HomeMy WebLinkAboutAdden 06jlI Washington State
Department of Transportation
S u pplementa I Agreement Organization and Address
Number 6 KPG,P.S.
3131 Elliott Ave.,Suite 400
Original Agreement Number Seattle,WA 98121
CAG-15-089
Phone:(253)627-0720
Project Number Execution Date Completion Date
TED4003813 10/23/2015 12/31/2021
Project Title New Maximum Amount Payable
Rainier Ave South -Phase 4 (S 3rd St to NW 3rd P1)$3,173,539
Description of Work
Provide Right of Way acquisition services for Rainier Ave S -S 3rd Street to NE 3rd Place.KPG will subcontract with Epic Land
Solutions to provide these services.
The Local Agency of City of Renton
desires to supplement the agreement entered in to with KPG.P.S.
and executed on 10/23/20 15 and identified as Agreement No.AG-l5-089
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
Section 1,SCOPE OF WORK,is hereby changed to read:
Please see attached Exhibit 7,scope of work
II
Section IV,TIME FOR BEGINNING AND COMPLETION,is amended to change the number of calendar days
for completion of the work to read:No change -Completion date remains 12/31/2021
________________________________
III
Section V1 PAYMENT,shall be amended as follows:
This supplement adds $219,072 to the contract.Please see Exhibit D for specific breakdown.
as set forth in the attached Exhibit A,and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above,please sign in the Appropriate
spaces below and return to this office for final action.
By Jason Fritzler -KPG.P.S.By:.
consiJ11rsignature Approving Authority Signature
Date
DOT Form 140-063n.....:..A nnflnnc
4-20-2020
CAG-15-089, Adden #6-20
Mayor Armondo Pavone
EXHIBIT 7
MODIFIES EXHIBIT A OF THE ORIGINAL AGREEMENT AND EXHIBIT 6 OF SUPPLEMENT 5
SCOPE OF WORK
SUPPLEMENT 6
AGENCY: CITY OF RENTON
CONSULTANT: KPG, P.S.
CONTRACT: CAG-15-089
PROJECT: RAINIER AVE S - S 3" St to NW 3rd PI
A. PROJECT DESCRIPTION
The City of Renton is planning to continue infrastructure improvements to the Rainier Ave S
corridor with a new Phase 4. The approximate project limits of the new phase are between S 3rd
St and NW 3rd PI. Similar to Phase 3, this new phase includes infrastructure improvements for
enhanced transit mobility, traffic safety and pedestrian safety. Construction of Rainier Avenue S
- Phase 4 will be divided into two phases due to limited available construction funding. Phase 4A
(S 3rd St to S Tobin St) will be constructed first and followed by Phase 413 (S Tobin St to NW 3rd PI)
once funding becomes available. Design and right of way acquisition services will be performed
over the entire project length. The goals of Phase 4 are to enhance traffic flow, improve safety,
eliminate sub -standard conditions and provide an enhanced pedestrian environment.
B. PURPOSE
The City of Renton (AGENCY) is requesting that KPG, P.S. (CONSULTANT) begin Right of Way
(ROW) acquisition services for Rainier Ave S —S 3rd Street to NE 3rd Place Project (PROJECT). The
CONSULTANT will subcontract with Epic Land Solutions to provide these services. The
CONSULTANT will utilize approved contract Tasks 24 and 27 to manage and provide ROW support
to Epic Land Solutions respectively. This supplemental agreement includes the following ROW
efforts:
1. Title Report Updates, Examination, Clearance, and Pre -Closing
3. Property Rights Acquisition/Negotiations
4. Eminent Domain/Condemnation Support
5. WSDOT Right of Way Certification Consultation
E. TASK ASSUMPTIONS
1. Assumes 20 client meetings, monthly status report preparation, and related tasks.
2. Assumes 34 tax parcels with 28 unique owners are impacted.
3. Assumes multiple one on one meeting with each property owner.
4. Assumes Client will provide Right of Way document templates or Epic will provide WSDOT templates
for the AGENCY's review and approval.
City of Renton Page 1 of 4 KPG
Rainier Ave S — S 3rd St to NW 3rd PI
Supplement 6 31412020
5. Assumes 18 partial fee acquisitions, no full acquisitions or relocations.
6. Assumes 27 Temporary Construction Easement acquisitions.
7. Assumes 22 Permanent Utility Easement acquisitions.
8. Assumes approximately 5 complex/difficult acquisitions that could lead to Condemnation.
9. Condemnation preparation will be charged in addition to the Not to Exceed hourly rates above.
Court/Arbitration hearing preparation and/or testimony is two times the hourly rates provided above.
10. Assumes eminent domain support will include impasse letters, and copies, owner files and diaries
sent to the attorney. Deposition, court testimony and expert witness fees are additional, to be
compensated on a time and materials basis.
11. Assumes no Phase I or Phase II Site Assessments are required.
12. Assumes project has no delays and that scope can be completed within 9 months from NTP.
13. Deposition, court testimony and expert witness fees are additional, to be compensated on a time
and materials basis.
