Loading...
HomeMy WebLinkAboutD_Solera_Minor_Mod_LUA20000305_210818DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Project Location Map D_Solera_Minor_Mod_LUA20000305_210818 A. ADMINISTRATIVE MODIFICATION REPORT & DECISION Decision: APPROVED APPROVED SUBJECT TO CONDITIONS DENIED Report Date: August 19, 2021 Project File/Name: PR18-000333 Solera Master Plan Land Use File Number: LUA20-000305, MOD Project Manager: Matt Herrera, Current Planning Manager Owner/Applicant/Contact: Tom Neubauer, Solera Manager LLC, 10900 NE 8th Street, Suite 120, Bellevue, WA, 98004 Mark Gropper, Renton Housing Authority, 2900 NE 10th St, Renton, WA 98056 Project Location: 2805, 2822, 2834 Sunset Ln NE; 2950, 2902, 2806 NE Sunset Blvd; 1171 Kirkland Ave NE; 975 NE 12th St Project Summary: The applicant is requesting a Minor Modification to the previously approved Master Site Plan that would include increases to dwelling units, parking spaces, and lobby/amenity space with a decrease in commercial area. The applicant also proposes to provide the project’s affordable housing component in Block A and the market rate housing all contained in Block B. Finally, the applicant proposes to modify the phasing schedule and move Block B and the master site plans infrastructure improvements to Phase 1 and Block A would then become Phase 2. Site Area: 10.8 acres DocuSign Envelope ID: 947FF1D0-D56C-468C-A2A2-D207ACEC2E2F City of Renton Department of Community & Economic Development PR18-000333 Solera Master Plan Administrative Modification Report & Decision LUA20-000305, MOD Report of August 19, 2021 Page 2 of 8 D_Solera_Minor_Mod_LUA20000305_210818 B. EXHIBITS: Exhibits 1-56 As provided in the Staff Report to the Hearing Examiner Exhibit 57: Hearing Examiner’s Decision Exhibit 58: Minor Modification Decision Exhibit 59: Modification Request Exhibit 60: Updated Architectural Plans C. PROJECT DESCRIPTION/BACKGROUND The Solera Master Site Plan was initially approved (LUA18-000490) on January 30, 2019 with a previous primary project applicant. The new ownership group, Solera Manager LLC, proposed changes to the approved master plan that required a major modification as it increased the number of units within the mixed-use buildings to 555 dwellings, which also included 277 affordable units, and decreased to the fee simple townhome count to 96 units. The major modification also increased the vehicle parking to a total of 1,024 off-street spaces, altered the on-street parking along NE Sunset Blvd to a diagonal orientation, and increased the width of the Sunset Lane NE/Jefferson Ave NE and NE 11th St.to 59-feet to accommodate parking on both sides of the street (Exhibits 1- 56). The City’s Hearing Examiner issued approval of the major modification to the master site plan and site plan review approval to Blocks A and B on March 14, 2021 (Exhibit 57). On May 25, 2021 the applicant submitted a request to modify the major modification and site plan review approvals issued on March 14, 2021. As provided in the modifications and justifications report (Exhibit 59) and updated architectural plans (Exhibit 60), the applicant has requested to increase the units within Blocks A and B to a total of 590 units. Additionally, the major modification proposed to provide a mix of affordable and market rate units within both Blocks A and B however due financing constraints, the applicant has proposed to provide the affordable units within Block A (275 units) and the market rate units within Block B (315 units). Phasing of the master site plan would also change as the applicant has proposed to construct the market rate Block B and site infrastructure as Phase 1 with Block A moving to Phase 2. No changes to Phase 3 were proposed. To accommodate the additional multifamily units within Blocks A and B, the applicant has proposed to increase off-street parking to total 1,088 spaces. Block A would provide 406 spaces with an additional level of subgrade parking and Block B would provide 490. No changes to Blocks C and D and their allotted 192 spaces are proposed. Exterior architectural modifications proposed by the applicant include an additional floor on Block A along the Sunset Lane NE/Jefferson Ave NE frontage and a step down on the ground floor brick façade on Block B along NE Sunset Blvd. Additionally the applicant proposes changes to the Blocks roof profiles, modulations, color palette, and fenestration. D. FINDINGS OF FACT (FOF): 1. The City’s Department of Community and Economic Development accepted the above master application for review and determined it complete on May 25, 2021. Following project acceptence, the applicant indicated additional refinements were needed to the application resulting in the modification being placed on-hold until documents were resubmitted on July 22, 2021. The project complies with the 120- day review period. 