ 4-93 I g II
1
�N .1 Ilk
1. `` c 10-BO 10-85
icrIT
5-44 `\�< �4�56 11 ��� FEND' 7 0? i
Al
,� � j-j-i,
I. -• -08 III,
4-09�'ti4-9 3 •
I • m
`�`cr , O iD a-. z�
1/(
G 1 NZ U a-76 4-6 ...
I
�
a-6a a-ao� 10-33d
10—zo
10-469
O ^ 4 5 I
4-69 r•� L....
—
0
5-407 -
Ei
ECT Ptw w�
r srrrc r_mr
411111.
Washington State Northwest Region
ig Department of Transportation 15700 Dayton Avenue North
P.O.Box 330310
S d Morrison Seattle,WA 98133-9710
Secretary of Transportation
(206)440-4000
Yh DEVELOPMENT SERVICES
DATE: A 8, 1998 CITY OF RENTON
TO: Mark Pywell MAY 13 1998
City of Renton,Project Manager
200 Mill Avenue South RECEIVED
Renton WA 98055
Subject: SR 405 MP 4.54 CS 1743
Mitigated Determination of
Nonsignificance-Boeing Crane Bridge
Building Construction of a 6,600 sq. ft.
building to be used for the construction of
replacement crane bridges.
File No.LUA-98-035,ECF
FROM: Robert A. Josephson,PE,Manager of Planning&Local
Coordination
Washington State Department of Transportation
Northwest Region
15700 Dayton Avenue North,MS 122
P. O. Box 330310
Seattle,WA 98133-9710
Thank you for giving us the opportunity to review this project which, is located at 800
Park Ave. N. Our response is below:
•
We have reviewed the subject document and have no further comments. The
project will have no significant impact on the state highway system.
If you have any questions,please contact Don Hurter at 440-4664 or Vickie Erickson at
440-4915 of my Developer Services section
VEE:vee
File Name
; ') CITY OF RENTON
I': Planning/Building/Public Works Department
Jesse Tanner,Mayor Gregg Zimmerman P.E.,Administrator
May 12, 1998
Paul Crane
The Boeing Company
PO Box 3707, MS 63-01
Seattle, WA 98124
SUBJECT: Boeing Crane Bridge Building
Project No. LUA-98-035,ECF
Dear Mr. Crane:
This letter is to inform you that the comment and appeal periods have ended for the Environmental
Review Committee's (ERC) Determination of Non-Significance - Mitigated for the above-referenced
project.
No appeals were filed. This decision is final and application for the appropriately required permits may
proceed. The applicant must comply with all ERC Mitigation Measures and Conditions of Approval.
If you have any questions, please feel free to contact me at (425) 277-5586.
For the Environmental Review Committee,
Mark R. P , AICP
Project Manager
200 Mill Avenue South - Renton, Washington 98055
.t.
CITY OF RENTON
CURRENT PLANNING DIVISION
AFFIDAVIT OF SERVICE BY MAILING
On the_Z2.'^41- day of 1.. , 1998, I deposited in the mails of the United
States, a :pealed envelope containing
documents. This information was sent to:
CRG eletev yvi►v►tfleV•S
Name Representing
Departmen of Ecology
Don Hurter WSDOT
KC Wastewater Treatment Division
Larry Fisher Washington Department of Fisheries
David F. Di:tzman Department of Natural Resources
Shirley Lull hang Seattle Public Utilities
Duwamish Indian Tribe
Rod Malco n Muckleshoot Indian Tribe
Joe Jainga Puget Sound Energy
(Signature: of Sender) AtI _aL.
STATE OF WASHINGTON )
SS
COUNTY JF KING ) _
I certify that I know or have satisfactory evidence that signed this
instrument and acknowledged it to be his/her/their free and voluntary act for tlie uses and purposes
mentioned in the instrument.
Dated: « 3, 61 )'1 � C
Notary Pu c in and for the State o&shington
Notary (Print)
My appointment x it
COMMISSION EXPIRES 6/29/99
Project Name: t,3o'<►b.ct crane_ lv►te �u► i'
Project NL tuber: uuR .496 03S Et-r
NOTARY.DOC
.. t,
CITX OF RENTON
:.i i \7 Planning/Building/Public Works Department
Jesse Tannel,Mayor Gregg Zimmerman P.E.,Administrator
April 23, 1998
Washington Stet(
Department of Ec Dlogy
Environmental Rf view Section
PO Box 47703
Olympia, WA 98 304-7703
Subject: Environmental Determinations
Transmitted here with is a copy of the Environmental Determination and Environmental Checklist for the following project reviewed by
the Environmentz I Review Committee(ERC) on April 21, 1998:
DETERMINATION OF NON-SIGNIFICANCE-MITIGATED
BOEING CRANE BRIDGE BUILDING
LUA-98.035,ECF
The app icant seeks to construct a metal clad 6,600 sf building to be used for the construction of replacement crane bridges.
The building will be located close to the assembly buildings to provide easy access to these buildings once the cranes have
been col structed. The intent of the proposed building is to provide an area out of the weather where the crane bridges can
be asseribled. The crane bridges are used in the assembly hangars to move wings and sections of the planes around the
assembl/area. The proposed building will have 30'wide openings at each end with no doors and no heat. No foundation
will be p iured for the building, only footings. The proposed building will be removed once the crane bridges are installed in
the resp active buildings. The building will be painted to match the existing Boeing buildings in the area. Location: 800 Park
Ave. Noi th.
Comments rega'ding the environmental determination must be filed in writing on or before 5:00 PM May 11, 1998. Any
aggrieved person feeling that the environmental determination of the Environmental Review Committee is based on erroneous
procedure, errors of law or fact, error in judgment, or the discovery of new evidence which could not be reasonably available at the
time of the deterr iination may submit written comments.After review of the comments, if Environmental Review Committee finds
there is not suffic ent evidence to amend its original determination, then there will be no further extension of the appeal period. Any
person wishing tc take further action would need to file a formal appeal within the original 15-day timeframe. Written comments must
be filed with: Jar a Huerter, Land Use Review Supervisor, City of Renton Development Services Division, 200 Mill Avenue South,
Renton, WA 980l 5. If an appeal of the environmental determination is also filed with the Hearing Examiner during the same 15-day
comment period, then the Environmental Review Committee will first take action on the request for reconsideration and the appellant
will be notified that the appeal is on hold pending the Committee's decision on the reconsideration request. The City will notify the
appellant/person -equesting reconsideration and parties of record and the Hearing Examiner of the Environmental Review
Committee's fina determination. The appeal process will then be continued unless the appellant notifies the Hearing Examiner in
writing that he wi hes to withdraw the appeal. Appeals of the environmental determination must be filed in writing on or before
5:00 PM May 11 1998. Appeals must be filed in writing together with the required $75.00 application fee with: Hearing Examiner,
City of Renton, 2)0 Mill Avenue South, Renton, WA 98055. Appeals to the Examiner are governed by City of Renton Municipal Code
Section 4-8-11B. Additional information regarding the appeal process may be obtained from the Renton City Clerk's Office, (425)-
235-2501.
If you have quest ons, please call me at(425)277-5586.
For the Environrr ental Review Committee,
Mark R. P ell, /;ICP
Project Manager
cc: King Co.nty Wastewater Treatment Division
Larry Fi ,her, Department of Fisheries
David F. Dietzman, Department of Natural Resources
Don Hui ter, Department of Transportation
Shirley I.ukhang, Seattle Public Utilities
Duwamish Tribal Office
Rod Ma com, Fisheries, Muckleshoot Indian Tribe(Ordinance)
Joe Jair ga, Puget Sound Energy
AGNC LTR.DOC\
200 Mill Avenue South - Renton, Washington 98055
CIT OF RENTON
..li s<
Planning/Building/Public Works Department
Jesse Tanne Mayor Gregg Zimmerman P.E.,Administrator
April 22, 1998
Paul Crane
The Boeing Com npany
PO Box 3707, MS 63-01
Seattle, WA 98124
SUBJECT: Boeing Crane Bridge Building
Project No. LUA-98-035,ECF
Dear Mr. Crane:
This letter is written on behalf of the Environmental Review Committee (ERC) and is to advise you that they have
completed their review of the subject project. The ERC, on April 21, 1998, issued a threshold Determination of Non-
Significance-Mitigated with Mitigation Measures. See the enclosed Mitigation Measures document.
Comments re larding the environmental determination must be filed in writing on or before 5:00 PM May 11,
1998. Any aggrieved person feeling that the environmental determination of the Environmental Review Committee'is
based on erroneous procedure, errors of law or fact, error in judgment, or the discovery of new evidence which could not
be reasonably available at the time of the determination may submit written comments. After review of the comments, if
Environmental Review Committee finds there is not sufficient evidence to amend its original determination, then there
will be no further extension of the appeal period. Any person wishing to take further action would need to file a formal
appeal within the original 15-day timeframe. Written comments must be filed with: Jana Huerter, Land Use Review
Supervisor, City of Renton Development Services Division, 200 Mill Avenue South, Renton, WA 98055. If an appeal of
the environme ital determination is also filed with the Hearing Examiner during the same 15-day comment period, then
the Environmental Review Committee will first take action on the request for reconsideration and the appellant will be
notified that the appeal is on hold pending the Committee's decision on the reconsideration request. The City will notify
the appellant/person requesting reconsideration and parties of record and the Hearing Examiner of the Environmental
Review Committee's final determination. The appeal process will then be continued unless the appellant notifies the
Hearing Examiner in writing that he wishes to withdraw the appeal. Appeals of the environmental determination must
be filed in writing on or before 5:00 PM May 11, 1998. Appeals must be filed in writing together with the required
$75.00 application fee with: Hearing Examiner, City of Renton, 200 Mill Avenue South, Renton, WA 98055. Appeals to
the Examiner are governed by City of Renton Municipal Code Section 4-8-11 B. Additional information regarding the
appeal process may be obtained from the Renton City Clerk's Office, (425)-235-2501.
The preceding information will assist you in planning for implementation of your project and enable you to exercise your
appeal rights r lore fully, if you choose to do so. If you have any questions or desire clarification of the above, please call
me at (425) 2 i 7-5586.
For the Environmental Review Committee,
Mark R. P ell, AICP
Project Manager
Enclosure
DNSMLTR.DOC
200 Mill Avenue South - Renton, Washington 98055
6i)This paper contains 50%recycled material,20%post consumer
CITY OF RENTON
DETERMINATION OF NON-SIGNIFICANCE
(MITIGATED)
MITIGATION MEASURES
APPLICE TION NO(S): LUA-98-035,ECF
APPLICE NT: The Boeing Company
PROJECT NAME: Crane Bridge Building
DESCRIPTION OF PROPOSAL: The applicant seeks to construct a metal clad 6,600 sf building
to be used for the construction of replacement crane bridges. The building will be located close to the
assembly buildings to provide easy access to these buildings once the cranes have been constructed.
The ini ent of the proposed building is to provide an area out of the weather where the crane bridges can
be ass:mbled. The crane bridges are used in the assembly hangars to move wings and sections of the
planes around the assembly area. The proposed building will have 30' wide openings at each end with
no doc rs and no heat. No foundation will be poured for the building, only footings. The proposed
buildin will be removed once the crane bridges are installed in the respective buildings. The building
will be painted to match the existing Boeing buildings in the area.
LOCATI DN OF PROPOSAL: 800 Park Ave. North
MITIGATION MEASURES:
1. Pri)r to the issuance of building permits the applicant shall provide a Fire Mitigation Fee of$0.52 per
squarc foot building area. (Estimated fee: $0.52 x 6,600 sf= $3,432.00)
• 4
CITY OF RENTON
DETERMINATION OF NON-SIGNIFICANCE
(MITIGATED)
ADVISORY NOTES
APPLICATION NO(S): LUA-98-035,ECF
APPLICANT: The Boeing Company
PF OJECT NAME: Crane Bridge Building
DESCRIPTION OF PROPOSAL: The applicant seeks to construct a metal clad 6,600 sf
bu 'ding to be used for the construction of replacement crane bridges. The building will be
located close to the assembly buildings to provide easy access to these buildings once the
cranes have been constructed. The intent of the proposed building is to provide an area out of
the weather where the crane bridges can be assembled. The crane bridges are used in the
assembly hangars to move wings and sections of the planes around the assembly area. The
proposed building will have 30' wide openings at each end with no doors and no heat. No
foundation will be poured for the building, only footings. The proposed building will be removed
once the crane bridges are installed in the respective buildings. The building will be painted to
match the existing Boeing buildings in the area.
LOCATION OF PROPOSAL: 800 Park Ave. North
Advisory Notes to Applicant:
TI e following notes are supplemental information provided in conjunction with the
er vironmental determination. Because these notes are provided as information only, they
are not subject to the appeal process for environmental determinations.
1. Garbage and recyclable deposit areas and collection points shall be easily and safely
accessible to hauling trucks.
Police Department
1. It is estimated that the proposed building could generate 3.4 calls for service annually, based
or the size of the building.
2. The Police Department also recommends that security fencing and lighting be provided
ai ound the construction site to help reduce the potential for theft of tools and building materials.
Fire Prevention
1, The preliminary fire flow is 1500 gpm this requires one fire hydrant within 150 feet of the
building and one fire hydrant within 300 feet of the building.
