FIELD REPORT
Date Project Name Project No. Report No.
2021-09-20 Bethany Corner 20160674E002 025
Location Municipality AESI Project Manager AESI Field Rep
16451 111th Ave SE Renton Matthew A. Miller, P.E. Josh Greer
Permit No. Client/Owner Attn Requested By
Mark Seek (Tiger Mountain Homes) Mark Seek Client
Engineer/Architect General Contractor Paving Contractor Weather
D.R. Strong Tiger Mountain Homes / Mark Seek Becker Blacktop / Joe Sunny, 70’s
THE FOLLOWING WAS NOTED:
Associated Earth Sciences, Inc. (AESI) arrived on site at approximately 12:30 PM to observe a building foundation
subgrade. While on site, we met with Mark with Tiger Mountain Homes.
Foundation Subgrade Observations (Lot 9 ADU):
Upon arrival, the foundation subgrade for the Lot 9 ADU was overexcavated approximately 6 feet. AESI observed that
overexcavation had progressed through approximately 6 feet of loose fill soil and encountered dense, native, lodgement
till at the bottom of the excavation. Mark Seek indicated that the Lot 9 ADU foundation would be backfilled back up to the
planned foundation grade with on-site soil.
While on site, AESI notified Mark Seek of all observations. AESI will return upon request to continue foundation subgrade
observations.
Figure 1: Site Plan with Observed Location
N
Lot 9 ADU
overexcavated