HomeMy WebLinkAboutSTAFF COMMENTS_PRE21-000308PREAPPLICATION MEETING FOR
Petrovitsky Apartments
11204 SE Petrovitsky Road
PRE21-000308
CITY OF RENTON
Department of Community & Economic Development
Planning Division
September 9, 2021
Contact Information:
Planner: Angelea Weihs, 425.430.7312, aweihs@rentonwa.gov
Public Works Plan Reviewer: Nathan Janders, 425.430.7382, njanders@rentonwa.gov
Fire Prevention Reviewer: Corey Thomas, 425.276.9582, cthomas@rentonrfa.org
Building Department Reviewer: Rob Shuey, 425.430.7235, rshuey@rentonwa.gov
Please retain this packet throughout the course of your project as a reference. Consider
giving copies of it to any engineers, architects, and contractors who work on the
project. You will need to submit a copy of this packet when you apply for land use
and/or environmental permits.
Pre-screening: When you have the project application ready for submittal, call and
schedule an appointment with the assigned planner to have the documents pre-
screened.
The pre-application meeting is informal and non-binding. The comments provided on
the proposal are based on the codes and policies in effect at the time of review. The
applicant is cautioned that the development regulations are regularly amended and the
proposal will be formally reviewed under the regulations in effect at the time of project
submittal. The information contained in this summary is subject to modification and/or
concurrence by official decision-makers (e.g., Hearing Examiner, Planning Director,
Community & Economic Development Administrator, Public Works Administrator, and
City Council).
M E M O R A N D U M
DATE:August 26, 2021
TO:Angelea Weihs, Associate Planner
FROM:Corey Thomas, Lead Plans Review Inspector
SUBJECT:Petrovitsky Apartments
1. The preliminary fire flow is 2,000 gpm. A minimum of two fire hydrants are required.
One within 150-feet and one within 300-feet of the building. Existing hydrants may be counted
toward the requirements if they meet current code. A minimum of one new fire hydrant will be
required within 50-feet of the fire sprinkler outlet. Water is provided by Soos Creek Water
District. A water availability certificate is required at time of plan review.
2. Fire impact fees are currently applicable at the rate of $964.53 per multi-family unit.
This fee is paid at time of building permit issuance. Credit would be applied for the removal of
any existing homes.
3. Approved fire sprinkler (NFPA 13R) and fire alarm systems are required throughout the
buildings. Direct outside access is required to the fire sprinkler riser rooms. Fire alarm systems
are required to be fully addressable and full detection is required. Separate plans and permits
required by the fire department.
4. Fire department apparatus access roadways are required to be minimum 20-feet wide
fully paved, with 25-feet inside and 45-feet outside turning radius. Fire access roadways shall
be constructed to support a 30-ton vehicle with 75-psi point loading. Access is required within
150-feet of all points on all buildings. Dead end streets that exceed 150-feet in length require
an approved turnaround. Proposed hammerhead type turnaround appears adequate, to verify
upon plan review.
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE:September 2, 2021
TO:Angelea Weihs, Current Planning
FROM:Nathan Janders, Development Engineering Plan Review
SUBJECT:Petrovitsky Apartments
11204 SE Petrovitsky Road
PRE21-000308
NOTE: The applicant is cautioned that information contained in this summary is preliminary and non-binding and
may be subject to modification and/or concurrence by official City decision-makers. Review comments may also
need to be revised based on site planning and other design changes required by City staff or made by the
applicant.
I have completed a preliminary review for the above-referenced proposal located at parcel 2923059029. The
following comments are based on the pre-application submittal made to the City of Renton by the applicant.
WATER
1. The subject property is within the water service area of Soos Creek Water and Sewer Service Utility District.
2. The applicant shall obtain a certificate of water availability from the Soos Creek and provide a copy to the
City as part of the land use permit application for the development.
3. Review of the water plans will be conducted by King County Water District 90 and the Renton Regional Fire
Authority.
4. Plans approved by King County Water District 90 shall be routed to the City for final review prior to permit
issuance.
SANITARY SEWER
1. The project is within Soos Creek Water and Sewer District.
2. The applicant shall obtain a sewer availability certificate from Soos Creek and provide a copy to the City as
part of the land use permit application for the development.