2 Separate plans and permits are required for the sprinkler and fire alarm system.
3 Provide a list of any flammable, combustible liquids or hazardous chemicals that are to be
u:,ed or stored on site.
Airport Manager
1 If a determination is made that the proposed temporary building would be shielded by existing
si ructures or other objects, as provided by Section 77.15, FAA Form 7460-1, a Notice of
Proposed Construction is not needed.
N.OTICE
ENVIRONMENTAL DETERMINATION
POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION
PROJECT NAME: CRANE BRIDGE BUILDING
PROJECT NUMBER: LUA•98-035,ECF
The applicant seeks to construct a metal clad 8,600 st building to be used for the construction of replacement
crane bridges. The building will be located close to Um assembly buildings to provide easy access to these
buildings once the cranes have been consbucted.The intent of the proposed building is to provide an area out
of the weather where the crane bridges can be assembled.The crane bridges are used In the assembly hangars
to move wings and sections of the planes around the assembly area. The proposed building will have 30'wide
openings at each end with no doors and no heal. No foundation will be poured for the building,only footings.
The proposed building will be removed once the crane bridges are installed in the respective buildings. The
building will be painted to match the existing Boeing buildings in the area.Location:8)00 Park Ave.North.
THE CITY OF RENTON ENVIRONMENTAL REVIEW COMMITTEE D
NED
THAT THE PROPOSED ACTION DOES NOT HAVE A SIGNIFICANT ADVERSE HAS
ONITHE
ENVIRONMENT. •
COMMENTS REGARDING THE ENVIRONMENTAL DETERMINATION MUST BE FILED IN WRITING ON OR BEFORE 5:00 PM
MAY 11, 199e. ANY AGGRIEVED PERSON FEEUNG THAT THE ENVIRONMENTAL DETERMINATION OF THE
ENVIRONMENTAL REVIEW COMMITTEE IS BASED ON ERRONEOUS PROCEDURE,ERRORS OF LAW OR FACT,ERROR IN
JUDGMENT,OR THE DISCOVERY OF NEW EVIDENCE WHICH COULD NOT BE REASONABLY AVAILABLE AT THE TIME OF
THE DETERMINATION MAY SUBMIT WRITTEN COMMENTS.AFTER REVIEW OF THE COMMENTS.IF ENVIRONMENTAL
REVIEW COMMITTEE FINDS THERE IS NOT SUFFICIENT EVIDENCE TO AMEND ITS ORIGINAL DETERMINATION,THEN
•
THERE WILL BE NO FURTHER EXTENSION OF THE APPEAL PERIOD.ANY PERSON WISHING TO TAKE FURTHER ACTION
WOULD NEED TO FILE A FORMAL APPEAL WITHIN THE ORIGINAL 15-DAY TIMEFRAME WRITTEN COMMENTS MUST BE
FILED WITH: JANA HUERTER.LAND USE REVIEW SUPERVISOR.CITY OF RENTON DEVELOPMENT SERVICES DIVISION.
200 MILL AVENUE SOUTH.RENTON,WA 98055. IF AN APPEAL OF THE ENVIRONMENTAL DETERMINATION IS ALSO FILED i
WITH THE HEARING EXAMINER DURING THE SAME 15-DAY COMMENT PERIOD,THEN THE ENVIRONMENTAL REVIEW
COMMITTEE WILL FIRST TAKE ACTION ON THE REQUEST FOR RECONSIDERATION AND THE APPELLANT WILL BE
NOTIFIED THAT THE APPEAL IS ON HOLD PENDING THE COMMITTEE'S DECISION ON THE RECONSIDERATION REQUEST.
THE CITY WILL NOTIFY THE APPELLANT/PERSON REQUESTING RECONSIDERATION AND PARTIES OF RECORD AND THE
HEARING EXAMINER OF THE ENVIRONMENTAL REVIEW COMMITTEE'S FINAL DETERMINATION. THE APPEAL PROCESS
WILL THEN BE CONTINUED UNLESS THE APPELLANT NOTIFIES THE HEARING EXAMINER IN WRITING THAT HE WISHES
TO WITHDRAW THE APPEAL.APPEALS OF THE ENVIRONMENTAL DETERMINATION MUST BE FILED IN WRITING ON OR
BEFORE 5:00 PM MAY 11,1898. APPEALS MUST BE FILED IN WRITING TOGETHER WITH THE REQUIRED 575.00
APPLICATION FEE WITH:HEARING EXAMINER,CITY OF RENTON,200 MILL AVENUE SOUTH,RENTON,WA 98055.
APPEALS TO THE EXAMINER ARE GOVERNED BY CITY OF RENTON MUNICIPAL CODE SECTION 48-11B. ADDITIONAL
INFORMATION REGARDING THE APPEAL PROCESS MAY BE OBTAINED FROM THE RENTON CITY CLERK'S OFFICE,(425)-
235.2501.
LAKE WASHINGTON / '
V Aw,i,"'t \.w.10•11.1
�Al R\
i II
11 rvit :......
_,,
..,. ,.11 121:_-
PA
..II 1116c%ai=© I
ate' Ili-4
o - - lmKa--'..--.
NJ., Alf.--o
FOR FURTHER INFORMATION,
P EB DIVISION AT(25)23LEASE CONTACT THE
RENTON,DEVELOPMENT
SERVIDO NOT REMOVE THIS NOTICE WITHOUT PROPER AUTHORIZATION I
I Please include the project NUMBER when calling for proper file Identification.
CERTIFICATION
I, SaYltitl mi hni-h , hereby certify that 3 copies of the above
document were posted by me in 3 conspicuous places on or nearby
the described property on A-pr i I gib,t;t98 •
Signed: ,V L 1/NOAsin.t+1
ATTEST: Subcribed and sworn before me, a Nortary Public, in andWor the State of
Washington residing in o Oyes , on the 4-/'h day of Mao- / yal
_ Y,,r)t-CA..g*"
MARILYN KAMCHEFF
COMMISSION EXPIRES 6/29/99
AFFIDAVIT OF PUBLICATION
Kristina J. Thompson, being first duly sworn on oath states that neisne is me Legal Clerk of
the
SOUTH COUNTY JOURNAL
NOTICE OF ENVIRONMENTAL
600 S. Washington Avenue, Kent, Washington 98032 DETERMINATION
ENVIRONMENTAL REVIEW COMMITTEE
RENTON,WASHINGTON
a daily newspaper published seven (7) times a week. Said newspaper is a legal The Environmental Review Committee
(ERC) has issued a Determination of Non-
newspaper of general publication and is now and has been for more than six months Significance - Mitigated for the following
prior to the date of publication, referred to, printed and published in the English language project under the authority of the Renton
continually as a daily newspaper in Kent, King County, Washington. The South County Municipal Code.
CRANE BRIDGE BUILDING
Journal has been approved as a legal newspaper by order of the Superior Court of the LUA-98-035,ECF
State of Washington for King County. The applicant, The Boeing Company,
seeks approval to construct a 6,600 sq.ft.
The notice in the exact form attached, was published in the South County building to be used for construction of
Journal (and not in supplemental form)which was regularly distributed to the subscribers replacement crane bridges. Location: 800
during the below stated period. The annexed notice, a Park Ave.North.
The 15 day comment and appeal period
for this project will run concurrently. The
Crane Bridge Building comment/appeal periods for this project will
end at 5:00 PM on May 11, 1998. Written
comments shall be forwarded to the
as published on: 4/27/98 Development Services Division Land Use
Review Supervisor. Information on the pro-
ject file and the mitigation measures
The full amount of the fee charged for said foregoing publication is the sum of$48.08 imposed by the City of Renton's
Legal Number 4527 Environmental Review Committee are
available at the Development Services
Division, Third Floor, Municipal Building,
Renton, Washington 98055. Phone: 235-
I:gal
2550. Appeal procedures are available in
the City Clerk's office,First Floor,Municipal
CI rk;'South Co my Journal Building.
Published in the South County Journal
April 27, 1998.4527
Subscribed and sworn before me this day of 1)7a&I , 19 "/ ,�
``` ,E.tN�yti i-
E. i 7(1,
• o F• Notary Public of the State of Washington
.v NOTAgy `�+•
_ residing in Renton
—•— i = King County, Washington
▪ •; G a -'
pUBI‘
or
9�ii0L•WASH` ‘
‘
NOTICE OF ENVIRONMENTAL DETERMINATION
ENVIRONMENTAL REVIEW COMMITTEE
RENTON, WASHINGTON
The E nvironmental Review Committee (ERC) has issued a Determination of Non-Significance -
Mitigi ted for the following project under the authority of the Renton Municipal Code.
CRANE BRIDGE BUILDING
LUA-98-035,ECF
The applicant, The Boeing Company, seeks approval to construct a 6,600 sq.ft. building
to be used for construction of replacement crane bridges. Location: 800 Park Ave.
North.
The 15 day comment and appeal period for this project will run concurrently. The comment/appeal
perioc s for this project will end at 5:00 PM on May 11, 1998. Written comments shall be forwarded to
the D )velopment Services Division Land Use Review Supervisor. Information on the project file and the
mitig tion measures imposed by the City of Renton's Environmental Review Committee are available at
the E evelopment Services Division, Third Floor, Municipal Building, Renton, Washington 98055.
Phone: 235-2550. Appeal procedures are available in the City Clerk's office, First Floor, Municipal
Building.
Publication Date: April 27,1 998
Acco ant No. 51067
dnsm Dub.dot
1
CITY OF RENTON
DETERMINATION OF NON-SIGNIFICANCE
(MITIGATED)
APPLICATION NC(S): LUA-98-035,ECF
APPLICANT: The Boeing Company
PROJECT NAME: Crane Bridge Building
DESCRIPTION OI'PROPOSAL: The applicant seeks to construct a metal clad 6,600 sf building to be used for the construction of
replacement crane bridges. The building will be located close to the assembly buildings to provide easy access to these buildings once the cranes have been
constructed. The i itent of the proposed building is to provide an area out of the weather where the crane bridges can be assembled. The crane bridges are
used in the asseml ly hangars to move wings and sections of the planes around the assembly area. The proposed building will have 30'wide openings at each
end with no doors;nd no heat. No foundation will be poured for the building,only footings. The proposed building will be removed once the crane bridges are
installed in the rest ective buildings. The building will be painted to match the existing Boeing buildings in the area.
LOCATION OF PF OPOSAL: 800 Park Ave.North
LEAD AGENCY: City of Renton
Department of Planning/Building/Public Works
Development Planning Section
The City of Rentoi Environmental Review Committee has determined that it does not have a probable significant adverse impact on the environment. An
Environmental Imp ict Statement(EIS)is not required under RCW 43.21 C.030(2)(c). Conditions were imposed as mitigation measures by the Environmental
Review Committee under their authority of Section 4-6-6 Renton Municipal Code. These conditions are necessary to mitigate environmental impacts identified
during the environr iental review process.
Comments regar ling the environmental determination must be filed in writing on or before 5:00 PM May 11, 1998. Any aggrieved person feeling
that the environme ital determination of the Environmental Review Committee is based on erroneous procedure,errors of law or fact, error in judgment,or the
discovery of new :vidence which could not be reasonably available at the time of the determination may submit written comments. After review of the
comments,if Envir mmental Review Committee finds there is not sufficient evidence to amend its original determination,then there will be no further extension
of the appeal peric d. Any person wishing to take further action would need to file a formal appeal within the original 15-day timeframe. Written comments
must be filed with: Jana Huerter,Land Use Review Supervisor,City of Renton Development Services Division,200 Mill Avenue South, Renton,WA 98055. If
an appeal of the ei vironmental determination is also filed with the Hearing Examiner during the same 15-day comment period,then the Environmental Review
Committee will first take action on the request for reconsideration and the appellant will be notified that the appeal is on hold pending the Committee's decision
on the reconsiders:ion request. The City will notify the appellant/person requesting reconsideration and parties of record and the Hearing Examiner of the
Environmental Rey iew Committee's final determination. The appeal process will then be continued unless the appellant notifies the Hearing Examiner in
writing that he wis ies to withdraw the appeal. Appeals of the environmental determination must be filed in writing on or before 5:00 PM May 11,
1998. Appeals mast be filed in writing together with the required $75.00 application fee with: Hearing Examiner, City of Renton, 200 Mill Avenue South,
Renton,WA 9805;. Appeals to the Examiner are governed by City of Renton Municipal Code Section 4-8-11 B. Additional information regarding the appeal
process may be of gained from the Renton City Clerk's Office,(425)-235-2501.
PUBLICATION DI.TE: April 27,1998
DATE OF DECISI:)N: April 21,1998
SIGNATURES:
APC �47///eee RRei v j i i /i
Gregg Zimmer r, dministr D E
Department of an,ing/ ' ing/Public Works
-C l LG ��r c 2 /e...11-
Community )
m hastain,Adi ninistratorDATE Services Administrator
i
i
Lee W eeler,Fire Chief DATE
Renton Fire Depar ment
DNSMSIG.DOC
CITY OF RENTON
DETERMINATION OF NON-SIGNIFICANCE
(MITIGATED)
MITIGATION MEASURES
APPLIC, TION NO(S): LUA-98-035,ECF
APPLIO+NT: The Boeing Company
PROJE(T NAME: Crane Bridge Building
DESCRI'TION OF PROPOSAL: The applicant seeks to construct a metal clad 6,600 sf building
to be i sed for the construction of replacement crane bridges. The building will be located close to the
assem)ly buildings to provide easy access to these buildings once the cranes have been constructed.
