Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutRES 4447CITY OF RENTON, WASHINGTON
RESOLUTION NO. 4447
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, UPDATING AND
EXTENDING RENTON'S SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM
FOR 2022 — 2027.
WHEREAS, the City of Renton has adopted a Six -Year Transportation Improvement
Program ("TIP") pursuant to RCW 35.77.010 (Perpetual advanced six -year plans for coordinated
transportation program expenditures), and the TIP has been updated, amended, and modified
from time to time as authorized and required by law; and
WHEREAS, the City Council held a duly noticed public hearing on October 4, 2021, for the
purpose of considering updates to the TIP; and
WHEREAS, the City Council has reviewed the work accomplished under the TIP,
considered any public testimony given at the public hearing held on October 4, 2021, considered
proposed updates to the TIP, and determined current City transportation needs;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO
RESOLVE AS FOLLOWS:
SECTION I. The City of Renton's 2022 — 2027 Six -Year Transportation Improvement
Program, attached as Exhibit A and fully incorporated herein by this reference, is adopted as the
City's updated and extended TIP.
SECTION II. The updated and extended TIP, as attached, shall be and constitute
Renton's 2022 — 2027 Six -Year Transportation Improvement Program for purposes of compliance
with RCW 35.77.010, and shall remain in full force and effect until further revised, amended, and
modified as provided by law.
1
RESOLUTION NO. 4447
SECTION III. The Administrator of the Public Works Department and the City Clerk are
authorized and directed to file this resolution, together with Exhibit A, with the Washington State
Secretary of Transportation within 30 days of its adoption.
PASSED BY THE CITY COUNCIL this 4th day of October, 2021.
APPROVED BY THE MAYOR this 4th day of October, 2021.
Approved as to form:
Shane Moloney, City Attorney
RES.1886:8/24/2021
FA
Arrhon
Pavone, Mayor
EXHIBIT A
2022 - 2027
TRANSPORTATION IMPROVEMENT PROGRAM
ADOPTED
OCTOBER 4, 2021
F
ACKNOWLEDGEMENTS
MAYOR
Armondo Pavone
CITY COUNCIL
Randy Corman, Council President
Ryan Mclrvin, Council President Pro-Tem
Angelina Benedetti
Valerie O'Halloran
Ruth Perez
Ed Prince
Kim-Khanh Van
CHIEF ADMINISTRATIVE OFFICER
Ed VanValey
PUBLIC WORKS
Martin Pastucha, Public Works Administrator
Jim Seitz, Transportation Systems Director
Vangie Garcia, Transportation Planning & Programming Manager
Bob Hanson, Transportation Design Manager
Chris Barnes, Transportation Operations Manager
Eric Cutshall, Transportation Maintenance Manager
Heather Gregersen, Program Development Coordinator
GAT Y ok
+ +
2022 — 2027 TRANSPORTATION IMPROVEMENT PROGRAM
LET V O,c
RFNTO[�
Title VI Declaration
It is the City's policy to assure full compliance with Title VI of the Civil Rights Act of 1964, the
Civil Rights Restoration Act of 1987, and related statutes and regulations in all programs and
activities. Title VI requires that no person shall, on the grounds of race, color, sex, or national
origin be excluded from the participation in, be denied the benefits of, or be otherwise
subjected to discrimination under any Federal Aid Highway program or other activity for which
the City of Renton receives Federal financial assistance.
Any person who believes they have been aggrieved by an unlawful discriminatory practice under
Title VI has a right to file a formal complaint with the City of Renton. Any such complaint must
be in writing and filed with the City of Renton Human Resources within one hundred, eighty
(180) days following the date of the alleged discriminatory occurrence. Title VI Discrimination
Complaint Forms may be obtained from the City's website (www.rentonwa.gov) or from the
Human Resources office at no cost to the complainant by calling (425) 430-7655.
To Request Translated Materials
aM P-A ada@rentonwa.gov.
Si necesita traducir esta informacion al espanol, correo electronico ada@rentonwa.gov.
Neu quy vi can thong tin nay chuyen ngCr sang tieng Viet xin gu'i den h6m thu, dien tu'
ada@rentonwa.gov.
2022 - 2027 TRANSPORTATION IMPROVEMENT PROGRAM
TABLE OF CONTENTS
SECTION A — INTRODUCTION
Purpose of the Transportation Improvement Program & Changes from Previous TIP 2
SECTION B — PROJECTS MAP AND INDEX LOCATION
Map Index 8
Transportation Improvement Program Map 9
SECTION C — DEVELOPMENT AND PRIORITIZATION
TIP Development 13
City Business Plan 16
Expenditures and Revenues 17
Summary of Projects and Prioritization 19
SECTION D — PROGRAM/PROJECT DESCRIPTIONS
Individual Program/Project Pages 25
SECTION E —APPENDIX
Abbreviations and Acronyms
Resolution to Adopt Six -Year 2022-2027 TIP
0 5
toltc I Fm e P, rw
SECTION A
INTRODUCTION
2022 - 2027 TRANSPORTATION IMPROVEMENT PROGRAM
City of Renton O 2022 - 2027 TRANSPORTATION IMPROVEMENT PROGRAM
PURPOSE OF THE TRANSPORTATION IMPROVEMENT PROGRAM
This document is Renton's comprehensive transportation program for the ensuing six calendar years and is
mandated by the Revised Code of Washington and Washington Administrative Code. The Transportation
Improvement Program (TIP) is a multi -year planning tool that updates the future plans for transportation
projects and programs within the City that:
• support the mission and vision of the Renton Business Plan
• include new or enhanced bicycle or pedestrian facilities
or other applicable changes that promote non -motorized transit
• reflect the involvement of the public and the City's elected officials
This document enables the Mayor and the City Council a way to review work that has been accomplished as
well as current and future transportation needs. The TIP is a planning document that identifies
transportation -related projects which are, or may become, eligible for federal, state and/or local funding. A
significant purpose of the TIP is that local projects must be included to be eligible for state and federal grant
programs.
COMPREHENSIVE PLAN
Land Use Vision
Projects in the City to be Other Regional Projects in
built to City standards/ which the City may wish
COMMUNITY PLANS plans By Others to Participate
City Center Community Plan
Benson Hill Community Plan
Sunset Area Community
Investment Strategy Capital Investment
Downtown Civic Core Vision . • . • Program (CIP)
and Action Plan Funded Priorities
Renton Trails and Bicycle
Master Plan ' • _ \�
PROGRAM INPUT
®
STATE & REGIONAL
TRANSPORTATION
Maintenance and
IMPROVEMENT
Operations
PROGRAM
Walkway and Safety
(STIP/RTIP)
Bridge and Guardrail
Project Development/
Mandated by law
Planning
City of Renton `'} 2022 - 2027 TRANSPORTATION IMPROVEMENT PROGRAM
CHANGES FROM PREVIOUS TIP
NEW GRANTS FUNDING
Transportation received grant funding from King County, Washington State Department of Transportation
and FHWA for various fiscal years. Details are noted in specific program and project sheets.
Current City efforts have been focused on funding existing grant -funded projects through completion and
being conscientious of the City's ability to meet match requirements for upcoming funding.
Funding Phase Amount Fiscal Year
Rainier Ave S Corridor Improvements - Phase 4A
State
Construction
$2,000,000
2022
SE 168th Street Protected Bike Lanes
State
Design
$500,000
2021
Safer Access to Neighborhood Destinations Program -
Phase 1
Federal
Planning
$137,200
2021
Federal
$112,700
2022
PROJECTS/PROGRAMS ADDED
• Safe Routes to Transit (TIP #21-06.1)
Total $2,749,900
• Safer Access to Neighborhood Destinations (TIP #21-14)
• Grady Way Overpass (TIP #21-32)
• North 8th Street Direct Access Ramps (TIP #21-41)
3
0 '%f
toltc 6 k i -�m
SECTION 6
PROJECTS MAP AND INDEX
2022 - 2027 TRANSPORTATION IMPROVEMENT PROGRAM
City of Renton 0 2022 - 2027 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT NUMBERING AND MAP
This section explains the annual TIP number system. All TIP numbers start with the year the TIP document is
adopted then followed by a "-" (dash). The TIP project numbering system starts with programmatic activities
that typically have annual financial allocations. With this in mind, the TIP numbers for these programs
essentially remain the same for future TIPS and are at the beginning of the list since they are often citywide.
The next grouping of projects in alphabetical order are projects with full or partial funding secured, such as
with federal or state grants or developer contributions, or where the City has a financial commitment to
implementing within the six -year period.
The last group of projects, where the projects start over in alphabetical order, are unfunded local projects
and then outside agency -led projects, that have been identified in other long-range plans for the City.
The following map shows the projects in the 2022 - 2027 Transportation Improvement Program (TIP), listed
by TIP number after the prefix "21-". City-wide projects or programs are challenging to display on a map
and are not shown.
City of Renton O 2022 - 2027 TRANSPORTATION IMPROVEMENT PROGRAM
MAP INDEX
Programs are not shown on map.
TIP #21-06-1 Safe Routes to Transit
project locations have been
identified separately due to the
potential of becoming discrete TIP/
CIP projects in the future.
Project Name
43rd St Resurfacing, SR 167 to west City Limits
720akesdale
Ave SW Preservation Project
esdale Ave SW & SW 41st St Intersection Improvements
6.1
Safe Routes to Transit
15
Bronson Way Bridge Seismic Retrofit/Painting
16
Duvall Ave NE Roadway Improvements
17
Houser Way Bridge Seismic Retrofit and Painting
18
Houser Way Intersection and Pedestrian Improvements
19
Lake Washington Loop Trail Phase 3
19.1
Lake Washington Loop Trail Phase 5
20
NE Sunset Boulevard (SR 900) Corridor Improvements
21
Park Ave North Extension
22
Rainier Ave S/N Corridor Improvements Phase 4
23
Renton Connector
24
Renton Elementary and Middle School Crossings
25
SE 168th St Protected Bike Lanes
26
South 2nd Street Conversion Project
27
South 7th Street Corridor Improvements
28
Williams Ave N Bridge Seismic Retrofit and Painting
29
Williams Ave S and Wells Ave S Conversion Project
30
116th Ave SE Improvements
31
Carr Road improvements
32
Grady Way Overpass at Rainier Ave S
33
Hoquiam Ave NE Non -motorized Improvements
34
Houser Way Non -Motorized Improvements
35
Houser Way North Shared Use Path
36
Lind Ave SW Roadway Widening
38
Logan Ave North Improvements
39
Maple Valley Highway Barriers
40
Monster Road SW/68th Ave S Roadway Improvements
41
N 8th St Direct Access Ramps
42
NE 3rd Street Corridor Improvements
43
NE 4th St Corridor Improvements
44
NE Sunset Blvd Transit and Access Improvements
45
Nile Ave NE Bridge Replacement
46
Rainier Ave S/N Corridor Improvements Phase 5
47
Renton Bus Rapid Transit (BRT) Improvements
48
South 3rd Street Conversion Project
49
South Grady Way Multi -Modal Improvements
52
Lake to Sound (L2S) Trail
53
South Lake Washington Transit Stop
54
Southport Pedestrian Connection
55
SW 27th Street/Strander Boulevard Connection
CED-1
1-405/44th Gateway Signage & Green-scaping Improvements
1-1 li I -a urrCru `�I o
lake j3yo i
V /�^ CED-1 )� - 9aren • i l
\\\ 41 NEWCASTLE mF rmo of
v a �
KenKfcpnXdale j
45
NE 241h 51 WI 1 r✓ I y
_ 1
Rd \ Washington
0
d
h<IhI .lvssa90ah
Rtl
I I � o� �\ <•• 2 a za,I w r,.; 44 � I�ep�ojll �o
901
KPnn/11 "NE 121h
1 'y8 i 54♦ 33 ) i
-'-'-9
\ m
\5--._._._." 21 •;J m �16� i._._y
20 ° w SE 116th St
1-----� S 116th St
35 in 0 o NE 10th SI
¢'
a' 1r7 E NE 91hs ; Highlands m2 38 41 r x E
A N 61n s'
z z G Hi�'fil.�ii It I _
West Hill m o" ¢ z I
,,:.. dill ' 46 + ^ J a
o G o
v
43E 41h S1 _--_--
S Langston Rd r--'-_•I `` 0 28 m 42 - Y.
19 6 E
1 ( ° 15
22
j sK 34 /
26 _ m
F 48 18 1 17
n 1 1 xYhy 39
x 401 *C- Crt - 29
t9fack River 52 23 a
_ RENTON
`
27 ♦ a e
49 ,
WaY (32:47
0 m
� SW 16Ih St
� o
h
j Valley
36 1
tel j (22�
56 valley 1P
j J tP
z+ SW 111h S1
' S.1
SW 41 It St
2.1
City-wide projects or programs are not mapped.
N"ns of
O
Q 0
�yF
SE,. 30
m
Bens
m
25 _
asty. eau
�24
F
- 1 5E 141515t j
Cea%
Cedar River SE 1
i "} lLhdpYe-Irai�,Y
_
1 _ _ "
�._ ._._._._.-------- � •-'-� ' se 160mq
j T
a T �
4$#E Pelr0"\sV`Y
_ I
N 31� 3
<' 17
i
- SE lsmn s1 -•-✓
i
i
v
- SE 192nd St
i
i
Talbot _
i
# TIP Number #21-_ (exceptforCED-1)
Funded/Partially Funded Projects
#20-06.1 Safe Route to Transit
Project Locations
Candidate Projects
Projects Led by Others
10
SECTION C
DEVELOPMENT AND PRIORITIZATION
2022 - 2027 TRANSPORTATION IMPROVEMENT PROGRAM
`v:
City of Renton O 2022 - 2027 TRANSPORTATION IMPROVEMENT PROGRAM
TIP DEVELOPMENT
The Transportation Systems Division creates and maintains an interconnected, multimodal network so that
people and goods move safely and efficiently. The six -year Transportation Improvement Program (TIP) is a
short-range planning document that is annually updated based on needs and policies identified in the City of
Renton's Comprehensive Plan, and other adopted plans such as: the City Center Community Plan, Sunset
Area Community Investment Strategy, Benson Hill Community Plan, Downtown Civic Core Vision & Action
Plan, and the Renton Trails and Bicycle Master Plan.
As the city business plan is updated annually and reflects current Council priorities, the annual update of the
TIP helps ensure that Transportation Capital Programming stays aligned with the City's current goals and
aspirations. This year's Business Plan Goals includes focused emphasis on Equity and Sustainability.
Programs and long-term plans are intended for equitable outcomes citywide and to address historical
inequities in the services that the Transportation System Division provides. Out of these efforts come the
discreet projects that are funded or waiting to be funded.
TIP project and financial development activities are intricately intertwined and involve interactions with
multiple groups and agencies at the local, regional, state and federal levels. Within the Transportation
Systems Division, the Planning and Programming Section coordinates project development year-round
with the Transportation Operations, Transportation Maintenance Section, and the Transportation Design
Section.
N
What Should
Be Happening?
Within the City of Renton, there are actions and interactions involving other departments and divisions, the
private sector, the City Council and Administration, which strongly influence the direction of the
transportation program. With its heavy dependence on many different and unpredictable sources of
external funding and with the significant impacts created by ongoing local and regional land use decisions,
transportation project development is a continuous activity comprised of a multitude of diverse elements.
This TIP represents Renton's current list of needed projects and programs for the next six years.
Transportation Mayor reviews
Projects are generally Initial
\
City Council
City Council
Business Case DRAFT TIP and
scoped with identified Prioritized List Committee reviews
reviews DRAFT
adopts the
Assessment Initial Prioritized List feedback
project aspects created provides
PHearing
TIP/Public
next year's
and provides feedback /
TIP
ANNUAL TIP UPDATE PROCESS
13
City of Renton 0 2022 - 2027 TRANSPORTATION IMPROVEMENT PROGRAM
The TIP process increases
transparency and alignment to
the City's vision as projects or
programs get added, edited, or
removed with each annual
update. Each program and
project is assigned a category Non-Motorizec
type for CIP organization: 18
Operations and Safety (OS),
Maintenance and Preservation
(MP) , Roadway Corridor (RC),
and Other Programs/Planning
(OP).
