Loading...
HomeMy WebLinkAboutMFP21003815.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP21003815 IVR Number: 21003815 Permit Information Permit Name: Comcast Cable Franchise Permit Address/Location:08/05/2021Application Date:1253800120Parcel Number: 2700 LIND AVE SW Permit Type:08/24/2021Issue Date:Franchise Permit Work Class:08/24/2022Expiration Date:Major Utility Job Number: 726997Franchise Type:Cable Description: Comcast TIE INTO EXISTING SPLICE CASE SP.WAKV.0430 WITH 48CT FIBER OPEN TRENCH ON SOFT SURFACE. INSTALL (2) 2" CONDUITS. PULL (1) 48CT FIBER THROUGH (1) 2" CONDUIT BORE. INSTALL (2) 2" CONDUITS. PULL (1) 48CT FIBER THROUGH (1) 2" CONDUIT. PLACE NEW 17x30 VAULT. PLACE NEW SPLICE CASE IN VAULT. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENON STANDARDS. Contacts Name Address PhoneTypeBilling Rhonda Resnik Comcast 410 Valley Ave NW, Suite 12, Bldg C Puyallup, WA 98371 B: (253) 864-4246Applicant Shannon Heaton Cannon Construction 406, Porter Way Milton, WA 98354 Applicant Tom Donnelly Comcast Business Communications 1701 Jfk Blvd, 32nd Floor Philadelphia, PA 19103 B: (215) 286-7347 C: (215) 286-7557 Contact Michael Cannon Cannon Construction Inc 406 Porter Way Milton, WA 98354-9638 B: (253) 922-2787 C: (253) 588-4034 Contractor Business License Number: 20838Electrical Contractor: CANNOCI873CL Construction Contractor: CANNOCI055CS CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Laurie Dietz Comcast - Billing 1701 John F. Kennedy Blvd. Philadelphia, PA 19103 H: (425) 741-5733Specialized Billing X General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Comcast Cable Communications Management JB0000726997 Rhonda Resnik 253-864-4246 Rhonda_Resnik@comcast.com 2700 Lind Ave SW, Renton, WA 98057 Hardwoods Specialty TIE INTO EXISTING SPLICE CASE SP.WAKV.0430 WITH 48CT FIBER OPEN TRENCH ON SOFT SURFACE. INSTALL (2) 2" CONDUITS. PULL (1) 48CT FIBER THROUGH (1) 2" CONDUIT BORE. INSTALL (2) 2" CONDUITS. PULL (1) 48CT FIBER THROUGH (1) 2" CONDUIT. PLACE NEW 17x30 VAULT. PLACE NEW SPLICE CASE IN VAULT 741 ft. Cannon Construction LLC - Shannon Heaton 253-922-2787 ext 258 601590363 20838 8/5/2021 MFP21003815 Scott Warlick POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS 8/24/2021 This permit is for Major construction work in the ROW and will be billed at an additional $60/HR for inspections. After hours and weekend work will be billed at $125/HR DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 11/25/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 11/25/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.☐ A copy of the Traffic Control Plan (TCP) Application form. 2.☐ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ☐Include map(s) showing the location of the project and work area. ☐Be legible lettering and clear, contrasting, symbols of viewing or printing. ☐Must indicate street names, and north arrow and scale. ☐All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ☐Types of plans required: ☐Work hour plan – show all mobility impacts during construction hours. ☐Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ☐Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ☐Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering