Loading...
HomeMy WebLinkAboutEx_06_C_Advisory_Notes_Cypress_LaneDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 2 LUA21-000287 ADVISORY NOTES TO APPLICANT The following notes are supplemental information provided in conjunction with the administrative land use action. Because these notes are provided as information only, they are not subject to the appeal process for the land use action. Planning: (Contact: Jill Ding, 425-430-6598, jding@rentonwa.gov) 1. RMC section 4-4-030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless otherwise approved by the Development Services Division. 2. Commercial, multi-family, new single family and other nonresidential construction activities shall be restricted to the hours between seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m. and eight o’clock (8:00) p.m. No work shall be permitted on Sundays. 3. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an appropriate ground cover over any portion of the site that is graded or cleared of vegetation and wh ere no further construction work will occur within ninety (90) days. Alternative measures such as mulch, sodding, or plastic covering as specified in the current King County Surface Water Management Design Manual as adopted by the City of Renton may be proposed between the dates of November 1st and March 31st of each year. The Development Services Division’s approval of this work is required prior to final inspection and approval of the permit. 4. A National Permit Discharge Elimination System (NPDES) permit is required when more than one acre is being cleared. 5. The applicant may not fill, excavate, stack or store any equipment, dispose of any materials, supplies or fluids, operate any equipment, install impervious surfaces, or compact the earth in any way with in the area defined by the drip line of any tree to be retained. 6. The applicant shall erect and maintain six foot (6') high chain link temporary construction fencing around the drip lines of all retained trees, or along the perimeter of a stand of retained trees. Placards shall be placed on fencing every fifty feet (50') indicating the words, “NO TRESPASSING – Protected Trees” or on each side of the fencing if less than fifty feet (50'). Site access to individually protected trees or groups of trees shall be fenced and signed. Individual trees shall be fenced on four (4) sides. In addition, the applicant shall provide supervision whenever equipment or trucks are moving near trees. Development Engineering: (Contact: Nathan Janders, 425-430-7382, njanders@rentonwa.gov) 1. See Attached Development Engineering Memo dated August 12, 2021 Fire Authority: (Contact: Corey Thomas, 425-276-9582, cthomas@rentonrfa.org) 1. The fire impact fees are currently applicable at the rate of $829.77 per single family unit . This fee is paid at time of building permit issuance. Credit will be granted for any existing homes that are removed or retained. 2. The fire flow requirement for a single-family home is 1,000 gpm minimum for dwellings up to 3,600 square feet (including garage and basements). If the dwelling exceeds 3,600 square feet, a minimum of 1,500 gpm fire flow would be required. A minimum of one fire hydrant is required within 300-feet DocuSign Envelope ID: CA0F9445-1A24-40E1-824B-9EB5CF286C6E ADVISORY NOTES TO APPLICANT Page 2 of 2 LUA21-000287 of the proposed buildings and two hydrants if the fire flow goes up to 1,500 gpm. Water is provided by King County Water District 90. 3. Fire department apparatus access roadways are required to be a minimum of 20-feet wide fully paved, with 25-feet inside and 45-feet outside turning radius. Fire access roadways shall be constructed to support a 30-ton vehicle with 75-psi point loading. Access is required within 150-feet of all points on the buildings. Technical Services: (Contact: Amanda Askren, 425-430-7369, aaskren@rentonwa.gov) 1. None Community Services: (Contact: Leslie Betlach, 425-430-6619, lbetlach@rentonwa.gov) 1. Parks Impact fee per Ordinance 5670 applies. Police: (Contact: Cyndie Parks, 425-430-7521, cparks@rentonwa.gov) 1. None Building: (Contact: Rob Shuey, 425-430-7235, rshuey@rentonwa.gov) 1. None DocuSign Envelope ID: CA0F9445-1A24-40E1-824B-9EB5CF286C6E DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: August 12, 2021 TO: Jill Ding, Senior Planner FROM: Nathan Janders, Civil Engineer III SUBJECT: Cyprus Lane Plat 5816 NE 4th Pl LUA21-000287 I have reviewed the application for the Cyprus Lane Plat located