Major Franchise Permit: MFP21004567
IVR Number: 21004567
Permit Information
Permit Name: ExteNet Systems - Fiber
Address/Location:09/21/2021Application Date:6623400183Parcel Number: 19201 108TH AVE SE
Permit Type:10/07/2021Issue Date:Franchise
Permit Work Class:10/07/2022Expiration Date:Major Utility
Job Number: 2020-1119Franchise Type:Telephone
Description: ExteNet Systems to place new 1/4" strand on existing PSE poles and overlash new 1728CT fiber for 5,535 lineal feet.
Contacts
Name Address PhoneTypeBilling
Rachel Fenton
Extenet Systems LLC
3030 Warrenville Rd
Lisle, IL 60532
ApplicantX
Russell Phipps
Midnight Mountain Communications
3114 Harrier St NE
Lacey, WA 98516-3146
B: ((25) 3)
-973-x8886
C: ((25) 3)
-973-x8886
Contractor
Business License Number: 53525Construction Contractor: MIDNIMC826MK
SOOS CREEK INVESTMENTS LLC 19624 134TH CT SE
RENTON , WA 98058
Owner
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
This permit is for Major construction work in the ROW and will be billed at an additional
$60/HR for inspections. After hours and weekend work will be billed at $125/HR
MFP21004567
Scott Warlick
Justin Johnson
10/7/2021
10/7/2021
MFP21004567
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 10/7/2021
AERIAL LABORCONTACTS:2020‐1119 – SOUTH RENTON PHASE 1S 192ND ST, BETWEEN HWY 167 AND 108TH AVE SESCOPE OF WORK:SHEET INDEX:SITE LOCATION:PROJECT MAPROUTE PLAN 2ROUTE PLAN 3ROUTE PLAN 1UNDERGROUND LABORROUTE PLAN 4ROUTE PLAN 5 MIDNIGHT MOUNTAIN COMMUNICATIONSRUSSELL PHIPPSEXTENET SYSTEMS, INC.SITE CONTACT 2020‐1119COVERSHEET NUMBER:SHEET 1 OF 111PROPRIETARY INFORMATION:THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OF DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED.CELL: (253) 973‐8886RPHIPPS@MIDNIGHTMTNCOMM.COMDANIEL MENDOZAOFFICE: (951) 400‐9673CELL: (951) 400‐9673DMENDOZA@EXTENETSYSTEMS.COMRUSSELL PHIPPSCELL: (253) 973‐8886RPHIPPS@MIDNIGHTMTNCOMM.COMNO:DATE:REVISION:BY:SCALE:RUSSELL PHIPPSENGINEER: CHECKED BY:JOB NO: DESIGN BY:DATE:2020‐1119 RUSSELL PHIPPSNOT TO SCALE 1/12/20212020‐1119 – SOUTH RENTON PHASE 1S 192ND ST, BETWEEN HWY 167 & 108TH AVE SESHEET 1 ‐COVERSHEET 2 ‐SHEET 3 ‐SHEET 4 ‐SHEET 5 ‐SHEET 6 ‐TCP PLAN 3TCP PLAN 4TCP PLAN 2SHEET 8 ‐TCP PLAN 1SHEET 9 ‐SHEET 11 ‐RISER FOOTAGEPLACE CABLE IN EMPTYDRILL / BORE FOOTAGETRENCH FOOTAGEPROOF FOOTAGEPLACE CABLE IN OCCUPIED000000======PLACE CONDUIT INTERIOR 0=PLACE IN EMPTY INTERIOR 0=PLACE IN OCC. INTERIOR 0=TOTAL UG FOOTAGE 0=REQUIRED PERMITSCITY OF RENTONPSETOTAL AERIAL BUILDTOTAL POLE ATTACHMENTSNEW STRANDLASH NEW CABLEOVERLASH EXISTINGMAKE READY POLES5535325535553505======ROUTE PLAN 6SHEET 7 ‐SHEET 10 ‐MFP21004567
2020‐1119ROUTE PLANSHEET NUMBER:SHEET 2 OF 112PROPRIETARY INFORMATION:THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OF DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED.NO:DATE:REVISION:BY:SCALE:RUSSELL PHIPPSENGINEER: CHECKED BY:JOB NO: DESIGN BY:DATE:2020‐1119 RUSSELL PHIPPSNOT TO SCALE 1/12/20212020‐1119 – SOUTH RENTON PHASE 1S 192ND ST, BETWEEN HWY 167 & 108TH AVE SEWSDOT ROWPLACE NEW ¼” STRAND AND LASH NEW 1728CT FIBERMATCH SHEET 3MFP21004567
2020‐1119ROUTE PLANSHEET NUMBER:SHEET 3 OF 113PROPRIETARY INFORMATION:THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OF DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED.NO:DATE:REVISION:BY:SCALE:RUSSELL PHIPPSENGINEER: CHECKED BY:JOB NO: DESIGN BY:DATE:2020‐1119 RUSSELL PHIPPSNOT TO SCALE 1/12/20212020‐1119 – SOUTH RENTON PHASE 1S 192ND ST, BETWEEN HWY 167 & 108TH AVE SEPLACE NEW ¼” STRAND AND LASH NEW 1728CT FIBERMATCH SHEET 4MATCH SHEET 2 MFP21004567
