Thank you for your comments related to PR21-000272 Bread of Life Christian Church in Seattle (LUA21-000299). Your
comments will be added to the public land use file.
Regards,
Clark H. Close
Senior Planner
City of Renton
425-430-7289
COVID-19 UPDATE
City Hall is currently closed to the public but we are still available to assist you.
· Pay Invoice and Apply for Over-the-Counter Permit: Permitting Portal
· Schedule an Inspection: Permitting Portal -OR- Building: 425-430-7202; Civil/Site: 425-430-7203
· Contact Staff:
o Building or General Permitting: permittech@rentonwa.gov or 425-430-7200
o Planning: planningcustomerservice@rentonwa.gov or 4 25-430-7294
o Public Works Permitting: pwpermitting@rentonwa.gov or 206-402-8626
o Code Compliance: Renton Responds or 425-430-7373
From: Jim Carroll <JC-J2Co@msn.com>
Sent: Saturday, September 25, 2021 11:11 AM
To: Clark Close <CClose@Rentonwa.gov>; Cynthia Moya <CMoya@Rentonwa.gov>
Cc: Jack Dai <inbox@jackdai.net>; John Lin <john48187@yahoo.com>
Subject: Bread of Life LUA-21-000299
Clark thank you for sending the affidavit of mailing and exhibits 1-25. We have no issue with the exhibits.
It is clear that KUMC was mailed the notice of hearing- unfortunately it was mailed to the ‘sold’ church
address on Park Ave. and for some reason was not postal forwarded to the new address for the KUMC
corporation which is P.O. Box 629, Renton, WA 98057. We did not receive it. The church was sold 1/29/21
and all parties were notified (Metro, utilities, Renton, etc.) though we did not maintain a mailing affidavit.
It would have been useful for KUMC to have joined in the September 21st BOL hearing as the transcript
indicated some erroneous information, some speculation, and some items that could have easily been
clarified by KUMC. We will be bringing more detail in due course.
First a point of order. On page 7 of the Transcript, there was discussion of the need for a CUP because of
‘abandonment’ of our church for over a year with conjecture that it might have been a year and a half to
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless
you know the content is safe.
2
two years. That is absolutely incorrect. Our church sold on 1/29/21 with operations right up until a couple
weeks prior. In addition we were leasing space and limited use for a number of years to three other small
church groups and they operated until November/December. Their leases were terminated at that point
and they removed their possessions since the sale was imminent. So there was no such abandonment.
Please review Renton code sections 4-10-040 and 4-10-060. There is no change of use, no facility change,
and at this writing we are 4 months short of a year since sale- and several more months shorter since BOL
applied for a CUP- which apparently was never needed. Section 4-10-040 (codepublishing.com)