The ini ent of the proposed building is to provide an area out of the weather where the crane bridges can
be assmbled. The crane bridges are used in the assembly hangars to move wings and sections of the
planes around the assembly area. The proposed building will have 30' wide openings at each end with
no do(rs and no heat. No foundation will be poured for the building, only footings. The proposed
buildin 1 will be removed once the crane bridges are installed in the respective buildings. The building
will be painted to match the existing Boeing buildings in the area.
LOCATION OF PROPOSAL: 800 Park Ave. North
MITIGATION MEASURES:
1. Pric r to the issuance of building permits the applicant shall provide a Fire Mitigation Fee of$0.52 per
square foot building area. (Estimated fee: $0.52 x 6,600 sf= $3,432.00)
CITY OF RENTON
DETERMINATION OF NON-SIGNIFICANCE
(MITIGATED)
ADVISORY NOTES
AF'PLICATION NO(S): LUA-98-035,ECF
AF'PLICANT: The Boeing Company
PFOJECT NAME: Crane Bridge Building
DESCRIPTION OF PROPOSAL: The applicant seeks to construct a metal clad 6,600 sf
bu"Iding to be used for the construction of replacement crane bridges. The building will be
located close to the assembly buildings to provide easy access to these buildings once the
cr rnes have been constructed. The intent of the proposed building is to provide an area out of
thy weather where the crane bridges can be assembled. The crane bridges are used in the
assembly hangars to move wings and sections of the planes around the assembly area. The
proposed building will have 30' wide openings at each end with no doors and no heat. No
foundation will be poured for the building, only footings. The proposed building will be removed
once the crane bridges are installed in the respective buildings. The building will be painted to
mratch the existing Boeing buildings in the area.
LC,CATION OF PROPOSAL: 800 Park Ave. North
Advisory Notes to Applicant:
Ti e following notes are supplemental information provided in conjunction with the
er vironmental determination. Because these notes are provided as information only, they
an not subject to the appeal process for environmental determinations.
1. Garbage and recyclable deposit areas and collection points shall be easily and safely
ac,essible to hauling trucks.
Pr lice Department
1. It is estimated that the proposed building could generate 3.4 calls for service annually, based
on the size of the building.
2. The Police Department also recommends that security fencing and lighting be provided
around the construction site to help reduce the potential for theft of tools and building materials.
Fi•e Prevention
1. The preliminary fire flow is 1500 gpm this requires one fire hydrant within 150 feet of the
building and one fire hydrant within 300 feet of the building.
2. Separate plans and permits are required for the sprinkler and fire alarm system.
3. Provide a list of any flammable, combustible liquids or hazardous chemicals that are to be
us Kd or stored on site.
Ai port Manager
1. If a determination is made that the proposed temporary building would be shielded by existing
structures or other objects, as provided by Section 77.15, FAA Form 7460-1, a Notice of
Pr posed Construction is not needed.
STAFF City of Renton
REPORT Department of Planning/Building/Public Works
ENVIRONMENTAL REVIEW COMMITTEE
A. BACKGROUND
ERC MEETING DATE Apnl 21, 1998
Project Name Boeing Crane Bridge Building
Applicant The Boeing Company/Paul Crane
File Numt er LUA-98-035,ECF
Project M,lnager Mark R. Pywell, AICP
Project D?scription The applicant seeks to construct a metal clad 6,600 sf building to be used for the
construction of replacement crane bridges. The building will be located close to the
assembly buildings to provide easy access to these buildings once the cranes have
been constructed. The intent of the proposed building is to provide an area out of the
weather where the crane bridges can be assembled. The crane bridges are used in
the assembly hangars to move wings and sections of the planes around the assembly
area. The proposed building will have 30'wide openings at each end with no doors
and no heat. No foundation will be poured for the building, only footings. The
proposed building will be removed once the crane bridges are installed in the
respective buildings. The building will be painted to match the existing Boeing
buildings in the area.
Project Lc cation 800 Park Ave. North
Exist. Bldg 1. Area gsf N/A Proposed New Bldg. Area gsf 6,600 sf
Site Area 7,000 sf Total Building Area gsf 6,600 sf
RECOMN'ENDATION Staff Recommend that the Environmental Review Committee issue a Determination of
Non-Significance. _�,_• � �o
6! 510-I)!�//� err�j
�1 IV.' U66
10-I
\i 1
il
10-170`� 10-58 10-66
401\
ti
. 1-
I - 1051
10-I1� 100-S56S 10fi5
IY 1-/6 J32hlo3
1-W 1-17�Uy10mG0 1_71,035 i11 0 ®1- , /'-1i01�9'L¢ i �\\ (1�yr� LOT 7 2 b Ila9ol E 11111 d
5- .4
N fENC- - Ay-
1 tz 6 . 8_-OD lie -4-09---..-4-Iv A
1-]6 a
- \ 3 10J!
1-6, 1-11
10-16696w III4
Project Local ion Map 0 \ k.___ .J1 Rarrt 1 c
0 Q
Z1 5-109,� 4-69 r O ^ — -
tr eM1E-c-r. PUN NEW A
City of Rentar PB/PW Department .onmental Review Committee Staff Report
BOEING CR I NE BRIDGE BUILDIly k, L UA-98-035,ECF
• REPORT AND.)ECISION OF April 21, 1998 Page 2 of 4
B. RECOMMENDATION
Ba ied on analysis of probable impacts from the proposal, staff recommend that the Responsible Officials
m2 ke the following Environmental Determination:
DETERMINATION OF DETERMINATION OF
NON-SIGNIFICANCE NON-SIGNIFICANCE-MITIGATED.
Issue DNS with 14 day Appeal Period. XX Issue DNS-M with 15 day Comment Period
with Concurrent 14 da A.seal Period.
Issue DNS with 15 day Comment Period Issue DNS-M with 15 day Comment Period
with Concurrent 14 day Appeal Period. followed by a 14 day Appeal Period.
C. MITIGATION MEASURES
1. Prior to the issuance of building permits the applicant shall provide a Fire Mitigation Fee of$0.52 per square foot
building ar;a. (Estimated fee: $0.52 x 6,600 sf= $3,432.00)
Advisory,Votes to Applicant:
The following notes are supplemental information provided in conjunction with the environmental
determination. Because these notes are provided as information only, they are not subject to the appeal
process for environmental determinations.
1. Garba!ie and recyclable deposit areas and collection points shall be easily and safely accessible to hauling trucks.
Police De)artment
1. It is est mated that the proposed building could generate 3.4 calls for service annually, based on the size of the
building.
2. The Police Department also recommends that security fencing and lighting be provided around the construction
site to help reduce the potential for theft of tools and building materials.
Fire Prevention
1. The preliminary fire flow is 1500 gpm this requires one fire hydrant within 150 feet of the building and one fire
hydrant within 300 feet of the building.
2. Separate plans and permits are required for the sprinkler and fire alarm system.
3. Provide• a list of any flammable, combustible liquids or hazardous chemicals that are to be used or stored on site.
Airport Manager
1. If a determination is made that the proposed temporary building would be shielded by existing structures or other
objects, a: provided by Section 77.15, FAA Form 7460-1, a Notice of Proposed Construction is not needed.
ERCRPT.DC C
City of Rentoq P/B/PWDepartment ronmental Review Committee Staff Report
BOEING CR 4NE BRIDGE BUILDING LUA-98-035,ECF
REPORTAND )ECISIONOFApri121, 1998 Page 3 of 4
D. ENVIRONMENTAL IMPACTS
In ;ompliance with RCW 43.21 C. 240, the following project environmental review addresses only
the Ise project impacts that are not adequately addressed under existing development standards and
en'ironmental regulations.
Has the applicant adequately identified and addressed environmental impacts anticipated to occur in
co ijunction with the proposed development?
1. Ea lh
Impacts: l he proposed structure will be constructed on an existing paved area by the 4-77 and 4-70 buildings. The
only disturt,ance of the earth will be for the construction of the footings required for the building and the necessary tie-
ins for utilit es. Temporary erosion control measures as identified in the City of Renton Municipal Code will be
installed ar d monitored during the construction phase of the project.
Mitigation Measures: No further mitigation is required.
Nexus: N/,>
2.
Impacts: l he proposed project will have only minor impacts on the ambient air quality of the area and region. The
building wi I not be heated, thus their will be no exhaust emitted from a heating source. During construction air quality
impacts we uld be associated with fugitive dust from the construction of the footings for the building and the exhaust
from the vehicles used in the construction of the building. It is not anticipated that either of these will have a
significant mpact on the environment. There are existing City Ordinances that address these issues. In addition both
state and f 3deral regulations control the exhaust from vehicles. No further site specific mitigation measures are
required.
Mitigation Measures: None required.
Nexus: N/
3. W+iter
Impacts: 1 he are existing storm water facilities in this area that adequately treat the storm water prior to its release
into the en✓ironment. The proposed project will not expand the impervious area subject to vehicular travel on this
site. It will not increase the impervious area at all. Therefore, the proposed project will not have an adverse impact
on the wat,:r quality.
Mitigation Aeasures: None required.
Nexus: N/
4. Fii e Prevention Building
Impacts: 7'he applicant will need to provide the Code required improvements, such as the provision of an adequate
number of fire hydrants prior to occupying the proposed building. The Fire Prevention staff have also noted that
although tt e applicant has stated that the building is temporary, they have not provided a date by which the building
will be rerr oved. The applicant states that the building will be removed when the last of the crane bridges are
installed in the assembly buildings. Their intent is to have this work completed in approximately one year but they do
not want tc have to commit to a specific date in case construction delays occur that would impact the completion of
this work.
All new co istruction within the City, temporary or permanent, has an adverse impact on the City's ability to provide
service. Ir order to mitigate this adverse impact the City has adopted a Fire Mitigation Fee of$0.52 per square foot
of new cor struction. It may be possible for the applicant to request a credit from the Fire Prevention Bureau when the
building is removed that will be applicable to future construction on this site.
ERCRPT.DO
Ci ry of Rento)r P/B/PW Department 9nmental Review Committee Staff Report
BOEING CR INE BRIDGE BUILDING LUA-98-035,ECF
REPORT AND..)ECISIONOF April 21,1998 Page 4 of 4
Mitigation r leasures: Prior to the issuance of building permits the applicant shall provide a Fire Mitigation Fee of
$0.52 per s luare foot building area. (Estimated fee: $0.52 x 6,600 sf= $3,432.00)
Nexus:
E. CC MMENTS OF REVIEWING DEPARTMENTS
The propc sal has been circulated to City Departmental/Divisional Reviewers for their review. Where
applicable, these comments have been incorporated into the text of this report as Mitigation Measures and/or
Notes to 1 pplicant.
x_ Copies of all Review Comments are contained in the Official File.
Copies of all Review Comments are attached to this report.
Environmental Determination Comment Process Comments regarding the environmental
determination must be filed in writing on or before 5:00 PM May 11, 1998. Any aggrieved person feeling that the
environmental determination of the Environmental Review Committee is based on erroneous procedure, errors of law
or fact, error in judgment, or the discovery of new evidence which could not be reasonably available at the time of the
determination may submit written comments. After review of the comments, if Environmental Review Committee
finds there is not sufficient evidence to amend its original determination, then there will be no further extension of the
appeal per od. Any person wishing to take further action would need to file a formal appeal within the original 15-day
timeframe Written comments must be filed with: Jana Huerter, Land Use Review Supervisor, City of Renton
Developm mt Services Division, 200 Mill Avenue South, Renton, WA 98055. If an appeal of the environmental
determinal ion is also filed with the Hearing Examiner during the same 15-day comment period, then the
EnvironmE ntal Review Committee will first take action on the request for reconsideration and the appellant will be
notified th<t the appeal is on hold pending the Committee's decision on the reconsideration request. The City will
notify the ppellant/person requesting reconsideration and parties of record and the Hearing Examiner of the
EnvironmE ntal Review Committee's final determination. The appeal process will then be continued unless the
appellant r otifies the Hearing Examiner in writing that he wishes to withdraw the appeal.
Environmental Determination Appeal Process Appeals of the environmental determination must be
filed in writing on or before 5:00 PM May 11, 1998.
Appeals rr ust be filed in writing together with the required $75.00 application fee with: Hearing Examiner, City of
Renton, 200 Mill Avenue South, Renton, WA 98055. Appeals to the Examiner are governed by City of Renton
Municipal erode Section 4-8-11 B. Additional information regarding the appeal process may be obtained from the
Renton Ci y Clerk's Office, (425)-235-2501.
ERCRPT.DOC
City of Renton Department of Planning/Building/Public Works
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DE''ARTMENT: 1011CC. • COMMENTS DUE: APRIL 13, 1998
APPLICATION ND: LUA-98-035,ECF DATE CIRCULATED: MARCH 30, 1998
APPLICANT: The Boeing Company(Paul Crane) PROJECT MANAGER: MARK PYWELL
PROJECT TITLE: Crane Bridge Building WORK ORDER NO: 78353
LOCATION: 80( Park Avenue North
SITE AREA: 6,6J0 sq.ft. BUILDING AREA(gross): 6,600 sq.ft.