2020‐1119ROUTE PLANSHEET NUMBER:SHEET 4 OF 114PROPRIETARY INFORMATION:THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OF DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED.NO:DATE:REVISION:BY:SCALE:RUSSELL PHIPPSENGINEER: CHECKED BY:JOB NO: DESIGN BY:DATE:2020‐1119 RUSSELL PHIPPSNOT TO SCALE 1/12/20212020‐1119 – SOUTH RENTON PHASE 1S 192ND ST, BETWEEN HWY 167 & 108TH AVE SEMATCH SHEET 5MATCH SHEET 3PLACE NEW ¼” STRAND AND LASH NEW 1728CT FIBERMFP21004567
2020‐1119ROUTE PLANSHEET NUMBER:SHEET 5 OF 115PROPRIETARY INFORMATION:THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OF DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED.NO:DATE:REVISION:BY:SCALE:RUSSELL PHIPPSENGINEER: CHECKED BY:JOB NO: DESIGN BY:DATE:2020‐1119 RUSSELL PHIPPSNOT TO SCALE 1/12/20212020‐1119 – SOUTH RENTON PHASE 1S 192ND ST, BETWEEN HWY 167 & 108TH AVE SEMATCH SHEET 6MATCH SHEET 4PLACE NEW ¼” STRAND AND LASH NEW 1728CT FIBERMFP21004567
2020‐1119ROUTE PLANSHEET NUMBER:SHEET 6 OF 116PROPRIETARY INFORMATION:THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OF DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED.NO:DATE:REVISION:BY:SCALE:RUSSELL PHIPPSENGINEER: CHECKED BY:JOB NO: DESIGN BY:DATE:2020‐1119 RUSSELL PHIPPSNOT TO SCALE 1/12/20212020‐1119 – SOUTH RENTON PHASE 1S 192ND ST, BETWEEN HWY 167 & 108TH AVE SEMATCH SHEET 7MATCH SHEET 5 PLACE NEW ¼” STRAND AND LASH NEW 1728CT FIBERMFP21004567
2020‐1119ROUTE PLANSHEET NUMBER:SHEET 7 OF 117PROPRIETARY INFORMATION:THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OF DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED.NO:DATE:REVISION:BY:SCALE:RUSSELL PHIPPSENGINEER: CHECKED BY:JOB NO: DESIGN BY:DATE:2020‐1119 RUSSELL PHIPPSNOT TO SCALE 1/12/20212020‐1119 – SOUTH RENTON PHASE 1S 192ND ST, BETWEEN HWY 167 & 108TH AVE SEMATCH SHEET 6 PLACE NEW ¼” STRAND AND LASH NEW 1728CT FIBERMFP21004567
2020‐1119TCP PLAN 1SHEET NUMBER:SHEET 8 OF 118PROPRIETARY INFORMATION:THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OF DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED.NO:DATE:REVISION:BY:SCALE:RUSSELL PHIPPSENGINEER: CHECKED BY:JOB NO: DESIGN BY:DATE:2020‐1119 RUSSELL PHIPPSNOT TO SCALE 1/12/20212020‐1119 – SOUTH RENTON PHASE 1S 192ND ST, BETWEEN HWY 167 & 108TH AVE SESIGN SPACING = X (FEET)FREEWAYS & EXPRESSWAYS 50 / 70 MPH60 / 65 MPH45 / 55 MPH35 / 40 MPH25 / 30 MPH25 MPH OR LESS1500' +/‐ (OR AS PER MUTCO)800' +/‐500' +/‐350' +/‐200' +/‐100' +/‐RURAL HIGHWAYSRURAL ROADSRUAL ROADS & URBAN ARTERIALSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSRUAL ROADS & URBAN ARTERIALSALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DISIGNATED(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS, AND DRIVEWAYS(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONSALL CONTROL SET UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES ( M.U.T.C.D )CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON SITE TRAFFIC CONTROL PERSONEL TO SEE IF AND ANY SPECIAL CONDITIONS EXISTMINIMUM TAPER LENGTH IN FEETLANEWIDTHPOSTED SPEED LIMIT (MPH)25 30 35 40 45 50 55 60 65 70101112105115125150165180205225245270295320450495540500550600550605660‐660720‐‐780‐‐840Road Work AheadBePrepared To StopLONGITUDINAL BUFFER SPACE ‐ BSPEEDLENGTH25155302003525040305453605042555495605706578070840Road Work AheadBePrepared To StopRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopWORK AREASPEEDLIMIT25SPEEDLIMIT35SPEEDLIMIT25SPEEDLIMIT35WORK AREAWORK AREA IS A MOBILE OPERATION AND WILL BE AT EACH POLE FOR NO MORE THAN 5 MINUTES.USE OF 4 FLAGGERS FOR TALBOT RD S CROSSING.Road Work AheadMFP21004567