However, some projects or
programs fall into more than
one category and this is
conveyed by the project
aspects, or goals/purposes,
listed on each project
information page.
PROJECT ASPECTS:
Other Programs /
Safety, 14
By
,14
laintenance and
reservation, 12
♦ MAINTENANCE AND PRESERVATION: Projects with this aspect include transportation assets that should be
replaced or rehabilitated at the point of lowest cost in the life -cycle to maximize use of funding sources.
Projects that preserve and maintain an asset will extend the useful life before more extensive and costly
repairs or reconstruction are needed.
♦ OPERATIONS AND SAFETY: Projects and programs with this aspect help the safety and efficiency of traffic
operations. Typical project elements include roadway widening, road diets, channelization, signage,
street lighting, traffic signals, transit speed and reliability, and roadside safety.
♦ ACTIVE TRANSPORTATION / MULTI -MODAL: Projects that address improved mobility of any self-propelled,
human -powered mode of transportation improve community quality of life. This emphasizes that people
movement is not constrained to motor vehicles. A safe, healthy and vibrant community depends on the
ability to utilize and provide safe access to those walking, riding bicycles or other non -motorized vehicles.
Projects typically included in the TIP with this aspect expand the pedestrian and bicycle network through-
out the city where missing or where there is needed improvement.
♦ PLAN IMPLEMENTATION AND COMPLIANCE: This aspect involves efforts needed for planning, designing,
and construction of roadway improvements necessitated by new development, regulatory compliance
and other reasons, such as regional transportation projects, economic development, Council policy and/
or directive(s).
14
City of Renton 0
2022 - 2027 TRANSPORTATION IMPROVEMENT PROGRAM
Each program/project has a current FUNDING STATUS that identifies if it has funding or if it is a "candidate"
project with no determined funding source at this time.
Plan Category
Funding Status
Project Status
TIP Actions
Under Construction /
All funds programmed and all grant funds
Fully Funded - CN
Project Closeout
obligated.
Design >60% Complete /
All funds programmed and/or will
Funded for Construction
Funded - CN
Getting ready for Construction
obligate grant funds when ready, and if
Documentation.
necessary.
Design In Progress/ <60% Complete.
Some funds programmed for Construction
Partially Funded - CN
Environmental process complete.
phase, such as grant funding. More
Getting ready for Final Review plans.
funding needed.
CONSTRAINED
Programmed for PE and ROW and/or will
Partially Funded
Design In Progress/ >30% Complete.
obligate for ROW grant funds when ready
- PE/ROW
ROW phase is relevant to project.
and if necessary.
Construction Phase NOT FUNDED.
Design In Progress. Project only funded
Programmed for PE only and other
Partially Funded - PE
for Design. Waiting for available revenue
analysis remains to be done.
sources for other phases.
Construction Phase NOT FUNDED.
Program Funding
Multiple Projects in various phases.
Funding is allocated annually.
Candidate
Project identified in other Planning
No determined funding programmed.
Document(s) as high priority/high need.
May need further analysis.
Unprogrammed
Projects led by other departments or
Other— Led by Others
agencies but affects overall system.
No determined funding programmed.
Each program/project is ranked against the others on the
list using select criteria to create an initial priority list. The
prioritization list is developed primarily for rank order in
the Transportation CIP budget documents and then
adjusted for significant changes in the mid -biennium TIP.
Transportation Committee and the Mayor provide
feedback and comments for final ranking.
a
High
• Addresses identified hazard
Safety• Addresses traffic safety concerns
MMI • Preventative actions to reduce injuries
Medium
Directive
•
I&--
15
• Listed in existing city planning documents
• Aligns with existing City Plans
• Supports economic development
• Essential to transportation network operations
• Improves/maintains Infrastructure or System
• Fills gap in facilities or network
• Grant commitment/delivery needs
• Prevent loss of funds
• Reduces risk or liability
• Identified as priority by elected official
• Regulator directed/court order
• High rank in previous TIP
• Addresses environmental impacts
• Addresses development impacts
VISION Renton: The center of
opportunity in the Puget Sound Region
where families and businesses thrive
MISSION The City of Renton, in
partnership and communication with
residents, businesses, and schools, is
dedicated to:
■ Provide a safe, healthy, vibrant community
■ Promote economic vitality and strategically
position Renton for the future
■ Support planned growth and influence
decisions to foster environmental
sustainability
■ Build an inclusive informed city with
equitable outcomes for all in support of
social, economical, and racial justice
■ Meet service demands and provide
high quality customer service
Provide a safe, healthy and vibrant
community
■ Promote safety, health, and security through
effective communication and service
delivery
■ Facilitate successful neighborhoods through
community involvement
■ Encourage and partner in the development
of quality housing choices for people of all
ages and income levels
■ Support the growing need of human
services funding to address the challenges
of housing and mental health
■ Promote a walkable, pedestrian and bicycle -
friendly city with complete streets, trails,
and connections between neighborhoods
and community focal points
■ Provide opportunities for communities to be
better prepared for emergencies
Promote economic vitality and
strategically position Renton for
the future
■ Promote Renton as the progressive,
opportunity -rich city in the Puget Sound
region
■ Actively seek grants and other funding
opportunities
■ Capitalize on opportunities through bold
and creative economic development strategies
■ Recruit and retain businesses to ensure a
dynamic, diversified employment base
■ Nurture entrepreneurship and foster
successful partnerships with businesses and
community leaders
■ Leverage public/private resources to focus
development on economic centers
Support planned growth and
influence decisions to foster
environmental sustainability
■ Foster development of vibrant, sustainable,
attractive, mixed -use neighborhoods in
urban centers
■ Uphold a high standard of design and
property maintenance
■ Advocate Renton's interests through state
and federal lobbying efforts, regional
partnerships and other organizations
■ Pursue transportation and other regional
improvements and services that improve
quality of life
■ Assume a critical role in improving our
community's health and environmental
resiliency by addressing impacts of climate
change for future generations
■ Pursue initiatives to increase mobility,
promote clean energy in our existing
buildings and in new development, preserve
and expand open spaces and tree coverage,
and other efforts to reduce CO2 and
greenhouse gas emissions
Building an inclusive, informed
and hate -free city with equitable
outcomes for all in support of
social, economic, and racial justice
■ Achieve equitable outcomes by eliminating
racial, economic and social barriers in
internal practices, city programs, services,
and policies such as hiring and contracting
■ Improve access to city services, programs
and employment, provide opportunities and
eradicate disparities for residents, workers
and businesses
■ Promote understanding and appreciation
of our diversity through celebrations,
educational forums and festivals
■ Seek out opportunities for ongoing two-way
dialogue with ALL communities, engage
those historically marginalized, and ensure
that we lift every voice, listen and take
action on what we learn
■ Build capacity within the city to implement
inclusion and equity by providing the
knowledge, skills, awareness, and tools to
integrate anti -racism approaches into daily
work
Meet service demands and provide
high -quality customer service
■ Plan, develop, and maintain quality services,
infrastructure, and amenities
■ Prioritize services at levels that can be
sustained by revenue
■ Retain a skilled workforce by making Renton
the municipal employer of choice
■ Develop and maintain collaborative
partnerships and investment strategies that
improve services
■ Respond to growing service demands
through partnerships, innovation, and
outcome management
1.
City of Renton 0 2022 - 2027 TRANSPORTATION IMPROVEMENT PROGRAM
EXPENDITURES AND REVENUES
The TIP is developed using revenue forecasts generally consisting of state and local taxes and transportation
impact mitigation revenues that have been assigned to Fund 317 Transportation Capital Investment Program
(CIP) and Fund 305 Transportation Impact Mitigation Fund. The financial programming begins with financial
forecasts received by the Finance Department at the start of a fiscal year. Restricted revenues, such as state
fuel tax and impact fees, have limitations on what those revenues can be spent on. The City relies heavily on
grant funding to leverage the amount of local funding to implement the larger capital projects.
The COVID-19 pandemic impacted the financial forecasts because of the uncertainty of tax revenues return-
ing to typical levels. Conservative estimates have been used for programming particularly in the case of Fuel
Tax revenues that typically help fund the City's Street Overlay program. As actual revenues are received,
funding allocations will be reviewed to assess if budgets should be adjusted.
This document is one step in developing the fiscally -constrained Transportation CIP as part of the City's
Adopted Budget. Actual revenues and expenditures are reviewed and adjusted through each budget
adjustment.
Programmed Expenditures by Fund Type
$35,000,000
$30,000,000
$25,000,000
$20,000,000
$15,000,000
$10,000,000
$5,000,000
Other Local
■ Bond/LRF
Fuel Tax
■ Mitigation/Impact Fees
■ Grants/Other
1
1
1
0
M ■
$a
2022
2023
2024
2025
2026 2027
17
City of Renton O 2022 - 2027 TRANSPORTATION IMPROVEMENT PROGRAM
Since projects need to be included in the TIP to be eligible for grants, the projects and programs included in
the TIP are projects the City would like to implement in the six -year timeframe if funding were available. The
document also identifies secured or reasonably expected revenues and expenditures for each of the projects
included in the TIP to aid future budget discussions.
The graph reflects the conservative programming due to financial forecasts in this TIP and an assumed rate of
expenditure. The graph does not convey potential schedule adjustments or accelerated funding from grant
awards.
Secured vs. Unsecured Funding of 6-year Program
$35,000,000
$30,000,000
$25,000,000
$20,000,000
$15,000,000
$10,000,000
$5,000,000
1
1
1
1 ■ ■
$0
2022
2023
2024
2025 2026 2027
■ Secured funding
Unsecured funding
18
City of Renton 0 2022 - 2027 TRANSPORTATION IMPROVEMENT PROGRAM
SUMMARY OF PROJECTS AND PRIORITIZATION
The prioritization of the TIP is influenced by the interconnection and/or interdependence among TIP
projects, projects by other City departments, projects by other jurisdictions, as well as the timing of those
other projects. The significance of the prioritization process of the TIP in preparation for budget discussions
is that the projects and programs are in a ranked order and provide one way to look at the program as a
whole. The projects/programs that do not have secured funding would not appear in budget documents.
The ratings across the scoring criteria are qualitative because the intent to create an initial prioritized list of
all the projects and programs listed in the TIP. This prioritization does not directly affect how much
funding specific projects or programs receive. Ultimately, this is dependent on how much funding is
available and final funding decisions are made by the elected policy makers. The TIP is a resource that can
be used to help make policy and budget decisions.
Summary of Projects/Programs by
Neighborhood Planning Area
liBenson
Cedar River
City Center
i i Citywide/Various
37% East Plateau
Highlands
❑ Kennydale
❑ Valley
i i Talbot
19
RANK
Name
Life Safety
Plan Imp
System
Financial
Directive
Mitigative
Funding
Category
1
21-22
Rainier Ave S/N Corridor Improvements Phase 4
Partially Funded - CN
RC
2
21-01
Street Overlay
Q
71
71
Q
Q
Q
Program Funding
MP
3
21-02
Arterial Rehabilitation Program
Q
ii
71
Q
Q
Q
Program Funding
MP
4
21-15
Bronson Way Bridge Seismic Retrofit/Painting
Q
aD
71
Q
Q
Q
Funded - CN
M P
5
21-16
Duvall Ave NE Roadway Improvements
Q
o
Q
Q
Q
Q
Fully Funded - CN
RC
6
21-27
South 7th Street Corridor Improvements
Q
Q
Q
Q
Q
Funded - CN
NM
7
21-20
NE Sunset Boulevard (SR 900) Corridor Improvements
Gl
Q
Q
Q
Q
Partially Funded -
PE/ROW
RC
8
21-26
South 2nd Street Conversion Project
Q
Q
Q
Q
Partially Funded - PE
RC
9
21-29
Williams Ave S and Wells Ave S Conversion Project
X
Q
Q
Q
Q
111111111111TOly Funaea - CN
RC
30
21-18
Houser Way Intersection and Pedestrian Improvements
Q
Q
Q
Q
Fully Funded - CN
NM
11
21-17
Houser Way Bridge Seismic Retrofit and Painting
Q
al
Q
Q
Q
Funded - CN
MP
12
21-23
Renton Connector
Partially Funded - PE
NM
13
21-19
Lake Washington Loop Trail Phase 3
71
Q
Q
Q
Q
o
Funded - CN
NM
14
21-19.1
Lake Washington Loop Trail Phase 5
71
Q
Q
Q
Q
Candidate
NM
15
21-21
Park Ave North Extension
Q
Q
Q
Q
Q
Fully Funded - CN
RC
16
21-24
Renton Elementary and Middle School Crossings
Q
ii
Q
Q
—
Fully Funded - CN
NM
17
21-28
Williams Ave N Bridge Seismic Retrofit and Painting
Q
71
Q
Q
Q
Funded - CN
MP
18
21-05
Intersection Safety & Mobility Program
Q
Q
Q
Q
Program Funding
OS
19
21-08
Intelligent Transportation Systems (ITS) Program
Q
7I
Q
Q
Q
Program Funding
OS
20
21-11
Barrier -Free Transition Plan Implementation
Q
71
Q
Q
Q
Program Funding
NM
21
21-07
Preservation of Traffic Operation Devices Program
Q
ZJ
al
Q
Q
Program Funding
OS
22
21-09
Sidewalk Rehabilitation and Replacement Program
Q
ZJ
lJ
Q
Q
Program Funding
MP
23
21-10
Bridge Inspection & Repair Program
Q
GJ
GJ
Q
Q
Program Funding
MP
24
21-06
Traffic Safety Program
Q
71
Q
Q
Program Funding
OS
25
21-04
Roadway Safety and Guardrail Program
Q
Q
Q
G
Program Funding
MP
26
21-03
Walkway Program
Q
Q
Q
Q
o
Program Funding
NM
27
21-25
SE 168th St Protected Bike Lanes
Q
Q
71
o
Partially Funded - PE
NM
28
21-02.1
SW 43rd St Resurfacing
Q
Q
o
Q
Funded - CN
M P
29
21-12
Project Development & Pre -Design Program
71
Q
Q
Q
o
!