SUMMARY OF PROPOSAL: The Boeing Company proposes to construct a 6,600 sq.ft. building that will house the
asembly of rep acement crane bridges. Once the crane bridges are installed in the aircraft assembly buildings, the
proposed struc ure will be removed.
3-y
A. ENVIRONI-ENTAL IMPACT(e.g. Non-Code) COMMENTS
Element of the Probable Probable More Element of the Probable Probable More
Environment Minor Major Information Environment Minor Major Information
Impacts Impacts Necessary Impacts Impacts Necessary
Earth Housing
Air Aesthetics
Water Light/Glare
Plants Recreation
Land/Shoreline Use Utilities
Animals Transportation
Environmental Hearth Public Services
Energy/ Historic/Cultural
Natural Resources Preservation
Airport Environment
10,000 Feet
{-� 14,000 Feet
OL .Y U(NS o :Qck :tcon p016 C s er v ce -
Con sir - on s tt are o p errrd `( c get for bung 1&f
I,-eco►m me i se mri nCy ail l2(,1 lc() rivo. ma tei/i S 4- s l i g ht-
auck_ d.u1A aq frlo x ob jOcness bath seGu rtc/ <igkuh' (1
(Ira COnsi iin ! Spa o 1�/ SecLu(t fen v oi-icuncL
B. POLICY-I-ELATED COMMENTS
sl tQ uriti P ins ue)-&& ts f is hQd
st).mate .'o h cc CCU lS 26( scr _c_ W n u.a J U , basio
c U S► c biAA lAk
C. CODE-R=LATED COMMENTS
We have review 3d this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas
where additional information is needed to properly assess this proposal.
Signature of Director or Authorized Representative Date
DEVAPP.DOC Rev.10/93
City of Renton Department of Planning/Building/Public Works
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEP/RTMENT:T SpAahm COMMENTS DUE: APRIL 13, 1998
APPLICATION NO LUA-98-035,ECF DATE CIRCULATED: MARCH 30, 1998
APPLICANT: The Boeing Company(Paul Crane) PROJECT MANAGER: MARK PYWELL
PROJECT TITLE: Crane Bridge Building WORK ORDER NO: 78353
LOCATION: 800 ['ark Avenue North
SITE AREA: 6,60)sq.ft. BUILDING AREA(gross): 6,600 sq.ft.
SUMMARY OF PROPOSAL: The Boeing Company proposes to construct a 6,600 sq.ft. building that will house the
asembly of reply cement crane bridges. Once the crane bridges are installed in the aircraft assembly buildings, the
proposed structt re will be removed.
A. ENVIRONMENTAL IMPACT(e.g. Non-Code) COMMENTS
Element of the Probable Probable More Element of the Probable Probable More
Environment Minor Major Information Environment Minor Major Information
Impacts Impacts Necessary Impacts Impacts Necessary
Earth Housing
Air Aesthetics
Water Light/Glare
Plants Recreation
Land/Shoreline Use Utilities
Animals Transportation
Environmental Heal h Public Services
Energy/ Historic/Cultural
Natural Resources Preservation
Airport Environment
10,000 Feet
14,000 Feet
B. POLICY BELATED COMMENTS
S I►dc,G pr0, g /S tdOyeAtry iv/ Ate tdre — V0 IN G /M -{
u1041 -fee Yrlfloved.
C. CODE-/'ELATED COMMENTS
Nd SlYta t i.n, s Z ✓eq'pf
We have revie ved this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas
where addition it information is needed to properly assess this proposal.
Ale'. 1 w4 4/Z/g
Signature of D rector or Authorized Representative Date
DEVAPP DOC Rev.10/93
City of Renton Department of Planning/Building/Public Works
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT:SUxdace )WO.SieU. 6tiJ(-COMMENTS DUE: APRIL 13, 1998
APPLICATION NO: LUA-98-035,ECF DATE CIRCULATED: MARCH 30, 1998
APPLICANT: The I3oeing Company(Paul Crane) PROJECT MANAGER: MARK PYWELL
PROJECT TITLE: Crane Bridge Building WORK ORDER NO: 78353
LOCATION: 800 F ark Avenue North
SITE AREA: 6,60( sq.ft. BUILDING AREA(gross): 6,600 sq.ft.
SUMMARY OF PF OPOSAL: The Boeing Company proposes to construct a 6,600 sq.ft. building that will house the
asembly of replacement crane bridges. Once the crane bridges are installed in the aircraft assembly buildings, the
proposed structure will be removed.
A. ENVIRONM,=NTAL IMPACT(e.g. Non-Code) COMMENTS
Element of the Probable Probable More Element of the Probable Probable More
Environment Minor Major Information Environment Minor Major Information
Impacts Impacts Necessary Impacts Impacts Necessary
Earth Housing
Air Aesthetics
Water Light/Glare
Plants Recreation
Land/Shoreline Use Utilities
Animals Transportation
Environmental Heart Public Services
Energy/ Historic./Cultural
Natural Resources Preservation
Airport Environment
10,000 Feet
14,000 Feet
B. POLICY-RELATED COMMENTS
C. CODE-F ELATED COMMENTS
k)o CO '
We have reviel ied this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas
where additional information is needed to properly assess this proposal.
Signature of D rector or Authorized Representative Date
DEVAPP.DOC Rev 10/93
City r.anton Department of Planning/Building/Pi Works
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT: puts COMMENTS DUE: APRIL 13, 1998
APPLICATION NC: LUA-98-035,ECF DATE CIRCULATED: MARCH 30, 1998
APPLICANT: The Boeing Company(Paul Crane) PROJECT MANAGER: MARK PYWELL
PROJECT TITLE: Crane Bridge Building WORK ORDER NO: 78353
LOCATION: 800 'ark Avenue North
SITE AREA: 6,60J sq.ft. BUILDING AREA(gross): 6,600 sq.ft.
SUMMARY OF P 2OPOSAL: The Boeing Company proposes to construct a 6,600 sq.ft. building that will house the
asembly of replacement crane bridges. Once the crane bridges are installed in the aircraft assembly buildings, the
proposed structure will be removed.
A. ENVIRONN ENTAL IMPACT(e.g. Non-Code) COMMENTS
Element of the Probable Probable More Element of the Probable Probable More
Environment Minor Major Information Environment Minor Major Information
Impacts Impacts Necessary Impacts Impacts Necessary
Earth Housing
Air Aesthetics
Water Light/Glare
Plants Recreation
Land/Shoreline Use Utilities
Animals Transportation
Environmental Hea th Public Services
Energy/ Historic/Cultural
Natural Resources Preservation
Airport Environment
10,000 Feet
14,000 Feet
B. POLICY-RELATED COMMENTS rf�
1.0-4 X<!--
C. CODE-I ELATED COMMENTS
We have wed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas ,
where additional information is needed to properly assess this proposal.
-- ('/?
,; �
Signature of Director or Xluthonzed Representative Date
9 P
DEVAPP DOC Rev 10/93
City of Renton Department of Planning/Building/Public Works
ENVIRONMENTAL 8 DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEP/RTMENT: p\ Siiew..u),e; ,Y- COMMENTS DUE: APRIL 13, 1998
APPLICATION NO LUA-98-035,ECF DATE CIRCULATED: MARCH 30, 1998
APPLICANT: The 3oeing Company(Paul Crane) PROJECT MANAGER: MARK PYWELL
PROJECT TITLE: Crane Bridge Building WORK ORDER NO: 78353 ,'TY OF RENTON
LOCATION: 800 Park Avenue North
SITE AREA: 6,60) sq.ft. BUILDING AREA(gross): 6,600 sq.ft.
+ 0 o 998
w,wvit-1.-..N.t.a L)EVtSIQN
SUMMARY OF PROPOSAL: The Boeing Company proposes to construct a 6,600 sq.ft. building that will house the
asembly of replz cement crane bridges. Once the crane bridges are installed in the aircraft assembly buildings, the
proposed structt re will be removed.
A. ENVIRONMENTAL IMPACT(e.g. Non-Code) COMMENTS
Element of the Probable Probable More Element of the Probable Probable More
Environment Minor Major information Environment Minor Major Information
impacts Impacts Necessary Impacts Impacts Necessary
Earth Housing
Air Aesthetics
Water Light/Glare
Plants Recreation
Land/Shoreline Use Utilities
Animals Transportation
Environmental Heal h Public Services
Energy/ Historic/Cultural
Natural Resources Preservation
Airport Environment
10,000 Feet
14,000 Feet
B. POLICY-RELATED COMMENTS
C. CODE-I ELATED COMMENTS
;OD GO WI 144-et4/7 i
We have reviE wed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas
where additior al informatio A
issneeded to properly assess this proposal.
Ai-lT,� ( ./Y
Signature of C`irector or Authorized Representative Date
DEVAPP.DOC Rev 10/93
nRr-tit p.ITi N 8j-' PT
M ,at.
AR3 1 19
City of Renton Department of Planning/Building/Public Works 98
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEP/RTMENT: ,(G ry-etc COMMENTS DUE: APRIL 13, 1998
APPLICATION NO LUA-98-035,ECF DATE CIRCULATED: MARCH 30, 1998
APPLICANT: The Boeing Company(Paul Crane) PROJECT MANAGER: MARK PYWELL
PROJECT TITLE: Crane Bridge Building WORK ORDER NO: 78353
LOCATION: 800 Park Avenue North
SITE AREA: 6,60)sq.ft. BUILDING AREA(gross): 6,600 sq.ft.
SUMMARY OF PROPOSAL: The Boeing Company proposes to construct a 6,600 sq.ft. building that will house the
asembly of repl cement crane bridges. Once the crane bridges are installed in the aircraft assembly buildings, the
proposed structure will be removed.
A. ENVIRONMENTAL IMPACT(e.g. Non-Code) COMMENTS
Element of the Probable Probable More Element of the Probable Probable More
Environment Minor Major Information Environment Minor Major Information
Impacts Impacts Necessary Impacts Impacts Necessary
Earth Housing
Air Aesthetics
Water Light/Glare
Plants Recreation
Land/Shoreline Use Utilities
Animals Transportation
Environmental Heal h Public Services
Energy/ Historic/Cultural
Natural Resources Preservation
Airport Environment
10,000 Feet
14,000 Feet
;OA
B. POLICY-RELATED COMMENTS
41
C. CODE-,2ELATED COMMENTS
67ec' kCjel of-04
We have revih weg this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas
where additiot al information is nee,1:,jf o properly assess this proposal.
4 dift10 .1 047
Signature of[hector or Authorized Repr'sentative Date
DEVAPP.DOC Rev.10/93
•
G��Y O
ve
4 c CITY OF RENTON
FIRE PREVENTION BUREAU
MEMORANDUM
DATE: April 6, 1998
TO: Mark Pywell, Planner Q�
FROM: Jim Gray, Assistant Fire Marshal
SUBJECT: Boeing Crane Bldg, 800 Park Av. N.
Fire Department Comments:
1. The preliminary Fire flow is 1500 GPM which requires one fire
hydrant within 150 feet of the building and one additional hydrant within
300 feet of the building.
2. Separate plans and permits are required for the sprinkler and fire
alarm systems.
3. Provide a list of any flammable, combustible liquids or hazardous
chemicals that are to be used or stored on site.
4. A fire mitigation fee of$3,432.00 is required based on $.52 a square
foot .
Please feel free to contact me if you have any questions.
City of Renton Department of Planning/Building/Public Works
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPi.RTMENT: vtc,Alnkchoift Semce4 COMMENTS DUE: APRIL 13, 1998
APPLICATION NC: LUA-98-035,ECF DATE CIRCULATED: MARCH 30, 1998
APPLICANT: The Boeing Company(Paul Crane) PROJECT MANAGER: MARK PYWELL
PROJECT TITLE: Crane Bridge Building WORK ORDER NO: 78353
LOCATION: 800 Park Avenue North
SITE AREA: 6,600 sq.ft. BUILDING AREA(gross): 6,600 sq.ft.
SUMMARY OF PROPOSAL: The Boeing Company proposes to construct a 6,600 sq.ft. building that will house the
asembly of repl:lcement crane bridges. Once the crane bridges are installed in the aircraft assembly buildings, the
proposed struct Ire will be removed.
A. ENVIRONN ENTAL IMPACT(e.g. Non-Code) COMMENTS
Element of the Probable Probable More Element of the Probable Probable More
Environment Minor Major Information Environment Minor Major Information
Impacts Impacts Necessary Impacts Impacts Necessary
Earth Housing
Air Aesthetics
Water LightGlare
Plants Recreation
Land/Shoreline Use Utilities
Animals Transportation
Environmental Hea th Public Services
Energy/ Historic/Cultural
Natural Resources Preservation
Airport Environment
10,000 Feet
14,000 Feet
B. POLICY-RELATED COMMENTS
/t/d fVt
C. CODE-RELATED COMMENTS
We have revie ed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas
where additioi al information is needed to properly assess this proposal.
t�-� i--� 3 -3//r f
i ature of Dir r o Authorized Representative Dat
VAPP.DOC Rev.10/93
• e i
City of Renton Department of Planning/Building/Public Works
ENVIRONMENTAL It DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEP/RTMENT: t` COMMENTS DUE: APRIL 13, 1998
APPLICATION NO LUA-98-035,ECF DATE CIRCULATED: MARCH 30, 1998
APPLICANT: The 3oeing Company(Paul Crane) PROJECT MANAGER: MARK PYWELL
PROJECT TITLE: Crane Bridge Building WORK ORDER NO: 78353
LOCATION: 800 l'ark Avenue North
SITE AREA: 6,60 l sq.ft. BUILDING AREA(gross): 6,600 sq.ft.
