Loading...
HomeMy WebLinkAboutR-413608m o IQ m w I feel. = 20 feat. IE 400.23 CTR CHANNEL, 8" PVC S. & 6" PVC N. I, r C. DRrvE�- - - - u-RoTLEo cruea -- o S88'48'49 E 12&64'KC) o-12874'(RI) G+N) { -C/L C&c \ \1 - -- __-_ ___ _ CONC. SIDEWALK _�-s v 2 _ _ — i NCe L EXISTING PSE POWER POE (POI NEE DRY UIRITY coxsmucna II NOTE THIS SIREEr SHEET v m m LOT I C7 801110130 m r Z m DATUM Eld 390.00 SCALEr HORZ: 1" = 2( VERT: 1' = 5' — IE 40734 CTR CHArvNEL. 6" PVC NW. & 8" PVC E. \ w1A colNcgoalvE -� GONG DRIVE W w-_ _ E%. BwWATEp W _ W- - ROLLED CpR6 NE 1+7TH ST.� 40 0+80 1+1 1 . 1+60 EX_8" SANITARY Y SEWER 2r 2 40 _ 8 EX-EP 4 y 10 5 11_ f7 95 96 . 12 . P 1 V N09"W 30.00,.00' FINISHED GRADE - CONTOUR (TYP) ----EISTNG GRADE 1 0 CONTOUR (TOP) LOT 1 BREAK LINE • SEE SHEET C7 FOR CONTINUATION PLAN VIEW NE 7TH STREET (PUBLICI PROFILE VIEW 430 - - SCALE- H RIZONTAL 1"=M VERTICAL 11=5' PM STA:0+80. 0, 16.00' (R) PM FLOVAJNE=j 10.45 ENO CEMENT CONCRETE CURB TRANSITION CUR3 AUGNMENT GUTTEF, AND SIDEWALK. D ASPHALT P ENT TAPER. _ FROM EXISTING RB TO STA:1 2A7, 16.00' (R A:1+54.94f, 1 .77f' (R) CU AUGNMENT. FLOMPROPOSED E=413.48 DI Di PAVEM T=414.45f PVT STA:0+40. 16.00' (R) BEGIN BEGIN SPHALT PAWBI 1 OVIDE SMOOTH' TRANSITION TO PM FLOMDNE= 7.96 TAPER. MISTING EDGE OF PAVEMENT. 4201 EGINI CEMENT CONCR CURB, EXISTING GENE AT OUGHT UTTER, AND SIDEW OF WAY CENTS LINE (TYP) TA:0+35.71, 15.9Y (R) - _ _ - ---- LOWLINE=407.69 -- ONNECT TO EXISTING CURB _ - NO GUTTER. ROAPE SMOOTH TRA SITION. _ 5. FINISH AIDE AT EDGE ASPHALT PAVEMENT TAPE T 410 FINISH ADE AT CURB FLOWUN (TYP) 400, EXISTING GRA AT RIGHT FINISH GRA IE AT CURB FINISH GR AT EDGE OF OF WAY CEN NE (TYR) I FLOWUNE ( F ) ASPHALT P VEMENT TAPER 'V 1 m 7 0+00 0+40 0+80 1+20 C/l�K ENG/NEER/DIG B SURYEY/NO CALL 48 HOURJBEFORE YOU DrN 3371a y€� DIAL 811 '�y.,, BCIxTftPPP C' 429 - 29M 5T. NE. WILED PH: (253) 848-4282 "20ryAL 6 'S PUYALLUP. WA W72 ce.®ceeu. c.ccm 4/26/2021 1+60 2+00 2+40 IN CASE I IN CONC, 30' EASEMENT PLAN VIEW CALLOUTS O REMOVE ENSTNG TEMPORARY ASPHALT PAVEMENT RAMP AS NECESSARY TO CONSTRUCT PROPOSED FRONTAGE IMPROVEMENTS O CONNECT PROPOSED 5' SIDEWALK TO EAST END OF EXISTING SIDEWALK AND PIERCE PL NE DRIVEWAY APPROACH. PROVIDE SMOOTH TRANSITION AND SHALL BE ADA COMPLIANT. O BEGIN CEMENT WNCRETE CURB, GUTTER, AND SIDEWALK. STA:0+35.71f, 15.9Yf (R) FLOWUNE=407.69 CONNECT TO EXISTING CURB AND GUTTER. PROVIDE SMOOTH TRANSITION. O TRANSITION CURB AUGNMENT FROM EXISTING CURB TO PROPOSED CURB AUGNMENT. PM STA:0+40.00, 16.00' (R) PM ELOWIINE=407.96 OS PM STA:D+80.D0, 16,00' (R) PM FLOWIINE=410.45 OB 20, WIDE CEMENT CONCRETE DRIVEWAY ENTRANCE - TYPE RIB CENTERLINE STA:1+14.06, 16.00' (R) INSTALL PER CITY SM. PLAN 104.3 O END CEMENT CONCRETE CUR& GUTTER, AND SIDEWALK. STA:1+3207, 16.00' (R) FLOWUNE=413.48 BEGIN ASPHALT PAVEMENT TAPER. O END