Loading...
HomeMy WebLinkAboutR-418908rn 00 T 1 C) I AI 0 All p ANA , Ap29 - � 6CYCLONE FENCE pApA3 NZ OLLARDS �_ 1 iAP2 3 3 A CB-4b°- ------ TYPE 1 CATCH BASIN 34Ap3 RIM 445.48 IE (S) 442.85 IE (E) 441.50 Np3 h I F-2 22 AA,i 0 y I Ap3' AP3 I AAA 9 i �P 30 II 4 pp3 0 p39 1 • pA A I I B I 1 I Hz I \ pAA 2 PAR •ApA I PA I 1 \ I I I I I z I t PAA I I of pA S AAA •i 4 I IA A ANNI I I 1 1 I I 1 I pP ) N A p I I p 2 I Ib 1 PApAA p I •A' I 1 1 • 3 I I 1 PAA ; 1 A?� pP h I 1 h 1 C { N 3 IpA AA\ pP 4O• 'pAP9 In I 9A} v I Iph' 1 PPp 6 1J/A p� pA'A p AA 91 to A I 1 9 pPA / m 1 p 61 e ' ppAb p IAp ... h L pAA pph? I / I _IT Apyo I 1. I I I �1 0 AAA 6 I q - NA, pA 9 . P Aph' 1 D A9 /I 1 .ppe A E 1' 2 3 4 03 WATER QUALITY VAULT RIM 444.51 p3.'` Ap2;T-Ib pp2� NP2'i nA2? pP2'P 5p p�2Ah'pb PP2b pp2y pP2' pP26 pA2'A pA'' 3 IE (W) 441.16:1 4� 77 z s p 22 IE (E) 439.66= L .q Pp2 NA3 p3?l pp'p5 PPz AA2 pP2 Apt pP2 Pp2 pP2 pP2 /� _ 'pp2 o PP /pA9 pP�' P PP pw pA aP�-� �Pp� 9 A21 U,'A NNX APB p2 Pz' 9 pP2 pP2 p2. AAv+ \T'F'> �9' ,pP3' pp3 pp. Az. A pA'Z' A P .t. A _/ A P 17 LF, /p3' AP3 6 pA3 P 0 •PA ________-TP"' ____ ___ B CPEP__ Z /�^ 9 �' p- pz' -PP� 2LS 2 pP3� $ba.Q%IN NE p3' 111 66 . n20 AA � HO 444 3 h � �3 "P3' 01 .p3•P 44 TRANSITION FROM 8" / AF PERF TO BE CPEP PA3 330 LF FRENCH DRAM, 8' PERF CPEP S O.Q% - - - sL sL - so- ��� a AA' FRENCH FIBRIN au'2 •AIi AND PERFORATE / „pA PIPE 292 LF FRENCH DRAIN B" PERF. CPEP jpA b9 - _ y----.447.5'- - ---- Ab 6 P ppI b AAT' / No / 2 AA 2 p A^ •AAA h A `6. pph 6/ j'1 I ANF6 Lyle, p h 6 , AAh 1 iph I \ Ab 9 • AN' 9 Aph.A No - I TRANSITION TO 8" PERF. CPEP h / AIpAT s.0 IQA 9Ay3 6 b . 30 . h, PbI4%13 ---y,AA48.5.---e2 ---- h \ Ab • O 3 0 8° PERF. IGE EP h • •�•pA3' pph 2 446 6 B pp0? pA0 3 2 L 73 D M IN PER iy a - _ + CONNECT DRAIN FROM7 3LFaE'l./% AP IRRIGATION VAULTS TO ---- - _ N S=0.60$\ / 3 AA6'• AA9l O- , PZ':\. \ 6 A�_ pA1 ND 0 N pp0 • _`p � 0.5Z � ph� • • Y NP9 GBy1 NO p Lo�P E 1,hOATCH BASIN _ - .80 e4E (NW) 444.90 z ', a 4h'. -y �py� PROVIDE TURNED \ A / .P pP66 ATA`- j J :hT DOWN -ELBOWS ON \ pPC2 v�• Arno -`.. • TOP OUTLETS FOR ANY 111 01 f 18 LF 8 CPEP S=0.6% TRAN';MON FROM 8- PERF TO 8" CPEP CONFIRM WITH ENGI N EER AND CITY IF EXSTING ED LINE WILL BE PLUGGED, p.' ABANDONED OR • REMOVED PRIOR TO INSTALLATION OF NEW IT 8" CPEP CONNECTION INTO EXISTING MANHOLE �y AN g I III AXIS No No O4 6 7 PROVIDE CATCH BASIN WITH TURNEDDOWN PRIOR OWA DRAINAGE LEGEND TURNED DOW PRIOR TO WATER REVISION DATE QUALITY VAULT. RECOMMEND TYING CPEP FROM SOUTH FRENCH DRAIN _ _ PERF. CORR. POLY DRAIN TUBING, SIZE TO CATCH BASIN OR PROVIDE PER DRAWING ADDITIONAL CLEANOUTS AT BENDS. CPEP SUBSURFACE DRAINAGE COLLECTOR FENCE AA3 p3;2 Ap3' ' A R N OR STORM DRAIN PIPE pAa 4 tp tAA%p3 �j PA pP ® FRENCH DRAIN A No AP3 AAA 6 IMPORTED ROOT ZONE SAND