Program Funding
OP
30
21-06.1
Safe Routes to Transit
Program Funding
NM
31
21-14
Safer Access to Neighborhood Destinations
Q
Program Funding
OS
32
21-13
Arterial Circulation Program
Program Funding
OP
33
21-48
South 3rd Street Conversion Project
Candidate
RC
34
21-32
Grady Way Overpass at Rainier Ave S
Candidate
OS
35
21-02.2
Oakesdale Ave SW Preservation Project
Candidate
MP
36
21-05.1
Oakesdale Ave SW & SW 41st St Intersection
Improvements
Candidate
OS
37
21-31
Carr Road improvements
Q
Q
Q
o
o
Q
Candidate
RC
38
21-33
Hoquiam Ave NE Non -motorized Improvements
Q
Q
!`7
�J
Candidate
NM
39
21-41
N 8th St Direct Access Ramps
Other -Led by Others
RC
40
21-42
NE 3rd Street Corridor Improvements
Q
Q
Q
Candidate
RC
41
21-43
NE 4th St Corridor Improvements
Q
Q
Q
o
!J
Candidate
RC
20
City of Renton O 2022 - 2027 TRANSPORTATION IMPROVEMENT PROGRAM
RANK
Name
Life Safety
Plan Imp
System
Financial
Directive
Mitigative
Funding
Category
42
21-50
Transit Master Plan
Q
Q
Candidate
OS
43
21-45
Nile Ave NE Bridge Replacement
Q
Q
Candidate
MP
44
21-46
Rainier Ave S/N Corridor Improvements Phase 5
Candidate
RC
45
21-51
Walkway Master Plan
Q
Q
Candidate
NM
46
1 21-30
116th Ave SE Improvements
v
Q
Q
Q
Candidate
NM
47
21-37
Local Road Safety Plan Implementation
Q
Q
Candidate
OS
48
21-39
Maple Valley Highway Barriers
Q
Q
Candidate
OS
49
21-40
Monster Road SW/68th Ave S Roadway Improvements
Q
Q
Candidate
M P
50
21-52
Lake to Sound (L2S) Trail,
Q
Q
71
Other -Led by Others
NM
51
21-55
SW 27th Street/Strander Boulevard Connection
v
Q
Q
Other -Led by Others
RC
52
21-34
Houser Way Non -Motorized Improvements
v
Q
Q
Candidate
NM
53
21-38
Logan Ave North Improvements
v
Q
o
Q
Candidate
RC
54
21-36
Lind Ave SW Roadway Widening
71
o
©
Candidate
RC
55
21-44
NE Sunset Blvd Transit and Access Improvements
o
Candidate
OS
56
21-49
South Grady Way Multi -Modal Improvements
7I
Candidate
OS
57
21-47
Renton Bus Rapid Transit (BRT) Improvements
71
Candidate
OS
58
21-35
Houser Way North Shared Use Path
Candidate
NM
59
21-54
Southport Pedestrian Connection
©
Other -Led by Others
NM
60
21-53
South Lake Washington Transit Stop
Other -Led by Others
OS
21
f►0:
SECTION D
PROGRAM/PROJECT DETAILS
2022 - 2027 TRANSPORTATION IMPROVEMENT PROGRAM
23
24
City of Renton 0
2022 - 2027 TRANSPORTATION IMPROVEMENT PROGRAM
Name
Program/
ect
Planning Area
21-01
Street Overlay
Program
Citywide
21- 22
Arterial Rehabilitation Program
Program
Citywide
21-02.1
SW 43rd St Resurfacing, SR 167 to west City Limits
Project
Valley
21-02.2
Oakesdale Ave SW Preservation Project
Project
Valley
21-03
Walkway Program
Program
Citywide
21-04
Roadway Safety and Guardrail Program
Program
Citywide
21-05
Intersection Safety & Mobility Program
Program
Citywide
21-05.1
Oakesdale Ave SW & SW 41st St Intersection Improvements
Project
Valley
21-06
Traffic Safety Program
Program
Citywide
21-06.1
Safe Routes to Transit
Program
Various
21-07
Preservation of Traffic Operation Devices Program
Program
Citywide
21-08
Intelligent Transportation Systems (ITS) Program
Program
Citywide
21-09
Sidewalk Rehabilitation and Replacement Program
Program
Citywide
21-10
Bridge Inspection & Repair Program
Program
Citywide
21-11
Barrier -Free Transition Plan Implementation
Program
Citywide
21-12
Project Development & Pre -Design Program
Program
Citywide
21-13
Arterial Circulation Program
Program
Citywide
21-14
Safer Access to Neighborhood Destinations
Program
Various
21-15
Bronson Way Bridge Seismic Retrofit/Painting
Project
City Center
21-16
Duvall Ave NE Roadway Improvements
Project
Highlands, East Plateau
21-17
Houser Way Bridge Seismic Retrofit and Painting
Project
City Center
21-18
Houser Way Intersection and Pedestrian Improvements
Project
City Center
21-19
Lake Washington Loop Trail Phase 3
Project
City Center
21-19.1
Lake Washington Loop Trail Phase 5
Project
City Center
21-20
NE Sunset Boulevard (SR 900) Corridor Improvements
Project
Highlands
21-21
Park Ave North Extension
Project
City Center
21-22
Rainier Ave S/N Corridor Improvements Phase 4
Project
City Center
21-23
Renton Connector
Project
City Center
21-24
Renton Elementary and Middle School Crossings
Project
Various
21-25
SE 168th St Protected Bike Lanes
Project
Benson
21-26
South 2nd Street Conversion Project
Project
City Center
21-27
South 7th Street Corridor Improvements
Project
City Center
21-28
Williams Ave N Bridge Seismic Retrofit and Painting
Project
City Center
21-29
Williams Ave S and Wells Ave S Conversion Project
Project
City Center
21-30
116th Ave SE Improvements
Project
Benson
21-31
Carr Road improvements
Project
Talbot, Benson
21-32
Grady Way Overpass at Rainier Ave S
Project
City Center
21-33
Hoquiam Ave NE Non -motorized Improvements
Project
Citywide
21-34
Houser Way Non -Motorized Improvements
Project
City Center
25
Name
PrPooram/
je
Planning Area
21-35
Houser Way North Shared Use Path
Project
City Center
21-36
Lind Ave SW Roadway Widening
Project
Valley
21-37
Local Road Safety Plan Implementation
Program
Citywide
21-38
Logan Ave North Improvements
Project
City Center
21-39
Maple Valley Highway Barriers
Project
Cedar River
21-40
Monster Road SW/68th Ave S Roadway Improvements
Project
Valley
21-41
N 8th St Direct Access Ramps
Project
City Center
21-42
NE 3rd Street Corridor Improvements
Project
Highlands, East Plateau
21-43
NE 4th St Corridor Improvements
Project
Highlands, East Plateau
21-44
NE Sunset Blvd Transit and Access Improvements
Project
Highlands
21-45
Nile Ave NE Bridge Replacement
Project
East Plateau
21-46
Rainier Ave S/N Corridor Improvements Phase 5
Project
City Center
21-47
Renton Bus Rapid Transit (BRT) Improvements
Project
City Center
21-48
South 3rd Street Conversion Project
Project
City Center
21-49
South Grady Way Multi -Modal Improvements
Project
City Center
21-50
Transit Master Plan
Project
Citywide
21-51
Walkway Master Plan
Project
Citywide
21-52
Lake to Sound (L2S) Trail
Project
City Center
21-53
South Lake Washington Transit Stop
Project
City Center
21-54
Southport Pedestrian Connection
Project
City Center
21-55
SW 27th Street/Strander Boulevard Connection
Project
Valley
CED-1
1-405/44th Gateway Signage & Green-scaping Improvements
Project
Kennydale
26
City Account #: PlanningArea: Street Classification: varies Priority Rank•
122108 Citywide Project Length: various 2
Project Description:
This program funds the resurfacing and repairing of neighborhood (local), collector streets and alleyways. Installation of ADA-
compliant curb ramps is incorporated into the overlay program in accordance to federal requirements.
Maintenance and Preservation
Purpose: EXPENDITURES*
To extend the useful life of the pavement surface and reduce the need for Funding Status: Other -Program Funding
roadway reconstruction.
Planning: $0
Preliminary Engineering: $400,000
ROW: $0
Construction: $2,713,332
Construction Services: $0
Other-Misc: $0
Total Cost: $3,113,332
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
The 2020 "Pavement Management Program State of the Streets Report", prepared by a Consultant, rated the average Pavement
Condition Index (PCI) as 73. The work for the overlay was separated into concrete work and pavement work. State fuel tax
allocation typically helps fund this program. Funding programmed in 2021 will complete curb ramp work and funding in 2022 will
complete Overlay work.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Grants - Federal $125,544 $0 $0 $0 $0 $0 $0
Arterial Street Fund
$6,220,000
$0
$0
$0
$0
$0
$0
B & O Tax
$4,930,915
$400,000
$0
$0
$0
$0
$0
Fuel Tax
$944,099
$465,901
$606,000
$515,100
$437,835
$372,160
$316,336
REET1
$80,000
$0
$0
$0
$0
$0
$0
Other
$10,660
$0
$0
$0
$0
$0
$0
Revenues, by year:
$12,311,219
$865,901
$606,000
$515,100
$437,835
$372,160
$316,336 $3,113,332
2022-2027 Total
27
City Account #: PlanningArea: Street Classification: varies Priority Rank•
122186 Citywide Project Length: various 3
Project Description:
This program funds the resurfacing and repairing of principal and minor arterial streets. Installation of ADA-compliant curb ramps
is incorporated into the overlay program in accordance with federal requirements. This program provides the City match for
federally funded pavement restoration projects.
Maintenance and Preservation
Purpose: EXPENDITURES*
To extend the useful life of the pavement surface and reduce the need for Funding Status: Other -Program Funding
roadway reconstruction.
Planning: $0
Preliminary Engineering: $0
ROW: $0
Construction: $2,500,000
Construction Services: $0
Other-Misc: $0
Total Cost: $2,500,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
Expenditures and Revenue funds for 2022 are reflected in the project sheet for SW 43rd St Pavement Preservation (TIP #21-02.1).
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Fuel Tax $250,000 $0 $500,000 $500,000 $500,000 $500,000 $500,000
B & O Tax $1,513,468 $0
Revenues, by year: $1,763,468 $0
$0 $0 $0 $0 $0
$500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000
2022-2027 Total
28
City Account #: PlanningArea: Street Classification: Principal Arterial Priority Rank•
122999 Valley Project Length: 1.14 mi 28
Project Description:
This project will resurface the roadway from the western city limits to the SR 167 Ramps, except where there are existing
concrete panels. This project will also upgrade all intersection ramps to current ADA standards as well as install and replace all
delineation to City of Renton standards. Also included in this project are the adjustment or evaluation for replacement of existing
features affected by resurfacing such as monuments, catch basins, or drainage grates.
Maintenance and Preservation
Purpose: EXPENDITURES*
To extend the useful life of SW 43rd St and improve public safety. Funding Status: Funded - CN
Planning: $0
Preliminary Engineering: $500,000
ROW: $80,000
Construction: $1,800,000
Construction Services: $0
Other-Misc: $0
Total Cost: $2,380,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
The City was awarded a $1,000,000 STP grant for Pavement Preservation in 2018. In 2020, the federal STP funds were swapped
with local funds in the Williams Ave S and Wells Ave S Conversion Project (TIP # 21-29) to help PSRC fulfill an annual delivery
target.
Revenue Description Prior years 2022 2023 2024 2025 2026 2027
Fuel Tax $0 $0 $425,000 $260,372 $0 $0 $0
B & 0 Tax $495,323 $1,199,305 $0 $0 $0 $0 $0
Revenues, by year: $495,323 $1,199,305 $425,000 $260,372 $0 $0 $0 $1,884,677
2022-2027 Total
29
City Account #: PlanningArea: Street Classification: Principal Arterial Priority Rank:
Valley Project Length: 1.14 mi 35
Project Description:
This project will resurface the roadway along Oakesdale Ave SW from SW 34th St northward to SW 16th St. This project will
update channelization, adjust or upgrade intersection ramps and corners to current ADA standards, adjust or evaluate the
replacement of existing features affected by resurfacing such as monuments, catch basins, or drainage grates. The existing
shoulders north of SW 27th St serve as bike lanes as noted in the Trails and Bicycle Master Plan.
Maintenance and Preservation
Purpose: EXPENDITURES*
The current conditions of the pavement and the amount of heavy traffic on Funding Status: Candidate
this roadway warrants the need for preventative maintenance. This project is
on a major truck route on a key transit corridor. Resurfacing this roadway Planning: $0
will improve the overall condition of the pavement and the project will Preliminary Engineering: $400,000
extend the pavement life. ROW: $50,000
Construction: $1,500,000
Construction Services: $350,000
Other-Misc: $0
Total Cost: $2,300,000
* For Projects, expenditures are for the life of the project. For Programs, they
th t t 1 d;t d th 6 ; th TIP 2022 2027
Status/Changes: are e o a expen i ures programme for e years in e -
Project is awaiting available funding. This project is on the Countywide Pavement Preservation FHWA grant contingency list.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Undetermined $0 $0 $0 $0 $300,000 $150,000 $1,850,000
Revenues, by year: $0 $0 $0 $0
$300,000 $150,000 $1,850,000 $2,300,000
2022-2027 Total
30
City Account M PlanningArea: Street Classification: varies Priority Rank:
120009 Citywide Project Length: N/A 26
Project Description:
This program provides for the design and construction of non -motorized transportation facilities for pedestrians as well as to
provide City match funding for larger federal and state funded projects. This fund can also be used as City/local match for grant
applications.
Active Transportation
Purpose: EXPENDITURES*
To provide safe and convenient non -motorized facilities to complete the city- Funding Status: Other -Program Funding
wide transportation network. Specific improvements will respond to the
needs of school children, the elderly and persons with disabilities, and Planning: $0
support increased use of transit. Preliminary Engineering: $0
ROW: $0
Construction: $750,000
Construction Services: $0
Other-Misc: $0
Total Cost: $750,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
The S 7th St Corridor Improvements project (TIP #21-27) was selected to receive Sound Transit System Access funding in 2019 and
Countywide FHWA Non -motorized funding in 2020 (for fiscal year 2024). The Walkway Program funding allocated from 2021 -
2024 will be used as the local match requirement for these grants. The next project the City will be pursuing grant funding for is
the Lake Washington Loop Trail project - Phase 5 (TIP #21-19.1).
Revenue Description Prior years 2022 2023 2024 2025 2026 2027
B & 0 Tax $920,611 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000
Undetermined $0 $0 $50,000 $100,000 $100,000 $100,000 $100,000
Revenues, by year: $920,611 $50,000 $100,000 $150,000 $150,000 $150,000 $150,000 $750,000
2022-2027 Total
31
City Account #: PlanningArea: Street Classification: varies Priority Rank•
120110 Citywide Project Length: N/A 25
Project Description:
This program will provide guardrail improvements annually and will improve the safety of the roadside environment.
Maintenance and Preservation, Operations and Safety
Purpose: EXPENDITURES*
To implement roadside safety improvements including barrier systems and Funding Status: Other -Program Funding
hazardous object removal.
Planning: $0
Preliminary Engineering: $18,000
ROW: $0
Construction: $210,000
Construction Services: $12,000
Other-Misc: $0
Total Cost: $240,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
This program will develop a policy and standardized criteria for barriers and selection of projects.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Fuel Tax $250,000 $0 $0 $0 $0 $0 $0
B & O Tax $229,549 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000
Revenues, by year: $479,549 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $240,000
2022-2027 Total
32
City Account #: PlanningArea: Street Classification: varies Priority Rank:
122601 Citywide Project Length: N/A 18
Project Description:
This program will install new traffic signals, central signal system upgrades or make improvements to existing signals to improve
traffic signal operations. Historically, one traffic signal is designed and constructed every 2-3 years to meet safety and mobility
needs.
Operations and Safety
Purpose: EXPENDITURES*
To meet safety and mobility needs, new traffic signals are needed to meet Funding Status: Other -Program Funding
increasing demand for signalized traffic control. Elements used to prioritize
project intersections may include vehicular approach volumes, accident Planning: $0
analysis, signal -warrant analysis, and pedestrian volume. Preliminary Engineering: $0
ROW: $0
Construction: $660,000
Construction Services: $0
Other-Misc: $0
Total Cost: $660,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
Preliminary engineering and design began in 2018 for intersection improvements at Oakesdale Ave SW and SW 41st St (TIP #
21-05.1). Design will be completed in 2021 and then the project will be put on hold until all funding for construction has been
identified. Requests to include for future design consideration are eastbound right turn lanes at Maple Valley Hwy at 161st Ave
SE and 131st Ave SE.
Revenue Description Prior years 2022 2023 2024 2025 2026 2027
B & 0 Tax $912,123 $0 $0 $0 $0 $0 $0
Mitigation Fees $609,803
$60,000
$120,000
$120,000
$120,000
$120,000
$120,000
Grants - Other $8,397
$0
$0
$0
$0
$0
$0
Other $14,075
$0
$0
$0
$0
$0
$0
Revenues, by year: $1,544,398
$60,000
$120,000
$120,000
$120,000
$120,000
$120,000 $660,000
2022-2027 Total
33
City Account #: PlanningArea: Street Classification:
Principal Arterial Priority Rank:
Valley Project Length:
N/A 36
Project Description:
This project would install a new traffic signal with marked crosswalks at the intersection of Oakesdale Ave SW and SW 41st St.
Operations and Safety
Purpose:
EXPENDITURES*
To improve access and safety to meet safety and mobility needs. The project
Funding Status: Candidate
will help meet increasing demand and reduce the potential for crashes,
making the corridor more attractive to users of the adjacent Springbrook
Planning: $o
Creek Trail and for motorists/freight vehicles travelling through to the major
Preliminary Engineering: $390,000
retailers and businesses along this corridor and within the vicinity.