ASPHALT PAVEMENT TAPER. STA:1+54.94f, 11.77f' (R) EDGE OF PAVENENT=414.45f PROVIDE SMOOTH TRANSITION TO EXISTING EDGE OF PAVEMENT. O CEMENT CONCRETE TRAFFIC CURB AND GUTTER INSTALL PER CITY STD. PLAN 101 10 8' WIDE PLANTER STRIP 11 5' NOE CEMENT CONCRETE SIDEWALK INSTALL PER CITY STD. PLAN 102 12 EDGE OF ASPHALT PAVEMENT TAPER 13 PROVIDE CLEAN SAWCUT LINE AND REMOVE EXISTING ASPHALT PAVEMENT AS NECESSARY TO CONSTRUCT PROPOSED IMPROVEMENTS 14 GRIND AND OVERLAY EXISTING HALF STREET WITH 2' HMA PAVEMENT 15 PRESERVE AND PROTECT EXISTING GAS VALVE ADJUST LID TO DRIVEWAY ENTRANCE FINISH GRADE 18 PRESERVE AND PROTECT EXSTNG PSE POWER POLE (PO2). SEE DRY UTILITY CONSTRUCTION NOTE THIS SHEET. 17 5' WIDE TEMPORARY ASPHALT PAVEMENT ADA RAMP FROM END OF SIDEWALK TO EDGE OF PROPOSED PAVEMENT. RAMP SLOPE SHALL BE ADA COMPLIANT. DRY UTILITY CONSTRUCTION NOTE WRING DRY UTIUTY DESIGN AND INSTALLATION COORDINATOR WTH PUGET SOUND ENERGY (PSE) AND THE ATTACHED COMMUNICATION PROVIDERS THE OWNER/CONTRACTOR SHALL COORDINATE THE REQUIREMENTS OF A FUTURE CONDUIT PACKAGE TO BE INSTALLED BETWEEN EXISTING PSE POWER POLES P01 AND P02. THE FUTURE CONDUIT PACKAGE SHALL INCLUDE ALL NECESSARY POWER AND COMMUNICATIDN CONDUITS AND APPROPRIATE DIAMETERS TO ALLOW THE EXISTING OVERHEAD POWER DISTRIBUTION SYSTEM AND COMMUNICATION FACIUTIES TO BE CONVERTED TO UNDERGROUND IN THE FUTURE THE CONTRACTOR WILL BE RESPONSIBLE FOR TRENCHING BETWEEN EXISTING PSE POLES PDI AND P02 TO ALLOW PSE AND THE COMMUNICATION PROVIDERS TO INSTALL THE FUTURE CONDUIT PACKAGE. THE PROPOSED TRENCH EXCAVATION SHALL BE LOCATED WTHIN THE EXISTING AND PROPOSED LANDSCAPE PLANTER STRIP. ONCE THE CONDUIT PACKAGE HAS BEEN INSTALLED THE CONTRACTOR IS RESPONSIBLE FOR BACKRWNG AND RESTORATION OF, BUT NOT LIMITED TO, THE EXISTING CEMENT CONCRETE DRIVEWAY APPROACH, EXISTING LANDSCAPING (STREET TREES, SHRUBS, DECDRATVE ROCKS ETC.), AND POTENTIALLY THE EXISTING CLUSTER MAILBOX UNIT TO EXISTING OR BETTER CONDITION. SIDEWALK PER CITY PLANTER STD. PLAN 102 EXTEND BASE COURSE 1' (MIN BEYOND BACK OF CURB CEMENT CONCRETE TRAFFIC CURB AND GUTTER PER CITY STD. PLAN 101 STORM DRAINAGE SYSTEM AS REQUIRED �1 NE 7TH STREET ROADWAY SECTION PUBLIC STREET N.T.S xP SCALE 1'=20' wAl ONO OF RENTON REDUNE COMMENTS ENO 10 30 20 °—" ENO OF RENTON REDUNE COMMENTS ENO 8 18 20 °�iWe u�� DATUM REVISION BY DATE APPR """C°O10L FHB OCITY OF RENTON Planning/Building/Public Works Dept. mm `—ASPHALT PAVEMENT GRIND AND 2" HMA OVERLAY HMA CLASS 1/2' PG 58-22 C COMPACTED DEPTH MINIMUM - CRUSHED SURFACING TOP COURSE 2" COMPACTED DEPTH MINIMUM GRAVEL BASE COURSE 47 COMPACTED DEPTH MINIMUM R-413608 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING Nathan Janders 05/25/2021 al 7TH STREET SHORT PLAT CES NW JOB NO. 17234 NE 7TH STREET PLAN & PROFILE O O CID O O O N 16 O Q J T co V O O O it