2020‐1119TCP PLAN 2SHEET NUMBER:SHEET 9 OF 119PROPRIETARY INFORMATION:THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OF DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED.NO:DATE:REVISION:BY:SCALE:RUSSELL PHIPPSENGINEER: CHECKED BY:JOB NO: DESIGN BY:DATE:2020‐1119 RUSSELL PHIPPSNOT TO SCALE 1/12/20212020‐1119 – SOUTH RENTON PHASE 1S 192ND ST, BETWEEN HWY 167 & 108TH AVE SESIGN SPACING = X (FEET)FREEWAYS & EXPRESSWAYS 50 / 70 MPH60 / 65 MPH45 / 55 MPH35 / 40 MPH25 / 30 MPH25 MPH OR LESS1500' +/‐ (OR AS PER MUTCO)800' +/‐500' +/‐350' +/‐200' +/‐100' +/‐RURAL HIGHWAYSRURAL ROADSRUAL ROADS & URBAN ARTERIALSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSRUAL ROADS & URBAN ARTERIALSALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DISIGNATED(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS, AND DRIVEWAYS(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONSALL CONTROL SET UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES ( M.U.T.C.D )CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON SITE TRAFFIC CONTROL PERSONEL TO SEE IF AND ANY SPECIAL CONDITIONS EXISTMINIMUM TAPER LENGTH IN FEETLANEWIDTHPOSTED SPEED LIMIT (MPH)25 30 35 40 45 50 55 60 65 70101112105115125150165180205225245270295320450495540500550600550605660‐660720‐‐780‐‐840LONGITUDINAL BUFFER SPACE ‐ BSPEEDLENGTH25155302003525040305453605042555495605706578070840Road Work AheadBePrepared To StopRoad Work AheadRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopWORK AREARoad Work AheadBePrepared To StopWORK AREA IS A MOBILE OPERATION AND WILL BE AT EACH POLE FOR NO MORE THAN 5 MINUTES.USE OF 4 FLAGGERS FOR 102ND AVE SE CROSSING.MFP21004567
2020‐1119TCP PLAN 3SHEET NUMBER:SHEET 10 OF 1110PROPRIETARY INFORMATION:THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OF DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED.NO:DATE:REVISION:BY:SCALE:RUSSELL PHIPPSENGINEER: CHECKED BY:JOB NO: DESIGN BY:DATE:2020‐1119 RUSSELL PHIPPSNOT TO SCALE 1/12/20212020‐1119 – SOUTH RENTON PHASE 1S 192ND ST, BETWEEN HWY 167 & 108TH AVE SESIGN SPACING = X (FEET)FREEWAYS & EXPRESSWAYS 50 / 70 MPH60 / 65 MPH45 / 55 MPH35 / 40 MPH25 / 30 MPH25 MPH OR LESS1500' +/‐ (OR AS PER MUTCO)800' +/‐500' +/‐350' +/‐200' +/‐100' +/‐RURAL HIGHWAYSRURAL ROADSRUAL ROADS & URBAN ARTERIALSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSRUAL ROADS & URBAN ARTERIALSALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DISIGNATED(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS, AND DRIVEWAYS(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONSALL CONTROL SET UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES ( M.U.T.C.D )CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON SITE TRAFFIC CONTROL PERSONEL TO SEE IF AND ANY SPECIAL CONDITIONS EXISTMINIMUM TAPER LENGTH IN FEETLANEWIDTHPOSTED SPEED LIMIT (MPH)25 30 35 40 45 50 55 60 65 70101112105115125150165180205225245270295320450495540500550600550605660‐660720‐‐780‐‐840LONGITUDINAL BUFFER SPACE ‐ BSPEEDLENGTH25155302003525040305453605042555495605706578070840WORK AREA IS A MOBILE OPERATION AND WILL BE AT EACH POLE FOR NO MORE THAN 5 MINUTES.USE OF 4 FLAGGERS FOR 102ND AVE SE & 106TH AVE SE CROSSINGS.Road Work AheadBePrepared To StopRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopMFP21004567
2020‐1119TCP PLAN 4SHEET NUMBER:SHEET 11 OF 1111PROPRIETARY INFORMATION:THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OF DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED.NO:DATE:REVISION:BY:SCALE:RUSSELL PHIPPSENGINEER: CHECKED BY:JOB NO: DESIGN BY:DATE:2020‐1119 RUSSELL PHIPPSNOT TO SCALE 1/12/20212020‐1119 – SOUTH RENTON PHASE 1S 192ND ST, BETWEEN HWY 167 & 108TH AVE SEWORK AREAPoliceRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopBePrepared To StopRoad Work AheadRoad Work AheadBePrepared To StopSIGN SPACING = X (FEET)FREEWAYS & EXPRESSWAYS 50 / 70 MPH60 / 65 MPH45 / 55 MPH35 / 40 MPH25 / 30 MPH25 MPH OR LESS1500' +/‐ (OR AS PER MUTCO)800' +/‐500' +/‐350' +/‐200' +/‐100' +/‐RURAL HIGHWAYSRURAL ROADSRUAL ROADS & URBAN ARTERIALSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSRUAL ROADS & URBAN ARTERIALSALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DISIGNATED(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS, AND DRIVEWAYS(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONSALL CONTROL SET UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES ( M.U.T.C.D )CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON SITE TRAFFIC CONTROL PERSONEL TO SEE IF AND ANY SPECIAL CONDITIONS EXISTMINIMUM TAPER LENGTH IN FEETLANEWIDTHPOSTED SPEED LIMIT (MPH)25 30 35 40 45 50 55 60 65 70101112105115125150165180205225245270295320450495540500550600550605660‐660720‐‐780‐‐840LONGITUDINAL BUFFER SPACE ‐ BSPEEDLENGTH25155302003525040305453605042555495605706578070840WORK AREA IS A MOBILE OPERATION AND WILL BE AT EACH POLE FOR NO MORE THAN 5 MINUTES.USE OF 4 FLAGGERS FOR 106TH AVE SE CROSSING.USE OF A UPO AND 4 FLAGGERS TO ASSIST AT 108TH AVE SE.MFP21004567
City of Renton August 25, 2021
1055 South Grady Way
Renton, WA 98057
RE: Aerial Variance Request for Job Number 2020‐1119 – SOUTH RENTON PHASE 1
To Whom it May Concern:
Midnight Mountain Communications has been contracted to design, engineer and construct
this project on behalf of ExteNet Systems, Inc. (“ExteNet”). ExteNet is applying for an aerial
variance request in order to install new aerial fiber along Snake Hill. The specific exemption
ExteNet is seeking to utilize is under RMC 4-6-090 Utility Lines - Underground Installation,
Section D. Exemptions: 1. I, (i), and (ii). See attached submittal documents for further details.
ExteNet proposes to – Place new permanent aerial ¼” strand and 1728ct fiber on existing PSE
poles on SE 192nd St from HWY 167 to 108th Ave SE.
‐ Place Strand and complete Make Ready per PSE standards and approval.
‐ Place new 1728ct fiber on new proposed strand.
‐ Support and tag each pole with EXTENET labels (fiber tags).
ExteNet is requesting that the City of Renton approve this variance request based on the fact
that the requirements for undergrounding this proposed aerial fiber on existing infrastructure
will cause undue hardship. This section of fiber has been previously discussed with the city and
ExteNet and the City are in agreement that we should keep this section aerial for the
following reasons:
1.Safety is a top concern. Snake Hill is a windy sloped road and installation of
underground plant would be dangerous.
2.Installation of undergrounding facilities will increase the total cost of construction by
a factor of approximately 25 times, when compared to aerial installation.
3.Risk of potential damage to underground facilities will be increased.
4.There are sensitive areas along Snake Hill and utilizing an aerial installation will prevent
any impact on the sensitive lands in and around Snake Hill.
5.There are existing utility poles along Snake Hill that can be utilized for aerial attachment.
6.The variance is necessary to prevent any undue hardship due to the
increased construction costs if forced to install the proposed extension
underground, and avoid significant safety concerns.
7.The granting of the variance will not be materially detrimental to the public welfare.
ExteNet does agree to participate in future underground improvements for its
proportionate share of the undergrounding costs, waiving the obligation into the
future when all other utilities are undergrounded to prevent an undue hardship
against ExteNet currently.
Upon the granting of the variance, ExteNet will coordinate construction and traffic control
as per the requirements. ExteNet and their contractors want to cooperate at the highest
level and agree to adhere to all provisions and requirements set forth by the City of Renton
to insure safe installation and maintenance of the proposed facilities.