3. Review of the sewer plans will be conducted by Soos Creek Water and Sewer District.
4. Plans approved by Soos Creek shall be routed to the City for final review prior to construction permit
issuance
Pertovitsky Apartments – PRE21-000308
Page 2 of 4
September 2, 2021
Surface Water
1. There are no existing drainage features on site. The site is generally sloped from the southeast to the
northwest.
2. There is an existing public catch basin on the north side of SE Petrovitsky Road conveying stormwater
through a 12-inch public main to a 36-inch public main on the south side of SE Petrovitsky Road (see record
drawing R-261003).
3. There are existing private stormwater mains located within the Benson Down Apartments complex (see
record drawings R-2626).
4. Drainage plans and a drainage report complying with the adopted 2017 Renton Surface Water Design Manual
will be required. Refer to Figure 1.1.2.A – Flow Chart of the 2017 Renton Surface Water Design Manual
(RSWDM) to determine what type of drainage review is required for this site. The site falls within the City’s
Flow Control Duration Standard Matching Forested Site Conditions. The site falls within the Soos Creek
drainage basin.
5. Critical areas on or adjacent to the site that impact stormwater review include: regulated slopes.
6. The current Surface Water Standard Plans shall be used in all drainage plan submittals. The current City of
Renton Standard Details are available online in the City of Renton website
https://edocs.rentonwa.gov/Documents/Browse.aspx?id=990403&dbid=0&repo=CityofRenton
7. If the new plus replaced pollution generating impervious surface exceeds 5,000 SF, the applicant will be
required to provide enhanced basic water quality treatment. Any proposed detention and/or water quality
vault shall be designed in accordance with the RSWDM that is current at the time of civil construction permit
application. Separate structural plans will be required to be submitted for review and approval under a
separate building permit for the detention and/or water quality vault.
8. Appropriate on-site BMPs satisfying Core Requirement #9 will be required to help mitigate the new runoff
created by this development to the maximum extent feasible. On-site BMPs shall be evaluated as described
in Section C.1.2.9.1.D of the 2017 RSWDM. A preliminary drainage plan, including the application of on-site
BMPs, shall be included with the land use application, as applicable to the project. The final drainage plan and
drainage report must be submitted with the utility construction permit application.
9. A geotechnical soils report for the site is required per the 2017 Renton Surface Water Design Manual Section
C.1.3. Information on the water table and soil permeability (measured infiltration rates), with
recommendations of appropriate on-site BMPs per Core Requirement #9 and Appendix C shall be included in
the report. The report should also include information concerning the soils, geology, drainage patterns and
vegetation present shall be presented in order to evaluate the drainage, erosion control and slope stability
for site development of the proposed plat. The applicant must demonstrate the development will not result
in soil erosion and sedimentation, landslide, slippage, or excess surface water runoff.
10. Erosion control measures to meet the City requirements shall be provided.
11. The development falls within the R-14 zone which has a maximum impervious surface area of 80% per lot.
12. A Construction Stormwater Permit from Department of Ecology is required if clearing and grading of the site
exceeds one acre. If required, applicant must obtain permit and provide proof prior to Civil Permit issuance.
13. The development is subject to a surface water system development charge (SDC) fees. Fees will be charged
based on the rate at the time of construction permit issuance.
The current SDC fee is $0.80 per square foot of new impervious surface but not less than $2,000.
Pertovitsky Apartments – PRE21-000308
Page 3 of 4
September 2, 2021
TRANSPORTATION
1. Per City code 4-6-060 frontage improvements are required for new construction in excess of $150,000.
The proposed project fronts SE Petrovitsky Road along the south property line. SE Petrovitsky Road is
classified as a 5 lane Principal Arterial with an existing paved width of approximately 60 feet consisting
of four travel lanes and center turn lane. Existing Right-of-Way (ROW) width is approximately 92 feet
however the road centerline is offset and there is approximately 42 feet of ROW from the centerline to
property line per the King Conty Assessors map. To meet the City’s complete street standards for 5 lane
Principal Arterial streets, minimum ROW is 103 feet. Per City code 4-6-060 half street improvements
shall include a pavement width of 66 feet (33 feet from centerline), a 0.5-foot curb, an 8-foot planting
strip, an 8-foot sidewalk, a 2-foot clear space at back of walk, street trees and storm drainage
improvements.
a. However, SE Petrovitsky Road lies within the adopted Renton Trails and Bicycle Master Plan.
