HomeMy WebLinkAboutCD-4189TED-40-4189R-418901 C21-003650PR21-0002971 of 18
2 of 18
3 of 18
4 of 18
5 of 18
6 of 18
7 of 18
8 of 18
9 of 18
10 of 18
11 of 18
12 of 18
13 of 18
14 of 18
15 of 18
16 of 18
17 of 18
18 of 18
sheet 1 of 18
APPROVED
07/30/2021 msippo
DEVELOPMENT ENGINEERING DIVISION
TED-40-4189R-418902 C21-003650PR21-000297sheet 2 of 18
DEVELOPMENT ENGINEERING
msippo 07/30/2021
TED-40-4189R-418903 C21-003650PR21-000297sheet 3 of 18
contact city if any
work may appear to
impact trees or tree
critical root zones.
fire lane shall not be used
for staging of any
materials, vehicles, tesc
facilities and is required to
remain open and
unobstructed at all times.
if damage or fading of fire
lane striping occurs
during construction,
striping shall be returned
to original or better
condition following
project completion.
DEVELOPMENT ENGINEERING
msippo 07/30/2021
TED-40-4189R-418904 C21-003650PR21-000297sheet 4 of 18
DEVELOPMENT ENGINEERING
msippo 07/30/2021
TED-40-4189R-418905 C21-003650PR21-000297sheet 5 of 18
DEVELOPMENT ENGINEERING
msippo 07/30/2021
TED-40-4189R-418906 C21-003650PR21-000297sheet 6 of 18
DEVELOPMENT ENGINEERING
msippo 07/30/2021
TED-40-4189R-418907 C21-003650PR21-000297sheet 7 of 18
DEVELOPMENT ENGINEERING
msippo 07/30/2021
TED-40-4189R-418908 C21-003650PR21-000297sheet 8 of 18
provide catch basin with
turned down elbow for
presettling prior to water
quality vault. recommend tying
cpep from south french drain
to catch basin or provide
additional cleanouts at bends.
confirm with engineer
and city if existing sd
line will be plugged,
abandoned or
removed prior to
installation of new
8" cpep connection
into existing manhole
provide turned
down-elbows on
outlets for any
surface structures
located near infield.
DEVELOPMENT ENGINEERING
msippo 07/30/2021
TED-40-4189R-418909 C21-003650PR21-000297sheet 9 of 18
DEVELOPMENT ENGINEERING
msippo 07/30/2021
TED-40-4189R-418910 C21-003650PR21-000297sheet 10 of 18
fencing, backstop
and dugouts not
approved under this
permit. see approved
building permit plan
and details for
installation
instructions.
DEVELOPMENT ENGINEERING
msippo 07/30/2021
TED-40-4189R-418911 C21-003650PR21-000297sheet 11 of 18
provide approved
impermeable liner on
downstream side and
bottom of trench
provide approved
impermeable liner on
downstream side and
bottom of trench
apply perforation to
top half of tubing
only
apply perforation to
top half of tubing
only
DEVELOPMENT ENGINEERING
msippo 07/30/2021
TED-40-4189R-418912 C21-003650PR21-000297sheet 12 of 18
DEVELOPMENT ENGINEERING
msippo 07/30/2021
TED-40-4189R-418913 C21-003650PR21-000297sheet 13 of 18
DEVELOPMENT ENGINEERING
msippo 07/30/2021
TED-40-4189R-418914 C21-003650PR21-000297sheet 14 of 18
DEVELOPMENT ENGINEERING
msippo 07/30/2021
TED-40-4189R-418915 C21-003650PR21-000297sheet 15 of 18
fencing, backstop
and dugouts not
approved under this
permit. see approved
building permit plan
and details for
installation
instructions.
TED-40-4189R-418916 C21-003650PR21-000297sheet 16 of 18
fencing, backstop
and dugouts not
approved under this
permit. see approved
building permit plan
and details for
installation
instructions.
non-leachable covenant
required for painted
galvanized materials to be
approved prior to
finalization of the
construction permit.
TED-40-4189R-418917 C21-003650PR21-000297sheet 17 of 18
fencing, backstop
and dugouts not
approved under this
permit. see approved
building permit plan
and details for
installation
instructions.
DEVELOPMENT ENGINEERING
msippo 07/30/2021
TED-40-4189R-418918 C21-003650PR21-000297sheet 18 of 18
DEVELOPMENT ENGINEERING
msippo 07/30/2021