If you have any further questions regarding this project, please contact us at
rfenton@extenetsystems.com.
Thank you for your consideration in this matter.
Rachel Fenton
Rachel Fenton
Director, Government Relations ‐ Pacific Northwest
801.910.7949| www.extenetsystems.com
October 7, 2021
Rachel Fenton
Director, Government Relations – Pacific Northwest
3030 Warrenville Rd suite 3
Lisle, IL 60532
Via Email: rfenton@extenetsystems.com
SUBJECT: Request for Undergrounding Exemption (JB#2020-1119, MFP21004567, 19201 108th Ave SE)
Dear Ms. Fenton:
The City of Renton has reviewed your request to grant ExteNet Systems Inc. an exemption from Renton
Municipal Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be
required to be installed underground, pursuant to the standards of the section of RMC.
Midnight Mountain Communications on behalf of ExteNet proposes to overlash 5,535 lineal feet of new
1728CT fiber on existing Puget Sound Energy poles along SE 192nd St within the City. See the enclosed Site
Plan showing the proposed overlashing limits.
ANALYSIS: The City has considered the request for a temporary exemption from RMC 4-6-090. The
proposal would utilize existing poles and attach to the existing aerial path. Ordinance 6013 grants ExteNet
Systems Inc., the right to construct, remove, replace, repair, and/or restore any Facility, and may include,
but are not limited to, digging and/or excavating to construct, remove, replace, repair, and restore
pipeline(s) and/or Facilities with the Franchise area.
The proposal would utilize existing poles and attach to the existing communication aerial paths. As
minimum vertical height clearance of 15’-6” would need to be provided for, and any existing obsolete
cable would need to be removed. Staff recommends these as conditions of approval. Therefore, the city
is granting an exemption with conditions, Per RMC 4-6-090(D)(i)(i) which states there is a technological
difficulty associated with the particular facility, or the particular real property involved.
DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C)
in accordance with RMC 4-6-090(D)(i)(i), exemption due to a technological difficulty associated with the
particular facility, or the particular real property involved, as requested by the applicant is approved with
conditions subject to the conditions below.
Extenet Job# 2020-1119
Page 2 of 2
October 7, 2021
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of
construction. New aerial lines within the Project Reach must have a minimum vertical
clearance of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that
construction is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take
place until the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground
facilities in the future, at the Applicant’s cost, when any one of the following events occurs:
(1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is
proposed by a franchisee within the Project Reach, in which case the Applicant shall
participate in the joint use trench installation for the purpose of undergrounding its aerial
lines, or (3) a conduit is made available within the Project Reach that will accommodate the
aerial lines. The new aerial lines must be undergrounded within one year, or approved
otherwise by the City of Renton Community and Economic Development Administrator or
designee, from the first event triggering the requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period
from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed
with the City Clerk, along with the required appeal fee, by 5:00 pm, October 21, 2021. Due to the ongoing
state of emergency enacted by Governor’s Proclamation 20-05, the City Clerk’s Office is working remotely.
For that reason, appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or
delivered to City Hall 1st floor Lobby Hub only on Tuesdays and/or Wednesdays. The appeal fee, normally
due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted
electronically. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information
regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Manager
cc: C.E. “Chip” Vincent, CED Administrator
Vanessa Dolbee, Planning Director
Justin Johnson, Assistant Development Engineering Manager
Scott Warlick, Engineering Specialist III
Holly Powers, Permit Technician
Franchise Permits
Enclosures: Site Plan
AERIAL LABORCONTACTS:2020‐1119 – SOUTH RENTON PHASE 1S 192ND ST, BETWEEN HWY 167 AND 108TH AVE SESCOPE OF WORK:SHEET INDEX:SITE LOCATION:PROJECT MAPROUTE PLAN 2ROUTE PLAN 3ROUTE PLAN 1UNDERGROUND LABORROUTE PLAN 4ROUTE PLAN 5 MIDNIGHT MOUNTAIN COMMUNICATIONSRUSSELL PHIPPSEXTENET SYSTEMS, INC.SITE CONTACT 2020‐1119COVERSHEET NUMBER:SHEET 1 OF 111PROPRIETARY INFORMATION:THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OF DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED.CELL: (253) 973‐8886RPHIPPS@MIDNIGHTMTNCOMM.COMDANIEL MENDOZAOFFICE: (951) 400‐9673CELL: (951) 400‐9673DMENDOZA@EXTENETSYSTEMS.COMRUSSELL PHIPPSCELL: (253) 973‐8886RPHIPPS@MIDNIGHTMTNCOMM.COMNO:DATE:REVISION:BY:SCALE:RUSSELL PHIPPSENGINEER: CHECKED BY:JOB NO: DESIGN BY:DATE:2020‐1119 RUSSELL PHIPPSNOT TO SCALE 1/12/20212020‐1119 – SOUTH RENTON PHASE 1S 192ND ST, BETWEEN HWY 167 & 108TH AVE SESHEET 1 ‐COVERSHEET 2 ‐SHEET 3 ‐SHEET 4 ‐SHEET 5 ‐SHEET 6 ‐TCP PLAN 3TCP PLAN 4TCP PLAN 2SHEET 8 ‐TCP PLAN 1SHEET 9 ‐SHEET 11 ‐RISER FOOTAGEPLACE CABLE IN EMPTYDRILL / BORE FOOTAGETRENCH FOOTAGEPROOF FOOTAGEPLACE CABLE IN OCCUPIED000000======PLACE CONDUIT INTERIOR 0=PLACE IN EMPTY INTERIOR 0=PLACE IN OCC. INTERIOR 0=TOTAL UG FOOTAGE 0=REQUIRED PERMITSCITY OF RENTONPSETOTAL AERIAL BUILDTOTAL POLE ATTACHMENTSNEW STRANDLASH NEW CABLEOVERLASH EXISTINGMAKE READY POLES5535325535553505======ROUTE PLAN 6SHEET 7 ‐SHEET 10 ‐MFP21004567
2020‐1119ROUTE PLANSHEET NUMBER:SHEET 2 OF 112PROPRIETARY INFORMATION:THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OF DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED.NO:DATE:REVISION:BY:SCALE:RUSSELL PHIPPSENGINEER: CHECKED BY:JOB NO: DESIGN BY:DATE:2020‐1119 RUSSELL PHIPPSNOT TO SCALE 1/12/20212020‐1119 – SOUTH RENTON PHASE 1S 192ND ST, BETWEEN HWY 167 & 108TH AVE SEWSDOT ROWPLACE NEW ¼” STRAND AND LASH NEW 1728CT FIBERMATCH SHEET 3MFP21004567
2020‐1119ROUTE PLANSHEET NUMBER:SHEET 3 OF 113PROPRIETARY INFORMATION:THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OF DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED.NO:DATE:REVISION:BY:SCALE:RUSSELL PHIPPSENGINEER: CHECKED BY:JOB NO: DESIGN BY:DATE:2020‐1119 RUSSELL PHIPPSNOT TO SCALE 1/12/20212020‐1119 – SOUTH RENTON PHASE 1S 192ND ST, BETWEEN HWY 167 & 108TH AVE SEPLACE NEW ¼” STRAND AND LASH NEW 1728CT FIBERMATCH SHEET 4MATCH SHEET 2 MFP21004567
2020‐1119ROUTE PLANSHEET NUMBER:SHEET 4 OF 114PROPRIETARY INFORMATION:THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OF DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED.NO:DATE:REVISION:BY:SCALE:RUSSELL PHIPPSENGINEER: CHECKED BY:JOB NO: DESIGN BY:DATE:2020‐1119 RUSSELL PHIPPSNOT TO SCALE 1/12/20212020‐1119 – SOUTH RENTON PHASE 1S 192ND ST, BETWEEN HWY 167 & 108TH AVE SEMATCH SHEET 5MATCH SHEET 3PLACE NEW ¼” STRAND AND LASH NEW 1728CT FIBERMFP21004567
2020‐1119ROUTE PLANSHEET NUMBER:SHEET 5 OF 115PROPRIETARY INFORMATION:THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OF DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED.NO:DATE:REVISION:BY:SCALE:RUSSELL PHIPPSENGINEER: CHECKED BY:JOB NO: DESIGN BY:DATE:2020‐1119 RUSSELL PHIPPSNOT TO SCALE 1/12/20212020‐1119 – SOUTH RENTON PHASE 1S 192ND ST, BETWEEN HWY 167 & 108TH AVE SEMATCH SHEET 6MATCH SHEET 4PLACE NEW ¼” STRAND AND LASH NEW 1728CT FIBERMFP21004567
2020‐1119ROUTE PLANSHEET NUMBER:SHEET 6 OF 116PROPRIETARY INFORMATION:THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OF DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED.NO:DATE:REVISION:BY:SCALE:RUSSELL PHIPPSENGINEER: CHECKED BY:JOB NO: DESIGN BY:DATE:2020‐1119 RUSSELL PHIPPSNOT TO SCALE 1/12/20212020‐1119 – SOUTH RENTON PHASE 1S 192ND ST, BETWEEN HWY 167 & 108TH AVE SEMATCH SHEET 7MATCH SHEET 5 PLACE NEW ¼” STRAND AND LASH NEW 1728CT FIBERMFP21004567