Hardwoods Specialty 2700 Lind Ave SW, Renton, WA 98057 Monday Friday 8:00am 3:00pm TIE INTO EXISTING SPLICE OPEN TRENCH. BORE. INSTALL CONDUITS & PULL FIBER THROUGH. PLACE NEW 17x30 VAULT. PLACE NEW SPLICE CASE IN VAULT Cannon Construction LLC 253 922 2787 Shannon Heaton sheaton@cannonconstructioninc.com 406 Milton Way Milton, WA 98354 MFP21003815 Scott Warlick CED 8/24/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 11/25/2019 APPLICANT AGREES TO ALL THE FOLLOWING: •TCP must be approved prior to commencing the work, and all permit conditions shall be met. •Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. •Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. •The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. •Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. •TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. •Approved Temporary TCP must be at the work site during work hours. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. •The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date Shannon Heaton 8/5/2021 ROWROWROWROWROWROWDRIVEWAYLANDSCAPINGROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW3000LIND AVE SWEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPDRIVEWAYLANDSCAPINGSIDEWALKWTW20-1 W4-2R W20-5RDRIVEWAYW20-1 R2-1LANDSCAPING OF DATE REVISION BY QC CANNON COMPANIES 0000726997HARDWOODS SPECIALTY 2700 LIND AVE SW RENTON, WA 98057 TCP 1 3 7/26/2021 WK AG COMCAST SITE SPECIFIC TRAFFIC CONTROL PLAN THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED BY THE PUBLIC AUTHORITY HAVING JURISDICTION [UNDERGROUND WORK] CONTROL TYPE: SINGLE LANE CLOSURE FOUR-LANE ROAD SITE NOTES: 1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES 2. PLACE TEMP "NO PARKING" SIGNS AT LEAST 72 HOURS PRIOR TO WORK 3. SIDE WALKS TO REMAIN OPEN DURING ROAD WORK, UNLESS NOTED OTHERWISE SIGN SPACING = X (FEET) FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO) RURAL HIGHWAYS 60/65 MPH 800' +/- RURAL ROADS 45/55 MPH 500' +/- RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/- RURAL ROADS & URBAN ARTERIALS RESIDENTAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100' +/- 25/30 MPH 200' +/- ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS AND DRIVEWAYS. (2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 LANE WIDTH 25 30 35 40 45 50 55 60 65 70 MINIMUM TAPER LENGTH IN FEET = L POSTED SPEED LIMIT (MPH) SPEED 25 30 35 45 50 55 155 200 250 360 425 495 570 LONGITUDINAL BUFFER SPACE = B LENGTH 40 305 60 65 70 780 840 ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES (M.U.T.C.D) CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST ***TRAFFIC CONTROL ADDITIONAL NOTES *** - At aerial work, will be a moving traffic control setup -Will coordinate with business that will be affected by construction. -Will have Spotter on site to escort pedestrian through work zone. - All work will stop while pedestrians are escorted through work zones. N MFP21003815 SIDEWALKLANDSCAPINGLANDSCAPINGLANDSCAPINGSIDEWALKLANDSCAPINGROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW EOP EOP EOP EOP EOP ROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROW2900 SW 29TH ST EOP EOP EOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOPEOPEOPEOP EOPEOPEOPEOPEOPEOPEOPLIND AVE SWLANDSCAPINGLANDSCAPINGW20-1 W4-2R W20-5RWT W20-1 W20-1 R2-1 SIDEWALK SIDEWALK COMCAST SITE SPECIFIC TRAFFIC CONTROL PLAN THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED BY THE PUBLIC AUTHORITY HAVING JURISDICTION [UNDERGROUND WORK] CONTROL TYPE: SINGLE LANE CLOSURE FOUR-LANE ROAD SITE NOTES: 1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES 2. PLACE TEMP "NO PARKING" SIGNS AT LEAST 72 HOURS PRIOR TO WORK 3. SIDE WALKS TO REMAIN OPEN DURING ROAD WORK, UNLESS NOTED OTHERWISE SIGN SPACING = X (FEET) FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO) RURAL HIGHWAYS 60/65 MPH 800' +/- RURAL ROADS 45/55 MPH 500' +/- RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/- RURAL ROADS & URBAN ARTERIALS RESIDENTAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100' +/- 25/30 MPH 200' +/- ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS AND DRIVEWAYS. (2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 LANE WIDTH 25 30 35 40 45 50 55 60 65 70 MINIMUM TAPER LENGTH IN FEET = L POSTED SPEED LIMIT (MPH) SPEED 25 30 35 45 50 55 155 200 250 360 425 495 570 LONGITUDINAL BUFFER SPACE = B LENGTH 40 305 60 65 70 780 840 ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES (M.U.T.C.D) CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST ***TRAFFIC CONTROL ADDITIONAL NOTES *** - At aerial work, will be a moving traffic control setup -Will coordinate with business that will be affected by construction. -Will have Spotter on site to escort pedestrian through work zone. - All work will stop while pedestrians are escorted through work zones. N OF DATE REVISION BY QC CANNON COMPANIES 0000726997HARDWOODS SPECIALTY 2700 LIND AVE SW RENTON, WA 98057 TCP 2 3 7/26/2021 WK AG MFP21003815 SIDEWALKLANDSCAPINGLANDSCAPINGROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWEOPEOPEOPEOPEOPEOPEOPROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW EOP EOP EOP EOP EOP EOP EOP ROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROW 2700 SW 29TH STEOPEO P EOP EOPEOPEOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOPLIND AVE SWSIDEWALKLANDSCAPINGLANDSCAPINGDRIVEWAYLANDSCAPINGLANDSCAPINGW20-1 W20-1 W4-2R W20-5RWT R2-1 COMCAST SITE SPECIFIC TRAFFIC CONTROL PLAN THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED BY THE PUBLIC AUTHORITY HAVING JURISDICTION [UNDERGROUND WORK] CONTROL TYPE: SINGLE LANE CLOSURE FOUR-LANE ROAD SITE NOTES: 1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES 2. PLACE TEMP "NO PARKING" SIGNS AT LEAST 72 HOURS PRIOR TO WORK 3. SIDE WALKS TO REMAIN OPEN DURING ROAD WORK, UNLESS NOTED OTHERWISE SIGN SPACING = X (FEET) FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO) RURAL HIGHWAYS 60/65 MPH 800' +/- RURAL ROADS 45/55 MPH 500' +/- RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/- RURAL ROADS & URBAN ARTERIALS RESIDENTAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100' +/- 25/30 MPH 200' +/- ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS AND DRIVEWAYS. (2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 LANE WIDTH 25 30 35 40 45 50 55 60 65 70 MINIMUM TAPER LENGTH IN FEET = L POSTED SPEED LIMIT (MPH) SPEED 25 30 35 45 50 