at 5816 NE 4th Pl and have the following comments: EXISTING CONDITIONS The site comprises three existing parcels (1123059021, 1123059023 and 1123059031), is approximately 212,866 square feet in size and is a L shape. The site currently contains a single-family home and outbuilding on parcel 1123059021, a single family home on parcel 1123059031 and parcel 1123059023 is vacant. The site is fronted by NE 4th Pl to the south, Nile Ave NE to the west and private property to the east and north. WATER: The proposed development is within King County Water District 90’s water service area. SEWER: The proposed development is within the City’s sewer service area. There is an existing 8 -inch gravity wastewater main located in NE 4th Pl (record drawing S-295103), located south of the proposed site, conveying wastewater west. 3. There is an existing 8-inch gravity wastewater main located in an easement (KC recording number 20031022001986) on parcel 112305914 (see record drawing S-310201). There is an existing 8-inch gravity wastewater main located in Nile Ave NE to the north of the project (see record drawing S-318718) and to the south of the project (see record drawing S-291704). The existing homes are not connected to the City sewer system. STORM: The site is generally sloped from the northeast to the southwest. There is an outfall at the north property line abutting Orcas Ave NE. There is an existing 12-inch public stormwater main on the south side of NE 4th Pl (see record drawing R-295106). There is an existing 18-inch public stormwater main on the east side of Nile Ave NE (see record drawing R-310207). There is no existing on site stormwater conveyance system. STREETS: The proposed development fronts NE 4th Pl along the south property line. NE 4th Pl is classified as a Residential Access street. Existing right-of-way (ROW) width, according to the King County Assessor Map, is 28.5 feet however the centerline is offset and approximately 12 feet of ROW DocuSign Envelope ID: CA0F9445-1A24-40E1-824B-9EB5CF286C6E Cyprus Lane Plat– LUA21-000287 Page 2 of 7 August 12, 2021 fronts the property. The proposed development fronts Nile Ave Ne along the west property line. Nile Ave NE is classified as a collector arterial street. The existing ROW width, according to the King County Assessors Map, is 60 feet. The proposed development fronts Pasco Ave NE along a portion of the north property line. Pasco Ave NE is classified as a residential Access street. Existing ROW width, according to the King County Assessor Map, is 30 feet. WATER COMMENTS 1. Water service is provided by King County Water District 90. 2. Applicant shall obtain a water availability certificate from the District and provide it with the civil construction permit submittal. 3. Review of the water plans will be conducted by King County Water District 90 and the Renton Regional Fire Authority. 4. Plans approved by King County Water District 90 shall be routed to the City for final review prior to permit issuance. SEWER COMMENTS 1. A minimum 8-inch sewer main extension will be required to extend to the northernmost property line at Orcas Ave NE and Pascoe Ave NE from either NE 4th Pl or a combination of NE 4th Pl and the sewer on parcel 112305914. Sewer main extensions shall be in accordance with RMC 4-6-060. Addition extension of the sewer main may be required depending on final configuration of public roads. Any sewer main on private property will require a 15 ft wide public utility easement. 2. A minimum 8-inch sewer main extension will be required along the full property frontage along Nile Ave NE. a. Although the proposed layout does not extend along the full property frontage it is acceptable as all adjacent properties along the frontage have or will have service. 3. Individual sewer stubs from the new sewer main and individual side sewers are required for each lot. All new sewer stubs shall conform to the standards in RMC 4 -6-060 and City of Renton Standard Details. a. The proposed layout indicates a joint use sewer for lots 9/12 and lots 10/11 which is not compliant. Individual sewer stubs are required and may be placed in a joint trench. A private sewer easement is required for side sewers passing through lots other than the lot being serviced. 