SEE NOTE 2 F-1.1 6 S AP AP� •25 LF ;-1 S=0.50%_ SLOPE A1N8 CPEP E A MANHOLE e n t o n 44 SpN FLOW DIRECTION r°, PE 4 1.9 PpP 'IE 414.30 INVERT ELEVATION Ah SCHOOL DISTRICT AN p CIE 413.00 COLLECTOR INVERT ELEVATION - A :aa�xlstltlPc"R 'MANHOLE CATCH BASIN INLET (CBI) ;,.IE (NW) 439.16 TYPE 1 - EX IF (E) 432.85 - CONTRACTOR TO EXISTING CATCH BASIN INLET VERIFY IF PRIOR TO CONSTRUCTION SIERRA HEIGHTS "LG �A 7- , ELEMENTARY EXISTING CA BASIN lAAh �� WATER QUALITY VAULT RAISE R'M T° PLAYFIELD h.a DRAINAGE NOTES RENOVATIONS 1 ARA AGb A, 6 AAy, 1. STORM DRAINAGE PIPE CAN BE INSTALLED PRIOR TO FINAL ` •, Aah 9 pp50 ACCEPTANCE OF THE FIELD SUBGRADE. 250 LF F)h D - INIX 2. TRENCH EXCAVATION SHALL BE MADE TO THE ALIGNMENT, ELEVATION, 8" PERF. CPEP.x. GRADE AND SLOPE AS INDICATED ON THE DRAWINGS. TRENCHING S SHALL BE ACCOMPLISHED UTILIZING EQUIPMENT WITH SLOPE AND eAh ppe „6/pA pAbp; DEPTH CONTROL, SUCH AS "LASER PLANE CONTROL SYSTEM", SO AS TO ENSURE ACCURACY IN THE BOTTOM OF THE TRENCH. 2 pb 3. NO HIGH POINTS ABOVE DESIGNATED INVERT OR CALCULATED TRENCH AN 3A QA. -' BOTTOM ELEVATION WILL BE PERMITTED. NO SLOUGHING OF SITE O AA` t" AP6 _ PAb� MATERIAL OR LOOSE EXCAVATED SOIL WILL BE PERMITTED TO REMAIN 1lbz 3 e p pA 6. IN THE TRENCHES. o P Apy NoAIAy6 ,h Pb e [ Ir pab A '4- 4. EXCAVATION BELOW INVERT GRADE MUST BE ESTABLISHED TO A Npb 15 DEPTH SO AS TO PROVIDE FOR SPECIFIED PLACEMENT OF PEA K6 Iree, y py GRAVEL BEDDING AT BOTTOM OF PIPE ELEVATION PRIOR TO LAYING a e AA6bA -nb p12 THE FRENCH DRAIN PERFORATED PIPE. cq � DA HOGAN RPh pA3' - AP6 P APb ' THE FOR ALL PIPE LL BE EAN AAh p6b pbb'ph1pFC�ph AL 5 PEA GRAVEL. REFER TOTHESPECIFICATIONS CATIONSAFOR THELGRADATIONED 119 St Avenue Auth,! 1ID ". 20A2Rs.0400 Saaldq WaaM1ingbn �101 wwJaM1"ganmm ppy REQUIREMENTS. EA Ph _6. DURING PLACEMENT OF SPECIFIED TRENCH BACKFILL, PIPE MUST BE HELD IN PLACE TO PREVENT DISPLACEMENT AND PROVDE FOR pp""- p IIII pA1. ACHIEVING SPECIFIED INVERT ELEVATION. DO NOT DAMAGE PIPE OR po-'I' '®4n1ER ALLOW PIPE TO BE DISPLACED BY PLACEMENT OF BACKFILL .$ypTER MATERIAL 19 VALVE Q i •O .I EXISTING CATCH BASIN 7. CAP THE ENDS OF ALL PIPE RUNS. ALL OPEN ENDS DURING ADJUST RIM TO CONSTRUCTION ARE TO BE TEMPORARILY CAPPED OR PLUGGED. 446.8 n N ° NOTE LEGEND fee I e (INDICATES GENERAL CONSTRUCTION NOTE) 2DNA6 E 1, (INDICATES SPECIFIC CONSTRUCTION KEYNOTE) "r-- - --1 - nYyANOFAa y4s1.OFF h',S3' .. ..-. .Aap91`dA3 4 a TYPE 1 CATCH BASIN RAMR A p`pQ RIM 447.15 /RAMR RA1L5 I- ) dA5 Pp LIGHT SiANOAF E (W) YVM1 LE i M +RAMP FAILS PORTABLE AhO. F-2.2 i •'F_______________I PA9 DEVELOPMENT ENGINEERING msippo 07/30/2021 O R-418908 O to � ♦'! 4 NORTH Ire IN U 0 30' 60, SCALE: In- 30' BID SET DATE 6-16-21 SCALE 1"F20' DRAWN REF CHECKED EIS COPYRDNT Qmu DI ROGAN ®ASMOMBIS DRAINAGE PLAN SHEET F-1a3 SHEET 8 OF 18