This plan calls for a shared use path on the north side of Petrovitsky Road. Additionally, the
Transportation department has indicated that the existing curb-curb width is sufficient.
Therefore, half street improvements shall include retaining the existing pavement width
(approximately 30 feet from centerline), a 0.5 foot curb, an 8-foot planting strip, a 12 foot wide
shared use path, a 2-foot clear space at the back of walk, street trees and storm drainage
improvements. A modification is required for the alternate street section. Dedication of
approximately 10.5 feet is required for the improvements pending final survey.
2. Access to the site is proposed via a private street from the existing access easement. A copy of the
easement shall be included with the land use application.
a. The internal access street shall provide for fire access by being a minimum 20 feet wide with 25
foot inside and 45 foot outside turning radius and constructed to support a 30-ton vehicle with
75 PSI point loading.
3. For dead end roads in excess of 150 feet an approved fire access turnaround is required. See city code 4-
6-060.H for types of turnaround required.
4. Refer to City code 4-4-080 regarding driveway regulations.
5. All new and proposed electrical or communication utilities are required to be installed underground per
RMC 4-6-090.
6. Street lighting is required for a project that consists of more than four (4) residential units. See RMC 4-6-
060 for street lighting requirements.
7. Paving and trench restoration within the City of Renton right of way shall comply with the City’s Trench
Restoration and Street Overlay Requirements.
8. The development is subject to transportation impact fees. Fees will be charged based on the rate at the
time of construction permit issuance.
a. The current transportation impact fee is $6,717.10 per apartment.
GENERAL COMMENTS
1. If frontage improvements are required, all existing and proposed utility lines (i.e. electrical, phone, and cable
services, etc.) along property frontage or within the site must be underground as outlined in RMC 4-6-090 –
UTILITY LINES - UNDERGROUND INSTALLATION. The construction of these franchise utilities must be inspected
and approved by a City of Renton inspector.
Pertovitsky Apartments – PRE21-000308
Page 4 of 4
September 2, 2021
2. Maximum exposed retaining wall height is 6-ft and shall be setback a minimum of 3-ft from the right-of-way as
outlined in RMC 4-4-040 – Fences, Hedges and Retaining Walls.
3. Adequate separation between utilities as well as other features shall be provided in accordance with code
requirements.
a. 7-ft minimum horizontal and 1-ft vertical separation between storm and other utilities is required
with the exception of water lines which require 10-ft horizontal and 1.5-ft vertical.
b. The stormwater line should be minimum 5 feet away from any other structure or wall or building.
c. Trench of any utility should not be in the zone of influence of the retaining wall or of the building.
4. All construction utility permits for utility and street improvements will require separate plan submittals. All
utility plans shall confirm to the Renton Drafting Standards. A licensed Civil Engineer shall prepare the civil
plans. Please visit the Development Engineering Forms page for the most up-to-date plan submittal
requirements:
http://rentonwa.gov/business/default.aspx?id=42473
5. A landscaping plan shall be included with the civil plan submittal. Each plan shall be on separate sheets.
6. Fees quoted in this document reflect the fees applicable in the year 2021 only and will be assessed based on
the fee that is current at the time of the permit application or issuance, as applicable to the permit type.
Please visit www.rentonwa.gov for the current fee schedule.
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2020\PRE20-000274
DEPARTMENT OF COMMUNITY
& ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE:September 9, 2021
TO:Pre-application File No. 21-000308
FROM:Angelea Weihs, Associate Planner
SUBJECT:Petrovitsky Apartments – 11204 SE Petrovitsky Rd
General: We have completed a preliminary review of the pre-application for the above-
referenced development proposal. The following comments on development and permitting
issues are based on the pre-application submittals made to the City of Renton by the applicant
and the codes in effect on the date of review. The applicant is cautioned that information
contained in this summary may be subject to modification and/or concurrence by official
decision-makers (e.g., Hearing Examiner, Community & Economic Development Administrator,
Public Works Administrator, Planning Director, and City Council). Review comments may also
need to be revised based on site planning and other design changes required by City staff or
made by the applicant. The applicant is encouraged to review all applicable sections of the
Renton Municipal Code. The Development Regulations are available online at
https://www.codepublishing.com/WA/Renton/.