SUMMARY OF Pf tOPOSAL: The Boeing Company proposes to construct a 6,600 sq.ft. building that will house the
asembly of repl"cement crane bridges. Once the crane bridges are installed in the aircraft assembly buildings, the
proposed structt re will be removed.
A. ENVIRONMENTAL IMPACT(e.g. Non-Code) COMMENTS
Element of the Probable Probable More Element of the Probable Probable More
Environment Minor Major Information Environment Minor Major Information
Impacts Impacts Necessary Impacts Impacts Necessary
Earth r Housing
Air j Aesthetics
Water Light/Glare
Plants Recreation
Land/Shoreline Use Utilities
Animals Transportation
Environmental Heal h Public Services
Energy/ Historic/Cultural
Natural Resources Preservation
I
Airport Environment
10,000 Feet l{.�S
14,000 Feet ��,,LL�O
None
B. POLICY-?ELATED COMMENTS
None
C. CODE-('ELATED COMMENTS
If the determination is made that the proposed temporary building would be shielded
by exi!;ting structures or other objects , as provided by Sec. 77. 15, FAA Form 7460-1 ,
a Notii:e of Proposed Construction is not needed.
We have revie.ved this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas
where ad "on3l informs s needed to properly assess this proposal. 1' ._ - I
ticg
1 0 VU s(
Signature Director or Authorized Representative Date
DEVAPP. C Rev 10/93
NOTICE OF tmOPOSED CONSTRUCTION OR ALTERATInkl j : ' .,. ,�
§77.13 Construction or alteratlo r requiring notice. §77.15 Construction or alteratl requiring notice. ..L
(a) Except as provided in§77.15 each sponsor who proposes any of the following No person is required to notify tie Administrator for any of the following construc-
construction or alteration shall citify the Administrator in the form and manner ton or alteration:
prescribed in$77.17: (a) Any object that would be shielded by existing structures of a permanent and
(1)Any construction or alteratio i of more than 200 feet in height above the ground substantial character or by natural terrain or topographic features of equal or greater
level at its site. height, and would be located in the congested area of a city,town, or settlement
(2)Any construction or alteration)f greater height than an imaginary surface extending where it is evident beyond all reasonable doubt that the structure so shielded will
outward and upward at one of t ie following slopes: not adversely affect safety in air navigation.
•
(i) 100 to 1 for a horizontal distance of 20,000 feet from the nearest pant of (b)Any antenna structure of 20 feet or less in height except one that would increase
the nearest runway of each i irport specified in the of another antenna structure.
subparagraph(5)of this paragraph height
with at least one runway mot 3 than 3,200 feet in actual length,excluding heliports. (c)Any air navigation facility, airport visual approach or landing aid, aircraft arrest-
(ii) 50 to 1 for a horizontal distance of 10,000 feet from the nearest point of ing device, or meteorological device, of a type approved by the Administrator, or '
the nearest runway of each:irport specified in subparagraph(5)of this paragraph an appropriate military service on military airports,the location and height of which
with its longest runway no mere than 3,200 feet in actual length,excluding heliports. is fixed by its functional purpose.
(iii) 25 to 1 for a horizonta I distance of 5,000 feet from the nearest pant of (d)Any construction or alteration for which notice is required by any other FAA regulation.
the nearest landing and takeoff area of each heliport specified in subparagraph
(5)of this paragraph.
(3) Any highway,railroad, or other traverse way for mobile objects, of a height §77.17 Form and time of notice,
which,if adjusted upward 17 feet for an Interstate Highway that is part of the National (a) Each person who is required to notify the Administrator under$77.13 (a) shall
System of Military and Interstate Highways where overcrossings are designed for send one s form of FAA Fonn 7460 1,Notice of Proposed Construction
•
a minimum of 17 feet vertica distance, 15 feet for any other public roadway, 10 or Alteration,to the Manager,Air Traffic Division,FAA Regional Office having jurisdiction
over the area within which the construction or alteration will be kratari of
feet or the height ofthe highest mobile object that would normally traverse the FAA Form 7460-1 may be obtained from the headquarters of the Federal Aviation
road, which aver is greater, 'or a private road, 23 feet for a railroad, and for a Administration and the regional offices.
waterway or any other traverse way not previously mentioned, an amount equal
to the height of the highest mobile object that would normally traverse it, would (b)The notice required under$77.13(a) (1)through (4) must be submitted at least
exceed a standard of subpara graph(1)or(2)of this paragraph. 30 days before the earlier of the following dates—
(4) When requested by the I"AA, any construction or alteration that would be in (1) date proposedconstruction or alteration is to begin.
an instrument approach area (defined in the FAA standards governing instrument (2) date an i� a constru ton permit is to be filed.
hHowever, a notice relating to proposed construction or alteration that isto of
procedures)pav ailable information indicates it might exceed a standard tine licensing requirements of the Federal Communications Act may be subject e
FAA at the same time the application for construction is filed with the Federal
(5)Any construction or aiterat 3n on any of the following airports(including heliPorts): Communications Commission,or at any time before that filing.
(i)An airport that is available for public use and is listed in the Airport Directory
of the current Airman's Information Manual or in either the Alaska or Pacific (c)A proposed structure or an alteration to an existing structure that exceeds 2,000
Airman's Guide and Chart Supplement feet in height above the ground will be presumed to be a hazard to air navigation
(ii)An airport under cons)uction,that is the subject of a notice or proposal on result in an inefficient utilization of airspace and the applicant has the burden
file with the Federal Aviation Administration, and except for military airports, it of overcoming that presumption.Each notice submitted under the pertinent provisions
is clearly indicated that that airport will be available for public use. of Part 77 proposing a structure in excess of 2,000 feet above ground,or an alteration
(iii)An airport that is operated by an armed force of the United States. thatwill make an existing structure exceed that height must contain a detailed showing
directed to meeting this burden.Only in exceptional cases,where the FAA concludes
(b) Each sponsor who propoes construction or alteration that is the subject of a that a clear and compelling showing has been made that it would not result in an .. ,.
notice under paragraph(a)of this section and is advised by an FAA regional office inefficient utilization of the airspace and would not result in a hazard to air navigation,
that a supplemental notice is equired shall submit that notice on a prescribed form will a determination of no hazard be issued z to be received by the FAA rr gional office at least 48 hours before the start of the
construction or alteration. (d) In the case ofan emergency involving essential public services, public health,
Each or public safety,that requires immediate construction or alteration,the 30 day require-
(c) sponsor who undertakes construction or alteration that is the subject of merit in paragraph (b) of this section does not apply and the notice may be sent
a notice under paragraph(a)of this section shall,within 5 days after that construction by telephone, telegraph, or other expeditious means, with an executed FAA Form
or alteration reaches its greate st height,submit a supplemental notice on a prescribed 7460-1 submitted within five (5) days thereafter. Outside normal business hours,
form to the FAA regional other having jurisdiction over the area involved,if— emergency notices by telephone or telegraph may be submitted to the nearest FAA
(1) The construction or alit ration is more than 200 feet above the surface level Flight Service Station.
of its site;or (e) Each person who is required to notify the Administrator by paragraph (b)or(c) c
(2) An FAA regional office advises him that submission of the form is required. of §77.13, or both, shall send an executed copy of FAA Form 7460-2, Notice of
Actual Construction or Alteration,to the Manager,Air Traffic Division,FAA Regional
Office having jurisdiction over the area involved.
ADDRESSES OF THE REGIONAL OFFICES
Western Pacific Region Southern Region Great Lakes Region New England Region
HI,CA,NV,AZ,GU KY,TN,NC,SC,GA,AL, ND,WI,MI,SD,IL,OH,MN,IN MA,NH,VT,RI,CT,ME
Western-Pacific Regional office MS,FL,VI,PR Great Lakes Regional Office New England Regional Office
Air Traffic Division,AWP-!.30 Southern Regional Office Air Traffic Division,AGL-530 Air Traffic Division,ANE-530
15000 Aviation Boulevard Air Traffic Division,ASO-530 2300 Fast Devon Avenue 12 New England Executive Park
Hawthorne,CA 90260 3400 Norman Berry Drive Des Plaines,IL 60018 Burlington,MA 01803
Tel.310-297-1365 East Point,GA 30344 Tel.312-694-7568 Tel.617-273-7143
Mail Address: Tel.404-763-7646 Southwest Region Eastern Region
AWP-530 Mail Address: NM,TX,OK,AR,LA NY,PA,WV,VA,DC,MD,DE,NJ
P.O.Box 92007 Federal Aviation Administration Southwest Regional Office Eastern Re
ional Office
Worldway Postal Center Southern Regional Office Air Traffic Division,ASW-530 Air Traffic Division,AEA-530
Los Angeles,CA 90009 Air Traffic Division,ASO-530 4400 Blue Mound Road JFK International Airport
P.O.Box 20636
Alaskan Region Atlanta GA 30320 Fort Worth,TX 76193 Fitzgerald Federal Building
AK Tel.817-624-5534 Jamaica,NY 11430
Alaskan Regional Office Northwest Mountain Region Mail Address: Tel.718-553-1228
Air Traffic Division,AAL-.)30 WA,OR,MT,ID,WY,UT,CO Department of Transporation Fax:718-553-1384
222 West 7th Avenue Northwest Mountain Regional Office Federal Aviation Administration
Anchorage,AK 99513 Air Traffic Division,ANM-530 Fort Worth,TX 76193-0530
Tel.907-271-5893 1601 Lind Avenue,SW
Central Region
Mailing Address: Renton,WA 98055-4056 NE,IA,MO,KS
Federal Aviation Administration • Tel.206-227-2530 Central Regional Office
Alaskan Regional Office Fax:206-227-1530 Air Traffic Division,ACE-530
Air Traffic Division,AAL•530 601 East 12th Street '
222 West 7th Avenue,Eox 14 Kansas MO 64106
Anchorage,AK 99513-i 587
Tel 816-426-3408
Form 7460-1 (1-93)Supersedes Previous Edition .,,_ ..,.- ,.,.;-- .......,, . . . ,,_:. ;,,;,; .,,
_______________________:::_:_:„ r4 ) , . . , i! . tetif.. ,,,.,i t‘
i . ') '0 f. ."
r-gLV1 r ,, mitt ir --;E:::::11:51-:_::_:::_:::::_::::::::::::::::::::751-:::.:. ‘ .trya mikk—
_ z,___ __.
:_:_:_:_:_x_:_:_:_:_:_:_:_: i....„4 .„0..,_______-__:____:::::..::::_:::::;:::::::_:,4 am' si, ., ‘ . ,
I t Ill 2-::::::::::::::-:------------ 4. Ailliltil
____ k , . w 7 . j
: A ----- _____--- /A.IMF • Z*41 i \ A
4 •j 119
t ‘(' prit/IK ,'i
rr __ r_: r am-"ter • / =_- wi{- i t, Qf
.i iir,tbe F.... ..;, ,• „
. .7 --,
' i __:::::::::::::::::::::-:-:-:-:-:-.
A. 7 ' -
63' .„.,fir.,4-.:-..:::::IKEE:__§.E.:E.T._:.:-:::_s_::::::::1 /I ! . 1 liiiiri
Nre-:-:-:-:--------.:-:.-:-.:-:-:-:-:-:-:-:-.:..-__:_:____ A'------ ------------------------- ------ -Tekei im t., l'A:- ijil ' Ilk
. /,
.-:-:-5-e•-:-:•-:-::::-::-:-.:-:-.:-.:-.:-.:-:-:-:-:.E.:_:_:_.:_:._:.__ .01 . ffatifiga- ii so.
iY i xYxiiii �i � � � •�
Y it * 4r{?►v�i►v_�v� x�v'i '
!l:::--:::::::::24:17 7:1::::_iiii-:-::-xiYlxiYillV •U
__ r.
. _=3�/__--__=__=ti.�; ]]]]-§%���§,�j,{_�-�,[ ]yy]am�J��]„/}J�jjJJ;wr.I�1'I„.-., - _ �r� I ,4 [, , - .orni 4 ,,,.'�..j�'"FAN. .
► _j
__ -_ ____ _! ] ei lrgai7lYlxii_-YXYAiY r __ _ ._ `I � - 1 i
_ : : Ilx_iiSH_<iY 4,-_ , _—I_- VAYJ►l.- �~„tie,
•,Aim
li ,
=_ Nowt
'___ ________- i_r vwv_---z--_------:witiv�__ter_ -_ 1;=• t __ :?f•. .�e
ik
Lvo
\ __�_ _ --r�::::-�_:ti Sri i1-=r ---_ -- --_- �J: ` I1
Q_lac l' r. ���
VIM 1 , In
IgAilk
iir.i.
:j -rr== r_=r_-__=-=: r r =-==_---- =sir:--=-----”.__fattitiNititt-eigek.- \ ni �i
.1� \_':="=r" ___ - �: �� : :_� ram_ r _: \ ' 1 ��` �i...'e� .. As 1 .�j���jelArv...cieffroH4t
a. *
1 fi 1:�:Y-_--_ :3:5.= I•i ' 1 acit,_ � � i
.,_1
Leg/L4i!