4. The site is served by a private on-site-septic system. The septic system shall be abandoned in accordance with King County Department of Health regulations and the Renton Municipal Code. 5. The development is subject to a wastewater system development charge (SDC) fee. SDC fee for sewer is based on the size of the new domestic water to serve the project. Current fees can be found in the 2021 Development Fees Document on the City’s website. Fees will be charged based on the rate at the time of construction permit issuance. a. The current sewer fee for is $3,450.00 per 1-inch meter. b. Final determination of applicable fees will be made after the water meter size has been determined. c. The full fee schedule can be found at: https://edocs.rentonwa.gov/Documents/DocView.aspx?id=8373700&dbid=1&repo=City ofRenton DocuSign Envelope ID: CA0F9445-1A24-40E1-824B-9EB5CF286C6E Cyprus Lane Plat– LUA21-000287 Page 3 of 7 August 12, 2021 6. The East Renton Interceptor Special Assessment District (SAD) is applicable on the project. The SAD has reached its maximum assessment and is $316.80 per lot. Fees are due at the time of construction permit issuance. STORM DRAINAGE COMMENTS 1. A geotechnical report dated February 2, 2021, completed by Cobalt Geosciences, was provided with the Land Use Application. The report discusses the soil and groundwater characteristics of the site and provides recommendations for project design and construction. Geotechnical recommendations presented in this report do not support the use of infiltration. 2. Core Design, with the Land Use Application, submitted a Preliminary Drainage Plan and Technical Information Report (TIR), dated June 28, 2021. Based on the City of Renton’s flow control map, the site falls within the Flow Control Duration Standard- Matching Forested and is within the Lower Cedar River Drainage Basin. The report is based on a Full drainage review and Core Requirements 1 thru 9 and the six Special Requirements have been discussed in the Technical Information Report. a. Offsite Analysis, RSWDM Core Requirement #2: All proposed projects must submit an offsite analysis report that assesses potential offsite drainage and water quality impacts associated with development of the project site. The preliminary TIR submittal includes a Level 1 Downstream Analysis. i. The analysis indicates that there is negligible upstream tributary area, however, there is an existing outfall on the site. The proposed plans appear to remove the outfall and connect it to a conveyance system, however, the conveyance system depicted is not mapped in the City GIS nor is shown in as-builts. Applicant must verify conveyance system and provide verification that existing conveyance system can support the additional flows and demonstrate compliance with section 1.2.3.2.F. b. Flow Control, RSWDM Core Requirement #3: Any proposed detention and/or water quality vault shall be designed in accordance with the RSWDM that is current at the time of civil construction permit application. The project proposes two detention vaults, one within Tract A and one within Tract B. i. Modeling indicates that each lot has 4,000 SF of impervious surface, however zoning would allow for more impervious surface. Total effective impervious surface shall be restricted on the Plat such that the total of all lots in each basin is consistent with the lot impervious surface modeled. c. Conveyance, RSWDM Core Requirement #4: All new conveyance systems constructed as part of the project must be sized to RSWDM standards for the total tributary area (onsite and offsite) that the storm systems serve. The proposal indicates that an analysis will be addressed during final design. i. A conveyance capacity analysis shall be provided as part of the TIR included with the Civil Construction Permit application. d. Construction Stormwater Pollution Prevention, Core Requirement #5: The proposal indicates that a plan will be addressed during final design. i. A CSWPP plan shall be provided as part of the TIR and construction plans included with the Civil Construction Permit application. e. Maintenance and Operations, Core Requirement #6: The proposal indicates that a maintenance and operation manual will be addressed during final design. DocuSign Envelope ID: CA0F9445-1A24-40E1-824B-9EB5CF286C6E Cyprus Lane Plat– LUA21-000287 Page 4 of 7 August 12, 2021 i. A maintenance and operation manual shall be provided as part of the TIR and included with the Civil Construction Permit application. f. Water Quality, RSWDM Core Requirement #8: All projects that add more than 5,000 square feet of pollution generating impervious surface that is not fully dispersed and less than 0.75 acre of pollution generating pervious surface that is not fully dispersed require water quality. The TIR proposes wetvaults to meet the core requirement. g. Onsite BMPs, RSWDM Core Requirement #9: Appropriate on-site BMPs will be required to help mitigate the new runoff created by this development. The proposal discusses the feasibility of each BMP as listed in section 1.2.9.2.1 Small Lot BMP requirements. i. Each BMP feasibility shall be explicitly assessed with specific infeasibility criteria cited where not feasible. ii. Applicant may be able to obtain facility sizing credits for core requirement #3 based on review and implementation of BMP’s per section 1.2.9.4 of the RSWDM. 