Project Proposal: The project site is located within the Benson Community Planning Area at
11204 SE Petrovitsky Rd (Parcel Number 2923059029). According to the submittal documents,
the total site area is approximately 30,105 square feet (0.69 acres). The property is located in
the Residential-14 (R-14) zone and is designated Residential High Density in the Comprehensive
Plan. The applicant is proposing the construction of two new townhome structures with a total
of 9 units (5 units in one building and 4 units in the other building). There is an existing single-
family home, and existing accessory dwelling unit, and other accessory structures on site, all of
which are proposed for removal. Vehicular access to the site is proposed via an existing 20-foot
access easement granted by neighboring property to the east and an existing curb cut off of SE
Petrovitsky Rd. Based on COR Maps, the City’s mapping system, unregulated slopes are mapped
on the project site; however, no critical areas are mapped on the subject site.
Current Use: The property contains one (1) existing single-family structure and one (1) ADU,
both of which are proposed for removal.
Zoning: The subject property and surrounding area is located within the Residential High Density
(HD) land use designation and the Residential-14 (R-14) zoning classification. Attached dwellings
– Townhouses are a permitted use in the R-14 designation, provided the proposal complies
with the density range specified by the zone. The purpose of the Residential-14 Zone (R-14) is
to encourage development, and redevelopment, of residential neighborhoods that provide a
mix of detached and attached dwelling structures organized and designed to combine
characteristics of both typical single-family and small-scale multi-family developments. Structure
size is intended to be limited in terms of bulk and scale so that the various unit types allowed in
Petrovitsky Apartments, PRE21-000308
Page 2 of 7
September 9, 2021
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2021\PRE21-000308
the zone are compatible with one another and can be integrated together into a quality
neighborhood. Project features are encouraged, such as yards for private use, common open
spaces, and landscaped areas that enhance a neighborhood and foster a sense of community.
Development Standards: The project would be subject to RMC 4-2-110A, “Development
Standards for Residential Zoning Designations” effective at the time of complete application
(noted as “R-14 standards” herein). These standards are available on the City’s website.
Density – The subject property is located within the R-14 zoning classification. The density range
allowed in the R-14 zone is a minimum of 7.0 to a maximum of 14.0 dwelling units per net acre.
Density bonuses are possible for applicants requesting additional market-rate dwelling units in
exchange for the construction of affordable dwelling units (see RMC 4-9-065 for additional
information). The area of public and private streets (including frontage dedication) and critical
areas would be deducted from the gross site area to determine the “net” site area prior to
calculating density. Using the gross area of 0.69 acres, a 9 dwelling proposal arrives at a gross
density of roughly 13.0 du/ac (9 dwelling units / 0.69 acres = 13.0 du/ac), which is within the
density range permitted in the R-14 zone. Calculations for minimum or maximum density which
result in a fraction that is one-half (0.50) or greater shall be rounded up to the nearest whole
number. Those density calculations resulting in a fraction that is less than one-half (0.50) shall
be rounded down to the nearest whole number. A Density Worksheet would be required at the
time of building permit application. The applicant would be required to demonstrate
compliance with the net density requirements of the zone at the time of formal application.
Minimum Lot Size, Width and Depth – The minimum lot size in the R-14 zone is 3,000 square
feet. The minimum lot depth is 60 feet. The minimum lot width is 30 feet for interior lots and 40
feet for corner lots. No subdivision is proposed; therefore, the size, width, and depth standards
are not applicable.
Setbacks – Setbacks are the minimum required distance between the building footprint and the
property line and any private access easement. The required setbacks in the R-14 zone are 15
feet for the front yard (except when all vehicle access is taken from an alley, then 10 feet), 10
feet for the rear yards, secondary front yards (applies to corner lots) would be required to have
a 15-foot setback, and interior side yards are required to have a 4-foot setback. Setback
dimensions for the proposed new structures appear to comply with setback requirements.
Setbacks for the new structures would be verified for compliance at the time of building permit
review.
Building and Impervious Surface Coverage – The maximum building coverage in the R-14 zone is
65 percent. The maximum impervious surface coverage is 80 percent of total lot area. The
coverage requirements would be verified at the time of building permit application.
Building Height – The maximum wall plate height is 24 feet, with the possibility to increase up to
32 feet with an administrative conditional use permit. The maximum story limit is 3 stories.