2. The applicant’s submittal materials comply with the requirements necessary to process the modification request (Exhibit 59 and 60) DocuSign Envelope ID: 947FF1D0-D56C-468C-A2A2-D207ACEC2E2F City of Renton Department of Community & Economic Development PR18-000333 Solera Master Plan Administrative Modification Report & Decision LUA20-000305, MOD Report of August 19, 2021 Page 3 of 8 D_Solera_Minor_Mod_LUA20000305_210818 3. The project site is located 2805, 2822, 2834 Sunset Ln NE; 2950, 2902, 2806 NE Sunset Blvd; 1171 Kirkland Ave NE; 975 NE 12th St. 4. The project site was the site of the former Greater Hi-Lands Shopping Center that was recently demolished. The master site also includes the Renton Housing Authority “Piha Master Plan Site 11” referenced in the Renton Sunset Terrace Redevelopment Master Site Plan. 5. Access to the site would be provided via NE 10th Street, NE Sunset Blvd, NE 12th St, and Harrington Place NE. A new internal street alignment would extend from NE 10th St and align with Jefferson Ave NE and extend from Harrington Place NE and connect to NE Sunset Blvd. 6. The property is located within the Commercial & Mixed Use (CMU) Comprehensive Plan land use designation. 7. The site is located within the Center Village (CV) zoning classification. 8. There are approximately 31 trees located on-site, of which 13 are identified a significant trees. The applicant proposes to retain one (1) significant tree. 9. There are no Critical Ares on the subject property. 10. Approximately 30,000 cubic yards of material would be cut on-site and approximately 15,000 cubic yards of structural fill is proposed to be brought into the site. 11. The applicant currently has a civil construction permit and building permits for Blocks A and B under review. 12. The site is located in the Sunset Planned Action EIS area. Environmental review for the the area identified in the Planned Action Ordinance has already been completed. The Environmental Review Committee has issued a Concurrence Memorandum indicating the Solera Master Plan is a planned action. 13. Representatives from various city departments have reviewed the application materials to identify and address issues raised by the proposed development. These comments are contained in the official file, and the essence of the comments has been incorporated into the appropriate sections of this report and the Departmental Recommendation at the end of this report. 14. Site Plan Modification Analysis: The applicant is requesting a minor site plan modification to the approved Solera Master Site Plan and Site Plan Review for Blocks A and B in order to increase the unit count in Blocks A and B to 590 total multifamily dwellings, add 64 vehicle parking spaces to accommodate the additional units, and alter exterior architectural elements including but not limited to an additional floor on Block A along with changes to roof profiles, colors, and fenestration. The Hearing Examiner decision issued March 14, 2021 for the Solera Master Site Plan major modification provided specific threshold criteria in the table below to determine whether any modification(s) to the decision would be considered major requiring a new application, or minor in which case an administrative decision would be issued. The proposal does not exceed and is compliant with minor modification threshold criteria pursuant to the Hearing Examiners decision if all conditions of approval are met. The proposed project changes will be reviewed as a minor modification by administrative determination, if the proposed changes do not: Compliance Modification Criteria and Analysis Compliant if condition of approval is met a. Involve more than a ten percent (10%) increase or decrease in any measurable aspect of the approved plan such as, but not limited to, area, scale, building height, density, commercial area, amenities, public or private open space, landscaping, parking spaces, building materials (e.g., glazing) etc. Staff Comment: Measurable increases and decreases easily identified in the applicant’s justification report and updated architectural plans include: DocuSign Envelope ID: 947FF1D0-D56C-468C-A2A2-D207ACEC2E2F City of Renton Department of Community & Economic Development PR18-000333 Solera Master Plan Administrative Modification Report & Decision LUA20-000305, MOD Report of August 19, 2021 Page 4 of 8 D_Solera_Minor_Mod_LUA20000305_210818 • A density increase to approximately 74 dwelling units per net acre resulting in an increase of approximately 5.3%. • A parking space increase that would result in the master site plan to contain 1,088 off-street parking spaces resulting in an increase of approximately 5% • An area increase that would result in Blocks A and B to contain approximately 547,425 square feet of residential area resulting in an increase of approximately 7.4% • An area decrease that would result in Blocks A and B to contain approximately 37,616 square feet of non-residential/commercial area resulting in a decrease of approximately 2.6% to accommodate several egress corridors to comply with building code. • An increase to lobby/amenity space that would result in Blocks A and B to contain approximately 21,338 square feet resulting in an increase of approximately 9.3% Both Blocks A and B contain two wood frame structures on top of a podium. To accommodate the additional dwelling units, the applicant proposes to add one additional floor of units on the Block A western wood frame structure abutting Sunset Lane NE/Jefferson Ave NE. As noted on the