14. Litigation guaranties are not included but can be provided for an additional fee.
15. Legal descriptions of right of way area, plat maps, project plans, and right-of-way maps will be
provided by City of Renton or KPG at the Notice -to -Proceed.
16. Epic will request updated title reports for all 28 parcels. Cost of updated title reports will be billed
directly to the AGENCY as a Direct Cost.
17. Epic will conduct a detailed analysis of the title. Tasks related to title clearance may result in
additional scope/fees.
18. Agency ROW Procedures and Right of Way Plan will be approved by WSDOT before discussions with
the property owners will commence.
19. Assumes Project Funding Estimate has already been approved by WSDOT.
20. Property owners will have the opportunity to have property appraised and to received Just
Compensation per the Federal Uniform Act.
21. All activities will comply with WSDOT LAG Manual and Right of Way Manual.
22. Signed conveyance documents will be delivered to the AGENCY to process payment and recording.
Epic can provide escrow, payment and recording oversight at additional cost.
23. Hourly Billing Rates will be per WSDOT approved rate table.
24. Assumes the AGENCY will receive signed documents and will process closings, payments and
recordings if necessary.
25. Assumes complete acquisition files will be provided to the AGENCY for approval and forwarding to
WSDOT Local Agency Coordinator for certification.
26. Completed acquisition files will be delivered to the AGENCY for retention.
27. Expected term of the project is 9 Months.
F. DELIVERABLES
All task deliverables are included in in the tasks outlined in the Scope.
City of Renton Page 2 of 4
Rainier Ave S — S 3.d St to NW 3'd PI
Supplement 6
KPG
31412020
G. SCOPE
TASK 34 — ROW ACQUISITION SERVICES
Epic understands that the AGENCY is anticipating real estate services and right of way
acquisition tasks are required to complete the Rainier Avenue S Corridor Improvements
project. There are 27 Temporary Construction Easements, 21 permanent easements, and
18 fee acquisitions required for the 28 properties impacted by this project. The following
scope and fee proposal have been prepared with the assumption that WSDOT
Certification will be required.
34.1 ROW Services Project Management
Epic will interface with the AGENCY and its partners to manage the scope of the real
estate services necessary for this transportation project. Epic will prepare and maintain a
detailed project schedule and provide periodic progress reports to the AGENCY. We will
ensure the right of way process has been followed in accordance with all AGENCY,
Washington State Department of Transportation ("WSDOT") and federal policies and
regulations. Project management services includes meetings, right of way project
guidance, file maintenance, status reports, file close out, and budget tracking/analysis.
34.2 Title Examination, Clearance, and Pre -Closing
Epic will order title report updates, review title reports for the affected parcels and provide Title
Review Memos identifying all potential encumbrances to project team members. Epic will assist
in clearing the necessary encumbrances prior to closing, if feasible. Epic will facilitate recording
and payment as part of the pre -closing process.
34.3 Property Rights Acquisition/Negotiations
Epic will provide real estate acquisition and negotiation services for the 28 parcels
impacted by this project. There are 27 Temporary Construction Easements, 21 permanent
easements, and 18 fee acquisitions impacted by this project. Epic will assist the AGENCY
in developing all right-of-way documents and offer letters in accordance with the
AGENCY's right-of-way procedures for the acquisition of impacted properties. Epic will
draft the acquisition documents using AGENCY -approved forms or quality control of any
forms that are created directly by AGENCY staff for pre -acquisition review, before any
offers are made to property owners. Epic agents will act in good faith always and will
never coerce owners in an attempt to settle the parcel. All negotiations will start with an
in -person presentation of all offers when feasible. We will identify property owner issues,
concerns and differences early on and document that information in the individual parcel
negotiation diary. Epic will work with AGENCY staff throughout the negotiation process
with the property owner until settlement is reached.
34.4 Eminent Domain Support
While it is Epic's ultimate goal to negotiate a fair settlement between the Client and the
property owner, sometimes it is necessary to resolve valuation or design differences in
City of Renton Page 3 of 4 KPG
Rainier Ave S — S 31 St to NW 3rd PI
Supplement 6 31412020
court. If negotiations are unsuccessful, agents will prepare summary memos outlining
efforts made and the reason(s) for impasse. Epic will send an impasse letter to the
property owner(s) and begin eminent domain tasks, including preparation of litigation
briefings, recommendations and court testimony as needed. Each contact will be
documented (including the date, place and names) and maintained in the parcel file
throughout the negotiation process. It is estimated that 5 parcels may need these
services.
34.5 WSDOT Right of Way Certification Consultation
Epic will Q4/QC all project files to make sure all acquisition files meet state/federal laws
and regulations, as well as being compliant with WSDOT's Right of Way Manual and Local
Agency Guidelines Manual. Epic will work within the agency's Approved Right of Way
Procedures to assure compliance and will work closely with the AGENCY and WSDOT's
Local Agency Coordinator to make sure the federal process is followed.
