Loading...
HomeMy WebLinkAboutNOA_Project Acceptance_210909DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR21-000350 Boeing Apron D Slot Drain Replacement / LUA21-000343, SSDP Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: September 9, 2021 PROJECT NAME/NUMBER: PR21-000350 Boeing Apron D Slot Drain Replacement / LUA21-000343, SSDP PROJECT LOCATION: 737 Logan Ave N (APN's 0723059046 & 0723059001) APPLICANT/PROJECT CONTACT PERSON: Mark Clement, The Boeing Company / 737 Logan Ave N, Renton, WA 98057 / mark.d.clement@boeing.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/QWZExgy PROJECT DESCRIPTION: The applicant is requesting a Shoreline Substantial Development Permit for a storm water slot drain installation on Apron D at the Boeing plant site. The subject properties (APN 0723059001 and 0723059046) are located to the east of the Cedar River along the southern shore of Lake Washington. The site, home to the Boeing 737 plant and associated support buildings, is located in the Urban Center (UC) zone and has a Comprehensive Plan designation of Commercial Mixed Use (CMU). The project would include saw cutting and removing approximately 750 sq. ft. of existing concrete followed by the installation of approximately 96 linear feet of 13-inch slot drain to be connected to an existing catch basin. The proposed work would occur approximately 105 feet from the Cedar River Ordinary High Water Mark (OHWM) at the closest point. A High Seismic Hazard is mapped on the project site. In addition, the proposed work would occur within the Cedar River Reach A regulated shoreline area (Shoreline High Intensity overlay). No change in access to the site is proposed and no new impervious surface would be added. According to the applicant, no tree or vegetation removal would occur a part of the project. The applicant submitted a stormwater memo and Habitat Data Narrative Report with the application. DATE OF APPLICATION: September 9, 2021 NOTICE OF COMPLETE APPLICATION: September 9, 2021 PERMITS/REVIEW REQUESTED: Shoreline Substantial Development Permit OTHER PERMITS WHICH MAY BE REQUIRED: Construction Permit REQUESTED STUDIES: Drainage Report and Habitat Report Comments on the above application must be submitted in writing by 5:00 PM on September 23, 2021. Per RMC 4-9- 190.E.6, a thirty (30) day public comment is required for all Shoreline Development Permit applications. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. NOTICE DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT CONTACT PROJECT PLANNER: Alex Morganroth, Senior Planner Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov N 6th St Logan Ave N