ROW: $0
Construction: $1,300,000
Construction Services: $0
Other-Misc: $0
Total Cost: $1,690,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
This project was designed within the Intersection Safety and Mobility Program. Design to be completed in 2021 however the
project is currently on hold until construction funding can be identified or accumulated
through the yearly allocation of the
program.
Revenue Description Prior Years 2022 2023 2024 2025
2026 2027
Mitigation Fees $0 $0 $0 $0 $0
$250,000 $250,000
Undetermined $0 $0 $0 $0 $60,000
$580,000 $550,000
Revenues, by year: $0 $0 $0 $0 $60,000 $830,000 $800,000 $1,690,000
2022-2027 Total
34
City Account #: PlanningArea: Street Classification: varies Priority Rank•
122115 Citywide Project Length: N/A 24
Project Description:
This program funds small-scale traffic safety improvements that require materials, labor, or equipment. These types of
improvements include, but are not limited to, converting school zone signs to electronic operation, installation of pedestrian
safety traffic signals, radar speed signs, and physical devices for traffic calming.
Operations and Safety
Purpose: EXPENDITURES*
To address traffic safety concerns, increase pedestrian/bicycle safety, and Funding Status: Other -Program Funding
help encourage responsible driving through engineering.
Planning: $0
Preliminary Engineering: $0
ROW: $0
Construction: $360,000
Construction Services: $0
Other-Misc: $0
Total Cost: $360,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
Ongoing based on requests received by the public and city staff for evaluation and analysis. In 2020, Metro funded the design
and materials purchases for the Safe Routes to Transit project (TIP #21-06.1) in association with the Renton -Kent -Auburn Area
Mobility Plan. Puget Dr SE/116th Ave SE has received requests to install a roundabout and the design work is included in the Safe
Routes to Transit funding.
Revenue Description Prior years 2022 2023 2024 2025 2026 2027
Grants - Other $664,234 $0 $0 $0 $0 $0 $0
Mitigation Fees $390,507
$60,000
$0
$0
$0
$0
$0
B & 0 Tax $701,984
$0
$60,000
$60,000
$60,000
$60,000
$60,000
Fuel Tax $50,000
$0
$0
$0
$0
$0
$0
Revenues, by year: $1,806,725
$60,000
$60,000
$60,000
$60,000
$60,000
$60,000 $360,000
2022-2027 Total
35
City Account #: PlanningArea: Street Classification: varies Priority Rank:
123009 various Project Length: N/A 30
Project Description:
Capital projects that improve safety, convenience and accessibility for people walking, bicycling and using assistive mobility
devices (such as wheelchairs or walkers) to connect to transit services and facilities. King County Metro agreed to compensate
the City for design and acquire materials for agreed upon locations in Fall 2020. Construction is estimated to extend through
2028.
Operations and Safety, Active Transportation
Purpose: EXPENDITURES*
To improve safety, convenience and accessibility for people walking, bicycling Funding Status: Partially Funded - CN
and using assistive mobility devices (such as wheelchairs or walkers) to
connect to transit services and facilities Planning: $o
Preliminary Engineering: $1,200,000
ROW: $0
Construction: $7,600,000
Construction Services: $1,100,000
Other-Misc: $0
Total Cost: $9,900,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
New Project. The County's contribution costs shall not exceed a maximum amount of $1,500,000 (the "reimbursement cap"). All
projects are at 90% Design Plan stage and will be constructed as funding becomes available. Total of budgeted expenditures
exceeds funding shown as the project duration falls outside the 6 years within the TIP.
Revenue Description Prior years 2022 2023 2024 2025 2026 2027
Grants - Other $1,500,000 $0 $785,000 $0 $0 $0 $0
B & 0 Tax $385,000 $885,000 $0 $0 $0 $0 $0
Undetermined $0 $0 $0 $950,000 $950,000 $1,425,000 $670,000
Revenues, by year: $1,885,000 $885,000 $785,000 $950,000 $950,000 $1,425,000 $670,000 $5,665,000
2022-2027 Total
36
City Account #: PlanningArea: Street Classification: varies Priority Rank•
122904 Citywide Project Length: N/A 21
Project Description:
This program provides proactive and preventative maintenance sush as installation of new and/or replacing of video detection
cameras, signal heads, signal cabinets, signal poles, UPS batteries, traffic signs, luminaires, pavement markings, and curbing for an
intersection or corridor that exceed routine maintenance operations.
Maintenance and Preservation, Operations and Safety
Purpose: EXPENDITURES*
To maintain the City's traffic signals operating as efficiently as possible and to Funding Status: Other -Program Funding
maintain the retroflectivity of all the traffic signs.
Planning: $0
Preliminary Engineering: $0
ROW: $0
Construction: $700,000
Construction Services: $0
Other-Misc: $0
Total Cost: $700,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
Findings are based from yearly maintenance programs and engineering work orders. Projects are generated and budgeted
annually with available funding.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Property Tax $12,165 $0 $0 $0 $0 $0 $0
B & O Tax $1,196,411 $100,000 $0 $0 $0 $0 $0
Undetermined $0 $0 $120,000 $120,000 $120,000 $120,000 $120,000
Revenues, by year: $1,208,576 $100,000 $120,000 $120,000 $120,000 $120,000 $120,000 $700,000
2022-2027 Total
37
City Account #: PlanningArea: Street Classification: varies Priority Rank•
122162 Citywide Project Length: N/A 19
Project Description:
Intelligent Transportation Systems (ITS) includes physical tools and technologies such as signal controller upgrades, fiber optic
communication, supporting communication equipment, cameras for monitoring traffic congestion and effects of signal timing, a
data management system, dynamic message signs and transit signal priority.
Maintenance and Preservation, Operations and Safety
Purpose: EXPENDITURES*
To maximize the operations and efficiency of the roadway system without Funding Status: Other -Program Funding
adding additional capacity.
Planning: $0
Preliminary Engineering: $0
ROW: $0
Construction: $810,000
Construction Services: $0
Other-Misc: $0
Total Cost: $810,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
This program is currently in the process of installing fiber communications and expanding adaptive signal control which affects
70% of the City's traffic signals. In the outer years, attention can be given to updating the ITS Master Plan to reflect current
needs.
Revenue Description Prior years 2022 2023 2024 2025 2026 2027
B & O Tax $401,770 $0 $0 $0 $0 $0 $0
Mitigation Fees $279,891 $60,000 $150,000 $150,000 $150,000 $150,000 $150,000
Revenues, by year: $681,661 $60,000 $150,000 $150,000 $150,000 $150,000 $150,000 $810,000
2022-2027 Total
38
City Account #: PlanningArea: Street Classification: varies Priority Rank•
122801 Citywide Project Length: N/A 22
Project Description:
This program provides for the replacement of existing curb and gutter, sidewalks, and curb ramps where such facilities have
deteriorated or have been damaged.
Maintenance and Preservation, Active Transportation
Purpose: EXPENDITURES*
To address existing sidewalk deficiencies and provide safer facilities for Funding Status: Other -Program Funding
pedestrians on neighborhood streets.
Planning: $0
Preliminary Engineering: $0
ROW: $0
Construction: $625,000
Construction Services: $0
Other-Misc: $0
Total Cost: $625,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
Staff continue to receive location requests from the public and other staff for review and prioritization. Funding allocation is
considerably lower than standard due to financial forecasts caused by the COVID-19 pandemic. Actual revenue receipts will be
reviewed on an ongoing basis and budget will be adjusted accordingly.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
B & O Tax $1,762,165 $0 $75,000 $100,000 $150,000 $150,000 $150,000
Other $120,000 $0
Revenues, by year: $1,882,165 $0
$0 $0 $0 $0 $0
$75,000 $100,000 $150,000 $150,000 $150,000 $625,000
2022-2027 Total
39
City Account #: PlanningArea: Street Classification: varies Priority Rank:
120106 Citywide Project Length: N/A 23
Project Description:
Per 23 CFR 650 Subpart C, the City is required to perform condition inspections on all City owned bridge structures, located in the
public right-of-way, open for public use and spanning 20-ft or more. There are presently 27 bridge structures included in the
program. They are inspected every two years to monitor the condition of bridge elements and identify deficiencies in need of
repair. Updates to bridge load ratings and scour evaluations are periodically performed based upon the condition of the bridge
structures and/or new directives from FHWA and/or WSDOT.
Maintenance and Preservation, Plan Implementation and Compliance
Purpose: EXPENDITURES*
The goals of the program are to keep the bridges open and safe for public Funding Status: Other -Program Funding
use, preserve bridge infrastructure by maximizing the useful life through
active maintenance, retrofitting and rehabilitation, and replace bridges with Planning: $o
reliable new structures when repair or rehabilitation is not feasible. Preliminary Engineering: $250,000
ROW: $0
Construction: $300,000
Construction Services: $0
Other-Misc: $0
Total Cost: $550,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
Funds shown under construction are for minor repairs to bridge structures.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Grants - State $23,346 $0 $0 $0 $0 $0 $0
B & O Tax $709,143 $50,000 $100,000 $100,000 $100,000 $100,000 $100,000
Revenues, by year: $732,489 $50,000 $100,000 $100,000 $100,000 $100,000 $100,000 $550,000
2022-2027 Total
40
City Account #: PlanningArea: Street Classification: varies Priority Rank:
122705 Citywide Project Length: N/A 20
Project Description:
This program provides funding for designing and building features in response to individual requests to improve access for
pedestrians.
Operations and Safety, Plan Implementation and Compliance
Purpose: EXPENDITURES*
To support the City's effort to transition pedestrian facilities within the right- Funding Status: Other -Program Funding
of -way into conformity with provisions contained in the Americans with
Disabilities Act (ADA) Guidelines. The ADA Transition Plan was adopted on Planning: $0
May 18, 2015. A programmatic approach is required to ensure compliance Preliminary Engineering: $0
with federal law.
ROW: $0
Construction: $470,000
Construction Services: $0
Other-Misc: $0
Total Cost: $470,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
Staff continue to document the city's GIS system of existing barriers as well as update with compliant facilities. The city receives
requests from the public and evaluates per the current ADA Transition Plan. An update to the 2015 ADA Transition Plan began in
2020 and is anticipated to be complete in 2021. Included in the update will be a prioritized list of projects that will be
implemented through the Barrier Free Program or added to future TIP's as individual projects so they are eligible for funding
allocation or grant applications.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
B & O Tax $192,874 $35,000 $35,000 $100,000 $100,000 $100,000 $100,000
Revenues, by year: $192,874 $35,000 $35,000 $100,000 $100,000 $100,000 $100,000 $470,000
2022-2027 Total
Cy
City Account M PlanningArea: Street Classification: varies Priority Rank:
122150 Citywide Project Length: N/A 29
Project Description:
This program consists of critical activities to develop future capital improvement projects that consist of, but are not limited to,
project scoping, cost estimates, pre -design, interlocal agreements, analyses of existing and projected transportation problems,
local and regional mobility goals and deficiency analyses.
Plan Implementation and Compliance
Purpose: EXPENDITURES*
To develop transportation projects that best serve the needs of Renton and Funding Status: Other -Program Funding
meet eligibility requirements for grant applications.
Planning: $535,000
Preliminary Engineering: $0
ROW: $0
Construction: $0
Construction Services: $0
Other-Misc: $0
Total Cost: $535,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
Funding allocation is considerably lower than standard due to financial forecasts caused by the COVID-19 pandemic. Actual
revenue receipts will be reviewed on an ongoing basis and budget will be adjusted accordingly.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Other $2,833 $0 $0 $0 $0 $0 $0
B & 0 Tax $903,050 $35,000 $100,000 $100,000 $100,000 $100,000 $100,000
Revenues, by year: $905,883 $35,000 $100,000 $100,000 $100,000 $100,000 $100,000 $535,000
2022-2027 Total
Cy:
City Account #: PlanningArea: Street Classification: varies Priority Rank:
120029 Citywide Project Length: N/A 32
Project Description:
This program provides for the short and long-range planning and traffic analyses required to evaluate and update proposed
transportation improvements projects, to assess the impacts of new development proposals, and to recommend local and
regional transportation system improvements for all modes of travel. This program also covers programmatic activities to
maintain compliance in federal and state regulations, such as assuring that project specifications and management comply with
current State and Federal standards and regulations, Title VI reporting and ADA Transition Plan implementation.
Plan Implementation and Compliance
Purpose: EXPENDITURES*
To perform critical activities needed for the development of transportation Funding Status: Other -Program Funding
projects that will best serve the needs of Renton and be eligible for grant
Planning: $385,000
applications.
Preliminary Engineering: $0
ROW: $0
Construction: $0
Construction Services: $0
Other-Misc: $0
Total Cost: $385,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
A Network Mobility Evaluation study will begin in 2021 to prepare for the update of the Transportation Element of the City's
Comprehensive Plan. Funding allocation is considerably lower than standard due to financial forecasts caused by the COVID-19
pandemic. Actual revenue receipts will be reviewed on an ongoing basis and budgets will be adjusted accordingly.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
B & 0 Tax $1,087,409 $35,000 $50,000 $75,000 $75,000 $75,000 $75,000
Revenues, by year: $1,087,409 $35,000 $50,000 $75,000 $75,000 $75,000 $75,000 $385,000
2022-2027 Total
43
City Account M PlanningArea: Street Classification: varies Priority Rank:
West Hill, Benson Project Length: N/A 31
Project Description:
This program includes several components focused in two of Renton's most diverse, lowest -income neighborhoods —
Benson/Cascade and Skyway/West Hill. The project will focus on engagement activities geared towards school aged children,
young drivers, and adults in order to improve safety and address traffic stress around schools.
Active Transportation
Purpose: EXPENDITURES*
To improve safety for children walking and bicycling to school, traveler Funding Status: Other -Program Funding
behavior for all travel modes, and education of laws pertaining to motorists,
pedestrians and bicyclists. Planning: $o
Preliminary Engineering: $334,900
ROW: $0
Construction: $0
Construction Services: $0
Other-Misc: $0
Total Cost: $334,900
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
New project. The City was awarded a $249,900 grant from the Washington Traffic Safety Commission in 2021. Planning efforts to
begin in 2021.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Grants - Other $37,200 $100,000 $112,700 $0 $0 $0 $0
B & 0 Tax $5,000 $40,000 $40,000 $0 $0 $0 $0
Revenues, by year: $42,200 $140,000 $152,700 $0 $0 $0 $0 $292,700
2022-2027 Total
44
City Account #: PlanningArea: Street Classification: Principal Arterial Priority Rank•
123000 City Center Project Length: N/A 4
Project Description:
The project will remove the existing paint from the steel girders, repair corrosion damage and apply a new protective paint
system. The project will also perform a seismic analysis and retrofit along with other improvements. The Bronson Way Bridge was
built by WSDOT in 1939. Ownership was transferred to the City in January 2018 as part of the SR-900 turnback agreement. It is a
three span bridge that crosses over the Cedar River. The main span is carried by steel girders. The girders are coated with paint to
protect the steel from corrosion. Corrosion causes section loss which results in a reduced load carrying capacity of the girders.
The existing paint is failing. The bridge is located in a zone of moderate to high liquefication susceptibility during seismic events.
Maintenance and Preservation
Purpose: EXPENDITURES*
To extend the service life of the Bronson Way Bridge and reduce the seismic Funding Status: Funded - CN
vulnerability.
Planning: $0
Preliminary Engineering: $620,000
ROW: $0
Construction: $2,050,000
Construction Services: $430,000
Other-Misc: $0
Total Cost: $3,100,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
In April 2018, the project was awarded $3,000,000 of Washington State funding (2018 Supplemental Transportation Budget) to
perform a seismic retrofit and painting of the bridge. The project is currently in design. Construction is anticipated for summer
2022.