2020‐1119ROUTE PLANSHEET NUMBER:SHEET 7 OF 117PROPRIETARY INFORMATION:THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OF DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED.NO:DATE:REVISION:BY:SCALE:RUSSELL PHIPPSENGINEER: CHECKED BY:JOB NO: DESIGN BY:DATE:2020‐1119 RUSSELL PHIPPSNOT TO SCALE 1/12/20212020‐1119 – SOUTH RENTON PHASE 1S 192ND ST, BETWEEN HWY 167 & 108TH AVE SEMATCH SHEET 6 PLACE NEW ¼” STRAND AND LASH NEW 1728CT FIBERMFP21004567
2020‐1119TCP PLAN 1SHEET NUMBER:SHEET 8 OF 118PROPRIETARY INFORMATION:THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OF DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED.NO:DATE:REVISION:BY:SCALE:RUSSELL PHIPPSENGINEER: CHECKED BY:JOB NO: DESIGN BY:DATE:2020‐1119 RUSSELL PHIPPSNOT TO SCALE 1/12/20212020‐1119 – SOUTH RENTON PHASE 1S 192ND ST, BETWEEN HWY 167 & 108TH AVE SESIGN SPACING = X (FEET)FREEWAYS & EXPRESSWAYS 50 / 70 MPH60 / 65 MPH45 / 55 MPH35 / 40 MPH25 / 30 MPH25 MPH OR LESS1500' +/‐ (OR AS PER MUTCO)800' +/‐500' +/‐350' +/‐200' +/‐100' +/‐RURAL HIGHWAYSRURAL ROADSRUAL ROADS & URBAN ARTERIALSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSRUAL ROADS & URBAN ARTERIALSALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DISIGNATED(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS, AND DRIVEWAYS(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONSALL CONTROL SET UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES ( M.U.T.C.D )CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON SITE TRAFFIC CONTROL PERSONEL TO SEE IF AND ANY SPECIAL CONDITIONS EXISTMINIMUM TAPER LENGTH IN FEETLANEWIDTHPOSTED SPEED LIMIT (MPH)25 30 35 40 45 50 55 60 65 70101112105115125150165180205225245270295320450495540500550600550605660‐660720‐‐780‐‐840Road Work AheadBePrepared To StopLONGITUDINAL BUFFER SPACE ‐ BSPEEDLENGTH25155302003525040305453605042555495605706578070840Road Work AheadBePrepared To StopRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopWORK AREASPEEDLIMIT25SPEEDLIMIT35SPEEDLIMIT25SPEEDLIMIT35WORK AREAWORK AREA IS A MOBILE OPERATION AND WILL BE AT EACH POLE FOR NO MORE THAN 5 MINUTES.USE OF 4 FLAGGERS FOR TALBOT RD S CROSSING.Road Work AheadMFP21004567
2020‐1119TCP PLAN 2SHEET NUMBER:SHEET 9 OF 119PROPRIETARY INFORMATION:THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OF DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED.NO:DATE:REVISION:BY:SCALE:RUSSELL PHIPPSENGINEER: CHECKED BY:JOB NO: DESIGN BY:DATE:2020‐1119 RUSSELL PHIPPSNOT TO SCALE 1/12/20212020‐1119 – SOUTH RENTON PHASE 1S 192ND ST, BETWEEN HWY 167 & 108TH AVE SESIGN SPACING = X (FEET)FREEWAYS & EXPRESSWAYS 50 / 70 MPH60 / 65 MPH45 / 55 MPH35 / 40 MPH25 / 30 MPH25 MPH OR LESS1500' +/‐ (OR AS PER MUTCO)800' +/‐500' +/‐350' +/‐200' +/‐100' +/‐RURAL HIGHWAYSRURAL ROADSRUAL ROADS & URBAN ARTERIALSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSRUAL ROADS & URBAN ARTERIALSALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DISIGNATED(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS, AND DRIVEWAYS(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONSALL CONTROL SET UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES ( M.U.T.C.D )CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON SITE TRAFFIC CONTROL PERSONEL TO SEE IF AND ANY SPECIAL CONDITIONS EXISTMINIMUM TAPER LENGTH IN FEETLANEWIDTHPOSTED SPEED LIMIT (MPH)25 30 35 40 45 50 55 60 65 70101112105115125150165180205225245270295320450495540500550600550605660‐660720‐‐780‐‐840LONGITUDINAL BUFFER SPACE ‐ BSPEEDLENGTH25155302003525040305453605042555495605706578070840Road Work AheadBePrepared To StopRoad Work AheadRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopWORK AREARoad Work AheadBePrepared To StopWORK AREA IS A MOBILE OPERATION AND WILL BE AT EACH POLE FOR NO MORE THAN 5 MINUTES.USE OF 4 FLAGGERS FOR 102ND AVE SE CROSSING.MFP21004567