applicants Block A sections page on the updated architectural plans (Exhibit 60), the additional floor on the western tower does not increase the overall building height of Block A as it will be the same height as the eastern tower resulting in the same height calculation when reviewed in the major modification and site plan review application. Block A height would also remain consistent with the Conditional Use Permit height limitations from the initial master site plan approval. Building materials appear to be to the same in the proposed modification and approved plan. Roof profiles have been altered with the removal of the shorter and steeper pitched shed roofs replaced with more butterfly roofs or longer more gradual sloped shed profiles. There are appears to be expansive section of the roof profile where it is now devoid of features and appears flat compared to the approved plan (see Block A West Elevation and Block B West Elevation). A condition of approval related to key features added in section d below is intended to ensure roof elements maintain a comparable aesthetic to the approved plan. A glazing metric was not provided in the applicant’s modification application submittal. When comparing Block A and Block B Building Elevation sheet between the updated architectural plan (Exhibit 60) and the Building Elevations in the approved master plan and site plan review (Exhibits 23 and 24) there appears to be a reduction in glazing on the ground level two-story townhomes. Additionally, the upper story glazing appears to be reduced in the number of windows provided and the windows that are shown appear to be smaller than what was approved in the March 14, 2021 Hearing Examiner decision. To ensure the proposed glazing meets the 10% threshold for changes, staff recommends as a condition of approval, the applicant submit a glazing calculation exhibit for Block A and Block B with the building permit application. The exhibit shall provide a comparison of glazing from the approved master plan/site plan review and the modification. Any deficits in the glazing calculation shall be corrected to meet the 10% modification criterion. The glazing calculation exhibit shall be reviewed and approved by the Current Planning Project Manager prior to permit issuance. DocuSign Envelope ID: 947FF1D0-D56C-468C-A2A2-D207ACEC2E2F City of Renton Department of Community & Economic Development PR18-000333 Solera Master Plan Administrative Modification Report & Decision LUA20-000305, MOD Report of August 19, 2021 Page 5 of 8 D_Solera_Minor_Mod_LUA20000305_210818 ✓ b. Have a substantially greater impact on the environment and/or public facilities than the approved plan Staff Comment: The proposed modification would not have a substantially greater impact on the environment or public facilities. The applicant would be subject to applicable impact fees and system development charges related to the increase in units. The proposed height increase to Building A along the west façade is within the approved height limitation of 75-feet per the Conditional Use Permit associated with the initial master plan approval. Shade and shadow impacts were analyzed for a 75-foot structure and were found to be nominal. ✓ c. Change the boundaries of the originally approved plan. Staff Comment: The proposed modification would not alter the boundaries of the approved plan. Compliant if condition of approval is met d. Substantially alter a key feature of the approved plan. Staff Comment: The Solera project had a number of key features identified in Conclusion #11 of the Staff Report to the Hearing Examiner (Exhibit 1) related to bulk, scale, and aesthetic quality and interest that are important due to the overall size of the development. Overall, the proposed modification keeps many of those important key features intact, however there are several changes in the modification application that need attention to maintain a comparable proposal to what has already been approved and thereby not result in a substantial alteration. As mentioned in section a above, the roof profile has been altered in the proposed modification. The approved roof profile contained a mix of steeper angle shed and butterfly roofs on Blocks A and B that provided visual interest and avoided the appearance of flat roof profiles. The proposed modification has removed several shed roofs and incorporated more butterfly roofs. Additionally, the butterfly and shed roofs appear to lack the same pitch as what was approved. As an example, Block A West Elevation (Exhibit 60) the modified elevation shows an expansive flat roof where the approved elevation (Exhibit 23) provided a shed roof avoiding the expansive slat roof perception. The previous roof profile was superior in its ability to mitigate bulk and scale and provided visual interest. To maintain consistency with the approved master site plan/site plan review key features staff recommends as a condition of approval the applicant revise the roof profiles on Blocks A and B with the building permit applications to incorporate the quantity and pitch of the butterfly and shed roofs that is comparable to what was shown in the approved major modification/site