Revenue Description
Prior Years
2022
2023
2024
2025
2026
2027
Grants - State
$440,000
$2,500,000
$60,000
$0
$0
$0
$0
B & 0 Tax
$100,000
$0
$0
$0
$0
$0
$0
Revenues, by year:
$540,000
$2,500,000
$60,000
$0
$0
$0
$0
$2,560,000
2022-2027 Total
45
City Account #: PlanningArea: Street Classification: Principal Arterial Priority Rank•
122702 Highlands, East Plateau Project Length: 0.67 mi 5
Project Description:
Reconstruction/resurfacing of roadway, including new pavement, curb, gutter, sidewalk, street lights, storm drainage,
channelization and bike lanes from NE 7th St to Sunset Blvd NE.
Maintenance and Preservation, Operations and Safety, Active Transportation
Purpose: EXPENDITURES*
To enhance safety for pedestrians, bicyclists and vehicles along this corridor. Funding Status: Fully Funded - CN
Planning: $0
Preliminary Engineering: $1,213,176
ROW: $438,538
Construction: $5,445,043
Construction Services: $810,200
Other-Misc: $0
Total Cost: $7,906,957
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
The City was awarded a TIB grant in the amount of $3,468,289 (2015) for the roadway reconstruction between NE 10th St and NE
12th St, curb, gutter, sidewalk and streetlights on the west side and channelization from NE 12th St to south of the intersection
with NE Sunset Blvd. The City was also awarded a Department of Ecology (DOE) grant (2018) in the amount of $1,223,939 for
water quality improvements via the installation of water quality treatment facilities and a TIB grant of $500,000 (2018) for non -
motorized improvements along the east side of Duvall Ave NE, from NE 9th St to NE 10th St. This project will begin construction
in 2021.
Revenue Description Prior Years
2022
2023
2024
2025
2026
2027
Grants - State $2,798,622
$2,393,606
$0
$0
$0
$0
$0
Mitigation Fees $1,858,574
$856,155
$0
$0
$0
$0
$0
Revenues, by year: $4,657,196
$3,249,761
$0
$0
$0
$0
$0 $3,249,761
2022-2027 Total
46
City Account #: PlanningArea: Street Classification: Minor Arterial Priority Rank•
123007 City Center Project Length: N/A 11
Project Description:
This project will fund construction of new curb, gutter and sidewalk (including curb extensions), driveway and ADA improvements
along Houser Way between Williams Ave S and Wells Ave S.
Operations and Safety, Active Transportation
Purpose: EXPENDITURES*
To enhance safety for pedestrians and bicyclists crossing at this intersection. Funding Status: Fully Funded - CN
Planning: $0
Preliminary Engineering: $200,000
ROW: $100,000
Construction: $700,000
Construction Services: $0
Other-Misc: $0
Total Cost: $1,000,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
The city was awarded a TIB Complete Streets grant in the amount of $400,000 in 2019. The project is being constructed in
coordination with the Williams Ave S and Wells Ave S Conversion Project (TIP#20-29).
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Grants - State $400,000 $0 $0 $0 $0 $0 $0
B & O Tax $600,000 $0 $0 $0 $0 $0 $0
Revenues, by year: $1,000,000 $0 $0 $0 $0 $0 $0 $0
2022-2027 Total
47
City Account #: PlanningArea: Street Classification: Principal Arterial Priority Rank:
123001 City Center Project Length: N/A 10
Project Description:
The project will remove the existing paint from the steel girders, repair corrosion damage and apply a new protective paint
system. The project will also perform a seismic analysis and retrofit and replace/upgrade the bridge rails along with other
improvements. The Houser Way Bridge was built by the City of Renton in 1960. It is a three span bridge that crosses over the
Cedar River. The main span is carried by steel girders. The girders are coated with paint to protect the steel from corrosion.
Corrosion causes section loss which results in a reduced load carrying capacity of the girders. The existing paint is failing. The
bridge is located in a zone of moderate to high liquification susceptibility during seismic events. The bridge rail has been
damaged.
Maintenance and Preservation
Purpose: EXPENDITURES*
To help extend the service life of the Houser Way Bridge and reduce the Funding Status: Funded - CN
seismic vulnerability.
Planning: $0
Preliminary Engineering: $620,000
ROW: $50,000
Construction: $2,367,052
Construction Services: $435,000
Other-Misc: $0
Total Cost: $3,472,052
* For Projects, expenditures are for the life of the project. For Programs, they
h 1 ' d 6 h TIP 2022 2027
d a expen ith
Status/Changes: are t e tot
ures programme fort e years in t e -
In late 2017, the project was awarded a Federal Highway Administration (FHWA) grant of $2,999,000 to perform a seismic retrofit
and painting of the bridge. A 13.5% local match is required. The project is currently in the design phase. ROW acquisition (if
required) is anticipated to be completed by 2023. Construction is anticipated for summer 2023.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Grants - Federal $203,075 $200,000 $2,413,873 $182,052 $0 $0 $0
B & 0 Tax $38,299
Revenues, by year: $241,374
$50,000 $286,127 $98,626 $0
$250,000 $2,700,000 $280,678 $0
$0 $0
$0 $0 $3,230,678
2022-2027 Total
48
City Account #: PlanningArea: Street Classification: Principal Arterial Priority Rank•
122802 City Center Project Length: 0.4 mi 13
Project Description:
The Lake Washington Loop Trail project consists of phases 3-5 of pedestrian and bicycle facility improvements that complete a
gap in the Lake Washington trail system. Phase 3 improvements include a cycle track and separated sidewalk, upgrading existing
curb ramps to ADA standards, signage and pavement markings, and upgrades to existing traffic signals. This project also includes
30% design of Phase 4 and 5 (approximately 0.9 mi). Phase 4 includes improvements from the Airport Way/Rainier Ave N
intersection to 1000 ft north along Rainier Ave S. Phase 5 will connect phase 4 to the northern city limit.
Operations and Safety, Active Transportation
Purpose: EXPENDITURES*
To create a regional bike facility connecting Rainier Ave N with Seattle to the Funding Status: Fully Funded - CN
north and existing trail facilities on Logan Ave.
Planning: $0
Preliminary Engineering: $1,104,258
ROW: $0
Construction: $2,115,384
Construction Services: $345,000
Other-Misc: $0
Total Cost: $3,564,642
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
The City was awarded the following grants: TAP = $346,000 (2013); STP Non -Motorized = $575,000 (2015); Ped & Bike =
$426,000 (2015); STP = $1,694,278; Ped & Bike Safety = $430,000 (2017). The City deobligated the ROW funds in 2020 as that
phase of the project is no longer needed. Construction has been implemented in phases, with Phases 1 and 2 completed. Phase 3
(Logan Ave N/Cedar River to Rainier Ave N) design is complete and construction began in early 2021. Phase 4 design and
construction will be completed as part of the Rainier Ave S Corridor Improvements project - Phase 4B (TIP #21-22). Phase 5
design and construction is currently included in TIP #21-19.1
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Grants - Federal $1,741,073 $300,000 $0 $0 $0 $0 $0
Grants - State $806,000 $50,000 $0 $0 $0 $0 $0
Other $47,500 $0 $0 $0 $0 $0 $0
B & 0 Tax $549,985 $70,084 $0 $0 $0 $0 $0
Revenues, by year: $3,144,558 $420,084 $0 $0 $0 $0 $0 $420,084
2022-2027 Total
49
City Account M PlanningArea: Street Classification: Principal Arterial Priority Rank•
City Center Project Length: 0.76 mi 14
Project Description:
This is the last phase of the Lake Washington Loop Trail project that completes a gap in the Lake Washington trail system within
Renton city limits.
Active Transportation
Purpose:
EXPENDITURES*
To create a regional bike facility connecting Rainier
Ave N with Seattle to the Funding Status: Candidate
north and existing trail facilities on Logan Ave.
Planning: $0
Preliminary Engineering: $750,000
ROW: $0
Construction: $2,500,000
Construction Services: $0
Other-Misc: $0
Total Cost: $3,250,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes:
are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
The City was awarded a Federal TAP grant for design of the whole project in 2013. Construction has been implemented in phases.
30% Design will be completed as part of Rainier Avenue South Corridor Improvements project (TIP #21-22).
Revenue Description Prior Years 2022
2023 2024 2025 2026 2027
Undetermined $0 $0
$500,000 $750,000 $0 $0 $0
Grants - Federal $0 $0
$0 $0 $1,500,000 $500,000 $0
Grants - State $0 $0
$0 $0 $0 $0 $0
Revenues, by year: $0 $0
$500,000 $750,000 $1,500,000 $500,000 $0 $3,250,000
2022-2027 Total
50
City Account M PlanningArea: Street Classification: Principal Arterial Priority Rank•
122902 Highlands Project Length: 0.93 mi 7
Project Description:
This project addresses pedestrian, transit and bicycle needs through key improvements such as channelization, traffic signal
modifications, signal treatments, possible queue jumps, access management through installation of medians. Construction will be
implemented in phases.
Operations and Safety, Active Transportation, Plan Implementation and Compliance
Purpose:
EXPENDITURES*
To address area growth, this project will improve access to transit and non- Funding Status: Partially Funded - PE/ROW
motorized facility network.
Planning: $202,107
Preliminary Engineering: $3,058,000
ROW: $3,645,000
Construction: $22,678,000
Construction Services: $0
Other-Misc: $0
Total Cost: $29,583,107
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes:
are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
The project received a Surface Transportation Program (STP) grant in the amount of $1,313,935 for design in 2013. In 2020, the
project received $3,150,000 in STP funding for the ROW phase from the 2018 contingency list.
Revenue Description Prior Years
2022 2023 2024 2025 2026 2027
Grants - Federal $1,641,343
$1,822,592 $1,000,000 $0 $0 $0 $0
REET1 $200,000
$450,000 $639,732 $0 $0 $0 $0
B & 0 Tax $151,440
$450,000 $550,000 $0 $0 $0 $0
Undetermined $0
$0 $0 $6,278,000 $7,000,000 $5,800,000 $3,600,000
Revenues, by year: $1,992,783
$2,722,592 $2,189,732 $6,278,000 $7,000,000 $5,800,000 $3,600,000 $27,590,324
2022-2027 Total
51
City Account M PlanningArea: Street Classification: Principal Arterial Priority Rank•
122190 City Center Project Length: 0.23 mi 15
Project Description:
The project will extend Park Ave N to the north of Logan Ave N, to provide access to Southport, PSE property and The Boeing
Company. Improvements include the construction of a railroad crossing, signal improvements, utility improvements, illumination
installation, underground utility relocation and landscaping. The project is funded by Local Revitalization Financing (LRF) and
Developer contributions.
Operations and Safety, Active Transportation
Purpose: EXPENDITURES*
To improve accessibility and address additional development growth in the Funding Status: Fully Funded - CN
South Lake Washington Revitalization Area.
Planning: $0
Preliminary Engineering: $1,492,469
ROW: $4,014,000
Construction: $4,085,923
Construction Services: $1,115,100
Other-Misc: $0
Total Cost: $10,707,492
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
90% design was completed in 2021. Construction is contingent on agreements from partnering stakeholders to be in place before
moving forward to completion.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Bonds $6,806,725 $1,859,259 $0 $0 $0 $0 $0
Other $0 $2,041,508 $0 $0 $0 $0 $0
Revenues, by year: $6,806,725 $3,900,767 $0 $0 $0 $0 $0 $3,900,767
2022-2027 Total
52
City Account #: PlanningArea: Street Classification: Principal Arterial Priority Rank•
122195 City Center Project Length: 0.51 mi 1
Project Description:
Phase 4 of the Rainier Ave Corridor Improvements will extend previous corridor improvements from S 3rd St to 1,000 feet north
of Airport Way (NW 3rd PI). Project elements include extending southbound BAT lane from S 2nd St to S 3rd St, pedestrian
improvements with street scaping, ped actuated traffic signal (HAWK), transit facility upgrades, access management, and a
segment of a regional ped/bike path trail (Lake Washington Loop Trail) from Airport Way to 1,000 feet north of Airport Way.
Construction will be implemented in phases. Phase 4A is S 3rd St to S Tobin St. Phase 4B is from S Tobin St to NW 3rd Pl.
Maintenance and Preservation, Operations and Safety, Active Transportation
Purpose: EXPENDITURES*
To improve traffic operations, reduce collisions, and provide greater ease of Funding Status: Partially Funded - CN
non -motorized and transit -based travel.
Planning: $0
Preliminary Engineering: $3,210,000
ROW: $4,393,049
Construction: $21,500,000
Construction Services: $8,000,000
Other-Misc: $0
Total Cost: $37,103,049
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
A Surface Transportation Program (STP) grant in the amount of $2,600,000 was awarded (2014) for Design of Phase 4. Additional
STP grants were awarded for Right -of -Way for $3,000,000 (2018) and for Construction of Phase 4A for $4,500,000 (2018) and
Phase 4B for $4,793,000 (2020). The City also received a $2,000,000 Regional Mobility Grant in 2021 for Construction of Phase
4A. The City has submitted several Legislative asks for additional construction funding and is awaiting notification of award. The
project is currently in the Right -of -Way phase. Construction funds for the STP grant must be obligated by June 2022. The City will
apply for a Transportation Improvement Board grant in 2021 for construction.
Revenue Description Prior Years 2022 2023 2024 2025
Grants - Federal $5,600,000 $4,500,000 $1,807,583 $2,985,417 $0
Mitigation Fees $1,594,058 $3,000,000 $1,500,000 $1,000,000 $0
Grants - State $0 $2,000,000 $0 $0 $0
Undetermined $0 $3,000,000 $5,195,991 $4,920,000 $0
Revenues, by year: $7,194,058 $12,500,000 $8,503,574 $8,905,417 $0
2026 2027
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$29,908,991
2022-2027 Total
53
City Account M PlanningArea: Street Classification: Collector Priority Rank:
122103 City Center Project Length: 0.3 mi 12
Project Description:
The Renton Connector project will install a continuous non -motorized facility along Burnett Ave S between S 2nd St and S 5th St
via separated walkways, protected bicycle lanes (cycle track), and a multi -use path. This project will also include landscaped
medians, reconfigured public parking areas, curb ramp upgrades to ADA standards, and traffic signalization improvements.
Active Transportation
Purpose: EXPENDITURES*
To create a signature north -south non -motorized connection in the Funding Status: Partially Funded - PE
downtown core via a corridor for pedestrians and cyclists between the Cedar
River and the South Renton Transit Center to the South via S 7th St (TIP # Planning: $0
21-27). This becomes an essential link that connects to the Cedar River Trail, Preliminary Engineering: $1,760,612
Lake to Sound Trail, Lake Washington Loop Trail, and the Eastside Rail ROW: $0
Corridor.
Construction: $13,200,000
Construction Services: $0
Other-Misc: $0
Total Cost: $14,960,612
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
Transportation received Surface Transportation Program (STP) funding ($1,500,000) from the contingency list in 2019. Design is
currently underway.
Revenue Description
Prior Years
2022
2023
2024
2025
2026
2027
Grants - Federal
$500,000
$1,000,000
$0
$0
$0
$0
$0
B & O Tax
$60,612
$200,000
$0
$0
$0
$0
$0
Undetermined
$0
$0
$500,000
$2,000,000
$7,200,000
$3,500,000
$0
Revenues, by year:
$560,612
$1,200,000
$500,000
$2,000,000
$7,200,000
$3,500,000
$0 $14,400,000
2022-2027 Total
54
City Account #: PlanningArea: Street Classification: varies Priority Rank•
123008 various Project Length: N/A 16
Project Description:
This program will provide for pedestrian improvements at various elementary and middle school crossings throughout the City.
Project scope includes upgraded crosswalk markings, ADA accessible curb ramps, widened sidewalks and bulbouts, and
installation of pedestrian refuge islands and rectangular rapid flashing beacon systems with accessible push buttons.