Roofs with a pitch equal to or greater than 4:12 may project an additional six (6) vertical feet
from the maximum wall plate height; common rooftop features, such as chimneys, may project
an additional four (4) vertical feet from the roof surface. Non-exempt vertical projections (e.g.,
decks, railings, etc.) shall not extend above the maximum wall plate height unless the projection
is stepped back one-and-a-half (1.5) horizontal feet from each façade for each one (1) vertical
foot above the maximum wall plate height. The pre-application materials indicated that the
proposed buildings are 3 stories; however, the materials did not indicate the proposed
Petrovitsky Apartments, PRE21-000308
Page 3 of 7
September 9, 2021
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2021\PRE21-000308
building height. The applicant would be required to demonstrate compliance with the height
requirements of the zone at the time of building permit application.
Maximum Number of Units per Building – No more than six (6) units per building. The project
proposal complies with the maximum number of units permitted per building.
Residential Design and Open Space Standards: All new residential dwelling units in the R-14
zone would be subject to the Residential Design Standards outlined in RMC 4-2-115. For
example, dwellings shall be arranged to ensure privacy so that side yards abut other side yards
(or rights-of-way) and do not abut front or back yards. Lots accessed by easements or pipestems
shall be prohibited. An open space requirement for four (4) or more units requires 350 square
feet of common open space for each unit. Open space shall be located in a highly visible area
and be easily accessible to the neighborhood. Open space(s) shall be contiguous to the majority
of the dwellings in the development and accessible to all dwellings. For sites larger than one
acre in size, open space(s) shall be at least forty feet (40') in at least one dimension. For all sites,
to allow for variation, open space(s) of less than the minimum dimension (thirty feet (30') or
forty feet (40'), as applicable) are allowed; provided, that when all of a site’s open spaces are
averaged, the applicable dimension requirement is met. Common open space areas shall have a
maximum slope of five percent (5%).
Standards for private yards require each ground-related dwelling to have a private yard that is at
least two hundred fifty (250) square feet in size with no dimension less than eight feet (8') in
width. See RMC 4-2-115 for additional information and standards.
Primary entries from each unit hall take access from and face a street, park, common green,
pocket park, pedestrian easement, or open space. Additionally, the entry shall include a porch
or stoop with a minimum depth of five feet (5') and minimum height twelve inches (12") above
grade. All site design, open space and residential design standards applicable to the R-14 zone
would be verified at the time of building permit application.
Refuse and Recycling Areas: Refuse and recycling areas need to meet the requirements of RMC
4-4-090, “Refuse and Recyclables Standards.” Single family and two (2) attached residences
(duplexes) shall be exempt from refuse and recycling standards. For multi-family developments
a minimum of one and one-half (1-1/2) square feet per dwelling unit in multi-family residences
shall be provided for recyclables deposit areas, except where the development is participating in
a City-sponsored program in which individual recycling bins are used for curbside collection. A
minimum of three (3) square feet per dwelling unit shall be provided for refuse deposit areas. A
total minimum area of eighty (80) square feet shall be provided for refuse and recyclables
deposit areas. The proposed nine (9) townhomes (3-plex or greater) would require a minimum
of 80 square feet for refuse and recyclables deposit areas.
Multi-family residences using thirty-five (35) gallon garbage carts or smaller must be provided
either within the garage or outside. Storage within a garage must be appropriately sized to
accommodate both vehicles and refuse and recycling carts. Storage space for carts must
measure at least two feet by six feet (2’ x 6’) floor area and sixty inches (60”) high. This space
must be identified on floor plans. Storage located outside must measure at least two feet by six
feet (2’ x 6’) in size and be located on the same lot as the dwelling in a side or rear yard. Outdoor
storage must be adequately screened from public view, made of wood, masonry, or ornamental
metal. The submitted material does not show compliance with the refuse and recycling
standards. Compliance with the refuse and recyclable standards for multi-family use must be
Petrovitsky Apartments, PRE21-000308
Page 4 of 7
September 9, 2021
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2021\PRE21-000308
demonstrated at the time of building permit application. See RMC 4-4-090 for additional
information and standards.