55 155 200 250 360 425 495 570 LONGITUDINAL BUFFER SPACE = B LENGTH 40 305 60 65 70 780 840 ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES (M.U.T.C.D) CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST ***TRAFFIC CONTROL ADDITIONAL NOTES *** - At aerial work, will be a moving traffic control setup -Will coordinate with business that will be affected by construction. -Will have Spotter on site to escort pedestrian through work zone. - All work will stop while pedestrians are escorted through work zones. N OF DATE REVISION BY QC CANNON COMPANIES 0000726997HARDWOODS SPECIALTY 2700 LIND AVE SW RENTON, WA 98057 TCP 3 3 7/26/2021 WK AG MFP21003815 THIS IS PROPRIETARY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED CANNON COMPANIES CONTACTS: PROJECT MAP: 1 - COVER SHEET 2 -GENERAL NOTES 3 -LEGEND 4 -DETAILS 5 -OVERVIEW 6-7 -DESIGN - 48CT FIBER: 741 FT. + 20% STORAGE = 889 FT. *ALL FOOTAGES AND MATERIALS ARE ESTIMATED SCOPE OF WORK: SHEET INDEX: BILL OF MATERIALS*: NEW AERIAL = OVERLASH = NEW UNDERGROUND = EXISTING UNDERGROUND = RISER (0)= TOTAL FOOTAGE = 0 FT. 0 FT. 741 FT. 0 FT. 0 FT. 741 FT. PROJECT DESCRIPTION - ROW* NEW BUILDING PATH WAY = EXISTING BUILDING PATH WAY = NEW UNDERGROUND = EXISTING UNDERGROUND = TOTAL FOOTAGE = 0 FT. 0 FT. 0 FT. 0 FT. 0 FT. PROJECT DESCRIPTION -SITE* TOTAL PROJECT FOOTAGE =741 FT. - TIE INTO EXISTING SPLICE CASE SP.WAKV.0430 WITH 48CT FIBER - OPEN TRENCH ON SOFT SURFACE. INSTALL (2) 2" CONDUITS. PULL (1) 48CT FIBER THROUGH (1) 2" CONDUIT - BORE. INSTALL (2) 2" CONDUITS. PULL (1) 48CT FIBER THROUGH (1) 2" CONDUIT - PLACE NEW 17x30 VAULT. PLACE NEW SPLICE CASE IN VAULT - BORE. INSTALL (1) 2" CONDUITS. PULL (1) 48CT FIBER THROUGH 2700 LIND AVE SW HARDWOODS SPECIALTY CANNON COMPANIES SAFETY | QUALITY | INTEGRITY | TEAMWORK Connecting The Future Since 1985 COMCAST COMCAST COMMUNICATION Mike Fontenot - (425)-213-5482 - Mike_Fontenot@cable.comcast.com WORK AREA METRO-E JB# 0000726997 RENTON, WA 98057 CANNON COMPANIES Alex Gaunt - (206)-856-3583 - agaunt@cannonconstructioninc.com MFP21003815 This permit is for Major construction work in the ROW and will be billed at an additional $60/HR for inspections. After hours and weekend work will be billed at $125/HR OF DATE REVISION BY QC CANNON COMPANIES 0000726997HARDWOODS SPECIALTY 2700 LIND AVE SW RENTON, WA 98057 GENERAL NOTES 2 7 7/26/2021 WK AG COMCAST MFP21003815 EDGE OF PAVEMENT FOGLINE POWER COMMUNICATION SEWER DRAIN DRAINAGE DITCH GAS WATER TRAFFIC SIGNAL TELCOM STEAM UNKNOWN UTILITY RIGHT OF WAY TRAFFIC CONES PROPOSED NEW BORE STRAW WATTLES P LT CW R UTILITY POLE VAULT - SMALL PEDESTAL STREET LIGHT CROSSWALK LIGHT UTILITY RISER V VAULT - SMALL 444LA MANHOLE VAULT - 25TA CATCH BASIN CATCH BASIN WITH SOCK GLULAM UTILITY POLECENTER LINE LANE LINE FENCE HIGH VISIBILITY FENCE S SEWER MANHOLE D DRAIN MANHOLE W WATER MANHOLE V UTILITY VALVE SHRUBBERY BORE PIT VAULT - LARGE VAULT - 25TA C COMMUNICATION MANHOLE FIRE HYDRANT DISTANCE STATIONSTA 0+00 CONSTRUCTION NOTE CALLOUT# X.X DISTANCE DIMENSION ASPHALT SURFACE CONCRETE SIDEWALK PANEL CONCRETE ROADWAY PANEL HF H-FRAME VAULT - LARGE C CCAB CABINET LEGEND LANE DIRECTION INDICATOR PROPOSED MARK-UP NOTATIONS RESTORATION TYPESEXISTING