Operations and Safety, Plan Implementation and Compliance
Purpose: EXPENDITURES*
To improve safety at key school intersections. Funding Status: Fully Funded - CN
Planning: $0
Preliminary Engineering: $214,150
ROW: $0
Construction: $675,665
Construction Services: $0
Other-Misc: $0
Total Cost: $889,815
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
The city was awarded a WSDOT City Safety grant in the amount of $555,000 in 2018 for improvements at Sierra Heights
Elementary, Maplewood Heights Elementary, and McKnight Middle School. After further review by WSDOT additional funds were
granted to the project to help fund 100% of construction costs. Preliminary Engineering began in Summer of 2019. Construction
is currently underway.
Revenue Description
Prior Years
2022
2023
2024
2025
2026
2027
Grants - Federal
$728,905
$0
$0
$0
$0
$0
$0
B & 0 Tax
$160,910
$0
$0
$0
$0
$0
$0
Revenues, by year:
$889,815
$0
$0
$0
$0
$0
$0 $0
2022-2027 Total
55
City Account M PlanningArea:
Street Classification: Collector Priority Rank•
Benson
Project Length: 0.76 mi 27
Project Description:
This project will construct protected bike lanes on SE 168th St between 108th Ave SE and 128th Ave SE.
Operations and Safety, Active Transportation
Purpose:
EXPENDITURES*
To install an east -west bike route that connects multiple community Funding Status: Partially Funded - PE
destinations and improves access to transit.
Planning: $0
Preliminary Engineering: $600,000
ROW: $80,000
Construction: $2,500,000
Construction Services: $0
Other-Misc: $0
Total Cost: $3,180,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes:
are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
The City was awarded a $500,000 allocation in the 2021-2023
State Capital Budget. Staff is evaluating an interim project.
Programmed revenues are for Preliminary Engineering only.
Revenue Description Prior Years 2022 2023
2024 2025 2026 2027
Grants - State $0 $200,000 $300,000
$0 $0 $0 $0
B & O Tax $0 $0 $100,000
$0 $0 $0 $0
Revenues, by year: $0 $200,000 $400,000
$0 $0 $0 $0 $600,000
2022-2027 Total
56
City Account #: PlanningArea: Street Classification: Principal Arterial Priority Rank:
123006 City Center Project Length: 0.7 mi 8
Project Description:
The South 2nd Street Conversion Project will convert the existing 4—lane one-way roadway to a roadway with one through -lane in
each direction between Main Ave South and Rainier Ave South. This project also includes pedestrian and bicycle facilities, traffic
operations improvements, and transit upgrades that will provide better traffic operation and circulation for all modes of
transportation. Transit facility upgrades include new RapidRide stops and a transit queue jump at the new traffic signal at the
Shattuck intersection.
Operations and Safety, Active Transportation
Purpose: EXPENDITURES*
To improve multimodal mobility in and around the downtown core. This Funding Status: Partially Funded - PE
project also hopes to enhance downtown Renton as a destination, while
improving circulation and enhancing pedestrian safety. The intersection of S Planning: $0
2nd St and Burnett is a key connection to the Renton Connector Project (TIP # Preliminary Engineering: $3,051,956
21-23). ROW: $0
Construction: $17,150,000
Construction Services: $0
Other-Misc: $0
Total Cost: $20,201,956
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
The City was awarded $1,340,750 in Surface Transportation Program (STP) funds for Preliminary Engineering in the PSRC
Countywide competition in 2018. Design is currently underway.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Grants - Federal $240,750 $600,000 $500,000 $0 $0 $0 $0
B & O Tax $61,206 $80,000 $70,000 $0 $0 $0 $0
Undetermined $0 $0 $0 $1,500,000 $6,500,000 $5,500,000 $5,150,000
Revenues, by year: $301,956 $680,000 $570,000 $1,500,000 $6,500,000 $5,500,000 $5,150,000 $19,900,000
2022-2027 Total
57
City Account #: PlanningArea: Street Classification: Minor Arterial Priority Rank•
122151 City Center Project Length: 1.3 mi 6
Project Description:
This project develops S/SW 7th St as a key east -west bicycle route into the downtown: between Oakesdale Ave S and Burnett Ave
S. This project will install a multi -use path on S 7th St, between Shattuck and Burnett Ave S, and install intersection
improvements at multiple intersections along the corridor from Shattuck Ave S to Oakesdale Ave SW. The intersection
improvements from Shattuck Ave S westward along this corridor will improve bicycle facilities and intersection operations to
provide upgraded signage to bicyclists and will help simplify bicycle movements through complex intersections. Bicycle
improvements include push-button activation, green bike lanes through conflict/crossing zones, and pavement markings. This
project will also upgrade an existing marked crosswalk with flashing beacons with higher visibility technology.
Operations and Safety, Active Transportation
Purpose: EXPENDITURES*
To create a designated east -west ped/bike route through the City's Funding Status: Funded - CN
commercial core and an important link between regional trails.
Planning: $70,000
Preliminary Engineering: $800,000
ROW: $100,000
Construction: $2,000,000
Construction Services: $300,000
Other-Misc: $0
Total Cost: $3,270,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
Phase 1 was completed which included a traffic signal and an eastbound right -turn lane at S 7th St/Shattuck Ave S. In 2019,
Sound Transit awarded $1,000,000 toward Design and Construction of the multi -use path between Talbot and Shattuck. In 2020,
$1,450,000 of Surface Transportation Program (STP) funds was awarded for FY 2024 for construction of the multi -use path
between Shattuck and Burnett Ave S as well as various intersection improvements.
Revenue Description
Prior Years
2022
2023
2024
2025
2026
2027
Grants - Sound Transit
$400,000
$300,000
$0
$300,000
$0
$0
$0
B & 0 Tax
$135,000
$85,000
$50,000
$430,000
$120,000
$0
$0
Grants - Federal
$0
$0
$0
$1,450,000
$0
$0
$0
Revenues, by year:
$535,000
$385,000
$50,000
$2,180,000
$120,000
$0
$0 $2,735,000
2022-2027 Total
58
City Account #: PlanningArea: Street Classification: Minor Arterial Priority Rank:
123003 City Center Project Length: N/A 17
Project Description:
The project will remove the existing paint from the steel girders, repair corrosion damage and apply a new protective paint
system. The project will also perform a seismic analysis and retrofit along with other improvements. The Williams Ave Bridge was
built by the City of Renton in 1954. It is a three span bridge that crosses over the Cedar River. The main span is carried by steel
girders. The girders are coated with paint to protect the steel from corrosion. Corrosion causes section loss which results in a
reduced load carrying capacity of the girders. The existing paint is failing. The bridge is located in a zone of moderate to high
liquefication susceptibility during seismic events
Maintenance and Preservation
Purpose: EXPENDITURES*
To extend the service life of the Williams Ave Bridge and reduce seismic Funding Status: Fully Funded - CN
vulnerability.
Planning: $0
Preliminary Engineering: $620,000
ROW: $50,000
Construction: $2,350,867
Construction Services: $435,000
Other-Misc: $0
Total Cost: $3,455,867
* For Projects, expenditures are for the life of the project. For Programs, they
h 1 d' d h ' h
Status/Changes: are t e tota expen itures programme for t e 6 years in t e TIP, 2022-2027.
In late 2017, the project was awarded a Federal Highway Administration (FHWA) grant of $2,985,000 to perform a seismic retrofit
and painting of the bridge. A 13.5% local match is required. The project is currently in the design phase. ROW acquisition (if
needed) is anticipated to be completed by 2023. Construction is anticipated for summer 2023.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Grants - Federal $211,124 $180,000 $2,500,000 $93,876 $0 $0 $0
B & 0 Tax $28,805
Revenues, by year: $239,929
$70,000 $300,000 $72,062 $0
$250,000 $2,800,000 $165,938 $0
$0 $0
$0 $0 $3,215,938
2022-2027 Total
59
City Account #: PlanningArea: Street Classification: Minor Arterial Priority Rank:
122908 City Center Project Length: 1.35 mi 9
Project Description:
The project provides pedestrian and bicyclist facilities and enhancements, traffic operation and circulation improvements in
Downtown. The improvements include adding signalized raised intersections with bulb outs, lighting, street furniture,
streetscape, bike racks, signage and converting Williams Ave S and Wells Ave S to two-way traffic operations.
Operations and Safety, Active Transportation, Plan Implementation and Compliance
Purpose: EXPENDITURES*
This project is one of the strategies identified in the City Center Community Funding Status: Fully Funded - CN
Plan. The project enhances downtown Renton as a destination area, while
improving circulation, reducing traffic speeds and enhancing pedestrian Planning: $o
safety. A feasibility study, including a Downtown Circulation Traffic Analysis Preliminary Engineering: $1,300,231
for the conversion to two-way operations was completed.
ROW: $100,957
Construction: $8,466,692
Construction Services: $595,100
Other-Misc: $0
Total Cost: $10,462,980
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
The City was awarded a Surface Transportation Program (STP) grant in the amount of $3,850,000 in 2016. The project was
awarded $1,000,000 of additional STP funds through PSRC in 2020 as part of a rebalancing strategy for the Region. The project
also received federal money through the SR900 turnback agreement. Construction began in Spring 2020 and is expected to be
complete 2021.
Revenue Description Prior years 2022 2023 2024 2025 2026 2027
Grants - Federal $7,534,266 $0 $0 $0 $0 $0 $0
REET1
$611,995
$0
$0
$0
$0
$0
$0
B & 0 Tax
$446,882
$0
$0
$0
$0
$0
$0
Fuel Tax
$1,424,246
$0
$0
$0
$0
$0
$0
Other
$445,591
$0
$0
$0
$0
$0
$0
Revenues, by year:
$10,462,980
$0
$0
$0
$0
$0
$0 $0
2022-2027 Total
60
City Account #: PlanningArea: Street Classification: Minor Arterial Priority Rank•
122117 Benson Project Length: 2.5 mi 46
Project Description:
Widen roadway to provide a 3-lane roadway with bike lanes along 116th Ave SE and Edmonds Way SE, including new pavement,
curb, gutter, sidewalk, street lights, traffic signals, storm drainage, channelization and landscaping from Puget Drive SE to the
southern City limits. Benson Hill Community Plan recommended improvements for a first phase, based on the neighborhood
needs. The priority, cost and schedule for the phased improvements will be determined based on available funding.
Active Transportation, Plan Implementation and Compliance
Purpose: EXPENDITURES*
Improvements will enhance vehicular, bicycle and pedestrian safety along Funding Status: Candidate
this important north -south transportation corridor.
Planning: $0
Preliminary Engineering: $1,689,000
ROW: $1,043,000
Construction: $6,756,000
Construction Services: $0
Other-Misc: $0
Total Cost: $9,488,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
Transportation applied for WSDOT Ped-Bike funding for a walkway and bike lane on the west side of 116th, between SE 168th-SE
160th, but did not receive funding. Staff will continue to refine scope and continue to look for grant opportunities. Programmed
funding is for Preliminary Engineering only.
Revenue Description Prior years 2022 2023 2024 2025 2026 2027
Undetermined $0 $0 $0 $300,000 $389,000 $1,000,000 $0
Revenues, by year: $0 $0 $0 $300,000 $389,000 $1,000,000 $0 $1,689,000
2022-2027 Total
61
City Account #: PlanningArea: Street Classification: Principal Arterial Priority Rank:
122920 Talbot, Benson Project Length: 1.87 mi 37
Project Description:
This project would design needed infrastructure improvements on Carr Road, from Valley Medical Center past the SR 515/108th
Ave SE intersection. Potential improvements vary from roadway realignment/widening at several locations to address geometric
deficiencies, widening to 5-lane roadway (2 lanes westbound, 3 lanes eastbound), pavement restoration/reconstruction including
bicycle lanes on new alignment.
Maintenance and Preservation, Operations and Safety, Active Transportation
Purpose: EXPENDITURES*
Improvements are necessary to enhance vehicle traffic capacity and safety Funding Status: Candidate
for vehicles, bicycles, and pedestrians on this major east -west transportation
Planning: $200,000
corridor.
Preliminary Engineering: $0
ROW: $0
Construction: $0
Construction Services: $0
Other-Misc: $0
Total Cost: $200,000
* For Projects, expenditures are for the life of the project. For Programs, they
th t t 1 d;t d th 6 ; th TIP 2022 2027
Status/Changes: are e o a expen i ures programme for e years in e -
A corridor study prepared by King County in 2003 identified the need for roadway improvements from the Lind Ave SW and SW
43rd St intersection extending east and crossing SR 167 and ending at 116th Ave SE. Previous expenditures were for corridor
signal upgrades associated with a federal grant. Future roadway improvement options include spot safety improvements, bicycle
and pedestrian improvements, roadway widening and roadway on new alignment. Programmed estimates are for Planning only.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Undetermined $0 $0 $0 $0 $200,000 $0 $0
Revenues, by year: $0 $0 $0 $0
$200,000 $0 $0 $200,000
2022-2027 Total
62
City Account M PlanningArea: Street Classification: Principal Arterial Priority Rank:
City Center Project Length: N/A 34
Project Description:
The project will be a coordinated effort between the City of Renton and WSDOT and will make the following improvements;
provide grade separation of one eastbound and one westbound lane of Grady Way South over SR167, construct an additional
right turn lane from eastbound Grady Way South to southbound SR 167, construct new curbs, gutters, storm drainage and
sidewalk improvements and; install Transit Signal Priority through the intersection of SR 167 & Grady Way South.
Operations and Safety
Purpose: EXPENDITURES*
The project will provide a connection point to the Rainier Avenue transit Funding Status: Candidate
corridor which leads to Renton's key regional growth centers - downtown
Planning: $200,000
and Southport/The Landing.
Preliminary Engineering: $0
ROW: $0
Construction: $55,000,000
Construction Services: $0
Other-Misc: $0
Total Cost: $55,200,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
New project. Project will be led by WSDOT with coordination from the City. Programmed estimates are for Planning only.
Additional funding sources have yet to be identified.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Undetermined $0 $0 $0 $0 $200,000 $0 $0
Revenues, by year: $0 $0 $0 $0
$200,000 $0 $0 $200,000
2022-2027 Total
63
City Account M PlanningArea: Street Classification: Collector Priority Rank:
East Plateau Project Length: 0.42 mi 38
Project Description:
This project would improve the experience for people walking and biking along Hoquiam Ave NE between NE 10th PI and NE
Sunset Blvd by installing a walkway where needed and improving crossings.
Operations and Safety, Active Transportation
Purpose: EXPENDITURES*
Improve the experience for people walking and biking along Hoquiam Ave NE Funding Status: Candidate
between NE 10th PI and NE Sunset Blvd.
Planning: $50,000
Preliminary Engineering: $500,000
ROW: $0
Construction: $1,500,000
Construction Services: $0
Other-Misc: $0
Total Cost: $2,050,000
* For Projects, expenditures are for the life of the project. For Programs, they
S Ch are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
tatus/ anges.
Programmed funds are for a feasibility study to evaluate constructability requirements and to address the environmental
challenges. The preferred alternative may be a good candidate for Safe Routes to School -type grants.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
B & 0 Tax $50,000 $0 $0 $0 $0 $0 $0
Revenues, by year: $50,000 $0 $0 $0
$0 $0 $0 $0
2022-2027 Total
64
City Account #: PlanningArea: Street Classification: varies Priority Rank•
City Center Project Length: 0.36 mi 52
Project Description:
This project would install a separated bike facility on the north side of Houser Way S/N, between Mill Ave S. and Bronson Way N.
Intersection crossings would be improved at Cedar River Park Drive and Mill Ave S. The project will include planing and pavement
overlay, channelization, and intersection crossing improvements. For feasibility and constructability issues, the roadway and
pedestrian bridge sections would not be part of this project. The feedback during the public engagement process for the Trails
and Bicycle Master Plan update identified Houser Way as the route for the Eastside Rail Corridor alignment. With the
development of the Civic Core Plan, development of this section of the bicycle network creates an important connection point for
bicycle traffic between the north and south portions of the City's urban growth center.
Purpose:
To create a bike facility that creates a connection to the Cedar River Trail and
downtown. The crossing at Cedar River Park Drive is a connection point for
people connecting from Liberty Park to the Renton Community Center.