'II "P.'. :\-1'..,...
:„.:::::::::::::::::-:-:-:-: k'
Yrt.. '/ 1``e` `Ili7� �\ _ram== =:-L��_ �: ` az
Myg
.. 1�ibi
vilikiiii-1-1-1+-
1�Nill. illitt�•��itplit,,- ---.1 ::
:::::::::::::::::::::::::::::::::::::::::::::::::'::::::!:::::::::1:1 \,, ''' I 71.4:.
y " - fir r11l cr.._--_=_ _ �;ion ,rj,0 _iin Town
^ �-s;n- ',i\. � �► Z�‘ptirri. _v.6 I ii_74-01- P Iffarlau .6--19 IL% . . . jr.7.74 trill� ��' '�t'
r‘:
-. tiprzuh -1 . 1
. _#.,,, k: k'N filmapoluMINSal':..]g /1 1 hr;:i'ti-I'll ,---0, l' [11 Batt. III ;1
, _ .... ) 1 , oalt; la
1 Illit-i...,
, i imp IT=, CEE__ , 1 \ , ;triVZ ic.n1-1 rtiMiliillil zrilt 1 a
ill lir*.Latina "_,4 1 . a . *r.4470;360 igt,.4.era I , I
• I Ar;e4v,
oili
lor r , 1 't,,-41410.,L. PlimikENr.....--pg-
Alt
,. -- _ �■ii � �;; mpii El
ii
l ' �� k.. II .� -•,mil 1
ins �4V-1 . .•.. 0.
., 'Ell Vit?
16)7.--ks•-------......t.:......,....,,....,-.4111111111P__ .Pk. lit_, ..i i cia,Tn..as:IN,0410,:e921..dicroP41. ft 44 MAI ii ail .-. twirl!!!
,,.,,,,,,,,R211/ /nap ...
�� ► _ I 1 lb., -..-4* - Losfr,
'(_; lam: ,1•, 'LTA Sri i
7.. . , n_. . , yr.--ie •
...00.j
- '• -A-voni,,Irix trii191 -•.if.ii p
NIA'• ' . '
. _
_ voilik...i.1E1,111 t_,1 .
41/
4,),,
1111't 232 Is ii[I : i'' ,...---...,actik;..-!rawc.
Alibi MIA Ai:inlet' 4 at_. t • .. ,._ - ,,,:p..z.,‘,
Fl
H EE .1‘ .'--: ..
r,
111-0
i "II Eie g".....r.. Ali* rlitL>.'°•44".1.42/1,11.,
-. 0 1,,,• iril eii 1 0>(&Nm..t9. \..06711/ I
4 ''C- 7.k .1117t‘ailL"1- LA% '-•(44. 4.
\N. .0: i.
: \
•
I..•. dal g
Ir, w cu In
�f -via ,..
.-Le,,Alij t ,..
I ' ' \ - ,>,AI
11,_ Gr
Atli MAIM ;ZS, jilt _. , ,,. _.jw.., title)... . .: .1r i .:?.\,,,i tab_. ,
7..1 I Ilig. '
..ram- - 1 ,, '_. _ .. . g�,.,�
•
CIT". . OF RENTON
Planning/Building/Public Works Department
Jesse Tanner,Mayor Gregg Zimmerman P.E.,Administrator
March 31, 1998
Mr. Paul Crane
The Boeing Company
PO Box 3707, M/S 63-01
Seattle, WA 98124
SUBJECT: Crane Bridge Building
Project No. LUA-98-035,ECF
Dear Mr. Crane:
The Development Planning Section of the City of Renton has determined that the
subject application is complete according to submittal requirements and, therefore, is
accepted for review.
It is tentatively scheduled for consideration by the Environmental Review Committee on
April 21, 1998. Prior to that review, you will be notified if any additional information is
required to continue processing your application.
Please contact me, at (425) 277-5586, if you have any questions.
Sincerely,
#41/1,7
Mark R. P i'e , AICP
Project Manager
Arran TR nor.
200 Mill Avenue South - Renton, Washington 98055
[7�[7 rule„ana.r,n„eatr,c sn i.arvrtarl mcltn 2l �n i.,,,ce rn.,cl.,,or
C. O�
•
1 5Nr p,
NOTICE OF APPLICATION
PLANNING/BUILDING/PUBLIC WORKS
DATE: MARCH 31,1998
A Master Application has been filed and accepted with the Development Services Division of the City of Renton. The
following briefly describes the application and the necessary Public Approvals.
PROJECT NUMBERINAME: LUA-98-035,ECF I CRANE BRIDGE BUILDING
DESCRIPTION: The Boeing Company proposes to construct a 6,600 s0.ft.building that will
house the asembly of replacement crane bridges.Once the crane bridges are installed in the aircraft assembly buildings.
the proposed structure will be removed.
GENERAL LOCATION: 800 Park Avenue North
STUDIES REQUIRED/OR
AVAILABLE:
PUBUC APPROVALS: Environmental Review
Comments on the above application must be submitted in writing to Mark R. Pywell,AICP, Project Manager.
Development Services Division.200 Mill Avenue South.Renton,WA 98055,by 5:00 PM on April 14,1998. If you have
Questions about this proposal,or wish to De made a party of record and receive additional notification by mall,contact
Mr.Pywell at(425)277.5586. Anyone who submits written comments will automatically become a party of record and
will be notified of any decision on this project.
IPLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION
DATE OF APPUCATION: MARCH 19.1998
NOTICE OF COMPLETE APPLICATION: MARCH 31,1998
DATE OF NOTICE OF APPUCATION: MARCH 31,1998
ED;AV
LAKE WASHINGTON %/ v 6UG UrGNISOUN COMPAN;
\..
n'\\ i j\ 1.6. \\ / 0
n g
M-, I w Y
4
y Ai' tikIf _
l'� _ ' Qa ,o-Y •., oa.ul
''*31
i � .
_ eo �,iy. . °rya`IIIH�Y
r--3 '
rr • • —_,
we
a o ..
(....iigivii
ii
D 11'.1* a
;mom -Y/ --_
__
rga
9EN1 ,
¢ MELT e.'-,"-V---IA
CERTIFICATION
•
I, 414k: £�'j�e..//, hereby certify that copies of the above
document were p6sted by me in conspicuous places on or nearby
the described property on /"10,,•cA 7/ lam,
1
Signed:
ATTEST: Subcribed and worn before me, a Nortary Public, in and fo to f 19��
Washington residing in on the , ,,, day of
. ---/4/144.1 .... , 10 0%":".r.
• U3 to.,i3
1 73 y 4
at o c
,4
go NIA&
CITY OF RENTON
DEVELOPMENT SERVICES DIVISION
• MASTER APPLICATION
PROPERTY 'OWNER(S) PROJECT INFORMATION
Note: If there is more than one legal owner,please attach an additional
notarized Master Application for each owner. / PROJECT OR DEVELOPMENT NAME:
NAME: 1 kX VVM ) ) C6D 4.'e au'LU/.4,41 -
PROPERTY/PROJECT ADDRESS(S)/LOCATION:
ADDRESS: 'PO �OtoL 3767 M, 5 . 63 -Of ec,c7 � � .l..V� ,tJ•
i t 45sc r►ey._V ('GAv(.'7
KING COUNTY ASSESSOR'S ACCOUNT NUMBER(S):
CITY: i<je-A,-TTL,- ZIP: q4( Z 4
o7z305 — 'ro° I
TELEPHONE NUMBER: .4 2 S-qb 5^J(70 EXISTING LAND USE(S):
A QCL 7— pss 5L-r
APPLICANT (if other than owner)
PROPOSED LAND USES:
NAME: )0,06T- • c. mre__
COMPANY (if applicable): EXISTING COMPREHENSIVE PLAN MAP DESIGNATION:
Ipoven►m— -MP Lc,y/4e -T
ADDRESS: PROPOSED COMPREHENSIVE PLAN MAP DESIGNATION (if applicable):
CITY: ZIP: EXISTING ZONING:
1 — H
TELEPHONE NUMBER:
PROPOSED ZONING (if applicable):
CONTACT PERSON _ 44 .
PMENT p
SITE AREA (S ' . OR ACREAGq_IT' )FREN ONNIIN►G
NAME: pA>t.- �. G IJ� *� 40I II/QR
* R 9 1998
'RODE
COMPANY (if applicable): 71 $QF�/ COMP- r CE�V�D
„ 51 oop
/
ADDRESS: PC, . X 3707 h-t•5• 63-0 / IS THE SITE LOCATED IN THE AQUIFER PROTECTION AREA?
CITY: 56°k@`7LC ZIP: I-B f 4,4
IS THE SITE LOCATED IN ANY OTHER TYPE OF ENVIRONMENTALLY
SENSITIVE AREA?
TELEPHONE NUMBER: 4Z5— 965 —//70
•
iip
LEGAL DESCRI ON OF PROPERTY (Attach 'sepa , :sheet if; necessary) -
5E `
TYPE OF APPLICATION & FEES "
Check all application types that apply--City staff will determine fees.
— ANNEXATION $ SUBDIVISION:
_ COMP. PLAN AMENDMENT $
— REZONE $ _ LOT LINE ADJUSTMENT $
— SPECIAL PERMIT $ _ SHORT PLAT $
_TEMPORARY PERMIT $ _ TENTATIVE PLAT $
— CONDITIONAL USE PERMIT $ _ PRELIMINARY PLAT $
_ SITE PLAN APPROVAL $ _ FINAL PLAT $
_ GRADE & FILL PERMIT $
(NO. CU. YDS: 1 PLANNED UNIT DEVELOPMENT: S
_ VARIANCE $
(FROM SECTION: ) _ PRELIMINARY
_ WAIVER $ _ FINAL
_ WETLAND PERMIT $
ROUTINE VEGETATION MOBILE HOME PARKS: $
MANAGEMENT PERMIT $
_ BINDING SITE PLAN $
SHORELINE REVIEWS:
_ SUBSTANTIAL DEVELOPMENT $
_ CONDITIONAL USE $ •
_ VARIANCE $
EXEMPTION $No Charge ,, ENVIRONMENTAL REVIEW $ /�OO . '
REVISION $ ///
AFFIDAVIT OFI OWNERSHIP
I, (Print Name) P,e�(_ $, i!/_. declare that I am (please check one) roperry Invutved In r t appth.ativ",1 the
authorized representative to act for the property owner(please attach proof of authorization), and that the foregoing statements and answers herein
contained and the information herewith submitted are VAW d ; e and correct to the best of my knowledge and belief. ,
w , TEST: Subscribed and sworn to before me, a Notary Public, in and
L c�/y�.r��( r • the State of �,q residing at
ame o e tative) r u14 on the // day of
/ . , 199�
j ? V
(Sign toe o ner epresenta 1,- eV
`'-'-14, „ ,.,,-S. (Si nature of Notary Pub c)
•�
(This se o to be completed by City Staff.)
City File Number: 4e-•O CF SA R SHPL CU LLA PP FP TP SP RVMP V
AAD W FPUD ; M SME MHP BSP A CPA
TOTAL FEES: $ J — ,— TOTAL POSTAGE PROVIDED: $ 15
MASTERAP.DOC REVISED 9/96
CITY OF RENTON
DEVELOPMENT SERVICES DIVISION
LIST OF SURROUNDING PROPERTY OWNERS
within 300 feet of the subject site
PROJECT NAME:
APPLICA- ION NO:
The following is a list of property owners within 300 feet of the subject site. The Development
Services Division will notify these individuals of the proposed development.
NAME ADDRESS ASSESSOR'S PARCEL
NUMBER
A-u fsft r tom-( o c,1} s car , 36b. Ear o -
tgefi2 f/u3ex-r- (s r� ,vc eQ,rP y
40:44e
*J
(Attach additional sheets, if necessary)
(Continued)
NAME ADDRESS ASSESSOR'S PARCEL
NUMBER
Applicant Certification
I Pe5UC— , hereby certify that the above list(s) of adjacent property
(Print Name)
owners and their addresses were obtained from: w�
• r
ip
❑ City of Renton Technical Services Records
❑ Title Company Records ��
/ • g County Assessors Records MomTati! $
tI�
Signed r ti / Date 3 /(/7 v •
oto1w
(Applicant)
NOTARY
ATTESTED: Subscribed and sworn before me, a Notary Public, in and for the State of Washington,
residing at on the i( A`'day of '.ids.— , 19 9k.
Signed A.
(Notary Public)
****For City of Renton Use
CERTIFICATION OF MAILING
I, , hereby certify that notices of the proposed application were mailed to
(City Employee)
each listed property owner on
Signed Date:
NOTARY
ATTEST: Subscribed and sworn before me, a Notary Public, in and for the State of Washington
residing at on the day of 19
Signed
listprop.doc
REV 07/95
2
City of Renton
ENVIRONMENTAL CHECKLIST
A. BACKGROUND
1. Name of proposed project, if applicable:
Crane Bridge Building
2. Name of applicant:
BOEING COMMERCIAL AIRPLANE GROUP
3. Address and phone number of applicant and contact person:
Paul Crane Senior Environmental Planner
Boeing Commercial Airplanes
PO Box 3707, MS 63-01
Seattle, Washington 98124-2207
425-965-1170
C/71,
opMENT P
Date Checklist prepared: oFRFN 0NN"NG
MqR 1 3/11/98 .9 1998
RF c
5. Agency requesting checklist: CE/V&*
City of Renton Planning Department
6 Proposed timing or schedule (including phasing, if applicable):
N/A
7 Do you have any plans for future additions, expansions, or further activity
ri,Iated to or connected with this proposal? If yes, explain.
