Loading...
HomeMy WebLinkAboutR-418904rn 00 T I 1 ADAPTER SKIRT A GEOTEXDLE - FABRIC(MIRAFI OR APPROVED EQUAL F C D E 0 2 STRAP (TO BYPASS PEAK FLOWS) � SEDIMENT ACCUMULATOR (MIN. 0.5CF STORAGE) SCHEMATIC DETAIL PROVIDE "STREAMGUARD SEDIMENT CATCH BASIN INSERT" OR APPROVED EQUAL MANUFACTURER'S NAME: BOWHEAD ENVIRONMENTAL & SAFETY ADDRESS: PO BOX 375 PRESTON. WA 98050 TELEPHONE: FOR INFORMATION: (800) 909-3677 WWW.SHOPBOWHEAD.COM TEMPORARY CATCH BASIN PROTECTION NOT TO SCALE 3 1 4 ROCK MUST COMPLETELY COVER THE BOTTOM AND SIDES OF THE DITCH 6" MIN z m L = THE DISTANCE SUCH THAT POINTS A & B ARE OF EQUAL ELEVATION CROSSON ROCK IkIIkIIKIIFnrli {��. ��, IIkIIkIIKIIKRP=t�����t IlkllklCHECK DAM SPACING llklllkl�^I Ilk�^o Ikllkllk A MAINTENANCE STANDARDS 1. ANY SEDIMENT DEPOSITION OF MORE THAN 0.5 FEET SHALL BE REMOVED SO THAT THE CHANNEL IS RESTORED TO ITS DESIGN CAPACITY. 2. IF THE CHANNEL CAPACITY IS INSUFFICIENT FOR THE DESIGN STORM, R MUST BE DETERMINED WHETHER THE PROBLEM IS LOCAL (E.G., A CONSTRICTION OR BEND) OR THE CHANNEL IS UNDERDESIGNED. IF THE PROBLEM IS UNDERDESIGN, THE DESIGN ENGINEER SHALL BE NOTIFIED AND THE CHANNEL REDESIGNED TO A MORE CONSERVATIVE STANDARD TO BE APPROVED BY THE ENGINEER. 3. THE CHANNEL SHALL BE EXAMINED FOR SIGNS OF SCOURING AND EROSION OF THE BED AND BANKS. IF SCOURING OR EROSION HAS OCCURRED, AFFECTED AREAS SHALL BE PROTECTED BY RIP -RAP OR AN EROSION ROCK CHECK DAM NOT TO SCALE JOINTS IN FILTER FABRIC SHALL Q(v LENGTH PER SPLICED AT POSTS. USE STAPLES,, WIRE J P1AN RINGS, OR EQUIVALENT TO ATTACH FABRIC TO POSTS. PROVIDE FULL WIDTH OF INGRESS/EGRESS AREA 2"x2" BY 14 GA. WIRE OR EQUIVALENT, IF STANDARD STRENGTH FABRIC USED y t FILTER FABRIC - :.%STEEL RUMBLE PLAT fill z 3/4 PLYWOOD GEOTEXTILE FABRIC 5�0 - - iv EXISTING OR FIRST LIFT OF;j,c, ASPHALT CONCRETE SURFACE STABILIZED CONSTRUCTION ENTRANCE NOT TO SCALE LEVEL BOTTOM GRASS OR ROCK I 1' MIN. 2' 2' MIN. NOTES: GRADE: MAX. 5% WITH POSITIVE DRAINAGE TO A SUITABLE OUTLET SUCH AS A SETTLEMENT TRAP STABILIZATION: SEED, COVER MEASURES, OR ROCK 12" THICK, PRESSED INTO SWALE BANK AND EXTENDING AT LEAST B" VERTICAL FROM THE BOTTOM. TEMPORARY INTERCEPTOR SWALE F-0.3 NOT TO SCALE 6" MIN PONDING L R 1' MIN WASHED GRAVEL AROUND ALL SIDES OF EXISTING CB S 1' MI WATER EXISTING CS FOR USE AS TEMPORARY SUMP EXISTING CATCH BASIN SUMP DETAIL NOT TO SCALE EXISTING GRADE PUMP AND MOTOR BLOCKS Z. 6' MAX. (POST SPACING MAY' MINIMUM 4"x4"J N I BE INCREASED TO B' IF WIRE TRENCH LJ BACKING IS USED) BACKFILL TRENCH WITH NATIVE SOIL OR 3/4"-1.5" WASHED GRAVEL NOTE: FILTER FABRIC FENCES 2"x4" WOOD POSTS, STEEL SHALL BE INSTALLED ALONG FENCE POSTS, REBAR, OR CONTOUR WHENEVER POSSIBLE EQUIVALENT NOTE: 0.02 PERMITNTTY AND NATIVE BACKFILL REQUIRED. TEMPORARY FILTER FABRIC FENCE NOT TO SCALE CONSTRUCTION STORMWATER POLLUTION PREVENTION RECOMMENDED CONSTRUCTION SEQUENCE 1. PRE -CONSTRUCTION MEETING 2. POST SIGN WITH NAME AND PHONE NUMBER OF SCWPP/ESC SUPERVISOR (MAY BE CONSOLIDATED WITH THE REQUIRED NOTICE OF CONSTRUCTION SIGN). 3. FLAG OR FENCE CLEARING LIMITS. 4. INSTALL CATCH BASIN PROTECTION AND STORMWATER BMP AREA PROTECTION AS REQUIRED. 5. GRADE AND INSTALL CONSTRUCTION ENTRANCE. 6. INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.) 7. CONSTRUCT SEDIMENT PONDS AND TRAPS. 8. GRADE AND STABILIZE CONSTRUCTION ROADS. 9. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT. CONSTRUCT SWPPS CONTROLS IN ANTICIPATION OF SCHEDULED CONSTRUCTION ACTIVITY (T.G., CONCRETE -RELATED PH MEASURES FOR UTILITIES, VAULT OR ROADWAY CONSTRUCTION. 10. MAINTAIN EROSION CONTROL MEASURE IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL AND MANUFACTURER'S RECOMMENDATIONS. 11. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES 50 THAT AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL AND POLLUTION PREVENTION IS ALWAYS IN ACCORDANCE WITH THE CITY'S EROSION AND SEDIMENT CONTROL STANDARDS. 12. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON OR TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH COMPOST OR EQUIVALENT. 13. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS. 14. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS. 15. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND BMPS REMOVED IF APPROPRIATE. 6 1 7 CITY OF RENTON EROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES: 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANTS CONTRACTOR. 2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION STORMWATER GENERAL PERMIT, IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL MONITORING REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE CONSTRUCTION STORMWATER GENERAL PERMIT. 3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION COMMENCEMENT TO POST -PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS. 4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN ACCORDANCE WITH APPENDIX D OF OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS. MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK -OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE. PUBLIC ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING WATERS OF THE STATE. 7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BPMS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEANING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. ALL EXC BMPS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON -SITE EROSION DOES NOT EXIST. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT, ENHANCEMENT, AND B. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY. Q 10. APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES. RESTRICTORS. CHANNELS. OR STORMWATER FACILITIES. 11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL, 12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS. THAT WILL BE BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH APRIL 30TH) OR SEVEN DAYS RUING THE DRY SEASON (MAY 1ST THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G. SEEDING, MULCHING, PLASTIC COVERING, ET.) IN CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM. 13. WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITE BETWEEN OCTOBER 1ST AND APRIL 30TH, UNLESS OTHERWISE APPROVED BY THE CITY. 14. ANY AREA NEEDING ADDITIONAL ESC MEASURES. NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. 15. THE ESC BPMS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OF WITHIN 24 HOURS FOLLOWING A STORM EVEN. INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY. 16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIWTY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216.30 SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWN SLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING CONDITION. 17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE LEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM. 18. ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH NECESSARY ESC BMPS AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. 19. AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR ON -SITE BMPS (AMENDED SOILS, BIORETENTION. PERMEABLE PAVEMENT, ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION AND COMPACTION DURING CONSTRUCTION. 20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFY WHICH ONES SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. AN EXHIBIT OF THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW. 21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT -LADEN WATER FROM LEAVING THE PROJECT SITE, ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES AND ON -SITE BMPS SHALL BE RESTORED TO THEIR FULLY FUNCTIONING CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPE BEFORE OCTOBER 1ST. 22. P40T 13E GONSTRUCTED TO SERVE AS RE4AINING WALLS. Ad:b ROCIEERIES IN Gil), RGAB RIGHTS OF WAY Ski. A 11 '- Rp GONSTRIJETED IN A668RBAN6E WIT'' CITY STANDARBS. RGGKERhES BUTSBE OF READ RIGHTS OF WAK SHALL BE DEVELOPMENT ENGINEERING msippo 07/30/2021 0 { R-418904 O Lo m 4 a-� N U REVISION DATE /O rjLEe n t o.n SIERRA HEIGHTS ELEMENTARY PLAYFIELD RENOVATIONS DA HOGAN IA i,t Ae.... iWF,AM]N P. 20s285. 0400 se,wq W„hlrig,%n wu A,hog,,mm ;3U�'I:TI DATE 6-16-21 SCALE NTS DRAWN DMD CHECKED EIG COPYREM OID20 DA. W] N ®ASMMnS TESC DETAILS AND NOTES SHEET F-0"3 SHEET 4 OF 18