plan review decision. Additional roof profiles and further refinement of the butterfly/shed roof profiles would also be considered by the Current Planning Project Manager if those profiles provide the visual interest and bulk reduction as shown on the approved plan and is consistent with the Conditional Use Permit analysis and decision that granted the additional height allowance in the initial master plan decision (Exhibit 3). The revised roof profiles shall be reviewed and approved prior to permit issuance. Color palette and materials in the approved major modification/site plan review decision assisted in breaking down the bulk and scale of the upper story structures. Horizontal bands, material changes, and contrasting colors broke the façade down into smaller increments and added visual interest. The proposed Block A and B Elevations in the modification application have altered the color palette resulting in a contrast that is not as distinct than what was approved. Additionally there appears to be fewer color DocuSign Envelope ID: 947FF1D0-D56C-468C-A2A2-D207ACEC2E2F City of Renton Department of Community & Economic Development PR18-000333 Solera Master Plan Administrative Modification Report & Decision LUA20-000305, MOD Report of August 19, 2021 Page 6 of 8 D_Solera_Minor_Mod_LUA20000305_210818 changes and distinct features in and around the top two stories (e.g. Block A West Elevation) as was approved in the major modification/site plan review approval. To maintain consistency with the approved master plan/site plan review key features staff recommends as a condition of approval the applicant revise Block A and Block B Elevations with the building permit application that incorporates a contrasting color palette and articulation features comparable to what was shown in the approved major modification/site plan review decision. Additional colors and further refinement of the articulation, exterior cladding, and material changes would also be considered by the Current Planning Project Manager if those changes provide the visual interest and bulk reduction as shown on the approved plan and is consistent with the Conditional Use Permit analysis and decision that granted the additional height allowance in the initial master plan decision (Exhibit 3). The revised elevation shall be reviewed and approved by the Current Planning Project Manager prior to permit issuance. E. DECISION: The proposal does not exceed minor modification threshold criteria pursuant to the Hearing Examiners decision if all conditions of approval are met and the proposal satisfies all four (4) criteria listed in Condition #21.b of the Solera Master Site Plan Major Modification decision issued March 14, 2021 if all conditions of approval are met. Therefore, the Solera Master Site Plan and Block A and Block B Site Plan Review modification, File No. LUA20- 000305, MOD, is approved and is subject to the following conditions: 1. The applicant shall comply with all conditions of approval from the Solera Master Plan Modification to Master Plan, Site Plan and Preliminary Plan, and Street Modification Hearing Examiner’s decision dated March 14, 2021. 2. The applicant shall submit a glazing calculation exhibit for Block A and Block B with the building permit applications. The exhibit shall provide a comparison of glazing for each building from the approved master plan/site plan review and the modification. Any deficits in the glazing calculation shall be corrected to meet the 10% modification criterion. The glazing calculation exhibit shall be reviewed and approved by the Current Planning Project Manager prior to permit issuance. 3. The applicant shall revise the roof profiles on Blocks A and B with the building permit applications to incorporate the quantity and pitch of the butterfly and shed roofs that is comparable to what was shown in the approved major modification/site plan review decision. Additional roof profiles and further refinement of the butterfly/shed roof profiles would also be considered by the Current Planning Project Manager if those profiles provide the visual interest and bulk reduction as shown on the approved plan and is consistent with the Conditional Use Permit analysis and decision that granted the additional height allowance in the initial master plan decision (Exhibit 3). The revised roof profiles shall be reviewed and approved prior to permit issuance. 4. The applicant shall revise Block A and Block B Elevations with the building permit application that incorporates a greater contrasting color palette with articulation features comparable to what was shown in the approved major modification/site plan review decision. Additional colors and further refinement of the articulation, exterior cladding, and material changes would also be considered by the Current Planning Project Manager if those changes provide the visual interest and bulk reduction as shown on the approved plan and is consistent with the Conditional Use Permit analysis and decision that granted the additional height allowance in the initial master plan decision (Exhibit 3). The revised elevation shall be reviewed and approved by the Current Planning Project Manager