Active Transportation
EXPENDITURES*
Funding Status: Candidate
Planning: $0
Preliminary Engineering: $220,000
ROW: $165,000
Construction: $1,802,000
Construction Services: $0
Other-Misc: $0
Total Cost: $2,187,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
This project is pending available funding but is also subject to the schedule of the Houser Way Bridge - Seismic Retrofit and
Painting project (TIP #21-18) and the redevelopment of the 200 Mill site.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Undetermined $0 $0 $0 $220,000 $165,000 $902,000 $900,000
Revenues, by year: $0 $0 $0 $220,000 $165,000 $902,000 $900,000 $2,187,000
2022-2027 Total
65
City Account #: PlanningArea: Street Classification: Minor Arterial Priority Rank•
City Center Project Length: 0.57 mi 58
Project Description:
This project will develop a shared use path along the east side of Houser Way from Lake Washington Boulevard N to the existing
shared use path on N 8th St.
Active Transportation
Purpose:
EXPENDITURES*
To create an established bicycle facility connecting
the Eastside Rail Corridor Funding Status: Candidate
to the downtown core.
Planning: $100,000
Preliminary Engineering: $1,000,000
ROW: $0
Construction: $0
Construction Services: $0
Other-Misc: $0
Total Cost: $1,100,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes:
are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
This project was originally a widening and realignment project. The scope was changed to align with the Trails and Bicycle Master
Plan and is subject to available funding. A public
engagement process would be required during design to ensure involvement of
surrounding businesses.
Revenue Description Prior Years 2022
2023 2024 2025 2026 2027
Undetermined $0 $0
$0 $0 $0 $100,000 $1,000,000
Revenues, by year: $0 $0
$0 $0 $0 $100,000 $1,000,000 $1,100,000
2022-2027 Total
66
City Account #: PlanningArea: Street Classification: Principal Arterial Priority Rank•
120024 Valley Project Length: 0.73 mi 54
Project Description:
Widen existing roadway to five lanes where required. Includes new roadway, curbs, sidewalks, drainage, signals, lighting, signing
and channelization. Additionally, these improvements address demands resulting from an interchange at Lind Ave SW which is
included in the WSDOT 1-405 Master Plan (currently unfunded). A potential project could be a signal at the intersection at Lind
Ave SW and SW 34th St which is currently unsignalized.
Operations and Safety, Plan Implementation and Compliance
Purpose: EXPENDITURES*
To increase the capacity of this major north/south arterial to meet increasing Funding Status: Candidate
traffic demands in the Valley due in part to development.
Planning: $200,000
Preliminary Engineering: $1,300,000
ROW: $0
Construction: $0
Construction Services: $0
Other-Misc: $0
Total Cost: $1,500,000
* For Projects, expenditures are for the life of the project. For Programs, they
th t t 1 d;t d th 6 ; th TIP 2022 2027
Status/Changes: are e o a expen i ures programme for e years in e -
In 2020, a new subarea TOD study for the South Grady/north Valley area was begun. This roadway is critical for the 1-405 Master
Plan and may be important for any future light rail planning for the city. Programmed estimates are for Planning and Preliminary
Engineering only.
Revenue Description Prior years 2022 2023 2024 2025 2026 2027
Undetermined $0 $0 $0 $0 $0 $200,000 $1,300,000
Revenues, by year: $0 $0 $0 $0
$0 $200,000 $1,300,000 $1,500,000
2022-2027 Total
67
City Account M PlanningArea: Street Classification: varies Priority Rank•
Citywide Project Length: varies 47
Project Description:
This program would design and construct improvements identified in the Local Road and Safety Plan. An adopted plan is created
from analyzing the data of the fatal and serious injury crashes in the city and the conditions that exist when those crashes
occurred. A prioritized list of projects are developed by a set of criteria after analyzing the data.
Operations and Safety
Purpose: EXPENDITURES*
To address and mitigate or reduce the risk of fatal or serious injury crashes. Funding Status: Candidate
Planning: $0
Preliminary Engineering: $50,000
ROW: $0
Construction: $150,000
Construction Services: $0
Other-Misc: $0
Total Cost: $200,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
Staff is currently updating the City's Local Road Safety Plan. Once adopted, plan implementation would be contingent on
available funding.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
B & O Tax $0 $0 $50,000 $150,000 $0 $0 $0
Revenues, by year: $0 $0 $50,000 $150,000 $0
$0 $0 $200,000
2022-2027 Total
68
City Account M PlanningArea: Street Classification: Principal Arterial Priority Rank:
122303 City Center Project Length: 0.76 mi 53
Project Description:
Phase 1 (Cedar River Bridge to N 6th St) is complete. Phase 2 (N 6th St to Park Ave N) will add a NB lane, new curb, gutter,
sidewalks (on the east side), landscaped buffer, and a pedestrian/bicycle trail (west side), streetlights, pedestrian scale
illumination, crosswalks, channelization.
Operations and Safety, Active Transportation
Purpose: EXPENDITURES*
The increase in traffic and the new RapidRide transit have warranted Funding Status: Candidate
widening to add a northbound lane. Included with the improvements are
urban roadway amenities to implement "Complete Streets" practice per City Planning: $200,000
code. Preliminary Engineering: $3,500,000
ROW: $2,000,000
Construction: $10,000,000
Construction Services: $0
Other-Misc: $0
Total Cost: $15,700,000
* For Projects, expenditures are for the life of the project. For Programs, they
h 1 d; d h 6 h TI2022 2027 P
Status/Changes: are t e tota expen itures programme fort e years in t e -
Project has been closed out for Phase 1. Project is on hold until the Boeing Company is in a position to dedicate right-of-way to
the project. Planning studies would have to be conducted to analyze if intersection improvements are required to adjust for
current traffic conditions. Programmed estimates shown are for Planning and Preliminary Engineering phases.
Revenue Description Prior years 2022 2023 2024 2025 2026 2027
Undetermined $0 $0 $0 $0 $200,000 $1,500,000 $2,000,000
Revenues, by year: $0 $0 $0 $0
$200,000 $1,500,000 $2,000,000 $3,700,000
2022-2027 Total
69
City Account #: PlanningArea: Street Classification: Principal Arterial Priority Rank:
Cedar River Project Length: N/A 48
Project Description:
This project includes two barriers: One is to install a concrete median barrier between east and westbound travel lanes of the SR
169 S-Curve between the Riviera Apartments and S. 5th Street including associated roadway widening to add the barrier. The
second barrier improvement will remove the existing concrete barrier end treatment located eastbound (east of the Riviera
Apartments) and replace with 2 new concrete barriers extending west.
Maintenance and Preservation, Operations and Safety
Purpose: EXPENDITURES*
Maple Valley Highway (SR 169) is a principal arterial carrying 44,000 vehicles Funding Status: Candidate
per day. This project will improve safety for traffic on Maple Valley Highway
(SR 169) at this location, which has been the site of numerous collision Planning: $0
impacts. Preliminary Engineering: $522,970
ROW: $156,300
Construction: $2,458,630
Construction Services: $0
Other-Misc: $0
Total Cost: $3,137,900
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
The design report for the Cedar River half bridge is complete and was funded by the Roadway Safety and Guardrail Program (TIP #
21-04). Final design and construction pending funding availability.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Undetermined $0 $0 $0 $299,035 $1,000,000 $1,000,000 $838,865
Revenues, by year: $0 $0 $0 $299,035 $1,000,000 $1,000,000 $838,865 $3,137,900
2022-2027 Total
70
City Account #: PlanningArea: Street Classification: Principal Arterial Priority Rank•
Valley Project Length: 2.2 mi 49
Project Description:
Widen existing roadway to four lanes plus two -way -left -turn -lane where needed and bike lanes. Realign Beacon Coal Mine Road
approach to intersection with the Monster Road SW roadway. Includes new roadway, curbs, sidewalk, drainage, street lighting,
traffic signals, channelization, retaining walls and widening the existing bridge.
Operations and Safety, Active Transportation
Purpose: EXPENDITURES*
Will serve growing north -south traffic demand and help provide another Funding Status: Candidate
truck route into the city.
Planning: $500,000
Preliminary Engineering: $5,000,000
ROW: $3,000,000
Construction: $20,000,000
Construction Services: $0
Other-Misc: $0
Total Cost: $28,500,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
Phase 1 of improvements will address drainage problems between the Monster Rd Bridge and the City limits. A preliminary
design study was completed in 1999. The project cost is estimated at $32M, with the City's share estimated at $13M and King Co.
at $19M at the time. Scope, cost and implementation schedule to be determined. Programming includes planning studies only
to scope of possible phased implementation in coordination with King County.
Revenue Description Prior years 2022 2023 2024 2025 2026 2027
Undetermined $0 $0 $0 $500,000 $0 $0 $0
Revenues, by year: $0 $0 $0 $500,000 $0
$0 $0 $500,000
2022-2027 Total
71
City Account M PlanningArea: Street Classification: Collector Priority Rank•
City Center Project Length: N/A 39
Project Description:
This project would be part of the 1405 Implementation Plan to achieve a successful Regional Bus Rapid Transit (BRT) network and
improve transit service utilization.
Purpose:
Direct access ramps at North 8th Street would provide improved access to
the neighborhoods west of 1-405: residential neighborhoods within the City
Center (North Renton and South Renton), West Hill, south Seattle, and
unincorporated King County. These direct access ramps would not only
improve access to businesses such as, The Boeing Company, PACCAR Inc., and
SECO Development, but also would help decrease congestion in other parts
of the City that need access to 1-405.
Status/Changes:
Operations and Safety
EXPENDITURES*
Funding Status: Candidate
Planning: $0
Preliminary Engineering: $20,000,000
ROW: $0
Construction: $200,000,000
Construction Services: $30,000,000
Other-Misc: $0
Total Cost: $250,000,000
* For Projects, expenditures are for the life of the project. For Programs, they
are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
New project. Project is awaiting available funding and will be led by WSDOT. Preliminary estimates are still in development.
72
City Account #: PlanningArea: Street Classification: Principal Arterial Priority Rank•
122176 Highlands Project Length: 0.92 mi 40
Project Description:
This project involves a series of improvements in this corridor to improve traffic operations such as rechannelization and traffic
signal modifications, possible transit priority signal treatments and queue jumps.
Operations and Safety, Active Transportation
Purpose: EXPENDITURES*
To improve traffic operations for all modes of transportation, especially Funding Status: Candidate
addressing the needs of transit, bicycle and pedestrian traffic.
Planning: $100,000
Preliminary Engineering: $4,982,500
ROW: $37,000
Construction: $19,930,000
Construction Services: $0
Other-Misc: $0
Total Cost: $25,049,500
* For Projects, expenditures are for the life of the project. For Programs, they
h 1 h h
Status/Changes: are t e tota expenditures programmed for t e 6 years in t e TIP, 2022-2027.
This corridor has a strong potential for transit usage and is experiencing rapid residential and retail growth. The NE 3rd/4th
Corridor Study was adopted in May 2005. Funding will need to be identified to conduct a renewed public engagement process
and redefine/reconfirm project scope. Programmed estimates are for Planning and Preliminary Engineering only.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Undetermined $0 $0 $0 $0 $300,000 $2,000,000 $2,782,500
Revenues, by year: $0 $0 $0 $0
$300,000 $2,000,000 $2,782,500 $5,082,500
2022-2027 Total
73
City Account #: PlanningArea: Street Classification: Principal Arterial Priority Rank:
Highlands Project Length: 1.05 mi 41
Project Description:
This project involves a series of improvements to traffic operations such as rechannelization and traffic signal modifications,
possible transit priority signal treatments and queue jumps. This project also may include a new signal at NE 4th St and
Bremerton Ave NE, if warranted by development.
Operations and Safety, Active Transportation
Purpose: EXPENDITURES*
To improve traffic operations for all modes of transportation, especially Funding Status: Candidate
addressing the needs of transit, bicycle and pedestrian traffic.
Planning: $100,000
Preliminary Engineering: $5,463,750
ROW: $3,605,000
Construction: $21,855,000
Construction Services: $0
Other-Misc: $0
Total Cost: $31,023,750
* For Projects, expenditures are for the life of the project. For Programs, they
h 1 d; d h 6 h TI2022 2027 P
Status/Changes: are t e tota expen itures programme fort e years in t e -
The NE 3rd/4th Corridor Study was adopted in May 2005. Funding will need to be identified to conduct a renewed public
engagement process and redefine/reconfirm project scope. Programmed estimates are for Planning only.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Undetermined $0 $0 $0 $0 $0 $0 $100,000
Revenues, by year: $0 $0 $0 $0
$0 $0 $100,000 $100,000
2022-2027 Total
74
City Account #: PlanningArea: Street Classification: Principal Arterial Priority Rank:
Highlands Project Length: 0.70 mi 55
Project Description:
This project would address transit and traffic operational needs through key improvements such as channelization, traffic signal
modifications, signal treatments, possible queue jumps, access management through installation of medians. This project would
also include EB right turn only lanes at Elma PI NE and Hoquiam Ave NE.
Purpose:
Improve traffic operations and safety.
Operations and Safety, Active Transportation
EXPENDITURES*
Funding Status: Candidate
Planning: $100,000
Preliminary Engineering: $5,480,000
ROW: $3,700,000
Construction: $22,000,000
Construction Services: $0
Other-Misc: $0
Total Cost: $31,280,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
This project focuses on the eastern end of SR 900 around Duvall and prepares for potential upgrade of Metro route 240 to bus
rapid transit service. Programmed estimates are for Planning and Preliminary Engineering only.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Undetermined $0 $0 $0 $100,000 $2,500,000 $1,490,000 $1,490,000
Revenues, by year: $0 $0 $0 $100,000 $2,500,000 $1,490,000 $1,490,000 $5,580,000
2022-2027 Total
75
City Account #: PlanningArea: Street Classification: Collector Priority Rank:
123004 East Plateau Project Length: 1.16 mi 43
Project Description:
The Nile Ave NE Bridge was built by King County in 1951. Ownership was transferred to the City in 2009 as part of the MacKay
Annexation (Ord #5456). It is a single span bridge that crosses over May Creek. The initial phase of this project will evaluate
replacement options with a type, size and location (TS&L) study.
Maintenance and Preservation
Purpose: EXPENDITURES*
The bridge is 20 years beyond its original design life of 50 years. It will very Funding Status: Candidate
likely need to be replaced or significantly retrofitted within the next 10 years.
The main span is comprised of precast concrete girders. The girders are Planning: $o
supported on treated timber piles with timber caps. Some of the timber piles Preliminary Engineering: $750,000
are showing signs of deterioration.
ROW: $0
Construction: $6,000,000
Construction Services: $0
Other-Misc: $0
Total Cost: $6,750,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
To date the project has not received grant funding for replacement. However, with a TS&L study, the City will be in a very good
position to apply for Federal Highway Administration (FHWA) funding when the bridge condition qualifies for replacement
funding.
Revenue Description
Prior years
2022
2023
2024
2025
2026
2027
Undetermined
$0
$0
$0
$0
$1,000,000
$2,000,000
$3,000,000
B & 0 Tax
$0
$0
$250,000
$500,000
$0
$0
$0
Revenues, by year:
$0
$0
$250,000
$500,000
$1,000,000
$2,000,000
$3,000,000 $6,750,000
2022-2027 Total
76
City Account #: PlanningArea: Street Classification: Principal Arterial Priority Rank:
City Center Project Length: 0.76 mi 44
Project Description:
Phase 5 of the Rainier Ave Corridor Improvements will extend the improvements from NW 3rd PI to north City limits. Project
elements include widening of sidewalks with streetscaping, adding pedestrian -scale illumination and planted buffer strips. The
street may be narrowed from 5 to 3 lanes where feasible. On the east side of Rainier Ave S, the new multi -use trail will be
installed, as stated in TIP #21-19 (Lake Washington Loop Trail).
Maintenance and Preservation, Operations and Safety, Active Transportation
Purpose: EXPENDITURES*
The project will separate pedestrians and bicyclists from the vehicular traffic, Funding Status: Candidate
enhancing safety and encouraging residents to use active transportation
Planning: $100,000
modes.