2. There is a 2021 system Development Charge of $2,100 per new single family residence. SDC fees are payable at construction permit issuance. a. A credit will be applied if the existing house is demoed. TRANSPORTATION/STREET COMMENTS 1. Frontage improvements are required for all new construction with valuation in excess of $150,000. The proposed development fronts Nile Ave NE along the west property line, NE 4th Pl along the south property line, Pasco Ave NE along a portion of the north property line, Orcas Ave NE along a portion of the north property line, and private property along all other sides. a. The proposed project fronts NE 4th Pl along the south property line. NE 4th Pl is classified as a Residential Access street with an existing ROW of approximately 28.51-feet per the King County Assessors Map, however the centerline is offset and approximately 12 feet of ROW fronts the property. Per RMC 4-6-060, the minimum ROW width for a Residential Access street is 53-feet that includes a 26-foot paved road (13 feet from centerline), a 0.5- foot curb, an 8-foot planting strip, a 5 foot sidewalk, street trees and storm drainage improvements. Approximately 14.5 feet of dedication will be required pending final survey. i. The proposed plan shows 14.5 feet of dedication which is acceptable. ii. The proposed plan identifies frontage ending at the west property line. The street frontage shall be extended with a transition to tie into the existing curb and sidewalk. b. The proposed project fronts Nile Ave NE along the west property line. Nile Ave NE is classified as a collector arterial street with an existing ROW of approximately 60 feet per the King County Assessor Map. Per RMC 4-6-060, the minimum right-of-way width for a Collector Arterial street with 2 lanes is 83 feet that includes a 46 foot paved road (23 feet from centerline), a 0.5 foot curb, an 8 foot planting strip, an 8 foot sidewalk, street trees and storm drainage improvements. i. However, the adopted Renton Trails and Bicycle Master Plan includes a modified street section for the portion of Nile Ave NE fronting the site. The street section reduces the pavement width to 44 feet (22 feet from centerline) which includes one 11 foot travel lane in each direction, one 12 foot two-way turn lane, one 5 foot bike lane in each direction and no on-street parking. The modified street DocuSign Envelope ID: CA0F9445-1A24-40E1-824B-9EB5CF286C6E Cyprus Lane Plat– LUA21-000287 Page 5 of 7 August 12, 2021 standard requires a minimum ROW of 73 feet. Half street improvements shall include a pavement width of 22 feet, a 0.5 foot curb, an 8 foot planting strip a 5 foot sidewalk, a 1 foot clear space at back of walk, street trees and storm drainage improvements. Dedication of approximately 6.5 feet will be required pending the final survey. 1. A modification request was submit with the land use application for the above listed improvements. Staff has reviewed the request and recommends approval of the modification. c. The proposed project fronts Pasco Ave NE along a portion of the easternmost side of the north property line. Pasco Ave NE is a residential access street with an existing ROW of approximately 30 feet. Pasco Ave NE shall be extended such that it connects to Orcas Ave NE with improvements as per code. i. The proposed plan identifies an extension of Pasco Ave NE to the new through road as a 20 foot public alley which is acceptable provided that the alley meets minimum fire access requirements for loading and turning. Therefor e, staff recommends as a condition of approval that the alley shall provide pavement that can support a 30 ton firetruck with 75 PSI point load and that minimum inside an outside turning radii shall be 25 feet and 45 feet respectively. ii. The south end of Pasco Ave NE is unimproved and proposed plan terminates the alley