prior to permit issuance. DocuSign Envelope ID: 947FF1D0-D56C-468C-A2A2-D207ACEC2E2F City of Renton Department of Community & Economic Development PR18-000333 Solera Master Plan Administrative Modification Report & Decision LUA20-000305, MOD Report of August 19, 2021 Page 7 of 8 D_Solera_Minor_Mod_LUA20000305_210818 DATE OF DECISION ON LAND USE ACTION: SIGNATURE: Vanessa Dolbee, Planning Director Date TRANSMITTED on August 19, 2021 to the Owner/Applicant/Contact: Owner/Applicant/Contact: Owner/Applicant/Contact: Mark Gropper Renton Housing Authority 2900 NE 10th St, Renton, WA 98056 Tom Neubauer Solera Manager LLC 10900 NE 8th Street, Suite 120, Bellevue, WA, 98004 TRANSMITTED on August 19, 2021 to the Parties of Record: Paul Russo 3725 NE 6th St Renton, WA 98056 Louise Anderson Ul2k@yahoo.com Mark Santos-Johnson msantosjohnson@rentonwa.gov John Steifel 10919 Glen Acres S, Unit D Seattle, WA 98168 Barbara Underwood 1100 Harrington NE Apt 304 Renton, WA 98056 Andrew Grueter 4705 W. Marginal Way SW Renton, WA 98056 Ann M. Gygi 999 Third Avenue, Suite 4600 Seattle, WA 98104 Ralph M Evans 1414 Monroe AVE NE, APT 234 Renton, WA 98056 Gary Kriedt 201 S Jackson St, #MS KSC-TR 0431 Seattle, WA 98104 Dan Benapfl 1175 Harrington Pl Renton, WA 98056 Diane Dobson 625 S 4th St Renton, WA 98057 Joshua McGrew joshkm@gmail.com Greater Hilands LLC C/O JSH Properties 20415 72nd Ave S, #180 Kent, WA 98032 Jeremy Febus KPFF 1601 5th Ave, #1600 Seattle, WA 98101 Corey Watson Quadrant Homes 15900 SE Eastgate Way, #300 Bellevue, WA 98008 TRANSMITTED on August 19, 2021 to the following: Chip Vincent, CED Administrator Brianne Bannwarth, Development Engineering Manager Amanda Askren, Property Services Matt Herrera, Current Planning Manager Anjela Barton, Fire Marshal DocuSign Envelope ID: 947FF1D0-D56C-468C-A2A2-D207ACEC2E2F 8/19/2021 | 10:39 AM PDT City of Renton Department of Community & Economic Development PR18-000333 Solera Master Plan Administrative Modification Report & Decision LUA20-000305, MOD Report of August 19, 2021 Page 8 of 8 D_Solera_Minor_Mod_LUA20000305_210818 K. LAND USE ACTION APPEALS, REQUEST FOR RECONSIDERATION, & EXPIRATION: The administrative land use decision will become final if the decision is not appealed within 14 days of the decision date. APPEAL: This administrative land use decision will become final if not appealed in writing to the Hearing Examiner on or before 5:00 PM on September 2, 2021. An appeal of the decision must be filed within the 14- day appeal period (RCW 43.21.C.075(3); WAC 197-11-680). Due to the ongoing state of emergency enacted by Governor’s Proclamation 20-05, the City Clerk’s Office is working remotely. For that reason, appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub only on Tuesdays and/or Wednesdays. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. EXPIRATION: This Modification decision does not extend the initial Master Site Plan and Site Plan Review decisions and the expiration shall be consistent with the final decisions of LUA18-000490 and LUA20-000305. RECONSIDERATION: Within 14 days of the decision date, any party may request that the decision be reopened by the approval body. The approval body may modify his decision if material evidence not readily discoverable prior to the original decision is found or if he finds there was misrepresentation of fact. After review of the reconsideration request, if the approval body finds sufficient evidence to amend the original decision, there will be no further extension of the appeal period. Any person wishing to take further action must file a formal appeal within the 14-day appeal time frame. THE APPEARANCE OF FAIRNESS DOCTRINE: provides that no ex parte (private one-on-one) communications may occur concerning the land use decision. The Doctrine applies not only to the initial decision, but to Appeals to the Hearing Examiner as well. All communications after the decision/approval date must be made in writing through the Hearing Examiner. All communications are public record and this permits all interested parties to know the contents of the communication and would allow them to openly rebut the evidence in writing. Any violation of this doctrine could result in the invalidation of the appeal by the Court. DocuSign Envelope ID: 947FF1D0-D56C-468C-A2A2-D207ACEC2E2F CITY OF RENTON DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT ADMINISTRATIVE MODIFICATION REPORT & DECISION EXHIBITS Project Name: PR18-000333 Solera Master Plan Land Use File Number: LUA20-000305, MOD Date of Report August 19, 2021 Staff Contact Matt Herrera Current Planning Manager Project Contact/Applicant Tom Neubauer Solera Manager LLC 10900 NE 8th Street, Suite 120, Bellevue, WA, 98004 Project Location 2805, 2822, 2834 Sunset Ln NE; 2950, 2902, 2806 NE Sunset Blvd; 1171 Kirkland Ave NE; 975 NE 12th St The following exhibits are included with the Administrative Modification Report: Exhibits 1-56 As provided in the Staff Report to the Hearing Examiner Exhibit 57: Hearing Examiner’s Decision Exhibit 58: Minor Modification Decision Exhibit 59: Modification Request Exhibit 60: Updated Architectural Plans DocuSign Envelope ID: 947FF1D0-D56C-468C-A2A2-D207ACEC2E2F