Preliminary Engineering: $3,000,000
ROW: $0
Construction: $7,000,000
Construction Services: $0
Other-Misc: $0
Total Cost: $10,100,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
Phase 4 is currently in the right-of-way Phase (TIP #21-22) and Phase 3 of the Lake Washington Loop Trail project (TIP #21-19) is
currently under construction.
Revenue Description
Prior Years
2022
2023
2024
2025
2026
2027
B & O Tax
$0
$0
$100,000
$0
$0
$0
$0
Undetermined
$0
$0
$0
$1,000,000
$2,000,000
$3,500,000
$3,500,000
Revenues, by year:
$0
$0
$100,000
$1,000,000
$2,000,000
$3,500,000
$3,500,000 $10,100,000
2022-2027 Total
77
City Account #: PlanningArea: Street Classification: Principal Arterial Priority Rank:
City Center Project Length: 0.37 mi 57
Project Description:
New transit access road improvements from 1-405 exit 3 (Talbot Rd) to South Renton Transit Center. Includes reconfiguration of
Grady Way, Lake Ave S and S Renton Village Place to accommodate transit.
Operations and Safety, Active Transportation
Purpose: EXPENDITURES*
With current traffic conditions and configurations, improvements will be Funding Status: Other -Led by Others
needed to ensure speed and reliability of the BRT system into and out of the
South Renton Transit Center. This transit hub is currently and will remain a Planning: $o
key connection point for transit users for both Metro and Sound Transit. Preliminary Engineering: $0
Proximity to the Sounder Station and future increase of parking availability ROW: $0
also plays a key role in improvement accessibility needs.
Construction: $21,300,000
Construction Services: $0
Other -Mist: $0
Total Cost: $21,300,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
Estimated cost in Regional Transportation Plan is $21,300,000. Design and Construction should be implemented and coordinated
with South Renton Transit Center, development of Renton Village, and implementation of 1-405 Bus Rapid Transit. Project
completion year falls outside the 6 years of the TIP.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Undetermined $0 $0 $0 $0 $0 $300,000 $1,000,000
Revenues, by year: $0 $0 $0 $0 $0 $300,000 $1,000,000 $1,300,000
2022-2027 Total
78
City Account M PlanningArea: Street Classification: Principal Arterial Priority Rank•
City Center Project Length: 0.55 mi 33
Project Description:
The project provides pedestrian and bicyclist facilities and enhancements, traffic operation and circulation improvements in
Downtown. The improvements include adding raised intersections with bulb outs, parklets, pedestrian plaza, lighting, street
furniture, streetscape, bicycle blvd, bike racks, signage, wayfinding and converting S 3rd St to two-way operations.
Active Transportation, Plan Implementation and Compliance
Purpose:
This project is one of the strategies identified in the City Center Community
Plan and the Downtown Civic Core Plan. The project enhances downtown
Renton as a destination area, while improving circulation, reducing traffic
speeds and enhancing pedestrian safety. A feasibility study, including a
Downtown Circulation Traffic Analysis for the conversion to two-way
operations was completed.
Status/Changes:
EXPENDITURES*
Funding Status: Candidate
Planning: $0
Preliminary Engineering: $4,000,000
ROW: $100,000
Construction: $17,200,000
Construction Services: $0
Other-Misc: $0
Total Cost: $21,300,000
* For Projects, expenditures are for the life of the project. For Programs, they
are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
This is the last project of the Downtown Conversion to a two-way operations. It will continue the downtown improvements,
further enhancing the pedestrian and bicyclist environment. Project is pending future grant funding availability. Programmed
estimates are for Preliminary Engineering and ROW.
Revenue Description Prior years 2022 2023 2024 2025 2026 2027
Undetermined $0 $0 $500,000 $1,700,000 $1,500,000 $400,000 $0
Revenues, by year: $0 $0 $500,000 $1,700,000 $1,500,000 $400,000 $0 $4,100,000
2022-2027 Total
79
City Account M PlanningArea: Street Classification: Principal Arterial Priority Rank:
City Center Project Length: 1.16 mi 56
Project Description:
The project will remove the islands at the intersections of S Grady Way with Lake Ave S and Shattuck Ave S, to allow for a
continuous eastbound lane from Rainier Ave S to Talbot Rd S. Included are modifications to traffic signals, new pedestrian
crossings and channelization. This project will perform a comprehensive analysis of multi -modal transportation improvements,
including review of potential transit improvements along Grady Way, such as Business Access and Transit (BAT) lanes and Traffic
Signal Priority (TSP).
Operations and Safety
Purpose: EXPENDITURES*
To improve speed and reliability of transit, improve traffic operations at Funding Status: Candidate
intersections for all modes, and ease congestion in the Downtown.
Planning: $100,000
Preliminary Engineering: $1,500,000
ROW: $250,000
Construction: $4,580,000
Construction Services: $0
Other-Misc: $0
Total Cost: $6,430,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, lull-2027.
Project is pending future grant funding availability. The Rapid Ride I Line will implement a portion of this work. Reassessment
should occur after construction. Programmed estimates are for Planning only.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Undetermined $0 $0 $0 $0 $0 $100,000 $0
Revenues, by year: $0 $0 $0 $0
$0 $100,000 $0 $100,000
2022-2027 Total
80
City Account #: PlanningArea: Street Classification: varies Priority Rank:
123005 Citywide Project Length: N/A 42
Project Description:
The plan establishes scalable short- and long-term strategies, and identifies projects that will foster a high -quality transit system
to meet Renton's needs. Transportation staff have worked on and are currently working on multiple transit projects such as the
Renton Access to Transit Study (King County 2019 Proviso), Renton -Kent -Auburn Mobility Plan (RKAAMP), Rapid Ride I -Line, and
Sound Transit 1-405 BRT (Stride).
Operations and Safety, Active Transportation
Purpose: EXPENDITURES*
The Transit Master Plan provides the city with a means to influence decisions Funding Status: Candidate
made by regional transit authorities. It also provides a basis on which to
Planning: $500,000be in advancing proposed capital projects for further study, design and
prioritization, and position them to be strong competitors for grant funding. Preliminary Engineering: $0
ROW: $0
Construction: $0
Construction Services: $0
Other-Misc: $0
Total Cost: $500,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
Metro is updating their guiding documents, Service Guidelines and METRO CONNECTS in 2021. The COVID-19 pandemic has
affected both Metro and Sound Transit. This work would be to adjust to the new regional transit vision to ensure the needs of
Renton are met.
Revenue Description
Prior years
2022
2023
2024
2025
2026
2027
Undetermined
$0
$0
$250,000
$250,000
$0
$0
$0
Revenues, by year:
$0
$0
$250,000
$250,000
$0
$0
$0
$500,000
2022-2027 Total
81
City Account #: PlanningArea: Street Classification: varies Priority Rank:
Citywide Project Length: N/A 45
Project Description:
This project is to update the 2008 Citywide Comprehensive Walkway Study with a master plan of a pedestrian network.
Operations and Safety, Active Transportation
Purpose: EXPENDITURES*
To build upon the Trails and Bicycle Plan Master Plan and complete an Funding Status: Candidate
interconnected multimodal non -motorized network throughout the city that
is safe and accessible for all. Planning: $550,000
Preliminary Engineering: $0
ROW: $0
Construction: $0
Construction Services: $0
Other-Misc: $0
Total Cost: $550,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
Programmed estimates are for Planning only. The City will assess missing gaps and existing walkways that need repair in 2021.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Undetermined $0 $0 $250,000 $300,000 $0 $0 $0
Revenues, by year: $0 $0 $250,000 $300,000 $0 $0 $0 $550,000
2022-2027 Total
82
City Account #: PlanningArea: Street Classification: varies Priority Rank•
122903 City Center Project Length: 1.6 mi 50
Project Description:
The Lake to Sound (L2S) Trail is a joint partnership between the cities of Renton, SeaTac, Tukwila, Burien and Des Moines, in
coordination with King County. The 17-mile L2S Trail will provide an east -west connection between the shoreline of Lake
Washington (Renton) and the shoreline of Puget Sound (Des Moines). Phase A goes from Naches Ave SW (Renton) to Fort Dent
Park (Tukwila). The length between Naches Ave SW and Mill Ave S are future phases.
Purpose:
Phase A will connect Fort Dent (Tukwila) to the larger system of regional trails
in South King County, including the Green River Trail, the Interurban Trail and
the Cedar River Trail. Phase A will provide a 12-foot wide asphalt paved multi-
use trail, with 2-foot gravel shoulders. In the Downtown Civic Core Plan, the
L2S Trail connects to the Eastside Rail Corridor (ERC) and the Renton
Connector (TIP #21-23).
Status/Changes:
Active Transportation
EXPENDITURES*
Funding Status: Other -Led by Others
Planning: $0
Preliminary Engineering: $0
ROW: $0
Construction: $0
Construction Services: $0
Other-Misc: $0
Total Cost: $0
* For Projects, expenditures are for the life of the project. For Programs, they
are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
Construction of Phase A (Naches Ave SW to Fort Dent Park in Tukwila) was completed in early 2020. City staff will be developing
scope, cost and schedule for future phases. Alignment within BNSF would require King County to purchase ROW and new bridges
to cross roadways. An alignment on S 7th Street (TIP #21-27) can be developed as a reasonable alternative or parallel route as a
trail within railroad ROW is developed. Pending available funding.
83
City Account #: PlanningArea: Street Classification: Principal Arterial Priority Rank•
City Center Project Length: N/A 60
Project Description:
This project will implement a Rapid Ride Bus Transit Station in the vicinity of Park Ave. N and Garden Ave N. The project would
include the kit of parts associated for a Rapid Ride stop such as weather protection, lighting, seating, and litter receptacles.
Active Transportation
Purpose:
The project is proposed to meet recent travel demand growth in the area and
as a part of the connectivity of the regional transit system. This transit hub
will provide service to Southport and other new development in the area
which includes two hotels. In addition, a large manufacturing company's
employees will benefit from the transit hub's location as well as visitors to
The Landing and the 57-acre Gene Coulon Park.
EXPENDITURES*
Funding Status: Other -Led by Others
Planning: $0
Preliminary Engineering: $700,000
ROW: $0
Construction: $3,650,000
Construction Services: $0
Other-Misc: $0
Total Cost: $4,350,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
This project is pending available funding and coordination with King County Metro.
84
City Account M PlanningArea: Street Classification: Local Priority Rank•
City Center Project Length: 0.15 mi 59
Project Description:
A pedestrian path underneath the BNSF trestle that connects into Southport. The repair/rebuild of the trestle, and other
associated work, is funded by LRF which is programmed within the Park Ave N Extension project (TIP #21-21).
Active Transportation
Purpose: EXPENDITURES*
To create a pedestrian connection from Lake Washington Boulevard to the Funding Status: Other -Led by Others
boardwalk in Southport.
Planning: $0
Preliminary Engineering: $0
ROW: $0
Construction: $1,000,000
Construction Services: $0
Other-Misc: $0
Total Cost: $1,000,000
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
This project would be designed, constructed, and funded by the developer.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
Other $0 $0 $500,000 $500,000 $0 $0 $0
Revenues, by year: $0 $0 $500,000 $500,000 $0 $0 $0 $1,000,000
2022-2027 Total
85
City Account #: PlanningArea: Street Classification: Minor Arterial Priority Rank:
Valley Project Length: 1.27 mi 51
Project Description:
The project will provide a grade -separated crossing at the Union Pacific Railroad (UPRR) and Burlington Northern Santa Fe (BNSF)
railroad tracks. Bicycle and pedestrian connections will be provided to the Tukwila Station and the Interurban Trail. Phase 1- Seg
2a - 2 lane roadway from Naches Ave SW to the Sounder Station, including a BNSF bridge has been completed.
Operations and Safety, Active Transportation
Purpose:
EXPENDITURES*
A new east -west arterial roadway will connect the cities of Renton and
Funding Status: Other -Led by Others
Tukwila and provide significant congestion relief to existing arterials. The
new road will provide access to the Tukwila Train/Sound Transit Station.
Planning: $0
Preliminary Engineering: $0
ROW: $0
Construction: $0
Construction Services: $0
Other-Misc: $0
Total Cost: $0
Status/Changes:
* For Projects, expenditures are for the life of the project. For Programs, they
are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
The City of Tukwila had taken the lead for future phases, however, Tukwila City Council voted unanimously in 2019 to terminate
their efforts to manage the next phase of the Strander Blvd. Improvements due to multiple issues including rising project costs
that had surpassed sustainable funding levels for local jurisdictions to be the lead on.
86
City Account #: PlanningArea: Street Classification: Collector Priority Rank•
122102 Kennydale Project Length: N/A 31
Project Description:
This project will install major entry signage, enhanced landscaping, lighting and electrical features as part of the 1-405/NE 44th St
Interchange project.
Plan Implementation and Compliance
Purpose: EXPENDITURES*
To create a unique gateway for the city as part of the WSDOT 1-405 Renton to Funding Status: Partially Funded - CN
Bellevue Widening and Express Toll Lanes project.
Planning: $0
Preliminary Engineering: $57,700
ROW: $0
Construction: $210,000
Construction Services: $0
Other-Misc: $0
Total Cost: $267,700
* For Projects, expenditures are for the life of the project. For Programs, they
Status/Changes: are the total expenditures programmed for the 6 years in the TIP, 2022-2027.
The WSDOT 1-405 project started construction in 2020. The City received $210,000 from the State Legislature to fund gateway
entry signage into the City. City staff is currently working through Design and has conducted several meetings with the Renton
Municipal Arts Commission and Renton Municipal Arts Commission subcommittee. WSDOT is working to complete plans and
building Segment 16, which includes a preliminary landscape plan in the designated roundabouts at NE 44th St.
Revenue Description Prior Years 2022 2023 2024 2025 2026 2027
B & 0 Tax $57,700 $0 $0 $0 $0 $0 $0
Grants - State $210,000 $0 $0 $0 $0 $0 $0
Revenues, by year: $267,700 $0 $0 $0 $0 $0 $0 $0
2022-2027 Total
87
88
SECTION E
APPENDIX
2022 - 2027 TRANSPORTATION IMPROVEMENT PROGRAM
89
90
City of Renton 0
2022 - 2027 TRANSPORTATION IMPROVEMENT PROGRAM
ABBREVIATIONS AND ACRONYMS
The following list defines the abbreviated words and/or acronyms used in the City of Renton's Six -Year
Transportation Improvement Program.
ADA
American Disability Act
BAT
Business Access Transit
BNSF
Burlington Northern Santa Fe
BRAC
Bridge Replacement Advisory Committee
CBD
Central Business District
CIP
Capital Improvement Program
CMAQ
Congestion Mitigation and Air Quality
CTR
Commute Trip Reduction (State Act)
DOE
Department of Ecology
EB
Eastbound
ECL
East City Limits
EIS
Environmental Impact Study
FHWA
Federal Highway Administration
FMSIB
Freight Mobility Strategic Investment Board
FY
Fiscal Year
GIS
Geographic Information System
GMA
Growth Management Act
HOV
High Occupancy Vehicles
ITS
Intelligent Transportation System
LF
Linear Feet
LID
Local Improvement District
LRF
Local Revitalization Financing
LOS
Level of Service
MAP-21
Moving Ahead for Progress in the 215T Century Act
METRO
Municipality of Metropolitan Seattle
MOU
Memorandum of Understanding
MUTCD
Manual on Uniform Traffic Control Devices
NCL
North City Limits
NB
Northbound
PS&E
Plans, Specifications, and Estimates
ROW
Right -of -Way
RKAAMP
Renton Kent Auburn Area Mobility Plan
RTA
Regional Transit Authority
SB
Southbound
SCL
South City Limits
SOV
Single Occupant Vehicle
ST
Sound Transit
SR
State Route
STP
Surface Transportation Program
TDM
Transportation Demand Management Program
TIB
Transportation Improvement Board
TIP
Transportation Improvement Plan
WB
Westbound
WCL
West City Limits
WSDOT
Washington State Department of Transportation
91