Landscaping: With the exception of critical areas, all portions of the development area not
covered by structures, required parking, access, circulation or service areas, must be landscaped
with native, drought-resistant vegetative cover. The minimum on-site landscape width required
along street frontages is 10 feet and shall contain trees, shrubs, and landscaping. Street trees in
the ROW planter will also be required. Landscaping may include hardscape such as decorative
paving, rock outcroppings, fountains, plant containers, etc. Minimum planting strip widths
between the curb and sidewalk are established according to the street development standards
of RMC 4-6-060. Street trees and, at a minimum, groundcover are to be located in this area
when present. Street trees shall be planted in the center of the planting strip between the curb
and the sidewalk at the following intervals; provided, that, where right-of-way is constrained,
irregular intervals and slight increases or decreases may be permitted or required. Additionally,
trees shall be planted in locations that meet required spacing distances from facilities located in
the right-of-way including, but not limited to, underground utilities, street lights, utility poles,
traffic signs, fire hydrants, and driveways; such spacing standards are identified in the City’s
Approved Tree List. Generally, the following spacing is required: i. Small-sized maturing trees:
thirty feet (30') on center; ii. Medium-sized maturing trees: forty feet (40') on center; and iii.
Large-sized maturing trees: fifty feet (50') on center. A conceptual landscape plan shall be
provided with the building permit application as prepared by a registered Landscape Architect,
a certified nurseryman or other certified professional.
All surface parking lots shall have perimeter landscaping. Such landscaping shall be at least ten
feet (10') in width as measured from the street right-of-way. Standards for planting shall be as
follows: Trees shall be two-inch (2") caliper for multi-family, commercial, and industrial uses at
an average minimum rate of one tree per thirty (30) lineal feet of street frontage; Shrubs at the
minimum rate of one per twenty (20) square feet of landscaped area. Up to fifty percent (50%)
of shrubs may be deciduous; and Ground cover in sufficient quantities to provide at least ninety
percent (90%) coverage of the landscaped area within three (3) years of installation.
Storm drainage facilities are required to comply with the minimum 15-foot perimeter
landscaping strip on the outside of the fence unless otherwise determined through the site plan
review or subdivision review process. Please refer to landscape regulations RMC 4-4-070 for
further general and specific landscape requirements.
Utility boxes that are not located in alleyways or away from public gathering spaces shall be
screened with landscaping or berms.
Significant Tree Retention: If significant trees (greater than 6-inch caliper or 8-caliper inches for
alders and cottonwoods) are proposed to be removed, a tree inventory, tree retention plan,
arborist report, and tree retention worksheet shall be provided with the formal land use
application as defined in RMC 4-8-120. The tree retention plan must show preservation of at
least 20% of significant trees, and indicate how proposed building footprints would be sited to
accommodate preservation of significant trees that would be retained (RMC 4-4-130H1.a).
When the required number of protected trees cannot be retained, replacement trees, with at
least a two-inch (2") caliper or an evergreen at least six feet (6') tall, shall be planted at a rate of
twelve (12) caliper inches of new trees to replace each protected tree removed.
Significant trees shall be retained in the following priority order:
Petrovitsky Apartments, PRE21-000308
Page 5 of 7
September 9, 2021
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2021\PRE21-000308
Priority One: Landmark trees; significant trees that form a continuous canopy; significant trees
on slopes greater than 20%; significant trees adjacent to critical areas and their associated
buffers; and significant trees over 60’ in height or greater than 18” caliper.
Priority Two: Healthy tree groupings whose associated undergrowth can be preserved; other
significant native evergreen or deciduous trees; and other significant non- native trees.
Priority Three: Alders and cottonwoods shall be retained when all other trees have been
evaluated for retention and are not able to be retained, unless the alders and/ or cottonwoods
are used as part of an approved enhancement project within a critical area or its buffer.
The Administrator may require independent review of any land use application that involves
tree removal and land clearing at the City's discretion. According to COR Maps, existing trees
are present on site; however, the pre-application materials not indicate the preservation of
any existing trees. A formal tree retention plan prepared by an arborist or landscape architect
would be reviewed at the time of building permit application to verify compliance with tree
retention regulations.
Tree Density Requirements: Multi-family developments shall maintain a minimum tree density
of four (4) significant trees for every 5,000 square feet.
Fences/Retaining Walls: Any proposed fences must be designated on the landscape plan.
Retaining walls shall be composed of brick, rock, textured or patterned concrete, or other
masonry product that complements the proposed building and site development. There shall be
a minimum three-foot (3') landscaped setback at the base of retaining walls abutting public
rights-of-way. Please refer to retaining wall and fence standards (RMC 4-4-040) for additional
information.