City of Renton Page 4 of 4 KPG
Rainier Ave S — S 3rd St to NW 3rd PI
Supplement 6 31412020
! §e
�'�
•)�
r[
�)�
-
f(
�
!!
k\
o
! �
Mp
L'U
£.2
� @
:
� !!>
`!-
!%»
22\
C
//
4)
§
§
a.
§
z
§
_
_ -
\k�
!
-
@ r
-
R
,
§
§
k�
2)�
#£f\(\(
)
S \«§
%\»�22=
§J«
\)WW
; co
�
LLI
!2
°
2
i/
k
Epic Land Solutions, Inc.
KPG-City of Renton -Rainier Ave Project
2/13/2020
'Title
Advisory
Manager
Asst Project
Mgr/Sr Right of
Way Agent
Right of Way
Agent
Finance and
Project
Controls
Name
Dianna
Nausley
Nicole Bissett
Jay St.
Michell
Abigail Lopez
Direct Direct Rate
$60
$36.06
$26.44
$42.40
Fringe
0.0000
0.0000
0.0000
0.0000
OH
112.4652
62.4884
45.8179
73.4750
G&A
0.0000
0.0000
0.0000
0.0000
Profit
16.2250
9.0150
6.6100
10.6000
WSDOT Hourly Rates
IThis is a formula cell, do not enter data)
$ 193.59
$ 107.56
$ 78.87
$ 126.47
Right of Way Services:
Total Hours
Total per Task
1. Project Management (Meetings, File
maintenance, File close-out, Status
reports, etc.) & Certification
Consultation, Open Houses - Budget
200
20
220
$41,248
$41,248
2. Title Review, Clearing, Pre -Closing
39
78
117
$10,347
$10,347
3. Acquisition & Negotiations (Assumes
28 Property Owners - 27 TCEs, 22
Permanent Easements, and 18 fee
acquisitions)
64
550
650
1264
$122,814
$122,814
4. Eminent Domain/Condemnation
Support - Estimated 5 parcels to go to
Condemnation
50
125
175
$23,125
$23,125
5. WSDOT Right of Way Certification
Consultation/Support
10
40
50
$6,238
$6,238
0
$0
$0
324
�754
728 20
1826
$203,772
$203,772
'TOTAL
$62,723
$81,104
$57,416
$2,529
Rounded using accounting format
Other Direct Costs
,Mileage
$4,000
Postage/Overnight Packages
$2,000
On-line Data services
$900
Updated Title Reports 28 reports @ $300.00 each
$8,400
'TOTAL ODC's
$15,300
'TOTAL ROW SERVICES
$219,072
,Assumptions:
Assumes 20 client meetings, monthly status report preparation, and related tasks.
Assumes 34 tax parcels with 28 unique owners are impacted.
Assumes Client will provide Right of Way document templates. Epic can provide for an additional fee.
Assumes legal descriptions and plat maps will be provided by others.
Assumes eminent domain support will include impasse letters, and copies , owner files and diaries sent to the attCrrley. Additional eminent
domain services can be provided for additional fee.
Assumes 18 partial fee acquisitions, no full acquisitions or relocations.
Assumes 27 Temporary Construction Easement acquisitions.
Assumes 22 Permanent Utility Easement acquisitions.
Assumes approximate) 5 complex/difficult acquisitions that could lead to Condemnation.
Assumes no Phase I or Phase II Site Assessments are required.
Assumes Croject has no delays and that scope can be completed within 9 months from NTP.
Deposition, court testimony and expert witness fees are additional, to be com ensated on a time and materials basis.
Hourly Billing Rates will be per WSDOT approved rate table.
Litigation Auaranties are not included but can be provided for an additional fee.
Updated Title Reports will be ordered by Epic and billed to client as a direct cost.
Assumes the City will receive signed documents and will process closings, payments and recordings if necessary.
MWashington State
. Admik
Department of Transportation
August 30, 2019
Epic Land Solutions, Inc.
2601 Airport Drive, Suite 115
Torrance, CA 90505
Transportation Building
310 Maple Park Avenue S.E.
P.O. Box 47300
Olympia, WA 98504-7300
360-705-7000
TTY:1-800-833-6388
www.wsdot.wa.gov
Subject: Acceptance FYE 2018 ICR — Audit Office Review
Dear Cheryl Sinclair:
Transmitted herewith is the WSDOT Audit Office's memo of "Acceptance" of your
firm's FYE 2018 Indirect Cost Rate (ICR) of 173.29% of direct labor. This rate will be
applicable for WSDOT Agreements and Local Agency Contracts in Washington only.
This rate may be subject to additional review if considered necessary by WSDOT. Your
ICR must be updated on an annual basis.
Costs billed to agreements/contracts will still be subject to audit of actual costs, based
on the terms and conditions of the respective agreement/contract.
This was not a cognizant review. Any other entity contracting with your firm is
responsible for determining the acceptability of the ICR.
If you have any questions, feel free to contact our office at (360) 705-7019 or via email
con su lta n trates('w.wsdo t.wa. gov.
Regards;
Jonson, Erik
Aug 30 2019 5:15 PM
cosign
ERIK K. JONSON
Contract Services Manager
EKJ:ah
Acceptance ICR Audit Office Review