FEATURESLINE TYPES A 7 LANDSCAPE CROSS SECTION SYMBOL CROSS SECTION NAME CROSS SECTION SHOWN ON PAGE FL FL EOP P P TS TS C C D D DD DD DD DD DD DD G G W W T T ST ST ROW ROW S UK CB CB P P V V V V VV WORK BEING DONE1LOCATION PHOTO NOTE CALLOUT #PHOTO LOCATOR SYMBOL PROPOSED NEW TRENCH PROPOSED NEW AERIAL STRAND OF DATE REVISION BY QC CANNON COMPANIES 0000726997HARDWOODS SPECIALTY 2700 LIND AVE SW RENTON, WA 98057 LEGEND 3 7 7/26/2021 WK AG COMCAST MFP21003815 STORM DRAIN INLET PROTECTION STANDARD DETAIL2TRENCH - SOFT SURFACE STANDARD DETAIL1 OF DATE REVISION BY QC CANNON COMPANIES 0000726997HARDWOODS SPECIALTY 2700 LIND AVE SW RENTON, WA 98057 DETAILS 4 7 7/26/2021 WK AG COMCAST MFP21003815 3 2 1 CONSTRUCTION NOTES: TIE INTO EXISTING SPLICE CASE SP.WAKV.0430 WITH 48CT FIBER OPEN TRENCH ON SOFT SURFACE. INSTALL (2) 2" CONDUITS. PULL (1) 48CT FIBER THROUGH (1) 2" CONDUIT BORE. INSTALL (2) 2" CONDUITS. PULL (1) 48CT FIBER THROUGH (1) 2" CONDUIT PLACE NEW 17x30 VAULT. PLACE NEW SPLICE CASE IN VAULT BORE. INSTALL (1) 2" CONDUITS. PULL (1) 48CT FIBER THROUGH V V455' BORE3' TRENCH1 2 3 270' BORE3 3' TRENCH2 4 5 V 10' BORE5 4 OF DATE REVISION BY QC CANNON COMPANIES 0000726997HARDWOODS SPECIALTY 2700 LIND AVE SW RENTON, WA 98057 OVERVIEW 5 7 7/26/2021 WK AG COMCAST N MFP21003815 DRIVEWAYSTA 20+00STA 20+50STA 21+00STA 21+50STA 22+00STA 22+50STA 23+00STA 23+50STA 24+00STA 24+50DRIVEWAY SIDEWALK LANDSCAPING LANDSCAPING LANDSCAPING SIDEWALK LANDSCAPINGROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS D D D D D D D D D D D DDDDDDDDDDD D D DDDDDDD D D D D D D D D D D D D D D D D D D D D D D D D D DDDD D D D D D D W WWWWWWWW W W W W W W W W W W W VVVMMFHWWWWWWWWWWWWWWWW WWWWW WWWWWEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPVVG G G G G G G G G G G G G G G G G G G G G G G G G G G G G G LIND AVE SW C C C P P P P P P P P P P P P P P P P P P P P P P P P P P P P P LT LT V PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPP SIDEWALK LANDSCAPING LANDSCAPING DRIVEWAY LANDSCAPING SIDEWALK LANDSCAPING LANDSCAPING LANDSCAPING SCALE: 1"=30' 0'15'30'60' STATION START STATIONING STARTS AT 10+00 AT THE INTERSECTION OF SW 34TH ST & LIND AVE SW PROPOSED PATH DISCLAIMERS 1.PROPOSED PATH MAY CHANGE AT TIME OF CONSTRUCTION DUE TO UTILITY LOCATIONS AND INSPECTOR REQUIREMENTS 2.UNKNOWN UTILITY DEPTHS TO BE VERIFIED IN FILED DURING TIME OF CONSTRUCTION UTILITY DISCLAIMER ALL LOCATIONS OF UTILITIES SHOWN ARE APPROXIMATE. LOCATION OF ALL UTILITIES TO BE VERIFIED PRIOR TO CONSTRUCTION. CALL UTILITY UNDERGROUND LOCATION CENTER AT 1-800-424-5555 2 1 POTHOLE IS SOFT SURFACES WHEN AVAILABLE. PATCH POTHOLE LOCATION PER LOCAL JURISDICTION SPECIFICATION LOCATION POTHOLE DISCLAIMER CSWPP LEGEND NATIVE TRENCH MATERIAL SHALL BE COVER WITH PROTECTIVE TARP AND SECURED WITH SANDBAGS TO PREVENT RAIN WATER ABSORPTION. CATCH BASIN WITH SOCKCB CONSTRUCTION NOTES: TIE INTO EXISTING SPLICE CASE SP.WAKV.0430 WITH 48CT FIBER OPEN TRENCH ON SOFT SURFACE. INSTALL (2) 2" CONDUITS. PULL (1) 48CT FIBER THROUGH (1) 2" CONDUIT BORE. INSTALL (2) 2" CONDUITS. PULL (1) 48CT FIBER THROUGH (1) 2" CONDUIT DRAINAGE SYSTEM DISCLAIMER EXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.) SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT THE CONSTRUCTION PROJECT. IF ANY PARTS OF THE SYSTEM ARE IMPACTED BY CONSTRUCTION ACTIVITIES, THEY SHALL BE RESTORED TO THE ORIGINAL CONDITIONS. N BUS STOP. WILL HAVE TO COORDINATE WITH KING COUNTY METRO AT TIME OF CONSTRUCTION 3 1 CBCB BOREPIT 2R 1R 2 1R RESTORATION NOTES: RESTORE LANDSCAPING PER CITY OF RENTON SPECIFICATIONS RESTORE CONCRETE SIDEWALK PANEL PER CITY OF RENTON SPECIFICATIONS2R 3 455' BORE6' 8' 2'3' TRENCHSTA 20+15SSSMATCH LINESEE SHEET 7OF DATE REVISION BY QC CANNON COMPANIES 0000726997HARDWOODS SPECIALTY 2700 LIND AVE SW RENTON, WA 98057 DESIGN 6 7 7/26/2021 WK AG COMCAST MFP21003815 LANDSCAPING SIDEWALK LANDSCAPING STA 25+00STA 25+50STA 26+00STA 26+50STA 27+00STA 27+50STA 28+00STA 28+50STA 29+00STA 29+50SIDEWALK LANDSCAPING LANDSCAPING SIDEWALK LANDSCAPING LANDSCAPING ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROWROWEOPEOPROWROWROWROWSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS D DDDDDDDDDDD D D D D D DDDD D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D DDDWWWWWWWWWWWW WWWVVVVVVVVVFHFHFHWWWWWWWWWWWW WWWWWWWWWWWWWWW W SW 29TH STEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPVG G G G G G G G G G G G G G G G G G G G G G G G G G G G G GLIND AVE SW P P P P P P P P P P P P P P P P P P P P P P P P P P P P P PCBCB LT LT LT PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPP SIDEWALK LANDSCAPING LANDSCAPING DRIVEWAY LANDSCAPING LANDSCAPING SCALE: 1"=30' 0'15'30'60' N STATION START STATIONING STARTS AT 10+00 AT THE INTERSECTION OF SW 34TH ST & LIND AVE SW PROPOSED PATH DISCLAIMERS 1.PROPOSED PATH MAY CHANGE AT TIME OF CONSTRUCTION DUE TO UTILITY LOCATIONS AND INSPECTOR REQUIREMENTS 2.UNKNOWN UTILITY DEPTHS TO BE VERIFIED IN FILED DURING TIME OF CONSTRUCTION UTILITY DISCLAIMER ALL LOCATIONS OF UTILITIES SHOWN ARE APPROXIMATE. LOCATION OF ALL UTILITIES TO BE VERIFIED PRIOR TO CONSTRUCTION. CALL UTILITY UNDERGROUND LOCATION CENTER AT 1-800-424-5555 POTHOLE IS SOFT SURFACES WHEN AVAILABLE. PATCH POTHOLE LOCATION PER LOCAL JURISDICTION SPECIFICATION LOCATION POTHOLE DISCLAIMER CSWPP LEGEND NATIVE TRENCH MATERIAL SHALL BE COVER WITH PROTECTIVE TARP AND SECURED WITH SANDBAGS TO PREVENT RAIN WATER ABSORPTION. CATCH BASIN WITH SOCKCB DRAINAGE SYSTEM DISCLAIMER EXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.) SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT THE CONSTRUCTION PROJECT. IF ANY PARTS OF THE SYSTEM ARE IMPACTED BY CONSTRUCTION ACTIVITIES, THEY SHALL BE RESTORED TO THE ORIGINAL CONDITIONS. V BOREPIT BOREPIT 5'5' 5' 5' 2' 1 3' TRENCH SSSTA 24+76STA 24+791R 1RSEE SHEET 6MATCH LINE1 CONSTRUCTION NOTES: OPEN TRENCH ON SOFT SURFACE. INSTALL (2) 2" CONDUITS. PULL (1) 48CT FIBER THROUGH (1) 2" CONDUIT BORE. INSTALL (2) 2" CONDUITS. PULL (1) 48CT FIBER THROUGH (1) 2" CONDUIT PLACE NEW 17x30 VAULT. PLACE NEW SPLICE CASE IN VAULT BORE. INSTALL (1) 2" CONDUITS. PULL (1) 48CT FIBER THROUGH 2 2 270' BORE V BOREPIT 5' 10' BORE 3 4 4 1R 1R RESTORATION NOTES: RESTORE LANDSCAPING PER CITY OF RENTON SPECIFICATIONS 3STA 27+545' OF DATE REVISION BY QC CANNON COMPANIES 0000726997HARDWOODS SPECIALTY 2700 LIND AVE SW RENTON, WA 98057 DESIGN 7 7 7/26/2021 WK AG COMCAST N MFP21003815