at the property line. Applicant shall extend the proposed alley such that it connects to Pasco providing a paved through street. d. The project falls within the East Plateau Planning Area. The plan requires a through road for the extension of Orcas Place NE to Orcas Ave NE. The internal access road shall be a Residential Access street. Per RMC 4-6-060, the minimum right of way width for a Residential Access street is 53-feet that includes a 26-foot paved road (13 feet from centerline), a 0.5-foot curb, an 8-foot planting strip, a 5 foot sidewalk, street trees and storm drainage improvements. i. The proposed plan provides the required roadway extension which is acceptable. 2. Street lighting improvements are required for projects consisting of more than four (4) homes. a. The proposed plan does not identify street lighting. Street lighting conforming to the street light standards in RMC 4-6-060.I shall be provided along Nile Ave NE, NE 4th Pl and the new internal access Road A. Street lighting plans and a photometric study shall be included with the civil construction permit submittal. 3. Joint use driveways are allowed for access up to 2 lots provided that each lot abuts a public right- of-way. Refer to the shared driveway requirements as outlined in RMC 4-4-080I. Joint use access to the driveway shall be assured by easement or other legal form acceptable to the City. a. Proposal indicates a joint use driveway along the shared property line of lots 11 and 12 assured by an easement which is acceptable. 4. Refer to City code 4-4-080 regarding driveway regulations. a. A minimum separation of 5 feet is required between driveway and the property line. b. Maximum driveway slopes shall not exceed 15%. Driveways exceeding 8% shall provide slotted drains. c. The maximum width of single loaded garage driveway shall not exceed nine feet (9') and double-loaded garage driveway shall not exceed sixteen feet (16'). 5. Paving and trench restoration within the City of Renton right of way shall comply with the City’s Restoration and Overlay requirements. DocuSign Envelope ID: CA0F9445-1A24-40E1-824B-9EB5CF286C6E Cyprus Lane Plat– LUA21-000287 Page 6 of 7 August 12, 2021 6. The 2021 Transportation Impact Fee per single family dwelling is $10,861.69. The transportation impact fee that is current at the time of building permit application will be levied, payable at building permit issuance. A credit for the existing home will be applied. GENERAL COMMENTS 1. The fees listed are for 2021. The fees that are current at the time of the respective permit issuance will be levied. Please see the City of Renton website for the current fee schedule. 2. All civil plans shall conform to the current City of Renton survey and drafting standards. Current drafting standards can be found on the City of Renton website. 3. A separate plan submittal will be required for a construction permit for utility work and street improvements. All plans shall be prepared by a licensed Civil Engineer in the State of Washington. 4. Please see the City of Renton website for the Construction Permit Application and Construction Permit Process and Submittal Requirements. Please contact the City to schedule a construction permit intake meeting. 5. All utility lines (i.e. electrical, phone, and cable services, etc.) serving the proposed development must be underground in accordance with RMC 4-6-090. The construction of these franchise utilities must be inspected and approved by a City of Renton inspector. 6. Retaining walls that are 4’ or taller from bottom of footing and stormwater detention vaults will require a separate building permit. Structural calculations and plans prepared by a licensed engineer will be required as part of the building permit review. 7. Paving and trench restoration within the City of Renton right of way shall comply with the City’s Trench Restoration and Street Overlay Requirements. 8. Adequate separation between utilities as well as other features shall be provided in accordance with code requirements. a. 7-feet minimum horizontal and 1-foot vertical separation between storm and other utilities is required with the exception of water lines which require 10- feet horizontal and 1.5-feet vertical. b. The stormwater line should be minimum 5 feet away from any other structure or wall or building. c. Trench of any utility should not be in the zone of influence of the retaining wall or of the building. DocuSign Envelope ID: CA0F9445-1A24-40E1-824B-9EB5CF286C6E