N o.
3. List any environmental information you know about that has been
F repared, or will be prepared, directly related to this proposal.
Hone.
9. Do you know whether applications are pending for governmental approvals
of ocher proposals directly affecting the property covered by your proposal? If
yes, explain.
No.
10. List any governmental approvals or permits that will be needed for your
pro aosal, if known.
Rer ton Building , Electrical and Utility permit
Rer ton Environmental Review
11. Give brief, complete description of your proposal, including the proposed
USE s and the size of the project and site. There are several questions later in this
chE cklist that ask you to describe certain aspects of your proposal. You do not
necd to repeat those answers on this page.
The Boeing Company proposes to construct a 6,600 square foot building that will house
the assembly of replacement crane bridges, from the elements. The crane bridges are a
critical element in the assembly of commercial jet aircraft. Upon the completion of the
project of assembling the replacement crane bridges, the building will be dis-assembled
and sold as a surplus building.
12 Location of the proposal. Give sufficient information for a person to
understand the precise location of your proposed project, including a street
address, if any, and section, township, and range if known. If a proposal would
occur over a range of area, provide the range or boundaries of the site(s).
Pr3vide a legal description, site plan, vicinity map, and topography map, if
re isonably available. While you should submit any plans required by the agency,
yc u are not required to duplicate maps or detailed plans submitted with any
permit applications related to this checklist.
The proposed project is located in the center of our industrial plant. Please see the
attached site and neighborhood maps.
j'.
B ENVIRONMENTAL ELEMENTS
1. EARTH
a. General description of the site (circle one): flat, rolling, hilly, steep
slopes, mountainous, other
Flat.
b. What is the steepest slope on the site (approximate percent slope)? r
2%
c. What general types of soils are found on the site (for example,
c lay,sand, gravel, peat, muck)? If you know the classification of agricultural soils,
pecify them and note any prime farmland.
Sandy silt loam
d. Are there surface indications or history of unstable soils in the
imrr ediate vicinity? If so, describe.
There are no surface indications or history of unstable soils in the
imn ediate vicinity.
e. Describe the purpose, type, and approximate quantities of any filling or
gra cling proposed. Indicate source of fill.
No grading will occur. No foundation will be poured, only footings.
f. Could erosion occur as a result of clearing, construction, or use? If so,
generally describe.
No, erosion could not occur. Since the site is fully developed, there will
not be an increase in runoff.
g. About what percent of the site will be covered with impervious surfaces
aft3r project construction (for example, asphalt or buildings)?
Th: site will remain 100% impervious.
h. Proposed measures to reduce or control erosion, or other impacts to
this earth, if any:
No measures are proposed.
2. AIR
a. What types of emissions to the air would result from the proposal (i.e.,
dust, automobile, automobile, odors, industrial wood smoke) during construction
and when the project is completed? If any, generally describe and give
approximate quantities if known.
Minimal during construction.
b. Are there any off-site sources of emission?
No.
c. Proposed measures to reduce or control emissions or other impacts to
a r, if any:
No measures are proposed.
3. WATER
a. Surface:
1) Is there any surface water body on or in the immediate vicinity of
the site (including year-round and seasonal streams, saltwater, lakes, ponds,
wetlands)? If yes, describe type and provide names. If appropriate, state what
tream or river it flows into.
The Cedar River is in the vicinity.
2) Will the project require any work over, in, or adjacent to (within
200 feet) the described waters? If yes, please describe and attach available plans.
No.
3) Estimate the amount of fill and dredge material that would be
placed in or removed from surface water or wetlands and indicate the area of the
site that would be affected. Indicate the source of fill material.
N/A
4) Will the proposal require surface water withdrawals or
div mrsions? Give general description, purpose, and approximate quantities if
known.
No
5) Does the proposal lie within a 100-year floodplain? If so, note
location on the site plan.
No.
6) Does the proposal involve any discharges of waste materials to
surface waters? If so, describe the type of waste and anticipated volume of
di::charge.
Nc .
b. Ground:
1) Will ground water be withdrawn, or will water be discharged to
ground water? Give general description, purpose, and approximate quantities if
known.
N ).
2) Describe waste material that will be discharged into the ground
from septic tanks or other sources, if any (for example: Domestic sewage;
it dustrial, containing the following chemicals . . .; agricultural; etc.). Describe the
general size of the system, the number of such systems, the number of houses to
be served (if applicable), or the number of animals or humans the system(s) are
expected to serve.
N/A
c. Water Runoff (including storm water):
1) Describe the source of runoff (including storm water) and
method of collection and disposal, if any (include quantities, if known). Where
will this water flow? Will this water flow into other waters? If so, describe.
The roof drains will flow into existing catch basins. The existing site is impervious so
there will not be an increase in run off.
2) Could waste materials enter ground or surface waters? If so,
generally describe.
No.,
d. Proposed measures to reduce or control surface, ground, and runoff
impacts, if any:
Norge needed.
4. PLANTS
a. Check or circle types of vegetation found on the site:
deciduous tree: alder, maple, aspen, other: street trees
evergreen tree: fir, cedar, pine, other: street trees
Shrubs
grass
crop or grain
Wet soil plants: cattail, buttercup, bullrush, skunk cabbage,
other
water plants: water lily, eel grass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed or altered?
N/A
c. List threatened or endangered species known to be on or near the site.
There are no threatened or endangered species known to be on or near
th : site.
d. Proposed landscaping, use of native plants, or other measures to
pi eserve or enhance vegetation on the site, if any:
No measures are proposed.
5 ANIMALS
a. Circle any birds and animals which have been observed on or near the
s to or are known to be on or near the site:
Birds: Hawks, heron, eagle, songbirds, other
Mammals: Deer, bear, elk, beaver, other
Fish: bass, salmon, trout, herring, shellfish, other
b. List any threatened or endangered species known to be on or near the
ite.
There are no threatened or endangered species known to be on or near
tie site.
c. Is the site part of a migration route? If so, explain.
The site is not part of a migration route.
d. Proposed measures to preserve or enhance wildlife, if any:
No measures are proposed.
6. ENERGY AND NATURAL RESOURCES
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will
be used to meet the completed project's energy needs? Describe whether it will
be lased for heating, manufacturing, etc.
Ele:tricity.
b. Would your project affect the potential use of solar energy by adjacent
prc perties? If so, generally describe.
No
c. What kinds of energy conservation features are included in the plans of
this proposal? List other proposed measures to reduce or control energy
impacts, if any:
N/A
7. ENVIRONMENTAL HEALTH
a. Are there any environmental health hazards, including exposure to toxic
cf•emicals, risk of fire and explosion, spill, or hazardous waste, that could occur
a: a result of this proposal? If so, describe.
No, the proposal will not create any environmental health hazards.
1) Describe special emergency services that might be required.
None will be required.
2) Proposed measures to reduce or control environmental health
hazards, if any:
None will be required.
b. Noise
1) What types of noise exist in the area which may affect your
project (for example: traffic, equipment, operation, other)?
None will affect the project.
2) What types and levels of noise would be created by or
associated with the project on a short-term or a long-term basis (for example:
traffic, construction, operation, other)? Indicate what hours noise would come
from the site.
Some increase in noise during construction.
3) Proposed measures to reduce or control noise impacts, if any:
None will be required.
8. LAND AND SHORELINE USE
a. What is the current use of the site and adjacent properties?
Commercial Jet Aircraft assembly.
b. Has the site been used for agriculture? If so, describe.
The site has not been used for agriculture.
c. Describe any structures on the site.
None at this time. Assembly buildings are adjacent.
d. Will any structures be demolished? If so, what?
No.
e. What is the current zoning classification of the site?
I-H Heavy Industrial
f. What is the current comprehensive plan designation of the site?
Industrial - Employment
g. If applicable, what is the current shoreline master program designation
of the site?
N/A
h. Has any part of the site been classified as an "environmentally
sensitive" area? If so, specify.
No.
i. Approximately how many people would reside or work in the completed
project?
N/A
j. Approximately how many people would the completed project displace?
No one would be displaced as a result of this project.
k. Proposed measures to avoid or reduce displacement impacts, if any:
N/A
I. Proposed measures to ensure the proposal is compatible with existing
anc projected land uses and plans, if any:
Thi:; proposed buildings use support the assembly of Commercial Jet Aircraft.
9. HOUSING
a. Approximately how many units would be provided, if any? Indicate
whether high, middle, or low-income housing.
N/A
b. Approximately how many units, if any, would be eliminated? Indicate
wh ether high, middle, or low-income housing.
N/A
c. Proposed measures to reduce or control housing impacts, if any:
N/A
1(. AESTHETICS
a. What is the tallest height of any proposed structure(s), not including
antennas; what is the principal exterior building material(s) proposed?
25 feet
b. What views in the immediate vicinity would be altered or obstructed?
No views will be altered.
c. Proposed measures to reduce or control aesthetic impacts, if any:
No measures are proposed.
11. LIGHT AND GLARE
a. What type of light or glare will the proposal produce? What time of day
would it mainly occur?
Non:.
b. Could light or glare from the finished project be a safety hazard or
interfere with views?
No.
c. What existing off-site sources of light or glare may affect your
proposal?
None.
d. Proposed measures to reduce or control light and glare impacts, if any:
No measures are proposed.
12. RECREATION
a. What designated and informal recreational opportunities are in the
im nediate vicinity?
N/A
b. Would the proposed project displace any existing recreational uses? If
sc, describe.
No.
c. Proposed measures to reduce or control impacts on recreation,
including recreation opportunities to be provided by the project or applicant, if
any:
None will be required.
1 3. HISTORIC AND CULTURAL PRESERVATION
a. Are there any places or objects listed on, or proposed for, national,
s:ate, or local preservation registers known to be on or next to the site? If so,
generally describe.
There are no places or objects listed on, or proposed for national, state or
local preservation registers known to be on the site.
b. Generally describe any landmarks or evidence of historic,
rchaeological, scientific, or cultural importance known to be on or next to the
ite.
There are no landmarks or evidence of historic, archaeological, scientific,
or cultural importance known to be on or next to the site.
c. Proposed measures to reduce or control impacts, if any:
In the event that any landmarks or evidence of historic, archaeological,
sciE ntific, or cultural importance are discovered, construction will be stopped and the
Stae Historical Preservation officer will be consulted.
14. TRANSPORTATION
a. Identify public streets and highways serving the site, and describe
prc posed access to the existing street system. Show on site plans, if any:
N//,
b. Is site currently served by public transit? If not, what is the
ap)roximate distance to the nearest transit stop?
No.
c. How many parking spaces would the completed project have? How
many would the project eliminate?
N/A
d. Will the proposal require any new roads or streets, or improvements to
existing roads or streets, not including driveways? If so generally describe
(ir dicate whether public or private).
No.
e. Will the project use (or occur in the immediate vicinity of) water, rail, or
air transportation? If so, generally describe.
The project does not use or occur in the immediate vicinity of water, rail
o air transportation.
f. How many vehicular trips per day would be generated by the completed
project? If known, indicate when peak volumes would occur.
N/A
g. Proposed measures to reduce or control transportation impacts, if any:
N/A
15. PUBLIC SERVICES
a. Would the project result in an increased need for public services (for
example: fire protection, police protection, health care, schools, other)? If so,
gen 3rally describe.
There will not be an increased need for public services.
b. Proposed measures to reduce or control direct impacts on public
sere"ices, if any.
N/A
16. UTILITIES
a. Circle utilities currently available at the site: electricity, natural gas,
wa'er, refuse service, telephone, sanitary sewer, septic system, other
b. Describe the utilities that are proposed for the project, the utility
prc viding the service, and the general construction activities on the site or in the
immediate vicinity which might be needed.
N/A
C. SIGNATURE
I, the undersigned, state that to the best of my knowledge the above
inlormation is true and complete. It is understood that the lead agency may
withdraw any declaration of non-significance that it might issue in reliance upon
th s checklist should there by any willful misrepresentation or willful lack of full
disclosure on my part.
PROP T : (qe
Date: 3/1
P I Crane, Boeing Commercial Airplane Group
PROJECT DESCRIPTION
The Boeing Company proposes to construct a metal clad, 6,600 s.f. building
that will be used for the assembly of crane bridge replacements. The
building must be located close to the assembly buildings to allow barrier
free access for completed crane bridge replacements. Crane bridges are used
to fly wings, rudders etc. over the assembly floor, to their destinations. The
building will sit on the existing asphalt with concrete footings to be poured
to support the building posts. The building will have minimal lighting and
plant air. The building will have 30 openings at each end with no doors, no
sprinklers and no heat. The color of the proposed building will match the
existing Boeing buildings. Upon the completion of the crane bridge project
Boeing will dis-assemble the building and sell it through our surplus sales.
BOEING COMMERCIAL AIRPLANE COMPANY
A DIVISION OF THE BOEING COMPANY
RENTON PLANT FACILITY
Tract Description Of
PARCEL I-80
City of Renton
King County, Washington
Containing 204.17 Acres
Or
8,893,560 Square Feet
Description Prepared By:
Horton Dennis & Associates, Inc.