Parking: Townhouses require a minimum of two (2) parking spaces per dwelling unit; however,
one (1) parking space per dwelling unit may be permitted for one (1) bedroom or less dwelling
units. Tandem parking is allowed. Parking spaces within the garages shall be a minimum of
9’x20’. Bicycle parking would only be required for residential developments that exceed five (5)
residential units. The proposal would be required to provide one-half (0.5) bicycle parking
space per dwelling unit.
The bicycle parking provided for the residents shall provide for secure extended use and shall
protect the entire bicycle and its components and accessories from theft and weather.
Acceptable examples include bike lockers, bike check-in systems, in-building parking, and limited
access fenced areas with weather protection. Spaces within the dwelling units or on balconies
do not count toward the bicycle parking requirement. However, designated bicycle parking
spaces within individual garages can count toward the minimum requirement.
Please review RMC 4-4-080.F.10 and RMC 4-4-080.F.11 for further general and specific bicycle
parking requirements.
Access/Driveways: Vehicular access to the site is proposed via an existing 20-foot access
easement granted by neighboring property to the east and an existing curb cut off of SE
Petrovitsky Rd. The maximum driveway slopes cannot exceed 15%. If the grade exceeds 15%, a
variance is required. Driveways exceeding 8% shall provide slotted drains at the lower end with
positive drainage discharge to restrict runoff from entering the residences or crossing any public
sidewalks. Per the residential design standards of RMC 4-2-115, lots accessed by easements or
pipestems are prohibited. Compliance with street requirements and minimum standards shall
be demonstrated at the time of formal land use application.
Petrovitsky Apartments, PRE21-000308
Page 6 of 7
September 9, 2021
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2021\PRE21-000308
Critical Areas: Based on the City’s Critical Areas Maps, there appears to be no critical areas
onsite. It is the applicant’s responsibility to ascertain whether any additional critical areas or
environmental concerns are present on the site during site development or building
construction.
Environmental Review: Based on the project proposal, the project is exempt from
environmental review. The construction of 9 multifamily residential dwelling units or less on a
project site is exempt from Environmental (SEPA) Review in accordance with local modification
set forth in RMC 4-9-070G.1b.
Permit Requirements: The proposal would require a building permit if bonus density is not
requested and increased height is not requested. Density bonus review would require an
administrative site plan review application and increased wall plate height would require an
administrative conditional use permit application, both Type II land use permits. The building
permit fees are based on the value of the proposed structures. Once a building permit
application is submitted, the initial review would be completed in an estimated time frame of
approximately 6 weeks.
Detailed information regarding the building permit application submittal can be found on the
City’s new website by clicking “Permits” on the Community & Economic Development page, and
then "Commercial/Multifamily". Other informational applications and handouts can be found
on the City’s Digital Records Library. The City requires electronic plan submittal for all
applications. Please refer to the City’s Electronic File Standards.
Public Information Sign: Public Information Signs are required for all Type II and Type III Land
Use Permits as classified by RMC 4-8-080. Public Information Signs are intended to inform the
public of potential land development, specific permits/actions being considered by the City, and
to facilitate timely and effective public participation in the review process. The applicant must
follow the specifications provided in the public information sign handout. The applicant is solely
responsible for the construction, installation, maintenance, removal, and any costs associated
with the sign.
Impact Fees: In addition to the applicable building and construction fees, impact fees would be
required. Such fees would apply to all projects and would be payable prior to building permit
issuance. The 2021 impact fees are as follows:
Fire Impact Fee currently assessed at $964.53 per new multi-family dwelling unit;
Transportation Impact Fee assessed at $6,717.10 per new multi-family dwelling unit;
Renton School District Impact Fee assessed at $4,989 per new multi-family dwelling unit
(+5% administrative fee); and
Parks Impact Fee currently assessed at $1,977.62 (5 or more units) per new dwelling unit.
A handout listing Renton’s development-related fees is available on the City of Renton website
for your review.
Next Steps: When the formal application materials are complete, should a land use application
be needed, the applicant shall have the application materials pre-screened prior to submitting
the complete application package. Please contact Angelea Weihs, Associate Planner at
aweihs@rentonwa.gov or 425-430-7312 for an appointment.
Petrovitsky Apartments, PRE21-000308
Page 7 of 7
September 9, 2021
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2021\PRE21-000308
Expiration: Upon approval, the building permit is valid for one year with a possible one