2020‐1119TCP PLAN 3SHEET NUMBER:SHEET 10 OF 1110PROPRIETARY INFORMATION:THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OF DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED.NO:DATE:REVISION:BY:SCALE:RUSSELL PHIPPSENGINEER: CHECKED BY:JOB NO: DESIGN BY:DATE:2020‐1119 RUSSELL PHIPPSNOT TO SCALE 1/12/20212020‐1119 – SOUTH RENTON PHASE 1S 192ND ST, BETWEEN HWY 167 & 108TH AVE SESIGN SPACING = X (FEET)FREEWAYS & EXPRESSWAYS 50 / 70 MPH60 / 65 MPH45 / 55 MPH35 / 40 MPH25 / 30 MPH25 MPH OR LESS1500' +/‐ (OR AS PER MUTCO)800' +/‐500' +/‐350' +/‐200' +/‐100' +/‐RURAL HIGHWAYSRURAL ROADSRUAL ROADS & URBAN ARTERIALSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSRUAL ROADS & URBAN ARTERIALSALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DISIGNATED(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS, AND DRIVEWAYS(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONSALL CONTROL SET UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES ( M.U.T.C.D )CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON SITE TRAFFIC CONTROL PERSONEL TO SEE IF AND ANY SPECIAL CONDITIONS EXISTMINIMUM TAPER LENGTH IN FEETLANEWIDTHPOSTED SPEED LIMIT (MPH)25 30 35 40 45 50 55 60 65 70101112105115125150165180205225245270295320450495540500550600550605660‐660720‐‐780‐‐840LONGITUDINAL BUFFER SPACE ‐ BSPEEDLENGTH25155302003525040305453605042555495605706578070840WORK AREA IS A MOBILE OPERATION AND WILL BE AT EACH POLE FOR NO MORE THAN 5 MINUTES.USE OF 4 FLAGGERS FOR 102ND AVE SE & 106TH AVE SE CROSSINGS.Road Work AheadBePrepared To StopRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopMFP21004567
2020‐1119TCP PLAN 4SHEET NUMBER:SHEET 11 OF 1111PROPRIETARY INFORMATION:THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OF DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED.NO:DATE:REVISION:BY:SCALE:RUSSELL PHIPPSENGINEER: CHECKED BY:JOB NO: DESIGN BY:DATE:2020‐1119 RUSSELL PHIPPSNOT TO SCALE 1/12/20212020‐1119 – SOUTH RENTON PHASE 1S 192ND ST, BETWEEN HWY 167 & 108TH AVE SEWORK AREAPoliceRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopRoad Work AheadBePrepared To StopBePrepared To StopRoad Work AheadRoad Work AheadBePrepared To StopSIGN SPACING = X (FEET)FREEWAYS & EXPRESSWAYS 50 / 70 MPH60 / 65 MPH45 / 55 MPH35 / 40 MPH25 / 30 MPH25 MPH OR LESS1500' +/‐ (OR AS PER MUTCO)800' +/‐500' +/‐350' +/‐200' +/‐100' +/‐RURAL HIGHWAYSRURAL ROADSRUAL ROADS & URBAN ARTERIALSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSRUAL ROADS & URBAN ARTERIALSALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DISIGNATED(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS, AND DRIVEWAYS(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONSALL CONTROL SET UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES ( M.U.T.C.D )CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON SITE TRAFFIC CONTROL PERSONEL TO SEE IF AND ANY SPECIAL CONDITIONS EXISTMINIMUM TAPER LENGTH IN FEETLANEWIDTHPOSTED SPEED LIMIT (MPH)25 30 35 40 45 50 55 60 65 70101112105115125150165180205225245270295320450495540500550600550605660‐660720‐‐780‐‐840LONGITUDINAL BUFFER SPACE ‐ BSPEEDLENGTH25155302003525040305453605042555495605706578070840WORK AREA IS A MOBILE OPERATION AND WILL BE AT EACH POLE FOR NO MORE THAN 5 MINUTES.USE OF 4 FLAGGERS FOR 106TH AVE SE CROSSING.USE OF A UPO AND 4 FLAGGERS TO ASSIST AT 108TH AVE SE.MFP21004567
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP21004567
Engineering
1 Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place.
2 Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15'-6".
3 A traffic control plan must be separately submitted to the City, and no construction may take place until the City
has approved a traffic control plan.
4 The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at the
Applicant’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the
Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case the
Applicant shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or
(3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial
lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and
Economic Development Administrator or designee, from the first event triggering the requirement to underground
the aerial lines.