.‘ May, 1980
DESCRIPTION
OF THE
BOEING COMMERCIAL AIRPLANE COMPANY
RENTON PLANT FACILITY
PARCEL I-80
CITY OF RENTON, KING COUNTY, WASHINGTON
the following described tract of land is the resultant consolidation of
F.ecord Title vested in the Boeing Company, a Delaware Corporation and
Puget Sound Power & Light Company, a Massachusetts Corporation, covered
the Pioneer National Title Insurance Company, Limited Liability
Reports Number A-253801 , A-253802, A-253803, A-253804, Unit 13, dated
January 11 , through January. 21 , 1980.
iLL BEARINGS ARE REFERENCED TO THE GRID MERIDIAN OF THE WASHINGTON
:OORDINATE SYSTEM, NORTH ZONE.THAT PORTION OF GOVERNMENT LOTS 1 AND 3 IN SECTION 7; AND OF
GOVERNMENT LOTS 1 , 2 AND 3 AND THE NORTHWEST QUARTER OF THE SOUTHWEST
QUARTER OF SECTION 8, TOWNSHIP 23 NORTH, RANGE 5 EAST, WILLAMETTE
MERIDIAN, IN THE CITY OF RENTON, KING COUNTY, WASHINGTON; AND OF C.N.
ADSIT'S LAKE WASHINGTON PLAT AS RECORDED IN VOLUME 8 OF PLATS, PAGE
79, RECORDS OF KING COUNTY, WASHINGTON; AND OF BLOCK C, THIRD
SUPPLEMENTAL MAP OF LAKE WASHINGTON SHORE LANDS, AS RECORDED UNDER
KING COUNTY AUDITOR'S FILE NUMBER 5927582; AND OF CERTAIN SHORE LANDS
OF LAKE WASHINGTON SHOWN ON SHEETS 3 AND 4 OF THE MAP PREPARED BY UDO
HESSE UNDER KING COUNTY SUPERIOR COURT CAUSE NUMBER 156371 ; AND OF
VACATED LAKE WASHINGTON BOULEVARD (FORMERLY PARK STREET) ; AND OF THE
ABANDONED BURLINGTON NORTHERN INC. RAILWAY (FORMERLY NORTHERN PACIFIC
RAILWAY) RIGHT-OF-WAY, ALL MORE PARTICULARLY DESCRIBED AS FOLLOWS:
BEGINNING AT THE INTERSECTION OF THE NORTH MARGIN OF SIXTH AVENUE
NORTH AND THE EASTERLY RIGHT-OF-WAY LINE OF COMMERCIAL WATERWAY
DISTRICT NO.2 IN GOVERNMENT LOT 2 OF SAID SECTION 7; THENCE WITH
SAID EASTERLY RIGHT-OF-WAY LINE NORTH 12°47'42" WEST 193.18 FEET;
NORTH 00°22 '54" EAST 454.50 FEET; NORTH 12°47 '42" WEST 2394.32
FEET TO THE SOUTHWEST CORNER OF BLOCK C, SAID THIRD SUPPLEMENTAL
MAP OF LAKE WASHINGTON SHORE LANDS; THENCE WITH THE BOUNDARIES OF
SAID BLOCK C, NORTH 12°47 '42" WEST 264.08 FEET TO THE NORTHWEST
CORNER THEREOF; THENCE CONTINUING WITH THE BOUNDARIES OF SAID
BLOCK C, NORTH 84°25'26" EAST 1299.96 FEET TO THE NORTHEAST CORNER
THEREOF, BEING ON THE INNER HARBOR LINE OF LAKE WASHINGTON SHORE
LANDS IN SAID SECTION 7 ; THENCE WITH SAID INNER HARBOR LINE NORTH
46°52'27" EAST 977.56 FEET;
�/ -1-
PARCEL I-80 (Continued)
THENCE WITHIN SAID SHORE LANDS SOUTH 43°06'56" EAST 932.91 FEET;
SOUTH 46°53 '04" WEST 220.00 FEET; SOUTH 31°37'32" EAST 448.37
FEET TO THE NORTHWESTERLY MARGIN OF SAID BURLINGTON NORTHERN,
INC. RIGHT-OF-WAY IN GOVERNMENT LOT 2 OF SAID SECTION 8; THENCE
WITH SAID RIGHT-OF-WAY SOUTH 50°41 '48" WEST 248.33 FEET TO THE
POINT OF CURVATURE OF A CURVE TO THE LEFT OF RADIUS 12,769.67
FEET; THENCE SOUTHWESTERLY WITH SAID CURVE (THROUGH A CENTRAL
ANGLE OF 0°10'00") 37.15 FEET TO THE POINT' OF COMPOUND CURVATURE
WITH'A CURVE TO THE LEFT OF RADIUS 6409.84 FEET; THENCE SOVTH-
WESTERLY ALONG SAID COMPOUND CURVE (THROUGH A CENTRAL ANGLE OF
0°20'00") 37.29 FEET TO THE POINT OF COMPOUND CURVATURE WITH A
CURVE TO THE LEFT OF RADIUS 4289.90 FEET; THENCE SOUTHWESTERLY
ALONG SAID COMPOUND CURVE (THROUGH A CENTRAL ANGLE OF 0°30'00")
37.44 MEET TO THE POINT OF COMPOUND CURVATURE WITH A CURVE TO
THE LEFT OF RADIUS 3229.93 FEET;
THENCE SOUTHWESTERLY ALONG SAID COMPOUND CURVE (THROUGH A CENTRAL
ANGLE OF 0°40'00") 37.58 FEET TO THE POINT OF COMPOUND CURVATURE
WITH A CURVE TO THE LEFT OF RADIUS 2593.96 FEET; THENCE SOUTH-
WESTERLY ALONG SAID COMPOUND CURVE (THROUGH A CENTRAL ANGLE OF
0°50'00") 37.73 FEET TO THE POINT OF COMPOUND CURVATURE WITH A
CURVE TO THE LEFT OF RADIUS 2169.97 FEET; THENCE SOUTHWESTERLY
ALONG SAID COMPOUND CURVE (THROUGH A CENTRAL ANGLE OF O1 °00'00")
37.87 FEET TO THE POINT OF COMPOUND CURVATURE WITH A CURVE TO
THE LEFT OF RADIUS 1867.13 FEET; THENCE SOUTHWESTERLY ALONG SAID
COMPOUND CURVE (THROUGH A CENTRAL ANGLE OF 01 °10'00") 38.02 FEET
TO THE POINT OF COMPOUND CURVATURE WITH A CURVE TO THE LEFT OF
RADIUS 1639.99 FEET;
THENCE SOUTHWESTERLY ALONG SAID COMPOUND CURVE (THROUGH A CENTRAL
ANGLE OF 01 °20'00") 38.16 FEET TO THE POINT OF COMPOUND CURVATURE
WITH A CURVE TO THE LEFT OF RADIUS 1482.69 FEET; THENCE SOUTH-
WESTERLY ALONG SAID COMPOUND CURVE 140.74 FEET TO A POINT ON
SAID NORTHWESTERLY MARGIN FROM WHENCE THE CENTER OF SAID CURVE
BEARS SOUTH 50°44 '31 " EAST; THENCE WITHIN SAID RIGHT-OF-WAY
NORTH 53°32 '36" EAST 854.31 FEET; NORTH 49°53'02" EAST 606.40
FEET; SOUTH 44°22 '57" EAST 25.00 FEET TO A POINT ON THE SOUTH-
EASTERLY MARGIN OF SAID RAILWAY RIGHT-OF-WAY, SAID POINT BEING
SOUTHEASTERLY AND RADIAL FROM THE MAIN TRACK CENTERLINE SURVEY
STATION 1068+00, SAID POINT BEING ON A CURVE TO THE RIGHT FROM
WHENCE THE CENTER BEARS NORTH 44°22'57" WEST 1639.99 FEET;
THENCE SOUTHWESTERLY ALONG SAID RIGHT-OF-WAY WITH SAID CURVE
(THROUGH A CENTRAL ANGLE OF 00°24'45") 11 .81 FEET TO THE POINT
OF COMPOUND CURVATURE WITH A CURVE TO THE RIGHT OF RADIUS 1867.13
FEET; THENCE SOUTHWESTERLY ALONG SAID COMPOUND CURVE (THROUGH A
CENTRAL ANGLE OF 00°40'33") 22.02 FEET TO A POINT FROM WHENCE
THE CENTER OF SAID CURVE BEARS NORTH 43°17'39" WEST, SAID POINT
BEING ON THE SOUTHWESTERLY RIGHT-OF-WAY OF PRIMARY STATE HIGHWAY
NO.1 (SR 405) NORTH RENTON INTERCHANGE;
-2-
A
PARCEL I-80 (Continued)
CONTAINING 204.17 ACRES, OR 8,893,560 SQUARE FEET, MORE OR LESS.
REFERENCE IS HEREBY MADE TO OWNERSHIP MAPS, RENTON PLANT FACILITIES,
1980 PROPERTY CONSOLIDATION, SHEETS 1 , 2, 3, 4, 5 AND 6 OF 6 SHEETS.
-4-
,
• HOEING COMMERCIAL AIRPLANE )MPANY
A DIVISION OF THE BOEING COMPANY
RENTON PLANT FACILITY
. - PARCEL 1- 80
8,893,560 SQUARE FEET
• 204.17 ACRES .
Poi 600 300 0 600 120C 11100
awl own Iwo
S C A LE IN FEET
• CITY OF RENTON• ,I
KING COUNTY, WASHINGTON
WILLAMETTE MERIDIAN
•
T23N • R5E
.• 6
S
--- ' ••
FOR EXCEPTION
�0+ j SEE EXHIBIT DRAWING
G BY KO.$A. DATED 10 e0 :)-
use'. r••P •
I
AKf • INN 1 S 7 0
d�.*
'��•.�„�''- MOR TN RCMTOM
. INTE.CMAN6E
I- 80
27 2 I
I•
z9
II
16 / 301
IB < <
S� �
.•� HE
BURtIMGTON NORTHERN ,
I \ / / OAOGHT0fWA. I
< i 4
•
o
Sw4 Nw ,[EC e
t j/ ...' / 0 r
a
a '
1 ■
s
V •
0
0
r. • i
I
a •� o
\ ..•
0 31"
a /
•
• w
..+ NW4,S■+, SEC.e •
Tem. eTN fTR[[T
\.. ... ... •
I\ .
33 32
2
S3d
1314........;;•••• %
1
V .‘; 2 oir I M
•
42� 37 _
1 I36
i 1 ELF-117n .
DEVELOPMENT SERVICES DIVISIO
WAIVER OF SUBMITTAL REQUIREMENTS FOR LAND USE
APPLICATIONS
LAND USE PERMIT SUBMITTAL WAIVED MODIFIED COMMENTS:
REQUIREMENTS: BY: BY:
Calculations, Survey,
• Drainage Control Plan 2 )23 31 ,i( / lu>s h.IGv-.1 Nt:T
Drainage Report 2 3
tnn v J tavS
Elevations, Architectural 3 ANo 4
Elevations, Grading 2
Existing Covenants (Recorded Copy)4_
Existing Easements (Recorded Copy) 4
Flood Plain Map, if applicable 4
Floor Plans 3AND4
Geotechnical Report2AND3 �,`3
Grading Plan, Conceptual 2
Grading Plan, Detailed 2
King County Assessor's Map Indicating Site 4
Landscaping Plan, Conceptual4 tiVrPsi
Legal Description 4
List of Surrounding Property Owners 4
Mailing Labels for Property Owners 4 iv
Map of Existing Site Conditions 4
Master Application Form 4
Monument Cards (one per monument) ,
Parking, Lot Coverage & Landscaping
Analysis 4
Plan Reductions (PMTs) 4
Postage 4
Public Works Approval Letter
Title Report or Plat Certificate 4
Topography Map (5' contours)3
Traffic Study 2
Tree CuttingNegetation Clearing Plan 4 L
Utilities Plan, Generalized 2 , !3 CoKeusae, ,
Wetlands Delineation Map4 U
Wetlands Planting Plan 4 ' I/4-
Wetlands Study 4 Ottl v
This requirement may be waived by: %f' ti6� aG• �1 •
1. Property Services Section PROJECT NAME: 1, 0 'US
2. Public Works Plan Review Section
3. Building Section DATE: 130//e
4. Development Planning Section
h:\division.s'develop.ser\dev.plan.ing\waiver.xls
:: OX-03.� �e'�/ate
CITY O . RENTON
INVOICE
DATE ACCOUNT INVOICE CUSTOMER REF PAYMENT DUE FOR INFORMATION CALL
03/31/98 r10-0004 006692 05/05/98 Dev Svcs- (425) 277-5562
THE BOEING CO CAG ''or y 00pp
ATTN:N Paul
3707 Crane O�'Jr "for�
POatipn
M/S 63-01
SEATTLE, WA 98124
DESCRIPTION AMOUNT
Environmextal Review 1, 000.00
Total amount due: 1, 000.00
FORM3127 10/9''
PLEASE REFERENCE INVOICE NUMBER WITH PAYMENT
Finance Department • 200 Mill Ave. S. • Renton, Washington 98055